CN107304629A - It is a kind of for guider of equipment once grouting and preparation method thereof - Google Patents
It is a kind of for guider of equipment once grouting and preparation method thereof Download PDFInfo
- Publication number
- CN107304629A CN107304629A CN201610253071.1A CN201610253071A CN107304629A CN 107304629 A CN107304629 A CN 107304629A CN 201610253071 A CN201610253071 A CN 201610253071A CN 107304629 A CN107304629 A CN 107304629A
- Authority
- CN
- China
- Prior art keywords
- pipe
- guide pipe
- funnel
- guider
- grouting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000002360 preparation method Methods 0.000 title claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 16
- 239000010959 steel Substances 0.000 claims abstract description 16
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 6
- 229910052742 iron Inorganic materials 0.000 claims abstract description 3
- 238000003466 welding Methods 0.000 claims description 6
- 239000002699 waste material Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 abstract description 8
- 238000010276 construction Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 7
- 238000009434 installation Methods 0.000 description 4
- 239000008267 milk Substances 0.000 description 4
- 210000004080 milk Anatomy 0.000 description 4
- 235000013336 milk Nutrition 0.000 description 4
- 238000003723 Smelting Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
A kind of guider for equipment once grouting, including guide pipe, funnel and support frame, it is characterised in that:The guide pipe is diameter >=60mm steel pipe, 90 degree are bent at from wherein one end port 0.5m, the funnel is the funnel that plastic funnel or iron sheet make, support frame as described above includes sleeve pipe and support bar, casing wall welds two Ф 12mm arranged in splayed, long 5m Rod Bracings bar, wherein:Sleeve pipe is inserted in guide pipe, and is clamped with tie down screw and guide pipe, and support bar supports the stability of funnel and guide pipe.The present invention's has the guider of grouting simple in construction, easy to make for guider of equipment once grouting and preparation method thereof, and filling speed is quick, grouting positive stop, and grouting quality is good, saves the advantage of grouting material and reduction engineering cost.
Description
Technical field
It is a kind of for guider of equipment once grouting and preparation method thereof specifically the present invention relates to a kind of guider.
Background technology
During equipment design and installation, because reserved sleeve is quick for installation, precision is not high, and precision of equipment installation can be finally reached again, is increasingly welcome by the mankind.But, after equipment coarse adjustment installation terminates, next operational procedure is that reserved sleeve is in the milk, i.e. once grouting.Once grouting is often stopped by plant bottom case, is generally tiltedly put as grouting guider using channel-section steel, and due to channel-section steel self structure reason, filling speed is slower, and easily wastes grouting material.
Therefore known grouting guider there are problems that above-mentioned a variety of inconvenience and.
The content of the invention
The purpose of the present invention, is the guider for equipment once grouting for proposing that a kind of filling speed is quick, be in the milk in place.
It is another object of the present invention to propose that a kind of filling speed is quick, the preparation method of the guider for equipment once grouting for the positive stop that is in the milk.
To achieve the above object, technical solution of the invention is:
A kind of guider for equipment once grouting, including guide pipe, funnel and support frame, it is characterised in that:
The guide pipe is diameter >=60mm steel pipe, 90 degree is bent at from wherein one end port 0.5m, so that the rectangular bend pipe of guide pipe;
The funnel is the funnel that plastic funnel or iron sheet make, and spout of funnel can be inserted in guide pipe;
Support frame as described above includes sleeve pipe and support bar, sleeve pipe Ф 75.5x3.75mm, long 0.1m, the same section of sleeve pipe circumference divides three equal parts position, respectively take hole Ф 20mm in casing wall, three holes respectively and nut-welding, M12 tie down screw of the nut provided with matching, casing wall welds two Ф 12mm arranged in splayed, long 5m Rod Bracings bar;
Wherein:Sleeve pipe is inserted in guide pipe, and is clamped with tie down screw and guide pipe, and support bar supports the stability of funnel and guide pipe.
The guider for equipment once grouting of the present invention can also be further achieved by the following technical measures.
The guider of equipment once grouting is previously described for, the wherein support bar of support frame as described above and the bend pipe of right-angle elbow pipe is set in the opposite direction.
The guider of equipment once grouting is previously described for, wherein the guide pipe is Ф 60x3.5mm, long 0.8m steel pipe.
The preparation method of a kind of guider for equipment once grouting, it is characterised in that comprise the following steps:
A, guide pipe make, and take Ф 60x3.5mm, length 0.8m steel pipes, therefrom at the 0.5m of one end centered on bend to 90 degree;
B, funnel make:The oily wasted oil bucket one of eating at home is taken, bottom plate is cut away using knife or scissors plastic funnel is made;
C, pipeline Ф 75.5x3.75mm, length 0.1m are taken as sleeve pipe, same section goes out the part of decile three and takes hole Ф 20mm in the middle of sleeve pipe, takes three sets of bolt M12, nut connects with eyelet welding respectively;12 length 10m of round steel Ф two are taken, are welded with pipeline gradient as support bar.
The preparation method of the guider for equipment once grouting of the present invention can also be further achieved by the following technical measures.
The support bar of foregoing method, wherein support frame as described above and the bend pipe of right-angle elbow pipe are set in the opposite direction.
Foregoing method, wherein the guide pipe internal diameter size is more than waste oil bung outside dimension, support frame casing inner diameter size is more than guide pipe outside dimension.
After adopting the above technical scheme, the present invention's has advantages below for guider of equipment once grouting and preparation method thereof:
1st, the guider of grouting is simple in construction, easy to make;
2nd, filling speed is quick, be in the milk positive stop, and grouting quality is good;
3rd, grouting material is saved, engineering cost is reduced.
Brief description of the drawings
Fig. 1 is the guider structural representation of the embodiment of the present invention;
Fig. 2 is A-A sectional views in Fig. 1.
In figure:1 support bar, 2 tie down screws, 3 funnels, 4 sleeve pipes, 5 guide pipes.
Embodiment
With reference to embodiments and its accompanying drawing to the present invention illustrate further.
Embodiment 1
The guider for equipment once grouting of the present invention, including guide pipe, funnel and support frame.
Referring now to Fig. 1 and Fig. 2, Fig. 1 is the guider structural representation of the embodiment of the present invention, and Fig. 2 is A-A sectional views in Fig. 1.As illustrated, the guide pipe 5 is 5 Ф 60x3.5mm, long 0.8m steel pipe bends to 90 degree at from wherein one end port 0.5m, so that the rectangular bend pipe of guide pipe;
The funnel 3 is the funnel of plastic funnel 3, and spout of funnel can be inserted in guide pipe;
Support frame as described above includes sleeve pipe 4 and support bar 1, sleeve pipe is Ф 75.5x3.75mm, long 0.1m, the same section of sleeve pipe circumference divides three equal parts position, respectively take hole Ф 20mm in casing wall, three holes respectively and nut-welding, M12 tie down screw 2 of the nut provided with matching, casing wall welds two Ф 12mm arranged in splayed, long 5m Rod Bracings bar;
Wherein:Sleeve pipe is inserted in guide pipe, and is clamped with tie down screw and guide pipe, and support bar supports the stability of funnel and guide pipe.The support bar of support frame as described above and the bend pipe of right-angle elbow pipe are set in the opposite direction.
Embodiment 2
A kind of preparation method of guider for equipment once grouting, comprises the following steps:
A, guide pipe make:Take Ф 60x3.5mm, length 0.8m steel pipes, therefrom at the 0.5m of one end centered on bend to 90 degree;
B, funnel make:The oily wasted oil bucket one of eating at home is taken, bottom plate is cut away using knife or scissors plastic funnel is made;
C, state support frame making:Pipeline Ф 75.5x3.75mm, length 0.1m are taken as sleeve pipe, same section goes out the part of decile three and takes hole Ф 20mm in the middle of sleeve pipe, takes three sets of bolt M12, nut connects with eyelet welding respectively;12 length 10m of round steel Ф two are taken, are welded with pipeline gradient as support bar.The support bar of support frame as described above and the bend pipe of right-angle elbow pipe are set in the opposite direction.The guide pipe internal diameter size is more than waste oil bung outside dimension, and support frame casing inner diameter size is more than guide pipe outside dimension.
The guider application method for equipment once grouting of the present invention is as follows:
First, it is oriented to infratubal port directly to align with the reserved sleeve-port of bolt, guide pipe is vertically put.Secondly, support frame sleeve pipe is inserted in from guide pipe upper end, two support frame support bar low sides and ground good contact, if ground is uneven can also to stopper the gap on support bar and ground using other objects.Again, using support frame bolt screw rod, make sleeve pipe closely coupled with guide pipe using jackscrew principle.Finally, oil drum mouthful insertion guide pipe upper port a, people pours into grouting material in oil drum, and grouting material is flowed in reserved sleeve by guide pipe, that is, has smoothly completed once grouting.
The guide pipe and support frame material, size of the guider for equipment once grouting of the present invention can be selected according to live real material, it is desirable to which guide pipe internal diameter size is more than oil drum mouthful outside dimension, and support frame casing inner diameter size is more than guide pipe outside dimension.Support frame can not be also made according to actual conditions, conduit and funnel is directly used.
The present invention has substantive distinguishing features and significant technological progress, and the guider for equipment once grouting of the invention is simple in construction, easy to make, and constructing, simple to operation, with low cost, movement is flexible, greatly improve once grouting efficiency.
In in June, 2015, the new smelting steel special steel in Hubei in rod engineering, first thick school of horizontal mill base is finished, and next process is equipment once grouting, but due to the obstruction of rolling mill base, once grouting can not be carried out directly.The guider for equipment once grouting using the present invention is not only smoothed out grouting procedure, more makes filling speed very fast, obtains accelerating construction progress, and the effect for saving grouting material is notable.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes should also belong to scope of the invention, should be limited by each claim.
Claims (6)
1. a kind of guider for equipment once grouting, including guide pipe, funnel and support frame, it is characterised in that:
The guide pipe is diameter >=60mm steel pipe, 90 degree is bent at from wherein one end port 0.5m, so that the rectangular bend pipe of guide pipe;
The funnel is the funnel that plastic funnel or iron sheet make, and spout of funnel can be inserted in guide pipe;
Support frame as described above includes sleeve pipe and support bar, sleeve pipe Ф 75.5x3.75mm, long 0.1m, the same section of sleeve pipe circumference divides three equal parts position, respectively take hole Ф 20mm in casing wall, three holes respectively and nut-welding, M12 tie down screw of the nut provided with matching, casing wall welds two Ф 12mm arranged in splayed, long 5m Rod Bracings bar;
Wherein:Sleeve pipe is inserted in guide pipe, and is clamped with tie down screw and guide pipe, and support bar supports the stability of funnel and guide pipe.
2. it is used for the guider of equipment once grouting as claimed in claim 1, it is characterised in that the support bar of support frame as described above and the bend pipe of right-angle elbow pipe are set in the opposite direction.
3. it is used for the guider of equipment once grouting as claimed in claim 1, it is characterised in that the guide pipe is Ф 60x3.5mm, long 0.8m steel pipe.
4. a kind of preparation method of the guider as claimed in claim 1 for equipment once grouting, it is characterised in that comprise the following steps:
A, guide pipe make, and take Ф 60x3.5mm, length 0.8m steel pipes, therefrom at the 0.5m of one end centered on bend to 90 degree;
B, funnel make:The oily wasted oil bucket one of eating at home is taken, bottom plate is cut away using knife or scissors plastic funnel is made;
C, pipeline Ф 75.5x3.75mm, length 0.1m are taken as sleeve pipe, same section goes out the part of decile three and takes hole Ф 20mm in the middle of sleeve pipe, takes three sets of bolt M12, nut connects with eyelet welding respectively;12 length 10m of round steel Ф two are taken, are welded with pipeline gradient as support bar.
5. it is used for the preparation method of the guider of equipment once grouting as claimed in claim 4, it is characterised in that the support bar of support frame as described above and the bend pipe of right-angle elbow pipe are set in the opposite direction.
6. being used for the preparation method of the guider of equipment once grouting as claimed in claim 4, it is characterised in that the guide pipe internal diameter size is more than waste oil bung outside dimension, support frame casing inner diameter size is more than guide pipe outside dimension.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610253071.1A CN107304629A (en) | 2016-04-22 | 2016-04-22 | It is a kind of for guider of equipment once grouting and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610253071.1A CN107304629A (en) | 2016-04-22 | 2016-04-22 | It is a kind of for guider of equipment once grouting and preparation method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107304629A true CN107304629A (en) | 2017-10-31 |
Family
ID=60151730
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610253071.1A Pending CN107304629A (en) | 2016-04-22 | 2016-04-22 | It is a kind of for guider of equipment once grouting and preparation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107304629A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593692A (en) * | 2019-08-28 | 2019-12-20 | 五冶集团上海有限公司 | Construction elevator floor protection door connecting piece |
CN112144531A (en) * | 2020-09-10 | 2020-12-29 | 芜湖质达设计有限公司 | Bridge pile foundation construction is with pouring equipment based on drift sand geology |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2637834A1 (en) * | 1988-10-13 | 1990-04-20 | Gilles Auguste | Device for transferring concrete from a bucket into a pipe secured to the bucket |
CN202691413U (en) * | 2012-07-18 | 2013-01-23 | 中国十七冶集团有限公司 | Buffer device of 90-degree elbow pipe of concrete delivery pipe |
CN202706037U (en) * | 2012-07-19 | 2013-01-30 | 山东电力建设第二工程公司 | Cement cushion block grouting device |
CN103485523A (en) * | 2013-09-30 | 2014-01-01 | 中国一冶集团有限公司 | Toppling-preventing internal scaffold for constructing coke oven |
CN205604732U (en) * | 2016-04-22 | 2016-09-28 | 五冶集团上海有限公司 | A guider for equipment once is in milk |
-
2016
- 2016-04-22 CN CN201610253071.1A patent/CN107304629A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2637834A1 (en) * | 1988-10-13 | 1990-04-20 | Gilles Auguste | Device for transferring concrete from a bucket into a pipe secured to the bucket |
CN202691413U (en) * | 2012-07-18 | 2013-01-23 | 中国十七冶集团有限公司 | Buffer device of 90-degree elbow pipe of concrete delivery pipe |
CN202706037U (en) * | 2012-07-19 | 2013-01-30 | 山东电力建设第二工程公司 | Cement cushion block grouting device |
CN103485523A (en) * | 2013-09-30 | 2014-01-01 | 中国一冶集团有限公司 | Toppling-preventing internal scaffold for constructing coke oven |
CN205604732U (en) * | 2016-04-22 | 2016-09-28 | 五冶集团上海有限公司 | A guider for equipment once is in milk |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593692A (en) * | 2019-08-28 | 2019-12-20 | 五冶集团上海有限公司 | Construction elevator floor protection door connecting piece |
CN112144531A (en) * | 2020-09-10 | 2020-12-29 | 芜湖质达设计有限公司 | Bridge pile foundation construction is with pouring equipment based on drift sand geology |
CN112144531B (en) * | 2020-09-10 | 2021-12-31 | 黄民 | Bridge pile foundation construction is with pouring equipment based on drift sand geology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205604732U (en) | A guider for equipment once is in milk | |
CN103350165A (en) | Processing device and method capable of manufacturing reinforcement cages with different diameters | |
CN107304629A (en) | It is a kind of for guider of equipment once grouting and preparation method thereof | |
CN106944495B (en) | A kind of oversize two phase stainless steel threeway integral forming method | |
CN202672773U (en) | Adjustable steel pipe support | |
CN206538773U (en) | A kind of fast arranging device of grating type side slope rainwater | |
CN207987925U (en) | A kind of bored concrete pile intercommunication grouting device | |
CN203426340U (en) | Machining device capable of manufacturing reinforcement cages with different diameters | |
CN102900075B (en) | A kind of helix concrete tubular pile device and preparation method thereof | |
CN104790671A (en) | Auxiliary hopper for well chamber wall concreting | |
CN204609313U (en) | The auxiliaring bucket of a kind of well room body of wall concreting | |
CN209077621U (en) | A kind of refrigeration pipeline part flaring die | |
CN209585120U (en) | A kind of prefabricated assembled lined with PVC sheets armored concrete anti-corrosion inspection shaft | |
CN203730920U (en) | Sill anchor used in tunnel and used for fixing petroleum and natural gas pipelines | |
CN217896505U (en) | Cross water concrete face flatness control device | |
CN214329191U (en) | Concrete guiding device for pouring rain and sewage vertical shaft | |
CN206242492U (en) | A kind of plastic pipe necking rounding device | |
CN212480374U (en) | Water stop pipe joint | |
CN209760410U (en) | Steel pipe sump pit device of adjustable elevation | |
CN207415612U (en) | A kind of casting device | |
CN213105385U (en) | Welding seam adjusting device for producing large-diameter steel pipe | |
CN209943695U (en) | Multi-pipe integrated waterproof steel sleeve | |
CN208650103U (en) | A kind of cylindrical concrete borehole wall pours device | |
CN210833217U (en) | Cooling tower balance pipe device | |
CN204122538U (en) | A kind of bearing bending machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171031 |
|
RJ01 | Rejection of invention patent application after publication |