CN107321752A - A kind of sludge lagoon place Ecosystem restoration system in situ - Google Patents

A kind of sludge lagoon place Ecosystem restoration system in situ Download PDF

Info

Publication number
CN107321752A
CN107321752A CN201710501190.9A CN201710501190A CN107321752A CN 107321752 A CN107321752 A CN 107321752A CN 201710501190 A CN201710501190 A CN 201710501190A CN 107321752 A CN107321752 A CN 107321752A
Authority
CN
China
Prior art keywords
layer
sludge
gas
sludge lagoon
lagoon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710501190.9A
Other languages
Chinese (zh)
Inventor
罗小勇
王艳明
李小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201710501190.9A priority Critical patent/CN107321752A/en
Publication of CN107321752A publication Critical patent/CN107321752A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE
    • B09B1/00Dumping solid waste
    • B09B1/004Covering of dumping sites
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE
    • B09B1/00Dumping solid waste
    • B09B1/006Shafts or wells in waste dumps
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Abstract

The invention discloses a kind of sludge lagoon place Ecosystem restoration system in situ, it is characterised in that:Ecosystem restoration system supports soil layer, nutrition vegetable layer to combine by buoyancy layer, reinforcing layer, leachate collection system, gas gathering system, horizontal impervious layer, rain water collecting system, covering from bottom to up.The present invention can it is economical, Closure cover disposal is fast and effectively carried out to sludge lagoon, and can adapt to sludge digestion degraded and draw its sedimentation and deformation, improve, recovery sludge lagoon periphery ecological environment.

