CN107301219A - A kind of Electric Power Network Planning data management system - Google Patents
A kind of Electric Power Network Planning data management system Download PDFInfo
- Publication number
- CN107301219A CN107301219A CN201710458203.9A CN201710458203A CN107301219A CN 107301219 A CN107301219 A CN 107301219A CN 201710458203 A CN201710458203 A CN 201710458203A CN 107301219 A CN107301219 A CN 107301219A
- Authority
- CN
- China
- Prior art keywords
- data
- power network
- module
- electric power
- network planning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
- G06F16/258—Data format conversion from or to a database
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/30—Authentication, i.e. establishing the identity or authorisation of security principals
- G06F21/31—User authentication
- G06F21/32—User authentication using biometric data, e.g. fingerprints, iris scans or voiceprints
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
The invention discloses a kind of Electric Power Network Planning data management system, the system includes acquisition module, human-computer interaction module, data markers module, data preparation module, data locating module, central processing unit, data retrieval calling module and data type-setting module.The application extracts the information in data according to preset field, and data record is formed according to the information, realizes data positioning and the foundation of data relationship automatically based on data record;And the identity information of typing person is carried by data, realize data reversibility;Conflict and redundancy between by clearing data, it is to avoid the repetition and conflict of data, improve the convenience that data query is called;And the promptness and accuracy of combined data are improved, realize the timely and conveniently management of Electric Power Network Planning data.
Description
Technical field
The present invention relates to data processing field, more particularly to a kind of Electric Power Network Planning data management system.
Background technology
Power system can be that industry-by-industry and field provide endlessly electric energy.It is limited in current power resource allocation
And under the uneven environment of distribution, how to be reasonably laid out and set the core that electric power resource is power system.
At present, the branch company in general institute of Utilities Electric Co. compass of competency, all can be according to its compass of competency in some cycles
Interior electric power carries out the planning and adjustment of power network.But it is due to stage of each electric power branch company all in independently working, point public affairs
The data of Electric Power Network Planning between department, and parent company are entirely to use Word+ to overall hold of each company's Electric Power Network Planning
Excel+Email semi-automatic transfer mode.
Existing data handling system, mostly using the artificial positioning for carrying out data storage location, it is easy to cause data
The confusion of storage;Meanwhile, conflict is also easily caused between data and is repeated so that the workload increase of data look-up functions,
Also so that system carry out data check when can make a mistake;And trackability is not present in all data.
The content of the invention
It is an object of the invention to provide a kind of Electric Power Network Planning data management system, data positioning and data relationship are realized automatically
Foundation;And the identity information of typing person is carried by data, realize data reversibility;Conflict between by clearing data and
Redundancy, improves the convenience of data query.
In view of this, the present invention provides a kind of Electric Power Network Planning data management system, and the system includes:
Acquisition module, is made up of multiple function detection modules including big dipper module, for gathering default monitoring management section
Power network monitoring data, and the power network monitoring data are marked using Big Dipper location data, draw mark power network monitoring
Data, the mark power network monitoring data are sent to data preparation module;
Human-computer interaction module, biological attribute data and data call instruction for obtaining user's input, by the biology
Characteristic and data call instruction are sent to central processing unit;Obtain the identity information of the user and the user
The Electric Power Network Planning related data of the default monitoring management section of input, the Electric Power Network Planning related data is sent to data mark
Remember module;
The data markers module, for the Electric Power Network Planning related data to be marked using the identity information,
Mark Electric Power Network Planning related data is drawn, the mark Electric Power Network Planning related data is sent to the data preparation module;
The data preparation module, for according to the mark power network monitoring data and the mark Electric Power Network Planning dependency number
According to, lookup redundant data and colliding data, and remove the redundant data and the colliding data;
Data locating module, for according to preset field, extracting the mark power network monitoring data after arranging and institute
State the information of mark Electric Power Network Planning related data;Data record is formed according to described information;Similarity number strong point is found, sets up described
Data record and the relation at the similarity number strong point;
Central processing unit, for the biological attribute data to be compared with the pre-stored biological attribute data, is obtained
Go out feature comparison result, the feature comparison result is decoded, when successfully decoded, data call instruction is sent extremely
Data retrieval calling module;
Data retrieval calling module, for being instructed according to the data call, calls the data in the database,
And send the data to data type-setting module;
Data type-setting module, for the data to be carried out into typesetting according to default type-setting mode.
