CN107304629A - It is a kind of for guider of equipment once grouting and preparation method thereof - Google Patents

It is a kind of for guider of equipment once grouting and preparation method thereof Download PDF

Info

Publication number
CN107304629A
CN107304629A CN201610253071.1A CN201610253071A CN107304629A CN 107304629 A CN107304629 A CN 107304629A CN 201610253071 A CN201610253071 A CN 201610253071A CN 107304629 A CN107304629 A CN 107304629A
Authority
CN
China
Prior art keywords
pipe
guide pipe
funnel
guider
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610253071.1A
Other languages
Chinese (zh)
Inventor
王海龙
兰静
袁淑玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201610253071.1A priority Critical patent/CN107304629A/en
Publication of CN107304629A publication Critical patent/CN107304629A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of guider for equipment once grouting, including guide pipe, funnel and support frame, it is characterised in that:The guide pipe is diameter >=60mm steel pipe, 90 degree are bent at from wherein one end port 0.5m, the funnel is the funnel that plastic funnel or iron sheet make, support frame as described above includes sleeve pipe and support bar, casing wall welds two Ф 12mm arranged in splayed, long 5m Rod Bracings bar, wherein:Sleeve pipe is inserted in guide pipe, and is clamped with tie down screw and guide pipe, and support bar supports the stability of funnel and guide pipe.The present invention's has the guider of grouting simple in construction, easy to make for guider of equipment once grouting and preparation method thereof, and filling speed is quick, grouting positive stop, and grouting quality is good, saves the advantage of grouting material and reduction engineering cost.

Description

It is a kind of for guider of equipment once grouting and preparation method thereof
Technical field
It is a kind of for guider of equipment once grouting and preparation method thereof specifically the present invention relates to a kind of guider.
Background technology
During equipment design and installation, because reserved sleeve is quick for installation, precision is not high, and precision of equipment installation can be finally reached again, is increasingly welcome by the mankind.But, after equipment coarse adjustment installation terminates, next operational procedure is that reserved sleeve is in the milk, i.e. once grouting.Once grouting is often stopped by plant bottom case, is generally tiltedly put as grouting guider using channel-section steel, and due to channel-section steel self structure reason, filling speed is slower, and easily wastes grouting material.
Therefore known grouting guider there are problems that above-mentioned a variety of inconvenience and.
The content of the invention
The purpose of the present invention, is the guider for equipment once grouting for proposing that a kind of filling speed is quick, be in the milk in place.
It is another object of the present invention to propose that a kind of filling speed is quick, the preparation method of the guider for equipment once grouting for the positive stop that is in the milk.
To achieve the above object, technical solution of the invention is:
A kind of guider for equipment once grouting, including guide pipe, funnel and support frame, it is characterised in that:
The guide pipe is diameter >=60mm steel pipe, 90 degree is bent at from wherein one end port 0.5m, so that the rectangular bend pipe of guide pipe;
The funnel is the funnel that plastic funnel or iron sheet make, and spout of funnel can be inserted in guide pipe;
Support frame as described above includes sleeve pipe and support bar, sleeve pipe Ф 75.5x3.75mm, long 0.1m, the same section of sleeve pipe circumference divides three equal parts position, respectively take hole Ф 20mm in casing wall, three holes respectively and nut-welding, M12 tie down screw of the nut provided with matching, casing wall welds two Ф 12mm arranged in splayed, long 5m Rod Bracings bar;
Wherein:Sleeve pipe is inserted in guide pipe, and is clamped with tie down screw and guide pipe, and support bar supports the stability of funnel and guide pipe.
The guider for equipment once grouting of the present invention can also be further achieved by the following technical measures.
The guider of equipment once grouting is previously described for, the wherein support bar of support frame as described above and the bend pipe of right-angle elbow pipe is set in the opposite direction.
The guider of equipment once grouting is previously described for, wherein the guide pipe is Ф 60x3.5mm, long 0.8m steel pipe.
The preparation method of a kind of guider for equipment once grouting, it is characterised in that comprise the following steps:
A, guide pipe make, and take Ф 60x3.5mm, length 0.8m steel pipes, therefrom at the 0.5m of one end centered on bend to 90 degree;
B, funnel make:The oily wasted oil bucket one of eating at home is taken, bottom plate is cut away using knife or scissors plastic funnel is made;
C, pipeline Ф 75.5x3.75mm, length 0.1m are taken as sleeve pipe, same section goes out the part of decile three and takes hole Ф 20mm in the middle of sleeve pipe, takes three sets of bolt M12, nut connects with eyelet welding respectively;12 length 10m of round steel Ф two are taken, are welded with pipeline gradient as support bar.
The preparation method of the guider for equipment once grouting of the present invention can also be further achieved by the following technical measures.
The support bar of foregoing method, wherein support frame as described above and the bend pipe of right-angle elbow pipe are set in the opposite direction.
Foregoing method, wherein the guide pipe internal diameter size is more than waste oil bung outside dimension, support frame casing inner diameter size is more than guide pipe outside dimension.
After adopting the above technical scheme, the present invention's has advantages below for guider of equipment once grouting and preparation method thereof:
1st, the guider of grouting is simple in construction, easy to make;
2nd, filling speed is quick, be in the milk positive stop, and grouting quality is good;
3rd, grouting material is saved, engineering cost is reduced.
Brief description of the drawings
Fig. 1 is the guider structural representation of the embodiment of the present invention;
Fig. 2 is A-A sectional views in Fig. 1.
In figure:1 support bar, 2 tie down screws, 3 funnels, 4 sleeve pipes, 5 guide pipes.
Embodiment
With reference to embodiments and its accompanying drawing to the present invention illustrate further.
Embodiment 1
The guider for equipment once grouting of the present invention, including guide pipe, funnel and support frame.
Referring now to Fig. 1 and Fig. 2, Fig. 1 is the guider structural representation of the embodiment of the present invention, and Fig. 2 is A-A sectional views in Fig. 1.As illustrated, the guide pipe 5 is 5 Ф 60x3.5mm, long 0.8m steel pipe bends to 90 degree at from wherein one end port 0.5m, so that the rectangular bend pipe of guide pipe;
The funnel 3 is the funnel of plastic funnel 3, and spout of funnel can be inserted in guide pipe;
Support frame as described above includes sleeve pipe 4 and support bar 1, sleeve pipe is Ф 75.5x3.75mm, long 0.1m, the same section of sleeve pipe circumference divides three equal parts position, respectively take hole Ф 20mm in casing wall, three holes respectively and nut-welding, M12 tie down screw 2 of the nut provided with matching, casing wall welds two Ф 12mm arranged in splayed, long 5m Rod Bracings bar;
Wherein:Sleeve pipe is inserted in guide pipe, and is clamped with tie down screw and guide pipe, and support bar supports the stability of funnel and guide pipe.The support bar of support frame as described above and the bend pipe of right-angle elbow pipe are set in the opposite direction.
Embodiment 2
A kind of preparation method of guider for equipment once grouting, comprises the following steps:
A, guide pipe make:Take Ф 60x3.5mm, length 0.8m steel pipes, therefrom at the 0.5m of one end centered on bend to 90 degree;
B, funnel make:The oily wasted oil bucket one of eating at home is taken, bottom plate is cut away using knife or scissors plastic funnel is made;
C, state support frame making:Pipeline Ф 75.5x3.75mm, length 0.1m are taken as sleeve pipe, same section goes out the part of decile three and takes hole Ф 20mm in the middle of sleeve pipe, takes three sets of bolt M12, nut connects with eyelet welding respectively;12 length 10m of round steel Ф two are taken, are welded with pipeline gradient as support bar.The support bar of support frame as described above and the bend pipe of right-angle elbow pipe are set in the opposite direction.The guide pipe internal diameter size is more than waste oil bung outside dimension, and support frame casing inner diameter size is more than guide pipe outside dimension.
The guider application method for equipment once grouting of the present invention is as follows:
First, it is oriented to infratubal port directly to align with the reserved sleeve-port of bolt, guide pipe is vertically put.Secondly, support frame sleeve pipe is inserted in from guide pipe upper end, two support frame support bar low sides and ground good contact, if ground is uneven can also to stopper the gap on support bar and ground using other objects.Again, using support frame bolt screw rod, make sleeve pipe closely coupled with guide pipe using jackscrew principle.Finally, oil drum mouthful insertion guide pipe upper port a, people pours into grouting material in oil drum, and grouting material is flowed in reserved sleeve by guide pipe, that is, has smoothly completed once grouting.
The guide pipe and support frame material, size of the guider for equipment once grouting of the present invention can be selected according to live real material, it is desirable to which guide pipe internal diameter size is more than oil drum mouthful outside dimension, and support frame casing inner diameter size is more than guide pipe outside dimension.Support frame can not be also made according to actual conditions, conduit and funnel is directly used.
The present invention has substantive distinguishing features and significant technological progress, and the guider for equipment once grouting of the invention is simple in construction, easy to make, and constructing, simple to operation, with low cost, movement is flexible, greatly improve once grouting efficiency.
In in June, 2015, the new smelting steel special steel in Hubei in rod engineering, first thick school of horizontal mill base is finished, and next process is equipment once grouting, but due to the obstruction of rolling mill base, once grouting can not be carried out directly.The guider for equipment once grouting using the present invention is not only smoothed out grouting procedure, more makes filling speed very fast, obtains accelerating construction progress, and the effect for saving grouting material is notable.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes should also belong to scope of the invention, should be limited by each claim.

Claims (6)

1. a kind of guider for equipment once grouting, including guide pipe, funnel and support frame, it is characterised in that:
The guide pipe is diameter >=60mm steel pipe, 90 degree is bent at from wherein one end port 0.5m, so that the rectangular bend pipe of guide pipe;
The funnel is the funnel that plastic funnel or iron sheet make, and spout of funnel can be inserted in guide pipe;
Support frame as described above includes sleeve pipe and support bar, sleeve pipe Ф 75.5x3.75mm, long 0.1m, the same section of sleeve pipe circumference divides three equal parts position, respectively take hole Ф 20mm in casing wall, three holes respectively and nut-welding, M12 tie down screw of the nut provided with matching, casing wall welds two Ф 12mm arranged in splayed, long 5m Rod Bracings bar;
Wherein:Sleeve pipe is inserted in guide pipe, and is clamped with tie down screw and guide pipe, and support bar supports the stability of funnel and guide pipe.
2. it is used for the guider of equipment once grouting as claimed in claim 1, it is characterised in that the support bar of support frame as described above and the bend pipe of right-angle elbow pipe are set in the opposite direction.
3. it is used for the guider of equipment once grouting as claimed in claim 1, it is characterised in that the guide pipe is Ф 60x3.5mm, long 0.8m steel pipe.
4. a kind of preparation method of the guider as claimed in claim 1 for equipment once grouting, it is characterised in that comprise the following steps:
A, guide pipe make, and take Ф 60x3.5mm, length 0.8m steel pipes, therefrom at the 0.5m of one end centered on bend to 90 degree;
B, funnel make:The oily wasted oil bucket one of eating at home is taken, bottom plate is cut away using knife or scissors plastic funnel is made;
C, pipeline Ф 75.5x3.75mm, length 0.1m are taken as sleeve pipe, same section goes out the part of decile three and takes hole Ф 20mm in the middle of sleeve pipe, takes three sets of bolt M12, nut connects with eyelet welding respectively;12 length 10m of round steel Ф two are taken, are welded with pipeline gradient as support bar.
5. it is used for the preparation method of the guider of equipment once grouting as claimed in claim 4, it is characterised in that the support bar of support frame as described above and the bend pipe of right-angle elbow pipe are set in the opposite direction.
6. being used for the preparation method of the guider of equipment once grouting as claimed in claim 4, it is characterised in that the guide pipe internal diameter size is more than waste oil bung outside dimension, support frame casing inner diameter size is more than guide pipe outside dimension.
CN201610253071.1A 2016-04-22 2016-04-22 It is a kind of for guider of equipment once grouting and preparation method thereof Pending CN107304629A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610253071.1A CN107304629A (en) 2016-04-22 2016-04-22 It is a kind of for guider of equipment once grouting and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610253071.1A CN107304629A (en) 2016-04-22 2016-04-22 It is a kind of for guider of equipment once grouting and preparation method thereof

Publications (1)

Publication Number Publication Date
CN107304629A true CN107304629A (en) 2017-10-31

Family

ID=60151730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610253071.1A Pending CN107304629A (en) 2016-04-22 2016-04-22 It is a kind of for guider of equipment once grouting and preparation method thereof

Country Status (1)

Country Link
CN (1) CN107304629A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593692A (en) * 2019-08-28 2019-12-20 五冶集团上海有限公司 Construction elevator floor protection door connecting piece
CN112144531A (en) * 2020-09-10 2020-12-29 芜湖质达设计有限公司 Bridge pile foundation construction is with pouring equipment based on drift sand geology

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2637834A1 (en) * 1988-10-13 1990-04-20 Gilles Auguste Device for transferring concrete from a bucket into a pipe secured to the bucket
CN202691413U (en) * 2012-07-18 2013-01-23 中国十七冶集团有限公司 Buffer device of 90-degree elbow pipe of concrete delivery pipe
CN202706037U (en) * 2012-07-19 2013-01-30 山东电力建设第二工程公司 Cement cushion block grouting device
CN103485523A (en) * 2013-09-30 2014-01-01 中国一冶集团有限公司 Toppling-preventing internal scaffold for constructing coke oven
CN205604732U (en) * 2016-04-22 2016-09-28 五冶集团上海有限公司 A guider for equipment once is in milk

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2637834A1 (en) * 1988-10-13 1990-04-20 Gilles Auguste Device for transferring concrete from a bucket into a pipe secured to the bucket
CN202691413U (en) * 2012-07-18 2013-01-23 中国十七冶集团有限公司 Buffer device of 90-degree elbow pipe of concrete delivery pipe
CN202706037U (en) * 2012-07-19 2013-01-30 山东电力建设第二工程公司 Cement cushion block grouting device
CN103485523A (en) * 2013-09-30 2014-01-01 中国一冶集团有限公司 Toppling-preventing internal scaffold for constructing coke oven
CN205604732U (en) * 2016-04-22 2016-09-28 五冶集团上海有限公司 A guider for equipment once is in milk

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593692A (en) * 2019-08-28 2019-12-20 五冶集团上海有限公司 Construction elevator floor protection door connecting piece
CN112144531A (en) * 2020-09-10 2020-12-29 芜湖质达设计有限公司 Bridge pile foundation construction is with pouring equipment based on drift sand geology
CN112144531B (en) * 2020-09-10 2021-12-31 黄民 Bridge pile foundation construction is with pouring equipment based on drift sand geology

Similar Documents

Publication Publication Date Title
CN205604732U (en) A guider for equipment once is in milk
CN103350165A (en) Processing device and method capable of manufacturing reinforcement cages with different diameters
CN107304629A (en) It is a kind of for guider of equipment once grouting and preparation method thereof
CN106944495B (en) A kind of oversize two phase stainless steel threeway integral forming method
CN202672773U (en) Adjustable steel pipe support
CN206538773U (en) A kind of fast arranging device of grating type side slope rainwater
CN207987925U (en) A kind of bored concrete pile intercommunication grouting device
CN203426340U (en) Machining device capable of manufacturing reinforcement cages with different diameters
CN102900075B (en) A kind of helix concrete tubular pile device and preparation method thereof
CN104790671A (en) Auxiliary hopper for well chamber wall concreting
CN204609313U (en) The auxiliaring bucket of a kind of well room body of wall concreting
CN209077621U (en) A kind of refrigeration pipeline part flaring die
CN209585120U (en) A kind of prefabricated assembled lined with PVC sheets armored concrete anti-corrosion inspection shaft
CN203730920U (en) Sill anchor used in tunnel and used for fixing petroleum and natural gas pipelines
CN217896505U (en) Cross water concrete face flatness control device
CN214329191U (en) Concrete guiding device for pouring rain and sewage vertical shaft
CN206242492U (en) A kind of plastic pipe necking rounding device
CN212480374U (en) Water stop pipe joint
CN209760410U (en) Steel pipe sump pit device of adjustable elevation
CN207415612U (en) A kind of casting device
CN213105385U (en) Welding seam adjusting device for producing large-diameter steel pipe
CN209943695U (en) Multi-pipe integrated waterproof steel sleeve
CN208650103U (en) A kind of cylindrical concrete borehole wall pours device
CN210833217U (en) Cooling tower balance pipe device
CN204122538U (en) A kind of bearing bending machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171031

RJ01 Rejection of invention patent application after publication