Description

A kind of sludge lagoon place Ecosystem restoration system in situ
Technical field
Topple over formed sludge lagoon place the present invention relates to municipal sludge sanitary landfills or non-hygiene landfill in situ ecological Repair system, specifically a kind of sludge lagoon Closure cover structure is received from lower on by buoyancy layer, reinforcing layer, percolate Collecting system, gas receive the parts such as system, horizontal impervious layer, rain water collecting system, covering support soil layer, nutrition vegetable layer. The present invention is conducive to gas and liquid collecting and auto-degradation in sludge lagoon stable, while can recover sludge lagoon itself and its periphery ecology Environment.
Background technology
22,000,000 tons of sludge discharges every year in municipal sewage plant of current China, and is increased with every year about 10% speed, dirty Mud processing handling problems are increasingly serious.Treatment of Sludge refers to sludge through cell process combined treatment, reach " minimizing, stabilisation, It is innoxious " overall process of purpose.Sludge treatment refers to sludge after treatment, throw aside with natural environment(Ground, underground, water In)Or recycle, final mode of dissolving that is steady in a long-term and being had no adverse effects to ecological environment can be reached.At present, sludge Processing mode mainly has the various ways such as sanitary landfills, land use, burning or recycling.Landfill stabilization small investment, fortune Row expense is low, and the amount of dissolving is big, is the major way of current China's sludge treatment.But China's Sludge landfill mode is simple and crude, A large amount of sludge such as are not dehydrated, digested, stablize at the pretreatment, fill the finger such as moisture content, infiltration coefficient, shearing strength of sludge Mark is far from reaching《Urban wastewater treatment specific resistance to filtration technical specification》In on sludge blended landfill and special fill out The index request buried.Sludge, which is toppled over, fills formed sludge lagoon(Hole)As artificial " marshland ", easily trigger and ask as follows Topic:(1)Take a large amount of soils of landfill yard;(2)Sludge sump directly outdoor exposure, periphery lacks safety protection facility, there is safety Hidden danger;(3)Sewage sludge overflow, substantial amounts of toxic and harmful gas in sludge sump(Mainly include CH4、NH3、H2S, stench etc.)Directly Connect and diffuse in air, cause sludge sump periphery ecological environment severe, direct threatening environment safety and public health.
Influence for solution sludge lagoon itself and its to periphery ecological environment, it is necessary to place ecology is carried out to sludge lagoon and repaiied It is multiple.It is general in fluidised form or stream modeling shape yet with sludge in sludge lagoon, with high-moisture, high organic content, high-compressibility, Hyposmosis coefficient, low shearing strength, and constantly carry out many bad engineering characteristics such as digestion degraded generation landfill gas so that it is right The work of sludge lagoon site remediation is very intractable.In-situ treatment disposal is carried out to sludge lagoon at present without effective method, is simply covered Fortifield village's envelope is low due to sludge intensity, exist collapse, the potential safety hazard such as sludge piping;And filled out after in-situ solidifying or dystopy dehydrating and curing Burying has the shortcomings that long in time limit, occupation of land is big, secondary pollution is serious, it is high to invest, and project is difficult to implement.
The content of the invention
Place restoration of the ecosystem is carried out for economy, fast and effectively to sludge lagoon, its shadow to periphery ecological environment is reduced Ring, present invention aims at providing reasonable in design, ecological, environmental protective, invest a kind of convenient sludge lagoon of less, construction safety Place original position Ecosystem restoration system, can be widely used in the in-situ immobilization disposal of sludge lagoon, make its periphery ecological environment Can effectively it be recovered.
To achieve the above object, the technical solution adopted in the present invention is:A kind of sludge lagoon place restoration of the ecosystem system in situ System, it is characterised in that:Ecosystem restoration system is from bottom to up by buoyancy layer, reinforcing layer, leachate collection system, gas collection system System, horizontal impervious layer, rain water collecting system, covering support soil layer, nutrition vegetable layer to combine, and leachate collection system includes Vertically and horizontally leachate collection french drain, vertically and horizontally leachate collection french drain crosspoint leachate collection well is set, vertically and horizontally percolate Collect and leachate collection pipe is set in french drain, the leachate collection pipe is connected to leachate collection well, percolate passes through diafiltration Liquid collects elevator pump or percolate discharge guiding pipe conveying sewage regulating reservoir in well;Gas collection is set on leachate collection french drain System, the gas gathering system includes the gas-collecting pipe laid along sludge lagoon periphery, lays rubble along gas-collecting pipe, outside Bag non-woven geotextile formation gas collection french drain;The geosynthetics network of rivers is laid on gas collection french drain and forms gas collection layer, Soil engineering composite drainage network is anchored into the anchoring groove of sludge lagoon periphery, and gas-collecting pipe is connected by gas discharge guiding pipe and gas discharging apparatus Connect.
Preferably, described buoyancy layer is spliced to form entirety by some buoyancy plates, and buoyancy plate is by 20 ~ 40cm thickness polyethylene Cystosepiment respectively sets one layer of 1 ~ 3cm thickness plank to constitute up and down.
Preferably, the reinforcing layer has spinning geotechnique by the high intensity reinforcement of the double-deck vertically and transversely cross-linking arrangements of 300 ~ 400kN/m Cloth is constituted, and reinforcement cloth is anchored into the anchoring groove of sludge lagoon periphery setting.
Preferably, the horizontal impervious layer is one layer of 1.5mmLLDPE or HDPE geomembrane, and geomembrane anchors into sludge lagoon week In the anchoring groove of side.
Preferably, rain water collecting system includes being covered in the soil engineering composite drainage network on horizontal impervious layer, and in geotechnique Composite, water-drain sets longitudinally, laterally rainwater-collecting french drain on the net, and longitudinally, laterally the access of rainwater collection collector is dirty in rainwater-collecting french drain The rain collection well set in mire, is imported in the surface water channel of sludge lagoon periphery by rainwater discharge guiding pipe or elevator pump.
Preferably, covering supports soil layer to be made up of thickness more than 450mm clay compactions, soil layer infiltration coefficient should be greater than 1 × 10-4cm/s。
Preferably, nutrition vegetable layer is vegetation growth nutritive layer, and should be greater than the cultivated soil of planting of 150mm by thickness is constituted.
Another object of the present invention is to provide reasonable in design, ecological, environmental protective, the less, construction safety of investment are convenient A kind of construction method of sludge lagoon place Ecosystem restoration system in situ, can be widely used at the in-situ immobilization of sludge lagoon Put, its periphery ecological environment is effectively recovered.
To achieve these goals, technical scheme is as follows:A kind of sludge lagoon place Ecosystem restoration system in situ Construction method, it is characterised in that:This method comprises the following steps:
A, the top layer vegetation removed first in sludge lagoon, rubbish, and pump drainage, Ran Houyan are carried out to the top layer supernatant in sludge lagoon Builder's road and anchoring groove are built in sludge lagoon periphery;
B, using wooden splint, steel plate, bolt that cystosepiment connection is overall, formation buoyancy layer;
C, after the pre-buried leachate collection well in precalculated position, gas discharge guiding pipe, rain collection well, rainwater discharge guiding pipe, buoyancy layer The high intensity reinforced geotextile of 2 layers of vertically and transversely cross-linking arrangement of upper laying, first lays longitudinal geotextiles, re-lays horizontal geotextiles;
D, the HDPE leachate collection pipes that laying installation is perforated in the middle part of sludge lagoon, and be connected with leachate collection well, along diafiltration Liquid collecting pipe lays rubble, outsourcing non-woven geotextile formation leachate collection french drain;
E, the HDPE gas-collecting pipes along the laying installation perforation of sludge lagoon periphery, and connected with gas discharge guiding pipe by elbow bend Connect;Rubble, outsourcing non-woven geotextile formation gas collection french drain are laid along gas-collecting pipe;Soil is laid on gas collection french drain Work Compound Water net formation gas collection layer, soil engineering composite drainage network two ends are anchored into anchoring groove;
F, laying HDPE film or LLDPE film horizontal impervious layer, horizontal impervious layer two ends are anchored into anchoring groove;
G, the laying soil engineering composite drainage network formation drainage blanket on horizontal impervious layer, in sludge lagoon medium position, geosynthetics row The HDPE rainwater collection collectors of perforation are installed in laying on the network of rivers, and are connected with rain collection well, lay rubble along rainwater collection collector, outside Bag non-woven geotextile formation rainwater-collecting french drain;
H, laying covering are supported soil layer and nutrition vegetable layer, and are compacted.
The present invention economical, fast and effectively can carry out Closure cover disposal to sludge lagoon, and can adapt to sludge digestion Its sedimentation and deformation is drawn in degraded, improves, recovers sludge lagoon periphery ecological environment.The invention has the advantages that:
1)Sludge lagoon foundation bearing capacity can effectively be solved low, construction machinery, workmen's safety problem;
2)Closure cover structure can bear itself load, it is to avoid sludge lagoon causes sludge after closing under uneven load action Gush, collapse outside, structure is safe and reliable;
3)The organized collection guide of percolate, landfill gas after closing in sludge lagoon, is conducive to the digestion of sludge, stabilizes; Meanwhile, sewage, foul smell extravasation pollution surrounding enviroment can be prevented effectively from;
4)The Closure cover system can prevent rainwater, surface water from entering in sludge lagoon, reduce diafiltration output of fluid;
5)The Closure cover system is adapted to the caused sedimentation and deformation of sludge degradation digestion, it is to avoid antiseepage film tensile failure;
6)The Closure cover system can recover sludge lagoon periphery ecological environment, landscape planting, and ecological benefits are good.
Brief description of the drawings
Fig. 1 is sludge lagoon Ecosystem restoration system plan in situ.
Fig. 2 is the A-A profiles in Fig. 1.
Fig. 3 is the B-B profiles in Fig. 1.
Fig. 4 is buoyancy layer cystosepiment connection detail drawing of the present invention.
Fig. 5 is the detail drawing of buoyancy layer cystosepiment connecting portion in Fig. 4.
Fig. 6 is leachate collection well construction detail drawing of the present invention.
Fig. 7 is the C-C profiles in Fig. 1, is percolate of the present invention and rainwater-collecting french drain detail drawing.
Fig. 8 is the D-D profiles in Fig. 1.
Fig. 9 is rain collection well detail of construction of the present invention.
Embodiment
Illustrate embodiments of the present invention, those skilled in the art below by way of specific instantiation and with reference to accompanying drawing Member can be understood the further advantage and effect of the present invention easily by content disclosed in the present specification.The present invention also can be by other Different instantiations is implemented or applied, and every details in the present invention can also not carried on the back based on different viewpoints and application Various modifications and change are carried out under spirit from the present invention.
As shown in Figure 1.It is as follows to the function and structure of lower and upper each layer:
Buoyancy layer 1:Sludge 11 is typically in fluidised form or stream plastic state in sludge lagoon, and its own intensity is extremely low, before sludge consolidation not Construction operation platform and carrying construction operation load can be formed.In sludge lagoon top layer laying buoyancy layer, buoyancy layer is spelled by buoyancy plate Entirety is connected into, as shown in Figure 2,3.Buoyancy plate of the present invention sets one by 20 ~ 40cm thickness polyethylene foam sheet is each about 12 Layer 1 ~ 3cm thickness plank 13 is constituted, and sets junction steel plate 14 respectively in the top and bottom of adjacent buoyant plate junction, and each piece is floated The connection of junction steel plate 14 is worn by 15 pairs of bolt between power plate buoyancy layer is integrally formed.Buoyancy plate planar dimension, bolt specification type Number and junction steel plate dimensional thickness meet the shaping that cystosepiment is connected with wooden splint, as shown in Figure 4 and Figure 5.
Reinforcing layer 2:In order to support itself load of Closure cover system, reinforcing layer is laid in buoyancy layer surface.Institute of the present invention State reinforcing layer to be made up of the high intensity reinforcement Woven geofabric 21 of the double-deck vertically and transversely cross-linking arrangements of 300 ~ 400kN/m, reinforcement cloth anchor In the anchoring groove 9 for entering the setting of sludge lagoon periphery, and reserved certain amount of tension, amount of tension is to estimate sedimentation after sludge lagoon closes Deflection, can adapt to triggered sedimentation and deformation of degrading.As shown in Figure 2,3.
Leachate collection system 3:In order to effectively collect after closing percolate in sludge lagoon, sludge lagoon is promoted to stabilize, Leachate collection system is set on reinforcing layer, as described in Figure 2.Leachate collection system of the present invention is received by vertically and horizontally percolate Collection french drain 31, leachate collection well 32 are constituted, as shown in Figure 1.Vertically and horizontally leachate collection french drain crosspoint sets percolate to receive Collect leachate collection pipe 33 in well 32, leachate collection french drain 31 and be connected to leachate collection well 32, percolate passes through percolate The elevator pump or percolate discharge guiding pipe conveying sewage regulating reservoir in well are collected, as shown in Fig. 1, Fig. 6.Percolate of the present invention is received Collect french drain and HDPE leachate collections pipe 33, rubble outsourcing non-woven geotextile composition, such as Fig. 6 institutes are wrapped up by 20 ~ 40mm graded broken stones Show.Leachate collection pipe of the present invention is HDPE perforated pipes, and pipe diameter size and percent opening are determined according to percolate water size. Leachate collection well 32 of the present invention is sealed by DE1000 HDPE prefabricated wells, shaft bottom using certain thickness HDPE shroudings, well Top is covered using the prefabricated membrane covers 35 of certain thickness HDPE, as shown in Figure 6.
Gas gathering system 4:In order to effectively collect the gas that sludge digestion degraded is produced in sludge lagoon after closing, in diafiltration Liquid is collected and sets gas gathering system on french drain, as shown in Figure 2,3.Gas gathering system of the present invention is by geosynthetics draining Net 41, gas collection french drain 42, gas discharge guiding pipe 43, gas discharging apparatus 44 are constituted, as shown in Figure 1.The digested drop of sludge lagoon Solve the gas produced and gas collection french drain is entered by soil engineering composite drainage network, discharged and filled by gas eventually through gas discharge guiding pipe Discharge is put, as shown in Figure 8.Soil engineering composite drainage network need to be anchored into sludge lagoon periphery anchoring groove 9, and reserved certain sedimentation and deformation Amount of tension.Gas collection french drain 42 of the present invention wraps up HDPE gas-collecting pipes 45, rubble outsourcing by 20 ~ 40mm graded broken stones Non-woven geotextile is constituted, as shown in Figure 2.Gas-collecting pipe of the present invention is HDPE perforated pipes, pipe diameter size and percent opening root Determined according to gas flow size.Gas discharge guiding pipe of the present invention is HDPE solid wall pipes, and pipe diameter size is determined according to gas flow size. Gas discharging apparatus of the present invention is made up of blast pipe 46, gas check valve 47, Unpowered ventilation device 48, the bottom of blast pipe 46 Led to by reducing two and connect gas discharge guiding pipe 43, air bleeding valve and Unpowered ventilation device 48 are installed in top, in Unpowered ventilation device 48 Gas check valve 47 is set with the junction of blast pipe 46, the uniform anti-corrosion steel wire rope in blast pipe periphery, blast pipe passes through anti-corrosion steel wire Rope 49 is fixed, windproof drawing destruction, as shown in Figure 8.
Horizontal impervious layer 5:In order to prevent rainwater and surface water from entering in sludge lagoon, while gas is without group in barrier sludge lagoon Knit into ambient air, horizontal impervious layer is laid on gas collection layer.Horizontal impervious layer of the present invention is one layer 1.5mmLLDPE or HDPE geomembranes 51, geomembrane is anchored into sludge lagoon periphery anchoring groove 9, and reserved certain sedimentation and deformation is drawn The amount of stretching, as shown in Figure 2,3.
Rainwater guide system 6:Go deep into collect rainfall in sludge lagoon Closure cover structure sheaf top covering support soil layer Rainwater, on horizontal impervious layer set rainwater guide system.Rainwater-collecting guide system of the present invention is by geosynthetics Drainage network 61, rainwater-collecting french drain 62,63 groups of layers of rain collection well, as shown in Figure 1.Soil engineering composite drainage network 61, is covered in anti- On infiltration layer, and rainwater-collecting in longitudinally, laterally rainwater-collecting french drain, rainwater-collecting french drain is set on soil engineering composite drainage network The rain collection well set in pipe access sludge lagoon, sludge lagoon periphery surface water channel is imported by rainwater discharge guiding pipe 64 or elevator pump Or in gutter 65, such as Fig. 1,8 show.Rainwater-collecting french drain of the present invention wraps up rainwater collection collector by 20 ~ 40mm graded broken stones 66, rubble outsourcing non-woven geotextile composition, as shown in Figure 4.Rainwater collection collector of the present invention is HDPE perforated pipes, pipe diameter size And determination is deeply measured in perforate filter according to rainwater.Rain collection well of the present invention is by DE1000 HDPE prefabricated wells, and shaft bottom uses one Determine the HDPE shroudings sealing of thickness, Jing Ding is covered using the prefabricated membrane covers 67 of 2.0mm HDPE, as shown in Figure 8.
Soil layer 7 is supported in covering:Top Nutrition Soil is supported, is made up of thickness more than 450mm clay compactions, soil layer infiltration coefficient It should be greater than 1 × 10-4Cm/s, as shown in Figure 2,3.
Nutrition vegetable layer 8:For vegetation growth nutritive layer, the cultivated soil of planting of 150mm should be greater than by thickness and constitute, soil material Ying Li In vegetation growth, as shown in Figure 2,3.
Maintenance road 10 is set around the sludge lagoon, and is connected with extraneous road.
The main implementation process of the present invention is as follows:Top layer vegetation garbage-cleaning, sewage pump drainage → build anchoring groove → installation Lay buoyancy layer → laying reinforcing layer → installation laying leachate collection guide system → laying gas collection layer → laying antiseepage Soil layer → nutrition vegetable layer → green grass, restoration of the ecosystem is supported in layer → installation laying rainwater-collecting layer → laying covering.
Before sludge lagoon Closure cover is implemented, top layer vegetation in sludge lagoon, rubbish should be removed first, and in sludge lagoon Top layer supernatant carries out pump drainage, then builds builder's road and anchoring groove along sludge lagoon periphery.Utilize wooden splint, steel plate, bolt Cystosepiment is connected overall, buoyancy layer is formed.Pre-buried leachate collection well, gas discharge guiding pipe, rain collection well in precalculated position, After rainwater discharge guiding pipe, 2 floor height intensity reinforced geotextiles are laid.Reinforced geotextile advises that two width are laying unit(Wide 10m), inciting somebody to action Geotextiles carry out sewing up for two width geotextiles during being stretched toward sludge face, being seamed on sludge face between each laying unit Carry out.Longitudinal geotextiles are first laid, horizontal geotextiles are re-layed.Before geotextiles anchoring, geotextiles in field should be made to try one's best loosely, in advance Stay certain sedimentation and deformation amount of tension.The HDPE leachate collection pipes of perforation are installed in laying in the middle part of sludge lagoon, and are received with percolate Ji Jing connections, rubble, outsourcing non-woven geotextile formation leachate collection french drain are laid along leachate collection pipe.Along sludge lagoon periphery The HDPE gas-collecting pipes of perforation are installed in laying, and are connected with gas discharge guiding pipe by elbow bend;Laid along gas-collecting pipe Rubble, outsourcing non-woven geotextile formation gas collection french drain;The geosynthetics network of rivers is laid on gas collection french drain and forms gas Collecting layer, the transverse lap width of adjacent geonet is not less than 100mm, and the lap width of longitudinal end is not less than 150mm, geotechnique Certain sedimentation and deformation amount of tension is reserved at composite drainage network two ends, and is anchored into anchoring groove.Install gas discharging apparatus, and with it is pre-buried Gas discharge guiding pipe connection.HDPE film or LLDPE film horizontal impervious layer are laid, certain sedimentation and deformation stretching is reserved at antiseepage film two ends Amount, and anchor into anchoring groove.Sealed between every width antiseepage film by sweat soldering, lap width is not less than 150mm, seam Place should avoid producing wrinkle as far as possible.Soil engineering composite drainage network formation drainage blanket is laid in antiseepage film, laying is required with exhaust Layer.The HDPE rainwater collection collectors of perforation, and and rainwater-collecting are installed in laying on sludge lagoon medium position, soil engineering composite drainage network Well is connected, and rubble, outsourcing non-woven geotextile formation rainwater-collecting french drain are laid along rainwater collection collector.Soil layer and nutrition are supported in covering Soil, and be compacted.The closing greening of Closure cover nutrition vegetable layer should mutually be coordinated with surrounding landscape, and according to soil thickness, soil Earth property, weather conditions etc. carry out plants configuration.
Above-mentioned embodiment is used for illustrating the present invention, rather than limits the invention, the present invention's In spirit and scope of the claims, any modifications and changes made to the present invention both fall within the protection model of the present invention Enclose.

Claims (7)

1. a kind of sludge lagoon place Ecosystem restoration system in situ, it is characterised in that:Ecosystem restoration system from bottom to up by buoyancy layer, Soil layer, nutrition are supported in reinforcing layer, leachate collection system, gas gathering system, horizontal impervious layer, rain water collecting system, covering Vegetable layer is combined, and leachate collection system includes vertically and horizontally leachate collection french drain, and vertically and horizontally leachate collection french drain is handed over Crunode sets leachate collection well, and leachate collection pipe, the leachate collection pipe are vertically and horizontally set in leachate collection french drain Leachate collection well is connected to, percolate conveys sewage by the elevator pump in leachate collection well or percolate discharge guiding pipe and adjusted Pond, gas gathering system is set on leachate collection french drain;The gas gathering system includes what is laid along sludge lagoon periphery Gas-collecting pipe, rubble, outsourcing non-woven geotextile formation gas collection french drain are laid along gas-collecting pipe;In gas collection french drain The upper laying geosynthetics network of rivers forms gas collection layer, and soil engineering composite drainage network is anchored into the anchoring groove of sludge lagoon periphery, and gas is received Collector is connected by gas discharge guiding pipe with gas discharging apparatus.
2. a kind of sludge lagoon place Ecosystem restoration system in situ according to claim 1, it is characterised in that:Described buoyancy Layer is spliced to form entirety by some buoyancy plates, and buoyancy plate respectively sets one layer of 1 ~ 3cm up and down by 20 ~ 40cm thickness polyethylene foam sheet Thickness plank is constituted.
3. a kind of sludge lagoon place Ecosystem restoration system in situ according to claim 1, it is characterised in that:The reinforcing layer It is made up of the high intensity reinforcement Woven geofabric of the double-deck vertically and transversely cross-linking arrangements of 300 ~ 400kN/m, reinforcement cloth anchors into sludge lagoon week In the anchoring groove that side is set.
4. a kind of sludge lagoon place Ecosystem restoration system in situ according to claim 1, it is characterised in that:Rainwater-collecting system System includes being covered in the soil engineering composite drainage network on horizontal impervious layer, and is set longitudinally, laterally on soil engineering composite drainage network Rainwater-collecting french drain, the rain collection well longitudinally, laterally set in rainwater-collecting french drain in rainwater collection collector access sludge lagoon, leads to Cross rainwater discharge guiding pipe or elevator pump is imported in the surface water channel of sludge lagoon periphery.
5. a kind of sludge lagoon place Ecosystem restoration system in situ according to claim 1, it is characterised in that:The level is prevented Infiltration layer is one layer of 1.5mmLLDPE or HDPE geomembrane, and geomembrane is anchored into the anchoring groove of sludge lagoon periphery.
6. a kind of sludge lagoon place Ecosystem restoration system in situ according to claim 1, it is characterised in that:Soil is supported in covering Layer is made up of thickness more than 450mm clay compactions, and soil layer infiltration coefficient should be greater than 1 × 10-4cm/s.
7. a kind of sludge lagoon place Ecosystem restoration system in situ according to claim 1, it is characterised in that:Nutrition vegetable layer For vegetation growth nutritive layer, the cultivated soil of planting of 150mm should be greater than by thickness and constitute.
CN201710501190.9A 2017-06-27 2017-06-27 A kind of sludge lagoon place Ecosystem restoration system in situ Pending CN107321752A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710501190.9A CN107321752A (en) 2017-06-27 2017-06-27 A kind of sludge lagoon place Ecosystem restoration system in situ

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710501190.9A CN107321752A (en) 2017-06-27 2017-06-27 A kind of sludge lagoon place Ecosystem restoration system in situ

Publications (1)

Publication Number Publication Date
CN107321752A true CN107321752A (en) 2017-11-07

Family

ID=60197722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710501190.9A Pending CN107321752A (en) 2017-06-27 2017-06-27 A kind of sludge lagoon place Ecosystem restoration system in situ

Country Status (1)

Country Link
CN (1) CN107321752A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109047267A (en) * 2018-09-27 2018-12-21 苏州金螳螂园林绿化景观有限公司 Degeneration system is polluted in refuse landfill
WO2021000487A1 (en) * 2019-07-02 2021-01-07 北京高能时代环境技术股份有限公司 Detachable flexible floating cover
CN114033009A (en) * 2021-11-02 2022-02-11 湘潭大学 Ecological restoration construction method and system for surface sludge of sludge landfill

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020094162A (en) * 2001-06-11 2002-12-18 주식회사 엔바이로피아 Final Cover System of Vertical Movable LFG Drainage with Sink of Landf ill
CN1769215A (en) * 2005-09-08 2006-05-10 浙江大学 Method and system for floating composite botanical zone in situ biologically rehabilitating water body
CN1785536A (en) * 2005-10-21 2006-06-14 同济大学 On site environment restoring method of demestic garbage loading embedding field
US20100272516A1 (en) * 2006-09-14 2010-10-28 Ayers Michael R Cover system with gas collection system for waste sites and environmental closures
KR20100117470A (en) * 2009-04-25 2010-11-03 이주형 Eco landfill facility structure
CN201817805U (en) * 2010-08-13 2011-05-04 中国水电顾问集团华东勘测设计研究院 Closure structure of sludge house
CN204456052U (en) * 2014-12-18 2015-07-08 北京高能时代环境技术股份有限公司 The ecology closing structure of the solid soil of reinforcement

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020094162A (en) * 2001-06-11 2002-12-18 주식회사 엔바이로피아 Final Cover System of Vertical Movable LFG Drainage with Sink of Landf ill
CN1769215A (en) * 2005-09-08 2006-05-10 浙江大学 Method and system for floating composite botanical zone in situ biologically rehabilitating water body
CN1785536A (en) * 2005-10-21 2006-06-14 同济大学 On site environment restoring method of demestic garbage loading embedding field
US20100272516A1 (en) * 2006-09-14 2010-10-28 Ayers Michael R Cover system with gas collection system for waste sites and environmental closures
KR20100117470A (en) * 2009-04-25 2010-11-03 이주형 Eco landfill facility structure
CN201817805U (en) * 2010-08-13 2011-05-04 中国水电顾问集团华东勘测设计研究院 Closure structure of sludge house
CN204456052U (en) * 2014-12-18 2015-07-08 北京高能时代环境技术股份有限公司 The ecology closing structure of the solid soil of reinforcement

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109047267A (en) * 2018-09-27 2018-12-21 苏州金螳螂园林绿化景观有限公司 Degeneration system is polluted in refuse landfill
WO2021000487A1 (en) * 2019-07-02 2021-01-07 北京高能时代环境技术股份有限公司 Detachable flexible floating cover
CN114033009A (en) * 2021-11-02 2022-02-11 湘潭大学 Ecological restoration construction method and system for surface sludge of sludge landfill
CN114033009B (en) * 2021-11-02 2022-10-21 湘潭大学 Ecological restoration construction method and system for surface sludge of sludge landfill

Similar Documents

Publication Publication Date Title
CN107366251A (en) A kind of construction method of sludge lagoon place original position Ecosystem restoration system
CN208104958U (en) A kind of ecostagnation band applied to town road
CN107321752A (en) A kind of sludge lagoon place Ecosystem restoration system in situ
CN109024458A (en) A kind of coal mine subsidence land landscape revetment and the construction method of water-bed antiseepage
CN108755589A (en) A kind of antiseep of artificial lake structure and its construction method
CN216865196U (en) Sealing covering structure of municipal solid waste landfill
CN206128142U (en) Be applied to landfill yard seepage prevention structure of mountain valley type landfill yard sludge sump solidification back ground
CN207138473U (en) A kind of sludge lagoon place original position Ecosystem restoration system
CN215122670U (en) Semiarid refuse dump side slope vegetation restoration structure of high-efficient rainfall of utilizing
CN212153470U (en) Household garbage landfill yard closing system and household garbage landfill yard
CN215483400U (en) Biological retention facility rainwater regulation and reuse system
CN114457855A (en) Sunken horizontal seepage-proofing and perpendicular seepage-proofing integrated configuration
CN110303022B (en) Anti-seepage pollution household garbage landfill system and method
CN208152219U (en) A kind of dry depression for sponge city
CN112868459A (en) Semi-arid waste dump slope vegetation restoration structure and method for efficiently utilizing rainfall
CN206352302U (en) A kind of protective slope structure
CN219080379U (en) Groundwater drainage system
CN219503430U (en) Vertical partition structure of household garbage landfill
CN114632814B (en) River basin ecological restoration structure and method adopting fly ash
CN220394656U (en) Loess area is with solid waste disposal site of loess replacement lining
CN218116567U (en) Eluviation water collection french drain structure
CN216194838U (en) Expansive soil slope flexible ecological supporting system with waterproof and drainage functions
CN217710882U (en) Anti structure of subsiding of landfill
CN114525817B (en) Construction method of horizontal seepage-proofing and vertical seepage-proofing combined structure
CN210439421U (en) Overflow drainage structure suitable for open field

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination