CN107315856A - The modeling method and device of a kind of power grid GIS based on chart database - Google Patents
The modeling method and device of a kind of power grid GIS based on chart database Download PDFInfo
- Publication number
- CN107315856A CN107315856A CN201710393227.0A CN201710393227A CN107315856A CN 107315856 A CN107315856 A CN 107315856A CN 201710393227 A CN201710393227 A CN 201710393227A CN 107315856 A CN107315856 A CN 107315856A
- Authority
- CN
- China
- Prior art keywords
- data
- power grid
- equipment
- grid gis
- chart database
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710393227.0A CN107315856A (en) | 2017-05-27 | 2017-05-27 | The modeling method and device of a kind of power grid GIS based on chart database |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710393227.0A CN107315856A (en) | 2017-05-27 | 2017-05-27 | The modeling method and device of a kind of power grid GIS based on chart database |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107315856A true CN107315856A (en) | 2017-11-03 |
Family
ID=60183527
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710393227.0A Pending CN107315856A (en) | 2017-05-27 | 2017-05-27 | The modeling method and device of a kind of power grid GIS based on chart database |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107315856A (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108090165A (en) * | 2017-12-13 | 2018-05-29 | 美林数据技术股份有限公司 | A kind of acquisition methods of the collection of illustrative plates variation based on embedded chart database |
CN108335120A (en) * | 2018-03-07 | 2018-07-27 | 物数(上海)信息科技有限公司 | Assets source tracing method, device, electronic equipment, storage medium based on block chain |
CN108647288A (en) * | 2018-05-04 | 2018-10-12 | 苏州朗动网络科技有限公司 | Method for digging, device, computer equipment and the storage medium of business connection |
CN109412149A (en) * | 2018-10-18 | 2019-03-01 | 全球能源互联网研究院有限公司 | Power grid subgraph construction method, topology analyzing method and device based on region division |
CN109840270A (en) * | 2018-12-23 | 2019-06-04 | 国网浙江省电力有限公司 | A kind of grid equipment approaches to IM based on Neo4j |
CN110110547A (en) * | 2019-04-08 | 2019-08-09 | 智链万源(北京)数字科技有限公司 | Data processing method of tracing to the source and device |
CN110134833A (en) * | 2019-05-09 | 2019-08-16 | 南京邮电大学 | Diagram data modeling and method towards power network topology management |
CN112231328A (en) * | 2020-10-13 | 2021-01-15 | 国网安徽省电力有限公司安庆供电公司 | Distribution network topology information and GIS information mapping and proofreading method based on artificial intelligence |
CN112364213A (en) * | 2020-11-12 | 2021-02-12 | 全球能源互联网研究院有限公司 | Graph database-based power grid retrieval method and system |
CN112699278A (en) * | 2020-12-23 | 2021-04-23 | 新奥数能科技有限公司 | Graph database construction method and device, readable storage medium and electronic equipment |
CN112886574A (en) * | 2021-01-26 | 2021-06-01 | 国网甘肃省电力公司武威供电公司 | Power grid operation control method and system based on graphic database |
CN113723810A (en) * | 2021-08-30 | 2021-11-30 | 广东电网有限责任公司 | Graph database-based power grid modeling method |
CN114840627A (en) * | 2022-05-24 | 2022-08-02 | 中国电建集团成都勘测设计研究院有限公司 | Urban underground comprehensive pipe network connectivity analysis method based on GIS + graph database |
CN115631309A (en) * | 2022-12-21 | 2023-01-20 | 广东电网有限责任公司江门供电局 | Three-dimensional modeling method and device for power distribution network equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140149369A1 (en) * | 2011-07-12 | 2014-05-29 | General Electric Company | Version control methodology for network model |
CN104866613A (en) * | 2015-06-08 | 2015-08-26 | 国家电网公司 | Method for establishing three-dimensional component model database of power grid equipment and facility |
CN106055590A (en) * | 2016-05-23 | 2016-10-26 | 环球大数据科技有限公司 | Power grid data processing method and system based on big data and graph database |
CN106339800A (en) * | 2016-08-23 | 2017-01-18 | 济南大学 | Method of quickly analyzing topology of large grid based on Graphx |
-
2017
- 2017-05-27 CN CN201710393227.0A patent/CN107315856A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140149369A1 (en) * | 2011-07-12 | 2014-05-29 | General Electric Company | Version control methodology for network model |
CN104866613A (en) * | 2015-06-08 | 2015-08-26 | 国家电网公司 | Method for establishing three-dimensional component model database of power grid equipment and facility |
CN106055590A (en) * | 2016-05-23 | 2016-10-26 | 环球大数据科技有限公司 | Power grid data processing method and system based on big data and graph database |
CN106339800A (en) * | 2016-08-23 | 2017-01-18 | 济南大学 | Method of quickly analyzing topology of large grid based on Graphx |
Non-Patent Citations (1)
Title |
---|
梁东贵: "图数据库在电网地理信息系统中的应用", 《科技视界》 * |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108090165B (en) * | 2017-12-13 | 2021-12-28 | 美林数据技术股份有限公司 | Method for acquiring map change difference based on embedded graph database |
CN108090165A (en) * | 2017-12-13 | 2018-05-29 | 美林数据技术股份有限公司 | A kind of acquisition methods of the collection of illustrative plates variation based on embedded chart database |
CN108335120A (en) * | 2018-03-07 | 2018-07-27 | 物数(上海)信息科技有限公司 | Assets source tracing method, device, electronic equipment, storage medium based on block chain |
CN108647288A (en) * | 2018-05-04 | 2018-10-12 | 苏州朗动网络科技有限公司 | Method for digging, device, computer equipment and the storage medium of business connection |
CN109412149A (en) * | 2018-10-18 | 2019-03-01 | 全球能源互联网研究院有限公司 | Power grid subgraph construction method, topology analyzing method and device based on region division |
CN109412149B (en) * | 2018-10-18 | 2020-08-28 | 全球能源互联网研究院有限公司 | Power grid subgraph construction method based on regional division, topology analysis method and device |
CN109840270A (en) * | 2018-12-23 | 2019-06-04 | 国网浙江省电力有限公司 | A kind of grid equipment approaches to IM based on Neo4j |
CN110110547A (en) * | 2019-04-08 | 2019-08-09 | 智链万源(北京)数字科技有限公司 | Data processing method of tracing to the source and device |
CN110134833A (en) * | 2019-05-09 | 2019-08-16 | 南京邮电大学 | Diagram data modeling and method towards power network topology management |
CN112231328A (en) * | 2020-10-13 | 2021-01-15 | 国网安徽省电力有限公司安庆供电公司 | Distribution network topology information and GIS information mapping and proofreading method based on artificial intelligence |
CN112364213A (en) * | 2020-11-12 | 2021-02-12 | 全球能源互联网研究院有限公司 | Graph database-based power grid retrieval method and system |
WO2022100233A1 (en) * | 2020-11-12 | 2022-05-19 | 全球能源互联网研究院有限公司 | Graph database-based power grid retrieval method and system |
CN112699278A (en) * | 2020-12-23 | 2021-04-23 | 新奥数能科技有限公司 | Graph database construction method and device, readable storage medium and electronic equipment |
WO2022134631A1 (en) * | 2020-12-23 | 2022-06-30 | 新奥数能科技有限公司 | Graph database construction method and apparatus, readable storage medium, and electronic device |
CN112886574A (en) * | 2021-01-26 | 2021-06-01 | 国网甘肃省电力公司武威供电公司 | Power grid operation control method and system based on graphic database |
CN112886574B (en) * | 2021-01-26 | 2023-06-30 | 国网甘肃省电力公司武威供电公司 | Power grid operation control method and system based on graphic database |
CN113723810A (en) * | 2021-08-30 | 2021-11-30 | 广东电网有限责任公司 | Graph database-based power grid modeling method |
CN114840627A (en) * | 2022-05-24 | 2022-08-02 | 中国电建集团成都勘测设计研究院有限公司 | Urban underground comprehensive pipe network connectivity analysis method based on GIS + graph database |
CN114840627B (en) * | 2022-05-24 | 2023-03-21 | 中国电建集团成都勘测设计研究院有限公司 | Urban underground comprehensive pipe network connectivity analysis method based on GIS + graph database |
CN115631309A (en) * | 2022-12-21 | 2023-01-20 | 广东电网有限责任公司江门供电局 | Three-dimensional modeling method and device for power distribution network equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107315856A (en) | The modeling method and device of a kind of power grid GIS based on chart database | |
CN101650191B (en) | Road network topology aggregation method and device | |
CN106202335B (en) | A kind of traffic big data cleaning method based on cloud computing framework | |
CN102411764B (en) | The data management system of grid equipment and management method | |
CN103123704B (en) | A kind of Logistics Distribution Method based on rich network attribute road network | |
CN109145957A (en) | The identification and processing method and processing device of power distribution network abnormal index based on big data | |
CN103093007B (en) | Power transmission iron tower three-dimensional virtual assembly method | |
Chen et al. | Understanding spatial structures and organizational patterns of city networks in China: A highway passenger flow perspective | |
CN107742169A (en) | A kind of Urban Transit Network system constituting method and performance estimating method based on complex network | |
CN103020267B (en) | Based on the complex network community structure method for digging of triangular cluster multi-label | |
CN102521364B (en) | Method for inquiring shortest path between two points on map | |
CN112685570B (en) | Multi-label graph-based power grid network frame knowledge graph construction method | |
CN107590749A (en) | A kind of processing method and system with electricity consumption data | |
CN105335478B (en) | The method and apparatus for building urban land space multistory survey data semantic association | |
CN106951453A (en) | A kind of geographical entity coding method of quick renewal and data sharing | |
CN111813778A (en) | Approximate keyword storage and query method for large-scale road network data | |
CN102780766A (en) | Design service resource cross-domain construction method for cloud manufacturing | |
CN114493088A (en) | Information model construction method for electric power internet of things terminal equipment | |
CN115169744A (en) | Method, device, equipment and medium for simulating and predicting land utilization change | |
CN115641407A (en) | Three-dimensional pipe network incremental updating modeling method and device, storage medium and electronic equipment | |
CN109063089A (en) | A kind of subgraph match method and device based on community structure | |
CN114818632A (en) | Method and device for compiling power limiting sequence table for over-planning power utilization | |
CN104376139A (en) | Graph isomorphism judging method based on spectrum analysis | |
Tang et al. | Supporting continuous skyline queries in dynamically weighted road networks | |
CN102981817B (en) | Based on the RFID middleware component base method for designing of Hadoop |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 102209 Beijing City, the future of science and Technology City Binhe Road, No. 18, No. Applicant after: Global energy Internet Institute, Inc. Applicant after: State Grid Corporation of China Applicant after: State Grid Anhui Electric Power Company Address before: 102211 Beijing city Changping District Xiaotangshan town big East Village Road No. 270 Applicant before: GLOBAL ENERGY INTERCONNECTION RESEARCH INSTITUTE Applicant before: State Grid Corporation of China Applicant before: State Grid Anhui Electric Power Company |
|
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 102209 18 Riverside Avenue, Changping District science and Technology City, Beijing Applicant after: Global energy Internet Institute, Inc. Applicant after: State Grid Corporation of China Applicant after: State Grid Anhui Electric Power Company Address before: 102209 18 Riverside Avenue, Changping District science and Technology City, Beijing Applicant before: Global energy Internet Institute, Inc. Applicant before: State Grid Corporation of China Applicant before: State Grid Anhui Electric Power Company |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171103 |