CN107309615B - A kind of nontoxic inside door powder coating methods - Google Patents
A kind of nontoxic inside door powder coating methods Download PDFInfo
- Publication number
- CN107309615B CN107309615B CN201710629156.XA CN201710629156A CN107309615B CN 107309615 B CN107309615 B CN 107309615B CN 201710629156 A CN201710629156 A CN 201710629156A CN 107309615 B CN107309615 B CN 107309615B
- Authority
- CN
- China
- Prior art keywords
- keel
- health
- door leaf
- powder spray
- environment temperature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D1/00—Processes for applying liquids or other fluent materials
- B05D1/02—Processes for applying liquids or other fluent materials performed by spraying
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Securing Of Glass Panes Or The Like (AREA)
Abstract
The present invention provides a kind of nontoxic inside door powder coating methods, characterized by the following steps: blanking;Code keel;Health;Fixed thickness sanding;Punching;Hot pressing is compound;Pressure maintaining health;Door leaf production line;Powder spray;Punching;Powder spray;Mating, trial assembly manually forms trial assembly;Outseam is inlayed;Health;Mating inspection declaration;It is packaged;Storage.The processes such as the present invention is using compound, the multiple health of reasonable hot pressing, powder spray, and outseam is inlayed are realized nontoxic after the inside door powder spray processed.
Description
Technical field
The present invention relates to a kind of inside door production method, a kind of specifically nontoxic inside door powder coating methods.
Background technique
For inside door in production, existing inside door surface forming method, which will be slow, releases noxious material, distributes in the room,
Human body is caused greatly to damage, pole is not environmentally.
Summary of the invention
The present invention provides a kind of nontoxic inside door powder coating methods to be made to produce the purpose is to solve prior art disadvantage
Inside door asepsis environment-protecting.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of nontoxic inside door powder coating methods, characterized by the following steps:
A: blanking: use sizing saw machine or hand saw blanking: keel use LVL;6A panel is using plain density board;Keel double open
Ventilating groove;
B: code keel: artificial code keel: in transom and centre keel stitching portion gluing, transom and centre keel junction are applied
Glue is simultaneously fixed with flat nail;
C: health: after code keel, horizontal piles up progress health in 8 hours;
D: thickness fixed thickness sanding: is confined to keel with contact calibrating machine;
E: punching: manual electric drill or machining center make a call to 3 carryings ventholes door leaf both ends are each, carry venthole be located at it is imperial
At bone and keel neutral gear;
F: hot pressing is compound: being pressed panel and keel with automatic heating crimping, glue-spread: 120g/ ㎡, pressure: 0.7kg/
cm2, temperature: 85 DEG C ± 5 DEG C, hot pressing time: 6-7min;The open hour of glue: should be in 1.5min at 25 DEG C of environment temperature >
Pressurized-heated is carried out, whens environment temperature≤25 DEG C should carry out Pressurized-heated in 3min;
G: pressure maintaining health: horizontal, which is piled up, after hot pressing carries out health: conditioned time 48 in the case of 20 DEG C of operating environment temperature >
Hour, conditioned time 24 hours in the case of operating environment temperature≤20 DEG C;
H: door leaf production line: with numerical control door leaf four while saw carry out door leaf it is net while, scale, groove milling, then mend poly-putty base;
I: powder spray powder spray: is carried out with powder spray line;
J: lockhole, hinge hole punching: are beaten to door leaf with digital control perforating machine;
K: powder spray powder spray: is carried out with powder spray line;
L: mating, trial assembly manually forms trial assembly;
M: outseam is inlayed: manually being inlayed lines, glass, door leaf and is inlayed;
N: health: outseam inlays rear straight stacking and carries out health: health in the case of 10 DEG C≤operating environment temperature≤35 DEG C
Time 12 hours;Conditioned time 24 hours in the case of 10 DEG C of 0 DEG C≤operating environment temperature <;
O: mating inspection declaration: lining, set line, the mating inspection of door leaf;
P: be packaged: baling press requires to pack according to PS Package Specification;
Q: storage.
The invention has the beneficial effects that:
The processes such as the present invention is using compound, the multiple health of reasonable hot pressing, powder spray, and outseam is inlayed, realize processing
It is nontoxic after inside door powder spray out.
Specific embodiment
The present invention is a kind of nontoxic inside door powder coating methods, characterized by the following steps:
A: blanking: use sizing saw machine or hand saw blanking: keel use LVL;6A panel is using plain density board;Keel double open
Ventilating groove, when groove depth 7mm, size≤1000mm, open 3;5 are opened when size > 1000mm;
B: code keel: artificial code keel: in transom and centre keel stitching portion gluing 3052, glue-spread: 20g/ fan, horizontal dragon
Bone and centre keel junction gluing are simultaneously fixed with flat nail;
C: health: after code keel, horizontal piles up progress health in 8 hours;
D: fixed thickness sanding: thickness is confined to keel with contact calibrating machine, 38 ± 0.2mm of precision uses abrasive band 40#/80#;
E: punching: manual electric drill or machining center make a call to 3 carrying ventholes door leaf both ends are each, and each carrying venthole is straight
Diameter 12mm carries venthole and is located at keel and keel neutral gear;
F: hot pressing is compound: panel and keel pressed with automatic heating crimping, glue-type number: 3052, and glue-spread: 120g/ ㎡, pressure
It is strong: 0.7kg/cm2, temperature: 85 DEG C ± 5 DEG C, hot pressing time: 6-7min;The open hour of glue: should be at 25 DEG C of environment temperature >
Carry out Pressurized-heated in 1.5min, whens environment temperature≤25 DEG C should carry out Pressurized-heated in 3min, there is honeycomb paper filling;
G: pressure maintaining health: horizontal, which is piled up, after hot pressing carries out health: conditioned time 48 in the case of 20 DEG C of operating environment temperature >
Hour, conditioned time 24 hours in the case of operating environment temperature≤20 DEG C, when health, whole plate thickness cannot be less than 18mm, above
Whole plate adds pressure maintaining square pressure maintaining, and pressure maintaining square is no less than three and uniformly places;
H: door leaf production line: with numerical control door leaf four while saw carry out door leaf it is net while, scale, (two long side of door leaf facet is fallen for groove milling
R2 fillet inserts the formula hinge door leaf side fillet of falling R2), then mend poly-putty base;
I: powder spray powder spray: is carried out with powder spray line;
J: lockhole, hinge hole punching: are beaten to door leaf with digital control perforating machine;
K: powder spray powder spray: is carried out with powder spray line;
L: mating, trial assembly manually forms trial assembly (lining, set line, door leaf are mating);
M: outseam is inlayed: manually being inlayed lines, glass, door leaf and is inlayed;Lines bonding: the coating of glass cement strip, hot melt adhesive
Dotted fixed lines, glass door are fixed with rummy promise fastener fixing lines and glass cement, after glue coating before the deadline
Lines are mounted on door leaf, the open hour of summer hot melt adhesive are 80 seconds, and winter is 50 seconds, and summer forbids being applied with fan blow-through
The glass cement of cloth avoids glass cement surface solid, influences adhesive tension;
N: health: outseam inlays rear straight stacking and carries out health: health in the case of 10 DEG C≤operating environment temperature≤35 DEG C
Time 12 hours;Conditioned time 24 hours in the case of 10 DEG C of 0 DEG C≤operating environment temperature <;
O: mating inspection declaration: lining, set line, the mating inspection of door leaf;
P: be packaged: baling press requires to pack according to PS Package Specification;
Q: storage.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.To the upper of the disclosed embodiments
It states bright, enables those skilled in the art to implement or use the present invention.Various modifications to these embodiments are to ability
Will be apparent for the professional technician in domain, the general principles defined herein can not depart from it is of the invention
In the case where spirit or scope, realize in other embodiments.Therefore, the present invention be not intended to be limited to it is shown in this article these
Embodiment, and it is to fit to the widest scope consistent with the principles and novel features disclosed herein.
Claims (1)
1. a kind of nontoxic inside door powder coating methods, characterized by the following steps:
A: blanking: use sizing saw machine or hand saw blanking: keel use LVL;6A panel is using plain density board;Keel double open is ventilative
Slot;
B: code keel: artificial code keel: in transom and centre keel stitching portion gluing, transom and centre keel junction gluing are simultaneously
It is fixed with flat nail;
C: health: after code keel, horizontal piles up progress health in 8 hours;
D: thickness fixed thickness sanding: is confined to keel with contact calibrating machine;
E: punching: manual electric drill or machining center make a call to 3 carryings ventholes door leaf both ends are each, carry venthole be located at keel and
At keel neutral gear;
F: hot pressing is compound: being pressed panel and keel with automatic heating crimping, glue-spread: 120g/ ㎡, pressure: 0.7kg/cm2, temperature
Degree: 85 DEG C ± 5 DEG C, hot pressing time: 6-7min;The open hour of glue: should be added in 1.5min at 25 DEG C of environment temperature >
Pressure heating, whens environment temperature≤25 DEG C, should carry out Pressurized-heated in 3min;
G: pressure maintaining health: horizontal, which is piled up, after hot pressing carries out health: conditioned time 48 hours in the case of 20 DEG C of operating environment temperature >,
Conditioned time 24 hours in the case of operating environment temperature≤20 DEG C;
H: door leaf production line: with numerical control door leaf four while saw carry out door leaf it is net while, scale, groove milling, then mend poly-putty base;
I: powder spray powder spray: is carried out with powder spray line;
J: lockhole, hinge hole punching: are beaten to door leaf with digital control perforating machine;
K: powder spray powder spray: is carried out with powder spray line;
L: mating, trial assembly manually forms trial assembly;
M: outseam is inlayed: manually being inlayed lines, glass, door leaf and is inlayed;
N: health: outseam inlays rear straight stacking and carries out health: conditioned time in the case of 10 DEG C≤operating environment temperature≤35 DEG C
12 hours;Conditioned time 24 hours in the case of 10 DEG C of 0 DEG C≤operating environment temperature <;
O: mating inspection declaration: lining, set line, the mating inspection of door leaf;
P: be packaged: baling press requires to pack according to PS Package Specification;
Q: storage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710629156.XA CN107309615B (en) | 2017-07-28 | 2017-07-28 | A kind of nontoxic inside door powder coating methods |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710629156.XA CN107309615B (en) | 2017-07-28 | 2017-07-28 | A kind of nontoxic inside door powder coating methods |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107309615A CN107309615A (en) | 2017-11-03 |
CN107309615B true CN107309615B (en) | 2019-01-04 |
Family
ID=60169841
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710629156.XA Active CN107309615B (en) | 2017-07-28 | 2017-07-28 | A kind of nontoxic inside door powder coating methods |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107309615B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112295869A (en) * | 2020-10-23 | 2021-02-02 | 河北盛可居装饰材料有限公司 | Electrostatic powder spraying method for indoor door |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2703443A (en) * | 1950-02-28 | 1955-03-08 | Raymond Snedaker E | Composite door construction and method of making the same |
CN2383941Y (en) * | 1999-08-10 | 2000-06-21 | 杨兴洲 | Imitative oak wood composite artistic door |
CN101769117B (en) * | 2010-01-27 | 2012-08-29 | 余奕君 | Manufacturing method of wood composite door |
CN103128823B (en) * | 2013-03-05 | 2014-10-29 | 哈尔滨盛世华林科技有限公司 | Method for manufacturing environment-friendly high-strength anti-deformation solid wood composite door |
CN203114074U (en) * | 2013-03-28 | 2013-08-07 | 杭州盛大高科技机电有限公司 | Split-mounting type arc door |
CN204386389U (en) * | 2014-12-27 | 2015-06-10 | 山东艺格实业有限公司 | A kind of shape of peripheral frame with health hole |
CN104742210B (en) * | 2015-02-10 | 2016-04-27 | 江苏肯帝亚木业有限公司 | A kind of manufacture craft of solid wood composite door |
-
2017
- 2017-07-28 CN CN201710629156.XA patent/CN107309615B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107309615A (en) | 2017-11-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105690973B (en) | It is bonded with the batch fabrication method of Korea Spro's paper of roll-up state and the fabric of fabric | |
WO2002062163A3 (en) | Undergarments made from multi-layered fabric laminate material | |
CN106827106A (en) | Aqueous banksia rose plate of zero Form aldehyde release and preparation method thereof | |
CN107309615B (en) | A kind of nontoxic inside door powder coating methods | |
CN101781485B (en) | Production method of fiber grain liquid wallpaper | |
EP1260329A3 (en) | Method for forming a curved surface in a curved decorated board | |
CN107116657B (en) | Processing method of bamboo shoot sheath round tea tray | |
CN104876482A (en) | Green environment-friendly architectural decoration material | |
JP3411228B2 (en) | Bamboo blind blade manufacturing method | |
CN102556465A (en) | Right-angled edge process of package box | |
WO2005051637A3 (en) | Decorative laminate and decorative laminate panel, and a method for producing the two | |
KR100757409B1 (en) | Manufacturing method of synthetic leather had ventilation function and its synthetic leather | |
CN106738175B (en) | A kind of processing method of the artificial funny face slicing veneer of imitative Huanghua Pear | |
KR19990037834A (en) | Method for coloring and printing cubic plucking | |
WO2013187729A1 (en) | Method for manufacturing a massage pad | |
WO2008087744A1 (en) | Method for producing wooden board | |
CN104859354B (en) | Manufacturing method for woodwork artistic pyrography | |
CN104131673B (en) | A kind of wall paper of repeatable self-adhesion and preparation method thereof | |
JPH04221162A (en) | Incombustible natural wooden inner decoration member and manufacture thereof | |
CA2766186C (en) | Method for producing sheets from renewable raw materials in an endless process and a sheet of renewable raw materials | |
CN109070625B (en) | Surface forming material for decoration and article decorated with the same | |
CN107680770A (en) | Soft magnetic ferrite green compact Carving Machining technique | |
JP2011224903A (en) | Wood ribbon | |
KR20080064270A (en) | Method for producing a tile having mother-of-pearl on surface | |
KR20220045811A (en) | Method of manufacturing household goods and products manufactured therefrom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 065000 Fukang road 145, Longhe hi tech Industrial Zone, Anci District, Langfang, Hebei Applicant after: Intelligent Home Furnishing Dongyirisheng Technology Co. Ltd. Address before: 065000 Fukang road 145, Longhe hi tech Industrial Zone, Anci District, Langfang, Hebei Applicant before: Dongyirisheng Furniture Co. Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |