CN107316185A - The method for building up of testing process and system is set up in a kind of LIMS systems - Google Patents
The method for building up of testing process and system is set up in a kind of LIMS systems Download PDFInfo
- Publication number
- CN107316185A CN107316185A CN201710558774.XA CN201710558774A CN107316185A CN 107316185 A CN107316185 A CN 107316185A CN 201710558774 A CN201710558774 A CN 201710558774A CN 107316185 A CN107316185 A CN 107316185A
- Authority
- CN
- China
- Prior art keywords
- template
- flow
- component
- project
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 56
- 230000008569 process Effects 0.000 title claims abstract description 36
- 238000004989 laser desorption mass spectroscopy Methods 0.000 title claims abstract description 29
- 238000012360 testing method Methods 0.000 title claims abstract description 28
- 238000012790 confirmation Methods 0.000 claims abstract description 9
- 230000004044 response Effects 0.000 claims abstract description 7
- 238000012545 processing Methods 0.000 claims description 10
- 238000012986 modification Methods 0.000 claims description 5
- 230000004048 modification Effects 0.000 claims description 5
- 238000012217 deletion Methods 0.000 claims description 4
- 230000037430 deletion Effects 0.000 claims description 4
- 230000008859 change Effects 0.000 claims description 3
- 238000006243 chemical reaction Methods 0.000 claims description 3
- 238000013500 data storage Methods 0.000 claims description 3
- 238000007726 management method Methods 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 6
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G10—MUSICAL INSTRUMENTS; ACOUSTICS
- G10L—SPEECH ANALYSIS TECHNIQUES OR SPEECH SYNTHESIS; SPEECH RECOGNITION; SPEECH OR VOICE PROCESSING TECHNIQUES; SPEECH OR AUDIO CODING OR DECODING
- G10L15/00—Speech recognition
- G10L15/26—Speech to text systems
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Acoustics & Sound (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Multimedia (AREA)
- Human Computer Interaction (AREA)
- Computational Linguistics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of method for building up of testing process in LIMS systems and system is set up, it comprises the following steps:Display target interface;Receive the request signal of establishment project flow;According to the request signal received, required flow template is searched in flow template table, if there is required flow template in flow template table, corresponding flow template is shown;Configure some step templates;Multiple step templates are associated, flow configuration are formed in existing flow template;Multiple flow templates are selected in flow template table, the flow template of selection is configured in project flow, sets up and is preserved with the project flow postponed in response to a confirmation signal.The present invention can provide the user flexible project flow, and user can freely configure flow, the step for needing to detect according to the actual requirements.
Description
Technical field
The invention belongs to field of computer technology, and in particular to the method for building up of testing process and be built in a kind of LIMS systems
Erection system.
Background technology
LIMS (Laboratory Information Management System, LIMS) system
System is a platform of laboratory calibration, and it connects the analytical instrument in laboratory by computer network, is used
The management thought of science, advanced database technology, workflow technology, sample identification technology, computer memory technical and quick
Data processing technique, realizes the comprehensive management using laboratory as the integrated environment of core.
LIMS system collection sample managing, quality management, personnel, client, instrument connection, data management (collection, transmission, place
Reason, output and issue), all multimodes such as Report Server Management be integrated, the laboratory integration management of composition complete set and product matter
Monitoring system is measured, the daily management requirement of outside can be met, the strict control and control of lab analysis data are can guarantee that again.
However, the testing process of LIMS systems is more fixed in the prior art, it is impossible to needed to carry out free configuration according to user
The content of the invention
In order to solve the above mentioned problem of prior art presence, built the invention provides testing process in a kind of LIMS systems
Cube method and set up system.
The technical solution adopted in the present invention is:The method for building up of testing process includes following step in a kind of LIMS systems
Suddenly:Display target interface;Receive the request signal of establishment project flow;According to the request signal received, in flow template table
Flow template needed for middle lookup, if there is required flow template in flow template table, shows corresponding flow template;
Configure some step templates;Multiple step templates are associated, flow configuration are formed in existing flow template;In flow mould
Multiple flow templates are selected in plate table, the flow template of selection is configured in project flow, are set up in response to a confirmation signal
And preserve with the project flow postponed.
Further, in the step of display target interface, target interface uses the page, a browser of browser
A display module in the upper page, and the one or more in a mobile phone A PP interface.
Further, the request signal that the basis is received searches the step of required flow template in flow template table
In rapid, if required flow template is not present in flow template table, visioning procedure template, its detailed process is:
1) search whether there is required step template in step template table, if it is present by multiple step templates
Configured after association in flow template;Otherwise, into step 2) foundation step template;
2) configuration of step template is realized by the way that component is added, changed or deleted in existing step template, with postponing
Step template deposit step template table in;
3) multiple step templates in obtaining step template table, and free sequence or any delete processing are carried out, will be multiple
Step template is configured in flow template, completes the establishment of flow template.
Further, the step of some step templates of the configuration, its detailed process is:
Component is added or deleted in existing step template;The data of configuration are preserved, and are committed to server;Server pair
The data received carry out data type conversion, judge the type with each component in the step template postponed, component class
Type includes newly-increased component, deletes component and modification component;If component belongs to newly-increased component, step is arrived into module data storage
In template table;If component belongs to deletion component, corresponding module data is deleted in step template table;If component belongs to
Component is changed, then corresponding module data is changed in step template table.
Further, it is described to set up and preserve in the step of matching somebody with somebody the project flow postponed, one in response to a confirmation signal
The multiple flow templates of project flow correspondence, the multiple step templates of flow template correspondence, the multiple steps of step template correspondence
Rapid example.
Further, the step template is made up of component.
Further, the step template preserves the information of each component of composition step template, the flow template
Its relation with step template is preserved, is connected by template Id with step template.
The system of setting up of testing process includes display module, receiving module, searching modul, step mould in a kind of LIMS systems
Plate configuration module, flow template configuration module, project flow configuration module;The display module is used for display target interface;Institute
State the request signal that receiving module is used to receive establishment project flow;The searching modul is used for according to request signal in flow mould
Required flow template is searched in plate table;The step template configuration module is used for by adding or deleting in existing step template
Except component is configured to existing step template;The flow template configuration module is used for after multiple step templates are associated
Flow configuration is formed in existing flow template;The project flow configuration module is used to configure the flow template of selection in item
In mesh flow, preserve with the project flow postponed.
Further, the system of setting up of testing process also includes sound identification module, the voice in the LIMS systems
Identification module is set up with flow template table and is connected;The sound identification module is used for the voice request letter for receiving establishment project flow
Number, and processing is identified to the voice request signal received, start the establishment of project flow according to identifying processing result.
Due to using above technical scheme, beneficial effects of the present invention are:The present invention can provide the user flexible item
Mesh flow, user can freely configure flow, the step for needing to detect according to the actual requirements.The present invention by confirmation signal really
Recognize process, it is possible to increase the accuracy that project flow is set up.In addition, starting project flow by being handled voice signal
Establishment, can reduce the manually operated time, further improve testing process and set up efficiency.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the accompanying drawing used required in technology description to be briefly described.It is clear that drawings in the following description are only this hair
Some bright embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can be with root
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the flow chart of the method for building up of testing process in a kind of LIMS systems that one embodiment of the invention is provided;
Fig. 2 is the structured flowchart for setting up system of testing process in a kind of LIMS systems that one embodiment of the invention is provided.
In figure:1- display modules;2- receiving modules;3- searching moduls;4- step template configuration modules;5- flow templates
Configuration module;6- project flow configuration modules;7- sound identification modules.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, technical scheme will be carried out below
Detailed description.Obviously, described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Base
Embodiment in the present invention, those of ordinary skill in the art are resulting on the premise of creative work is not made to be owned
Other embodiment, belongs to the scope that the present invention is protected.
As shown in figure 1, the invention provides a kind of method for building up of testing process in LIMS systems, it includes following step
Suddenly:
S1, display target interface.
S2, the request signal for receiving establishment project flow.
The request signal that S3, basis are received, searches required flow template, if flow template in flow template table
There is required flow template in table, then show corresponding flow template.Wherein, the multiple step moulds of flow template correspondence
Plate.
S4, some step templates are configured, its detailed process is:
Component is added or deleted in existing step template;The data of configuration are preserved, and are committed to server;Server pair
The data received carry out data type conversion, judge the type with each component in the step template postponed, wherein, group
Part type includes newly-increased component, deletes component and modification component.If component belongs to newly-increased component, module data storage is arrived
In step template table.If component belongs to deletion component, corresponding module data is deleted in step template table.If component
Belong to modification component, then corresponding module data is changed in step template table.
S5, multiple step templates are associated, form flow configuration in existing flow template.