Alternatively, in addition to:
Forecast analysis module, for receiving the power network monitoring data that the acquisition module is sent, according to preset algorithm
And the power network monitoring data carry out data prediction analysis, draw and predict the outcome.
Alternatively, the forecast analysis module includes:
Chart drawing unit, for according to the power network monitoring data, formation curve, the curve include tense curve and
Three-dimensional effect curve;
Comparative analysis unit, for the curve and former measured curve to be analyzed into prediction, draws analysis prediction
As a result;
Scholarly forecast analytic unit, for the power network monitoring data and pre-stored electric network data to be carried out into similarity pair
Than drawing comparison result;
Display unit, for showing that the analysis predicts the outcome and the comparison result.
Alternatively, the central processing unit includes:
Control instruction allocation unit, for receiving the control instruction that the user is inputted by the human-computer interaction module,
The control instruction is distributed to corresponding module;
Registering unit, for obtaining the registry biometrics characteristic data that the user is inputted by the human-computer interaction module,
The registry biometrics characteristic data is stored to the database, the pre-stored biological attribute data is drawn.
Alternatively, the data locating module includes:
Graduation range computing unit, for utilizing facet technology, calculates the facet distance between different pieces of information term;
Positioning unit, for carrying out data positioning according to the graduation range.
Alternatively, the biological attribute data includes voice print database, and the voice print database is bright for the user from typing
The vocal print feature data and lip extracted in the voice for reading specific authentication text move interval time data.
Alternatively, the network planning related data at least include business datum, spatial data, grid company data and
Programmed decision-making data.
Alternatively, the data preparation module includes:
Searching unit, for searching the institute between the mark power network monitoring data and the mark Electric Power Network Planning related data
State in redundant data, and the mark power network monitoring data, the mark Electric Power Network Planning related data and the database
Colliding data between data;
Redundant data clearing cell, for utilizing redundancy functions, removes the redundant data;
Colliding data clearing cell, for utilizing EKA algorithms and AKF algorithms, removes the colliding data.
A kind of Electric Power Network Planning data management system provided by the present invention, the system includes acquisition module, man-machine interaction mould
Block, data markers module, data preparation module, data locating module, central processing unit, data retrieval calling module and data
Type-setting module.The application extracts the information in data according to preset field, data record is formed according to the information, based on data
Record is automatic to realize data positioning and the foundation of data relationship;And the identity information of typing person is carried by data, realize data
Reversibility;Conflict and redundancy between by clearing data, it is to avoid the repetition and conflict of data, improve what data query was called
Convenience;And the promptness and accuracy of combined data are improved, realize the timely and conveniently management of Electric Power Network Planning data.
Brief description of the drawings
, below will be to embodiment or existing for the clearer explanation embodiment of the present invention or the technical scheme of prior art
The accompanying drawing used required in technology description is briefly described, it should be apparent that, drawings in the following description are only this hair
Some bright embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can be with root
Other accompanying drawings are obtained according to these accompanying drawings.
A kind of structure of the embodiment for the Electric Power Network Planning data management system that Fig. 1 is provided by the embodiment of the present invention
Schematic block diagram;
Embodiment
In order that those skilled in the art more fully understand the present invention program, with reference to the accompanying drawings and detailed description
The present invention is described in further detail.Obviously, described embodiment is only a part of embodiment of the invention, rather than
Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, belongs to the scope of protection of the invention.
Refer to Fig. 1, a kind of specific implementation for the Electric Power Network Planning data management system that Fig. 1 is provided by the embodiment of the present invention
The structural schematic block diagram of mode, the system can include:
Acquisition module 11, is made up of multiple function detection modules including big dipper module, for gathering default monitoring management
The power network monitoring data of section, and the power network monitoring data are marked using Big Dipper location data, draw mark power network prison
Data are surveyed, the mark power network monitoring data are sent to data preparation module.
Above-mentioned power network monitoring data can include presetting the voltage of monitoring management section, electric current, frequency, load, electric-field intensity
And the data such as magnetic field intensity.Preferably, acquisition module can gather the power network monitoring of specified monitoring management section at regular time and quantity
Data.
After collection power network monitoring data, pretreatment operation, i.e. acquisition module can be carried out to the data collected
Pretreatment unit can be included, the pretreatment unit utilizes the corresponding Big Dipper location data of data, and power network monitoring data are carried out
Mark;Then, sent by the power network monitoring data of tape label to data preparation module and forecast analysis module.
Human-computer interaction module 12, biological attribute data and data call instruction for obtaining user's input, by the life
Thing characteristic and data call instruction are sent to processing module;Obtain the identity information of the user and the user
The Electric Power Network Planning related data of the default monitoring management section of input, the Electric Power Network Planning related data is sent to data mark
Remember module.
Above-mentioned biological attribute data can include the voice print database that user inputs, and the voice print database can refer to from typing
User reads aloud the vocal print feature data extracted in the voice of specific authentication text and lip moves interval time data.The biological characteristic number
According to identification authentication data when can be User logs in.
User can be registered by human-computer interaction module, i.e., user can be in registration, and the biology for inputting itself is special
Data are levied, then system can generate the biological characteristic model of the User Identity, it is possible to by the biological characteristic generated
Model is stored into database, authentication when being easy to the subsequent user to log in.
Above-mentioned Electric Power Network Planning related data can at least include business datum, spatial data, grid company data and rule
Draw decision data etc..After the Electric Power Network Planning related data can be logging in system by user, inputted by human-computer interaction module
Data, i.e. Electric Power Network Planning related data can carry the identity information of importer.
, can be to received Electric Power Network Planning in order to ensure the accuracy for the Electric Power Network Planning related data that user is inputted
Related data is audited, therefore said system can also include data-auditing module, for being carried out to Electric Power Network Planning related data
Examination & verification, the data for auditing qualified are sent to data markers module.
Data markers module 13, for the Electric Power Network Planning related data to be marked using the identity information, is obtained
Go out to mark Electric Power Network Planning related data, the mark Electric Power Network Planning related data is sent to the data preparation module.
Electric Power Network Planning related data is the data inputted after User logs in, can obtain the identity information of importer, so
Electric Power Network Planning related data is marked using the identity information afterwards, can so be believed according to the identity in Electric Power Network Planning related data
Breath, determines the importer of data, data is had reversibility.And the logon account that above-mentioned identity information can include user is believed
Breath and other relevant informations.
Data preparation module 14, for according to the mark power network monitoring data and the mark Electric Power Network Planning dependency number
According to, lookup redundant data and colliding data, and remove the redundant data and the colliding data.
Above-mentioned redundant data can be digit synbol power network monitoring data and mark Electric Power Network Planning related data between exist it is superfluous
Remainder evidence;Above-mentioned colliding data can be digit synbol power network monitoring data, mark Electric Power Network Planning related data and system database
Colliding data between the data stored.
After finding out redundant data and colliding data, it can be shown with talking with box form, such user can lead to
Cross dialog box, it is thus understood that redundant data and colliding data, come to need selection the data of removing according to demand.
As a kind of embodiment, above-mentioned data preparation module can include:Searching unit, for searching the mark
Remember the redundant data between power network monitoring data and the mark Electric Power Network Planning related data, and the mark power network monitoring
The colliding data between data in data, the mark Electric Power Network Planning related data and the database;Redundant data is removed single
Member, for utilizing redundancy functions, removes the redundant data;Colliding data clearing cell, for using EKA algorithms and
AKF algorithms, remove the colliding data.
It is understood that after the data of removing needed for user has selected, it is possible to use EKA algorithms and AKF algorithms come
Colliding data is removed, its detailed process is well known to those skilled in the art, will not be repeated here;Utilize redundancy functions
, specifically, can be by k to remove redundant data1And k2In knowledge element take out e1And e2, then by e1And e2Middle X, Y and pass
It is that R taking-ups are compared, and contrasts xe respectively1、xe2、ye1And ye2, by the element entry deletion with identical content, retain former
There are relation R values, by the relation and be not deleted item and merge, realize the deletion of redundant data.
Data locating module 15, for according to preset field, extract the mark power network monitoring data after arranging and
The information of the mark Electric Power Network Planning related data;Data record is formed according to described information;Find out depositing for the data record
Storage space is put, and finds similarity number strong point, sets up the relation of the data record and the similarity number strong point.
It is possible, firstly, to from the data for removing redundant data and colliding data, according to the field pre-set, extract mark
Remember the information of power network monitoring data and mark Electric Power Network Planning related data, corresponding data record is formed using the information;Then,
The suitable storage location of data record is found in database, and finds out similarity number strong point, the pass set up between similarity number strong point
System.
As a kind of embodiment, above-mentioned data locating module can include:Graduation range computing unit, for profit
With facet technology, the facet distance between different pieces of information term is calculated;Positioning unit, for entering line number according to the graduation range
According to positioning.
Data positioning can be based on facet technology, and number is accurately positioned by calculating the facet distance between different pieces of information term
According to.Its detailed process can be as follows:Under known facet constraints, corresponding data terms are chosen, are realized to required data
Description;If chosen successfully, corresponding data is returned;If selection is unsuccessful, according to synonymicon and concept distance
Figure calculates the similitude of term, forms new definition information.
Central processing unit 16, for the biological attribute data to be compared with the pre-stored biological attribute data,
Feature comparison result is drawn, the feature comparison result is decoded, when successfully decoded, the data call is instructed and sent
To data retrieval calling module.
Control instruction, user's registration, rights management and the account password that central processing unit can also receive user's input are repaiied
Change.
As a kind of embodiment, above-mentioned central processing unit can include:Control instruction allocation unit, for receiving
The control instruction that the user is inputted by the human-computer interaction module, the control instruction is distributed to corresponding module;Registration
Unit, for obtaining the registry biometrics characteristic data that the user is inputted by the human-computer interaction module, the registration is given birth to
Thing characteristic is stored to the database, draws the pre-stored biological attribute data.
Data retrieval calling module 17, for being instructed according to the data call, calls the number in the database
According to, and the data are sent to data type-setting module.
Data type-setting module 18, for the data to be carried out into typesetting according to default type-setting mode.Draw after typesetting result,
Typesetting result can be sent to display screen and be shown.
Collect after power network monitoring data, power network can be predicted according to the power network monitoring data.
As a kind of embodiment, said system can also include:Forecast analysis module 19, for receiving described adopt
Collect the power network monitoring data that module is sent, data prediction point is carried out according to preset algorithm and the power network monitoring data
Analysis, draws and predicts the outcome.
It is possible, firstly, to according to the power network monitoring data inputted, draw generation response curve;Then, according to being generated
Curve and virgin curve are contrasted, and calculate similar between received power network monitoring data and pre-stored electric network data
Degree, analysis is predicted according to similarity.
Preferably, above-mentioned forecast analysis module can include:Chart drawing unit, for according to the power network monitoring number
According to formation curve, the curve includes tense curve and three-dimensional effect curve;Comparative analysis unit, for by the curve and
Prediction is analyzed in former measured curve, show that analysis predicts the outcome;Scholarly forecast analytic unit, for the power network to be supervised
Survey data and carry out similarity comparison with pre-stored electric network data, draw comparison result;Display unit, for showing that the analysis is pre-
Survey result and the comparison result.
It is understood that above-mentioned tense curve can show the initial data or electric power networks supplemental characteristic of each monitoring point
Change with time situation;Above-mentioned three-dimensional effect curve can protrude the monitoring result of same time different measuring points with electric power networks
The changing rule of spatial information.After curve is drawn out.Recurrence calculating can also be carried out using function pair curve.
Above-mentioned pre-stored electric network data can refer to be stored in all kinds of typical electric network datas and corresponding electricity in database
Net fault data.The similarity between current electric grid Monitoring Data and pre-stored electric network data is calculated, according to the height of similarity, is obtained
Go out comparison result.
In order to intuitively show comparison result, comparison result can also be carried out after ascending order or descending according to similarity, hair
Display screen is delivered to be shown.
The Electric Power Network Planning data management system that the embodiment of the present invention is provided, the system includes acquisition module, man-machine interaction
Module, data markers module, data preparation module, data locating module, central processing unit, data retrieval calling module and number
According to type-setting module.The system extracts the information in data according to preset field, data record is formed according to the information, based on number
Data positioning and the foundation of data relationship are realized according to record is automatic;And the identity information of typing person is carried by data, realize number
According to reversibility;Conflict and redundancy between by clearing data, it is to avoid the repetition and conflict of data, improve data query and call
Convenience;And the promptness and accuracy of combined data are improved, realize the timely and conveniently management of Electric Power Network Planning data.
Electric Power Network Planning data management system provided by the present invention is described in detail above.Tool used herein
Body example is set forth to the principle and embodiment of the present invention, and the explanation of above example is only intended to help and understands this hair
Bright method and its core concept.It should be pointed out that for those skilled in the art, not departing from the present invention
On the premise of principle, some improvement and modification can also be carried out to the present invention, these are improved and modification also falls into right of the present invention
It is required that protection domain in.
Claims (8)
1. a kind of Electric Power Network Planning data management system, it is characterised in that including:
Acquisition module, is made up of multiple function detection modules including big dipper module, the electricity for gathering default monitoring management section
Net Monitoring Data, and the power network monitoring data are marked using Big Dipper location data, mark power network monitoring data are drawn,
The mark power network monitoring data are sent to data preparation module;
Human-computer interaction module, biological attribute data and data call instruction for obtaining user's input, by the biological characteristic
Data and data call instruction are sent to central processing unit;Obtain identity information and the user input of the user
The default monitoring management section Electric Power Network Planning related data, the Electric Power Network Planning related data is sent to data markers mould
Block;
The data markers module, for the Electric Power Network Planning related data to be marked using the identity information, is drawn
Electric Power Network Planning related data is marked, the mark Electric Power Network Planning related data is sent to the data preparation module;
The data preparation module, for marking power network monitoring data and the mark Electric Power Network Planning related data according to described,
Redundant data and colliding data are searched, and removes the redundant data and the colliding data;
Data locating module, for according to preset field, extracting the mark power network monitoring data and the mark after arranging
Remember the information of Electric Power Network Planning related data;Data record is formed according to described information;Similarity number strong point is found, the data are set up
Record and the relation at the similarity number strong point;
Central processing unit, for the biological attribute data to be compared with the pre-stored biological attribute data, draws spy
Comparison result is levied, the feature comparison result is decoded, when successfully decoded, data call instruction is sent to data
Search call module;
Data retrieval calling module, for being instructed according to the data call, calls the data in the database, and will
The data are sent to data type-setting module;
Data type-setting module, for the data to be carried out into typesetting according to default type-setting mode.
2. Electric Power Network Planning data management system as claimed in claim 1, it is characterised in that also include:
Forecast analysis module, for receiving the power network monitoring data that the acquisition module is sent, according to preset algorithm and
The power network monitoring data carry out data prediction analysis, draw and predict the outcome.
3. Electric Power Network Planning data management system as claimed in claim 2, it is characterised in that the forecast analysis module includes:
Chart drawing unit, for according to the power network monitoring data, formation curve, the curve to include tense curve and space
Effect curve;
Comparative analysis unit, for the curve and former measured curve to be analyzed into prediction, show that analysis predicts the outcome;
Scholarly forecast analytic unit, for the power network monitoring data and pre-stored electric network data to be carried out into similarity comparison, is obtained
Go out comparison result;
Display unit, for showing that the analysis predicts the outcome and the comparison result.
4. Electric Power Network Planning data management system as claimed in claim 3, it is characterised in that the central processing unit includes:
Control instruction allocation unit, for receiving the control instruction that the user is inputted by the human-computer interaction module, by institute
Control instruction is stated to distribute to corresponding module;
Registering unit, for obtaining the registry biometrics characteristic data that the user is inputted by the human-computer interaction module, by institute
State registry biometrics characteristic data to store to the database, draw the pre-stored biological attribute data.
5. the Electric Power Network Planning data management system as described in any one of Claims 1-4, it is characterised in that the data positioning
Module includes:
Graduation range computing unit, for utilizing facet technology, calculates the facet distance between different pieces of information term;
Positioning unit, for carrying out data positioning according to the graduation range.
6. Electric Power Network Planning data management system as claimed in claim 5, it is characterised in that the biological attribute data includes sound
Line data, the voice print database be from the user of typing read aloud the voice of specific authentication text in the vocal print feature number that extracts
Interval time data are moved according to lip.
7. Electric Power Network Planning data management system as claimed in claim 5, it is characterised in that the network planning related data is extremely
Include business datum, spatial data, grid company data and programmed decision-making data less.
8. Electric Power Network Planning data management system as claimed in claim 5, it is characterised in that the data preparation module includes:
Searching unit, it is described superfluous between the mark power network monitoring data and the mark Electric Power Network Planning related data for searching
Remainder evidence, and the mark power network monitoring data, the mark Electric Power Network Planning related data and the data in the database
Between colliding data;
Redundant data clearing cell, for utilizing redundancy functions, removes the redundant data;
Colliding data clearing cell, for utilizing EKA algorithms and AKF algorithms, removes the colliding data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710458203.9A CN107301219A (en) | 2017-06-16 | 2017-06-16 | A kind of Electric Power Network Planning data management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710458203.9A CN107301219A (en) | 2017-06-16 | 2017-06-16 | A kind of Electric Power Network Planning data management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107301219A true CN107301219A (en) | 2017-10-27 |
Family
ID=60135403
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710458203.9A Pending CN107301219A (en) | 2017-06-16 | 2017-06-16 | A kind of Electric Power Network Planning data management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107301219A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111460042A (en) * | 2020-04-24 | 2020-07-28 | 国网吉林省电力有限公司 | Method for synchronizing and matching power grid user mark information among heterogeneous multiple systems |
CN112178755A (en) * | 2020-09-29 | 2021-01-05 | 华润电力(菏泽)有限公司 | Automatic control system of heating system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105513351A (en) * | 2015-12-17 | 2016-04-20 | 北京亚信蓝涛科技有限公司 | Traffic travel characteristic data extraction method based on big data |
CN106126914A (en) * | 2016-06-22 | 2016-11-16 | 宝鸡市中心医院 | Clinical information management system |
CN106372381A (en) * | 2016-08-12 | 2017-02-01 | 牡丹江医学院 | Medical information management system |
CN106570624A (en) * | 2016-10-26 | 2017-04-19 | 东北电力大学 | Economy management system |
CN106599240A (en) * | 2016-12-12 | 2017-04-26 | 长春理工大学 | Multi-source data processing method and system |
-
2017
- 2017-06-16 CN CN201710458203.9A patent/CN107301219A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105513351A (en) * | 2015-12-17 | 2016-04-20 | 北京亚信蓝涛科技有限公司 | Traffic travel characteristic data extraction method based on big data |
CN106126914A (en) * | 2016-06-22 | 2016-11-16 | 宝鸡市中心医院 | Clinical information management system |
CN106372381A (en) * | 2016-08-12 | 2017-02-01 | 牡丹江医学院 | Medical information management system |
CN106570624A (en) * | 2016-10-26 | 2017-04-19 | 东北电力大学 | Economy management system |
CN106599240A (en) * | 2016-12-12 | 2017-04-26 | 长春理工大学 | Multi-source data processing method and system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111460042A (en) * | 2020-04-24 | 2020-07-28 | 国网吉林省电力有限公司 | Method for synchronizing and matching power grid user mark information among heterogeneous multiple systems |
CN111460042B (en) * | 2020-04-24 | 2022-06-14 | 国网吉林省电力有限公司 | Method for synchronizing and matching power grid user mark information among heterogeneous multiple systems |
CN112178755A (en) * | 2020-09-29 | 2021-01-05 | 华润电力(菏泽)有限公司 | Automatic control system of heating system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109522312B (en) | Data processing method, device, server and storage medium | |
CN106650273A (en) | Behavior prediction method and device | |
CN106779581A (en) | A kind of HRMS | |
CN109409561B (en) | Construction method of multi-time scale time sequence collaborative prediction model | |
CN111127246A (en) | Intelligent prediction method for transmission line engineering cost | |
CN110782123A (en) | Matching method and device of decision scheme, computer equipment and storage medium | |
CN110704524A (en) | House source recording method, device and equipment and computer readable storage medium | |
CN109978215A (en) | Patrol management method and device | |
CN107798059A (en) | A kind of NCO meteorological datas structured storage method and apparatus | |
CN107301219A (en) | A kind of Electric Power Network Planning data management system | |
CN103399905A (en) | Method of information extraction for ocean eddy evolution process | |
CN110110172A (en) | Information displaying method and device | |
CN106886517A (en) | Business site selecting method, device and system | |
CN113158084B (en) | Method, device, computer equipment and storage medium for processing movement track data | |
CN110110153A (en) | A kind of method and apparatus of node searching | |
CN115017251B (en) | Standard mapping map establishing method and system for smart city | |
Li et al. | Automatic classification algorithm for multisearch data association rules in wireless networks | |
CN115544235A (en) | Power grid planning intelligent question-answering system based on text parsing | |
CN104156364B (en) | Map search result shows method and apparatus | |
Zhu et al. | Fast grid splitting detection for n-1 contingency analysis by graph computing | |
CN115495545A (en) | Power grid operation panoramic model retrieval method, electronic device and storage medium | |
CN109242132A (en) | Subregion peak load prediction technique based on MapReduce frame | |
CN117014316A (en) | Port detection method, system, terminal equipment and storage medium | |
CN109754159B (en) | Method and system for extracting information of power grid operation log | |
CN113435494A (en) | Low-voltage resident user abnormal electricity utilization identification method and simulation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171027 |
|
RJ01 | Rejection of invention patent application after publication |