CN107304677A - The regional prevention and controls of the bump of coal seam group mining - Google Patents

The regional prevention and controls of the bump of coal seam group mining Download PDF

Info

Publication number
CN107304677A
CN107304677A CN201610251958.7A CN201610251958A CN107304677A CN 107304677 A CN107304677 A CN 107304677A CN 201610251958 A CN201610251958 A CN 201610251958A CN 107304677 A CN107304677 A CN 107304677A
Authority
CN
China
Prior art keywords
coal
coal seam
mining
stress
bump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610251958.7A
Other languages
Chinese (zh)
Inventor
潘俊锋
朱海洲
孙锦华
秦子晗
刘新
刘一新
孙刘伟
连鸿全
夏永学
孙光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Long Coal Hegang Mining Co Ltd
Tiandi Science and Technology Co Ltd
Original Assignee
Heilongjiang Long Coal Hegang Mining Co Ltd
Tiandi Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Long Coal Hegang Mining Co Ltd, Tiandi Science and Technology Co Ltd filed Critical Heilongjiang Long Coal Hegang Mining Co Ltd
Priority to CN201610251958.7A priority Critical patent/CN107304677A/en
Publication of CN107304677A publication Critical patent/CN107304677A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The present invention relates to a kind of large-scale prevention and controls in coal seam group bump region, the shock hazard of production zone can be reduced from source.Before the new exploiting field of mine carries out digging, the identification of coal rock layer Burst Tendency and detecting earth stress work are carried out, the conceptual design based on erosion control purpose is carried out according to measurement result combination condition of coal seam occurrence.Rational Protective Coal Seam is determined according to coal rock layer Burst Tendency result first, the determination of coal-mining method and section coal pillar size is carried out further according to coal seam conditions, afterwards according to the crustal stress distribution situation in exploiting field, determine the arrangement of working excavation, after face layout form is determined, rational mining sequence is selected, the large-scale Controlling of Coal Outburst purpose in exploiting field can be reached by the design of determination.The problem of local danger releasing measures of current bump fundamentally can not reduce shock hazard is this method solve, with workable, the features such as quantities is small, Controlling of Coal Outburst effect will be caused to become apparent.

Description

The regional prevention and controls of the bump of coal seam group mining
Technical field
The invention belongs to prevention and control of mine disaster technical field, in particular for New Built Mine or new exploiting field, one kind of new height application Bump regionality prevention and controls.
Background technology
Bump is coal and rock around mine working or stope, produced due to the abrupt release of elastic deformation energy with suddenly, Drastically, the dynamic phenomenon that fierce destruction is characterized.Current China bump mine quantity has been over 140, distribution In more than 20 provinces (city, autonomous region).In bump mine, with the increase of China's coal-mine mining rate and mining depth, So that bump problem is more and more severe.Therefore, strengthen Controlling of Coal Outburst technical research, be to ensure that China's economy is quickly sent out The exhibition vital task very urgent with social progress and people's life, property safety.
Preventing and treating currently for bump mainly uses pressure relief method, including unloading by blasting, large diameter borehole release, high pressure injection The measures such as water, top plate presplitting, the above method has played certain effect in terms of Controlling of Coal Outburst, but belongs to local small model The preventing and controlling enclosed, still can not fundamentally solve the problem of stress concentration occurred in mining process, and such methods engineering amount Huge, construction cost is high.Therefore, in the urgent need to one kind can on a large scale be set about from region, reduction stress of coal seam concentrates situation, Prevent and treat the regional means of prevention of bump.
The content of the invention
It is an object of the invention to provide a kind of prevention and controls of bump, realize to the big model in the regions such as mining areas of mine or working face The Controlling of Coal Outburst enclosed, effectively reduces the bump danger that colliery is likely to occur.
To achieve the above objectives, solution of the present invention is:
The regional prevention and controls of a kind of coal mine rock burst, it is characterised in that comprise the following steps:
A, in the range of mine minable coal seam carry out Burst Tendency identification, determine the Burst Tendency in each coal seam.
B, to mine carry out detecting earth stress.
C, wherein one layer of selection are preferentially exploited as Protective Coal Seam, and other coal seams as being exploited again after by Protective Coal Seam, waiting to liberate.
D, according to condition of coal seam occurrence, selection coal-mining method and coal winning technology;
E, according to geology and mining conditions, using the roadway protection processing that fender is set without coal column or stay;
F, base area stress distribution feature, select gateway layout method, determine that tunnel is moved towards;
G, according to arrangement of mining area situation, determine mining sequence, it is to avoid formed island working face.
The Burst Tendency of Coal Seam identification, refers to and passes through collection in worksite coal seam and roof and floor to the minable coal seam in the range of the field with "nine squares" of colliery Sample, according to GB/T 25217《Bump is determined, predicted and prevention and controls》First and second part carries out Burst Tendency survey It is fixed, the Burst Tendency of coal seam and roof and floor is obtained, is divided into without impact, weak impact and thump.
The detecting earth stress, using stress relief method, is adopted to determine the rock mass internal stress under native state by test Direction, the size of maximum principal stress, minimum principal stress and intermediate principal stress in the range of area.
The Protective Coal Seam should follow following principle in selection:In the coal seam in the range of field with "nine squares", prioritizing selection is answered without impact coal seam It is used as Protective Coal Seam;If there is Burst Tendency, the weaker coal seam of selection Burst Tendency is used as Protective Coal Seam;If all coal seam punchings Hit that tendentiousness is the same, then select the coal seam of topmost to be used as Protective Coal Seam.
The selection of the coal-mining method and coal winning technology, should combine ocurrence of coal seam situation, coal-mining method prioritizing selection longwall mining Method, secondly coal winning technology prioritizing selection mining is fully mechanized mining.
The arrangement principle of the gateway layout method, should be on the basis of the determination of exploiting field crustal stress distribution situation, it is ensured that main roadway Axis is parallel with maximum horizontal principal stress so that tunnel is influenceed minimum by horizontal stress.
The coal column, which is stayed, to be set characterized in that, using gob side entry retaining or staying for lower curtate exploitation working face and setting 3~5m fenders Mode, it is to avoid the stress concentration in coal column.
The mining sequence is characterized in that, exploiting field inner working face is exploited in sequence, it is to avoid jump, which is adopted, causes island working face to be opened Adopt.
As a result of such scheme, the invention has the characteristics that:(1) answering for production zone can be reduced on a large scale from region Power concentrates situation, and then reduces the degree of danger of bump.(2) invention can reduce the bump in recovery process Prevention and cure project amount, reduces the cost accounting of bump.(3) this method fundamentally can reduce or release bump to life The threat of production, is conducive to safety in production.In addition, this method establishes bump regional control principle from another point of view, have It is workable, the features such as prevention effect is good, with higher application and popularization value.
Brief description of the drawings
The flow chart of Fig. 1 the inventive method.
Embodiment:
The method of the invention is described further with reference to accompanying drawing:
As shown in figure 1, the present invention is a kind of coal mine rock burst extensive area prevention and controls, this method is primarily adapted for use in newly-built Mine or new exploiting field, the exploitation of new height, bump can be reduced in the progress mining Design stage using this method from source The danger of generation, reduces local release quantities.
Treat that the geologic information of production zone is analyzed to mine first, determine all minable coal seams in limit of mining.Then pin The coal seam and its roof and floor of each layer of coal are sampled, can be by the way of collection coal petrography block or core during sampling.By coal petrography Sample is transported to behind laboratory, according to GB/T 25217《Bump is determined, predicted and prevention and controls》First and second part is carried out Burst Tendency is determined, and then obtains the Burst Tendency of every layer of coal and roof and floor.According to the Burst Tendency measurement result of gained, Select Protective Coal Seam (coal seam preferentially exploited) and by Protective Coal Seam (coal seam for obtaining unloading pressure protection).Protective Coal Seam should be followed in selection Following principle:Prioritizing selection is used as Protective Coal Seam without impact coal seam;If there is Burst Tendency, selection Burst Tendency is weaker Coal seam is used as Protective Coal Seam;If all Burst Tendency of Coal Seam are the same, the coal seam of selection topmost is used as Protective Coal Seam.
Determine after Protective Coal Seam, according to the occurrence condition in coal seam, determine the recovery method and production practice in coal seam, in the method, Following principle is mainly followed for preventing and treating bump:Coal-mining method prioritizing selection longwall system, coal winning technology prioritizing selection fully mechanized mining Sub-Level Caving, is secondly fully mechanized mining.Determine after coal-mining method, with reference to the occurrence condition and coal winning technology in coal seam, determine working face Between staying for section coal pillar set, for the exploitation of Protective Coal Seam, should take and not stay coal column or only stay the mode that sets 3~5m fenders.
Detecting earth stress is carried out in the development work of production zone, and obtains the maximum principal stress of production zone, minimum principal stress Size and direction with intermediate principal stress.According to detecting earth stress result, roadway workface arrangement is determined, based on impact ground Press the arrangement principle of preventing and treating, it is ensured that main roadway axis is parallel with maximum horizontal principal stress so that shadow of the tunnel by horizontal stress Ring minimum.
Finally after face layout form determination, exploiting field inner working face is exploited in sequence, it is to avoid jump, which is adopted, causes isolated island work Make face exploitation.
The inventive method is the large-scale prevention and controls in bump region, can by using this method in the Mining block design stage Bump is reduced from source dangerous, in addition, this method have the advantages that it is efficient and convenient, workable.
The above-mentioned example description to the present invention is understood that for the ease of those skilled in the art and using this hair It is bright, after person skilled in the art obviously can modify to examples detailed above, and the General Principle of this explanation is applied to In other embodiment, without passing through performing creative labour.Therefore, the invention is not restricted to example here, people in the art Member is according to the announcement of the present invention, and the improvement made for the present invention and modification all should be within protection scope of the present invention.

Claims (8)

1. a kind of bump regional control method of coal seam group mining, it is characterised in that comprise the following steps:
A, in the range of exploiting field minable coal seam carry out Burst Tendency identification, determine the burst trend of each coal seam and roof and floor Property.
B, to mine carry out detecting earth stress.
C, wherein one layer of selection are preferentially exploited as Protective Coal Seam, and other coal seams as being exploited again after by Protective Coal Seam, waiting to liberate.
D, according to condition of coal seam occurrence, selection coal-mining method and coal winning technology;
E, according to geology and mining conditions, using the roadway protection processing that fender is set without coal column or stay;
F, base area stress distribution feature, select gateway layout method, determine that tunnel is moved towards;
G, according to arrangement of mining area situation, determine mining sequence, it is to avoid formed island working face.
2. coal rock layer Burst Tendency described in claim 1 is identified, refer to and scene is passed through to the minable coal seam in the range of the field with "nine squares" of colliery Coal seam and roof and floor sample are gathered, according to GB/T 25217《Bump is determined, predicted and prevention and controls》First and second part Burst Tendency measure is carried out, the Burst Tendency of coal seam and roof and floor is obtained, is divided into without impact, weak impact and thump.
3. detecting earth stress described in claim 1 is determines the rock mass internal stress under native state, using stress relief method, Maximum principal stress, the direction of minimum principal stress and intermediate principal stress, the size in the range of exploiting field are obtained by test.
4. Protective Coal Seam described in claim 1 determines that following principle should be followed:In the coal seam in the range of field with "nine squares", prioritizing selection is answered Protective Coal Seam is used as without impact coal seam;If there is Burst Tendency, the weaker coal seam of selection Burst Tendency is used as Protective Coal Seam;If All Burst Tendency of Coal Seam are the same, then select the coal seam of topmost to be used as Protective Coal Seam.
5. the selection of coal-mining method described in claim 1 and coal winning technology, should combine ocurrence of coal seam situation, coal-mining method is excellent Longwall system is first selected, secondly coal winning technology prioritizing selection mining is fully mechanized mining.
6. the arrangement principle of gateway layout method described in claim 1, should on the basis of the determination of exploiting field crustal stress distribution situation, Ensure that main roadway axis is parallel with maximum horizontal principal stress so that tunnel is influenceed minimum by horizontal stress.
Set 7. coal column described in claim 1 is stayed characterized in that, using gob side entry retaining for lower curtate exploitation working face or staying If the mode of 3~5m fenders, it is to avoid the stress concentration in coal column.
8. mining sequence described in claim 1 is characterized in that, exploiting field inner working face is exploited in sequence, it is to avoid jump, which is adopted, draws Play island working face exploitation.
CN201610251958.7A 2016-04-22 2016-04-22 The regional prevention and controls of the bump of coal seam group mining Pending CN107304677A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610251958.7A CN107304677A (en) 2016-04-22 2016-04-22 The regional prevention and controls of the bump of coal seam group mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610251958.7A CN107304677A (en) 2016-04-22 2016-04-22 The regional prevention and controls of the bump of coal seam group mining

Publications (1)

Publication Number Publication Date
CN107304677A true CN107304677A (en) 2017-10-31

Family

ID=60152378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610251958.7A Pending CN107304677A (en) 2016-04-22 2016-04-22 The regional prevention and controls of the bump of coal seam group mining

Country Status (1)

Country Link
CN (1) CN107304677A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111553614A (en) * 2020-05-12 2020-08-18 华北科技学院 Anti-impact safe mining demonstration method for island working face
CN113482718A (en) * 2021-08-10 2021-10-08 中煤科工开采研究院有限公司 Method for preventing rock burst through pressure relief arrangement of roadway group of coal seam panel

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101162177A (en) * 2007-11-14 2008-04-16 南京银茂铅锌矿业有限公司 Method for measuring ground stress
CN103939099A (en) * 2014-04-11 2014-07-23 中国矿业大学 Method for controlling strong shock risk coal seam group rock burst
CN104564072A (en) * 2015-01-14 2015-04-29 中国矿业大学 Complete non-coal-pillar continuous depressurized mining method for close-distance coal seam groups

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101162177A (en) * 2007-11-14 2008-04-16 南京银茂铅锌矿业有限公司 Method for measuring ground stress
CN103939099A (en) * 2014-04-11 2014-07-23 中国矿业大学 Method for controlling strong shock risk coal seam group rock burst
CN104564072A (en) * 2015-01-14 2015-04-29 中国矿业大学 Complete non-coal-pillar continuous depressurized mining method for close-distance coal seam groups

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
余峰: "《平顶山矿区煤岩冲击试验及冲击地压预测研究》", 《中国优秀硕士学位论文全文数据库》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111553614A (en) * 2020-05-12 2020-08-18 华北科技学院 Anti-impact safe mining demonstration method for island working face
CN111553614B (en) * 2020-05-12 2022-04-05 华北科技学院 Anti-impact safe mining demonstration method for island working face
CN113482718A (en) * 2021-08-10 2021-10-08 中煤科工开采研究院有限公司 Method for preventing rock burst through pressure relief arrangement of roadway group of coal seam panel
CN113482718B (en) * 2021-08-10 2024-05-31 中煤科工开采研究院有限公司 Method for preventing rock burst through pressure relief arrangement of coal seam disc zone roadway group

Similar Documents

Publication Publication Date Title
Yuan Control of coal and gas outbursts in Huainan mines in China: A review
Gui et al. Types of water hazards in China coalmines and regional characteristics
Wang et al. Safety technologies for the excavation of coal and gas outburst-prone coal seams in deep shafts
Jin et al. Evaluation of the remote lower protective seam mining for coal mine gas control: a typical case study from the Zhuxianzhuang Coal Mine, Huaibei Coalfield, China
CN104594899A (en) Method for determining reasonable width of gob-side entrydriving narrow coal pillar
CN104314610A (en) Coal road stripe region burst-preventing method
CN107816365B (en) Coal seam drilling, blasting and pumping integrated outburst prevention method
CN108397227A (en) A kind of progressive extinction roadway layout method of tendency
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
WO2016041389A1 (en) Method for evaluating filling quality at working face of solid-filling coal mining
CN104632219A (en) Large mining height gob-side entry retaining method for thick coal seams
CN105673014A (en) Method for controlling rock burst of hard roof jump mining working face
Ding et al. Strata behavior investigation for high-intensity mining in the water-rich coal seam
Yuan Theories and techniques of coal bed methane control in China
CN108266189A (en) A kind of lane top Tunnelling Along Goaf goaf isolation method
Li et al. Floor water inrush risk evaluation for mining above confined aquifer in no. 5 coal seam of Taiyuan Group at Dongjiahe coal mine
Li Mining thin sub-layer as self-protective coal seam to reduce the danger of coal and gas outburst
CN110173295A (en) A method of utilizing concordant directional drilling mash gas extraction and fire extinguishing
CN109488329A (en) A kind of broken water drenching country rock administering method of Deep Soft Rock Tunnel large deformation
Li et al. The integrated drainage technique of directional high-level borehole of super large diameter on roof replacing roof extraction roadway: A case study of the underground Zhaozhuang Coal Mine
CN103147759B (en) Prospecting and short-hole shrinkage mining method of small inclined ore body
CN115749855A (en) Method for recovering fault coal pillar resources based on advanced pre-grouting
Li et al. Trial of small gateroad pillar in top coal caving longwall mining of large mining height
CN107304677A (en) The regional prevention and controls of the bump of coal seam group mining
Hongwei et al. Numerical investigation on the assessment and mitigation of coal bump in an island longwall panel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171031

WD01 Invention patent application deemed withdrawn after publication