S6, multiple flow templates are selected in flow template table, the flow template of selection is configured in project flow, rung
Ying Yuyi confirmation signals are set up and preserved with the project flow postponed.Wherein, the multiple flow templates of project flow correspondence, one
The multiple step templates of individual flow template correspondence, the multiple step examples of step template correspondence.Step template and flow template are equal
Outside project flow, a new project flow is often created, is stored after all the relation of corresponding templates can be replicated to step
In rapid example table, stored after correspondence component element is replicated into project flow table.
In above-mentioned steps S1, target interface can be the pre-configured interface for receiving information to be logged, for example, target
Interface can be a display module 11 in the page on a page or browser for browser, can also be hand
A machine APP interface.In addition, target interface can also be that experience default response operation in an interface redirects obtained interface.In advance
If response operation can be the form such as touch button or input voice.
In above-mentioned steps S3, if required flow template is not present in flow template table, visioning procedure template, it has
Body process is:
1) search whether there is required step template in step template table, if it is present by multiple step templates
Configured after association in flow template;Otherwise, into step 2) foundation step template.
2) step template is made up of least member-component, by existing step template add, change or
The flexible configuration that component realizes step template is deleted, with the step template deposit step template table postponed.
3) multiple step templates in obtaining step template table, and the processing such as free sequence or any deletion is carried out, will be many
Individual step template configuration completes the establishment of flow template in flow template.Flow template is made up of step template, flow mould
The difference of plate and step template is:What step template needed preservation is the information for each component for constituting step template, and
Flow template need to only preserve its relation with step template, be connected by template Id with step template.
System is set up present invention also offers testing process in a kind of LIMS systems, it includes display module 1, reception
Module 2, searching modul 3, step template configuration module 4, flow template configuration module 5, project flow configuration module 6.Wherein, show
Show that module 1 is used for display target interface;Receiving module 2 is used for the request signal for receiving establishment project flow;Searching modul 3 is used for
Required flow template is searched in flow template table according to request signal;Step template configuration module 4 is used for by existing
Component is added or deleted in step template to configure existing step template;Flow template configuration module 5 is used for multiple steps
Rapid template forms flow configuration in existing flow template after being associated;Project flow configuration module 6 is used for the stream of selection
Journey template configuration is preserved with the project flow postponed in project flow.
In above-described embodiment, the system of setting up of testing process also includes sound identification module 7, language in LIMS systems of the present invention
Sound identification module 7 is set up with flow template table and is connected.Sound identification module 7 is used for the voice request letter for receiving establishment project flow
Number, and processing is identified to the voice request signal received, start the establishment of project flow according to identifying processing result.
The method for building up of testing process and set up system in LIMS systems of the present invention and can provide the user flexible project
Flow, user can freely configure flow, the step for needing to detect according to the actual requirements.The confirmation that the present invention passes through confirmation signal
Process, it is possible to increase the accuracy that project flow is set up.In addition, starting project flow by being handled voice signal
Create, the manually operated time can be reduced, that further improves testing process sets up efficiency.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
Those familiar with the art can readily occur in change or replacement in presently disclosed technical scope, all should
It is included within the scope of the present invention.Therefore, protection scope of the present invention should using the scope of the claims as
It is accurate.
Claims (10)
1. the method for building up of testing process in a kind of LIMS systems, it is characterised in that it comprises the following steps:
Display target interface;
Receive the request signal of establishment project flow;
According to the request signal received, required flow template is searched in flow template table, if deposited in flow template table
In required flow template, then corresponding flow template is shown;
Configure some step templates;
Multiple step templates are associated, flow configuration are formed in existing flow template;
Multiple flow templates are selected in flow template table, the flow template of selection are configured in project flow, in response to one
Confirmation signal is set up and preserved with the project flow postponed.
2. the method for building up of testing process in a kind of LIMS systems as claimed in claim 1, it is characterised in that the display mesh
Demarcate face the step of in, target interface is using a display module in the page on the page of browser, browser, and hand
One or more in a machine APP interface.
3. the method for building up of testing process in a kind of LIMS systems as claimed in claim 1, it is characterised in that the basis connects
In the step of request signal received searches required flow template in flow template table, if be not present in flow template table
Required flow template, then visioning procedure template, its detailed process is:
1) search whether there is required step template in step template table, if it is present multiple step templates are associated
After configure in flow template;Otherwise, into step 2) foundation step template;
2) by being added in existing step template, the configuration that component realizes step template being changed or delete, with the step postponed
In rapid template deposit step template table;
3) multiple step templates in obtaining step template table, and free sequence or any delete processing are carried out, by multiple steps
Template configuration completes the establishment of flow template in flow template.
4. the method for building up of testing process in a kind of LIMS systems as claimed in claim 1, it is characterised in that if the configuration
The step of dry step template, its detailed process is:
Component is added or deleted in existing step template;The data of configuration are preserved, and are committed to server;Server is to receiving
The data arrived carry out data type conversion, judge the type with each component in the step template postponed, component type bag
Include newly-increased component, delete component and modification component;If component belongs to newly-increased component, step template is arrived into module data storage
In table;If component belongs to deletion component, corresponding module data is deleted in step template table;If component belongs to modification
Component, then change corresponding module data in step template table.
5. the method for building up of testing process in a kind of LIMS systems as claimed in claim 1 or 2 or 3 or 4, it is characterised in that
It is described to set up and preserve in the step of matching somebody with somebody the project flow postponed in response to a confirmation signal, the multiple streams of project flow correspondence
Journey template, the multiple step templates of flow template correspondence, the multiple step examples of step template correspondence.
6. the method for building up of testing process in a kind of LIMS systems as claimed in claim 1 or 2 or 3 or 4, it is characterised in that
The step template is made up of component.
7. the method for building up of testing process in a kind of LIMS systems as claimed in claim 1 or 2 or 3 or 4, it is characterised in that
The step template preserves the information of each component of composition step template, and the flow template preserves itself and step template
Relation, is connected by template Id with step template.
8. testing process sets up system in a kind of LIMS systems, it is characterised in that it includes display module, receiving module, looked into
Look for module, step template configuration module, flow template configuration module, project flow configuration module;The display module is used to show
Show target interface;The receiving module is used for the request signal for receiving establishment project flow;The searching modul is used for basis please
Signal is asked to search required flow template in flow template table;The step template configuration module is used for by existing step
Component is added or deleted in template to configure existing step template;The flow template configuration module is used for multiple steps
Template forms flow configuration in existing flow template after being associated;The project flow configuration module is used for the stream of selection
Journey template configuration is preserved with the project flow postponed in project flow.
9. testing process sets up system in a kind of LIMS systems as claimed in claim 8, it is characterised in that the LIMS systems
The system of setting up of testing process also includes sound identification module in system, and the sound identification module is set up with flow template table to be connected
Connect;The sound identification module is used for the voice request signal for receiving establishment project flow, and the voice request received is believed
Number processing is identified, starts the establishment of project flow according to identifying processing result.
10. testing process sets up system in a kind of LIMS systems as claimed in claim 8, it is characterised in that described in one
The multiple flow templates of project flow correspondence, the multiple step templates of the flow template correspondence, a step
The multiple step examples of rapid template correspondence.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710558774.XA CN107316185B (en) | 2017-07-10 | 2017-07-10 | Method and system for establishing detection process in LIMS (laser induced mechanical breakdown spectroscopy) system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710558774.XA CN107316185B (en) | 2017-07-10 | 2017-07-10 | Method and system for establishing detection process in LIMS (laser induced mechanical breakdown spectroscopy) system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107316185A true CN107316185A (en) | 2017-11-03 |
CN107316185B CN107316185B (en) | 2021-03-16 |
Family
ID=60177855
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710558774.XA Active CN107316185B (en) | 2017-07-10 | 2017-07-10 | Method and system for establishing detection process in LIMS (laser induced mechanical breakdown spectroscopy) system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107316185B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110097293A (en) * | 2019-05-14 | 2019-08-06 | 广州莱伯世开科技有限公司 | Laboratory Management System construction method and platform based on relevant criterion file |
CN112988115A (en) * | 2019-12-13 | 2021-06-18 | 阿里巴巴集团控股有限公司 | Application building method and device and computer readable storage medium |
CN113869883A (en) * | 2021-10-30 | 2021-12-31 | 哈尔滨工业大学 | Experimental project operation management method based on template instance strategy |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101266486A (en) * | 2008-05-08 | 2008-09-17 | 上海交通大学 | Semiconductor manufacture flow path assistant decision-making system |
CN101355436A (en) * | 2007-07-24 | 2009-01-28 | 中兴通讯股份有限公司 | System for rapidly configuring data based on formwork and implementing method |
CN101814064A (en) * | 2009-02-23 | 2010-08-25 | 华为技术有限公司 | Establishment method of report template, report generation method and report system |
US20150324423A1 (en) * | 2012-11-26 | 2015-11-12 | Zte Corporation | Report creation method, device and system |
CN106845849A (en) * | 2017-02-06 | 2017-06-13 | 郑州云海信息技术有限公司 | A kind of BPM method and system |
-
2017
- 2017-07-10 CN CN201710558774.XA patent/CN107316185B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101355436A (en) * | 2007-07-24 | 2009-01-28 | 中兴通讯股份有限公司 | System for rapidly configuring data based on formwork and implementing method |
CN101266486A (en) * | 2008-05-08 | 2008-09-17 | 上海交通大学 | Semiconductor manufacture flow path assistant decision-making system |
CN101814064A (en) * | 2009-02-23 | 2010-08-25 | 华为技术有限公司 | Establishment method of report template, report generation method and report system |
US20150324423A1 (en) * | 2012-11-26 | 2015-11-12 | Zte Corporation | Report creation method, device and system |
CN106845849A (en) * | 2017-02-06 | 2017-06-13 | 郑州云海信息技术有限公司 | A kind of BPM method and system |
Non-Patent Citations (1)
Title |
---|
林彤: "LIMS中样品检测报告模板的开发设计", 《信息通信》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110097293A (en) * | 2019-05-14 | 2019-08-06 | 广州莱伯世开科技有限公司 | Laboratory Management System construction method and platform based on relevant criterion file |
CN112988115A (en) * | 2019-12-13 | 2021-06-18 | 阿里巴巴集团控股有限公司 | Application building method and device and computer readable storage medium |
CN113869883A (en) * | 2021-10-30 | 2021-12-31 | 哈尔滨工业大学 | Experimental project operation management method based on template instance strategy |
Also Published As
Publication number | Publication date |
---|---|
CN107316185B (en) | 2021-03-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110019616B (en) | POI (Point of interest) situation acquisition method and equipment, storage medium and server thereof | |
CN111522927B (en) | Entity query method and device based on knowledge graph | |
CN108509569A (en) | Generation method, device, electronic equipment and the storage medium of enterprise's portrait | |
CN107316185A (en) | The method for building up of testing process and system is set up in a kind of LIMS systems | |
WO2021184833A1 (en) | Robot position deployment method and apparatus, device and medium | |
CN110704524A (en) | House source recording method, device and equipment and computer readable storage medium | |
CN113868427A (en) | Data processing method and device and electronic equipment | |
CN114595686A (en) | Knowledge extraction method, and training method and device of knowledge extraction model | |
CN113282611A (en) | Method and device for synchronizing stream data, computer equipment and storage medium | |
CN113326363B (en) | Searching method and device, prediction model training method and device and electronic equipment | |
CN113312539B (en) | Method, device, equipment and medium for providing search service | |
JP2010211575A (en) | Information evaluation support system | |
WO2021073434A1 (en) | Object behavior recognition method and apparatus, and terminal device | |
US10803861B2 (en) | Method and apparatus for identifying information | |
CN111460257A (en) | Thematic generation method and device, electronic equipment and storage medium | |
CN107315832A (en) | The input method and system of a kind of atomization element | |
CN110362694A (en) | Data in literature search method, equipment and readable storage medium storing program for executing based on artificial intelligence | |
CN111813555B (en) | Super-fusion infrastructure layered resource management system based on internet technology | |
CN202679425U (en) | System with data acquisition function and data synchronization processing function | |
CN114969114A (en) | Water conservancy information rapid retrieval method, system and computer readable medium | |
CN114817419A (en) | Kafka-based media asset data storage method and device, electronic equipment and storage medium | |
CN102880941A (en) | Method, device and system for interactive teaching resource evaluation and integration | |
CN110471708A (en) | The method and device that configuration item based on Reusable Module obtains | |
Cai et al. | Civil engineering process file information management system | |
CN117786098B (en) | Telephone recording abstract extraction method and device based on multi-mode large language model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210204 Address after: 510000 one 106, building 23, courtyard 100, Xianlie Middle Road, Yuexiu District, Guangzhou City, Guangdong Province Applicant after: Guangzhou Leber Shikai Technology Co.,Ltd. Address before: 6 / F, unit 1, building 3, 95 Shuangqing Middle Road, Qingyang District, Chengdu, Sichuan 610000 Applicant before: Tang Jun |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |