CN107299834A - A kind of mechanized coal mining method - Google Patents

A kind of mechanized coal mining method Download PDF

Info

Publication number
CN107299834A
CN107299834A CN201710738547.5A CN201710738547A CN107299834A CN 107299834 A CN107299834 A CN 107299834A CN 201710738547 A CN201710738547 A CN 201710738547A CN 107299834 A CN107299834 A CN 107299834A
Authority
CN
China
Prior art keywords
coal
main frame
mining
slotting
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710738547.5A
Other languages
Chinese (zh)
Other versions
CN107299834B (en
Inventor
王洁
刘万波
杨林
吴冬
罗昭荣
马江涛
禹云虎
梁楚培
王钰峰
何有明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Vocational Institute of Engineering
Original Assignee
Chongqing Vocational Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Vocational Institute of Engineering filed Critical Chongqing Vocational Institute of Engineering
Priority to CN201710738547.5A priority Critical patent/CN107299834B/en
Publication of CN107299834A publication Critical patent/CN107299834A/en
Application granted granted Critical
Publication of CN107299834B publication Critical patent/CN107299834B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C27/00Machines which completely free the mineral from the seam
    • E21C27/10Machines which completely free the mineral from the seam by both slitting and breaking-down
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/20General features of equipment for removal of chippings, e.g. for loading on conveyor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of mechanized coal mining method, the steps such as coal formula coal mining are mined and harrowed including working face arrangement, slotting, wherein, what working face was laid fells and transports coal all-in-one, constituted by felling and transporting coal main frame and cantilever design support, fell and transport coal main frame and be connected to support free end, support free end has the compound motion track of front and rear and elevating movement, fell and transport coal main frame and be formed with slotting coal mining portion and rake coal coal mining portion;Slotting is mined and forms coal groove on rib top;Rake coal formula, which mines to advance downwardly by support, fells and transports the progress of coal main frame.The beneficial effects of the invention are as follows mine and fell and transport the progress of coal main frame based on the compound motion for moving and moving forward and backward with oscillating lifting, its coal seam recovery ratio is high, and spoil is few in coal product, and quality is good.

Description

A kind of mechanized coal mining method
Technical field
The present invention relates to a kind of seam mining technology, particularly a kind of mechanized coal mining method.
Background technology
The rich coal resources of China, storage capacity is big, and preservation variation.Divided according to China's coal seam thickness, thickness 0.8 ~1.3m belongs to girdle, belongs to ultra-thin coal seam less than 0.8m, in coal in China reserves, and the recoverable reserves of girdle is about 60 Many hundred million tons, account for the 20% of national coal gross reserves.But the yield of girdle only accounts for the 10.4% of national coal total output, and This ratio is also in progressively downward trend.Its main cause be fell and transport the low integral mechanization degree of coal, single face output and Efficiency is low, drivage ratio is high, cost of winning is high, labor strength is big.But with the reduction of coal resources, girdle and very thin The exploitation in coal seam seems more and more urgent, and its optimal recovery method is exactly using Manless mining technology, current Manless mining Equipment has coal plough, drum-type to fell and transport coal all-in-one, the coal mining of drilling formula, but such equipment energy consumption is high, bulky, be not suitable with pole Girdle.Therefore, by the effort of those skilled in the art, developing a kind of scraper plate chain type and felling and transporting coal all-in-one, by portion Dividing on scraper plate sets coal cutting teeth to carry out coal cutting, and all-in-one machine structure is felled and transported so as to be formed.Although the machine can realize mechanical coal mining, When bellying, its net picking rate is low, in squeeze, and coal mining resistance is big, promotes difficult, high energy consumption, and spoil content is big, Coal product quality is low.Accordingly, it would be desirable to which the existing coal all-in-one that fells and transports is further improved.
The content of the invention
The purpose of the present invention is that, in view of the shortcomings of the prior art there is provided a kind of mechanized coal mining method, this method passes through tool Have the compound motion track for lifting and moving forward and backward fells and transports coal all-in-one, realizes that slotting formula mines to mine with rake coal formula and is combined Mining way realize mechanical coal mining, can easily adapt to Coal Seam Thickness Change requirement, it is ensured that net picking rate and coal product matter Amount.
To realize object defined above, the present invention is adopted the following technical scheme that.
A kind of mechanized coal mining method, comprises the following steps:
The first step, working face arrangement:It is included in lay in the open-off cut in coal seam and fells and transports coal all-in-one, and passes through support system Control top, to form just mining face;Wherein, fell and transport coal all-in-one and constituted by felling and transporting coal main frame and cantilever design support, fell and transport coal Main frame is connected to support free end, and support free end has the compound motion track that front and rear and oscillating lifting is moved, fells and transports coal master Machine is formed with slotting coal mining portion and rake coal coal mining portion;
Second step, slotting is mined:Adjusted including coal main frame will be felled and transported to rib, coal main frame is felled and transported in operation, and is passed through Support will fell and transport coal main frame and push ahead progress slotting formula coal mining, to form coal groove on rib top, and coal groove depth is not less than Fell and transport coal main frame width;
3rd step, rake coal formula is mined:The progress rake coal formula coal mining of coal main frame is felled and transported including being pushed down on by support, until coal Coal mining is finished below groove;
4th step, this seam mining completes to judge, is then to terminate to mine, no, then performs next step;
5th step, the advance of the face:Including promoting support system, second step and the 3rd step are repeated.
Using this method of preceding solution, by felling and transporting the coal mining device of coal all-in-one machine structure, realize that mechanization is adopted Coal, support system is used to control top and keeps control heights of roofs, coal-face is had enough operation and space, completes After the coal mining circulation of one step pitch or set depth, coal all-in-one is felled and transported with support system monolithic push is covered, is adopted into next Coal is circulated, and is terminated until mining.Coal mining process is to draw out a rectangle coal groove in working face wall upper end first;Then, downwards Propulsion is felled and transported coal main frame formation rake coal formula and mined, until working face wall is produced completion, is then advanced into next working face, Proceed slotting and rake coal is mined and circulated, until this seam mining is finished.During slotting, all coal cutting teeths participate in cutting successively Coal;Harrow during coal mining, mainly by running to the coal cutting teeth coal mining of lower section, the coal cutting teeth of front side plays auxiliary coal mining.
It is preferred that, in the step of slotting is mined, before slotting coal mining, in addition to fell and transport the adjustment of coal perspective. So that main frame is in horizontally or diagonally state when slotting is mined, to meet angle and the thickness change requirement of bearing.
It is preferred that, in the rake coal formula coal mining step, in addition to fell and transport the adjustment of coal perspective.So that main frame is in slotting In horizontally or diagonally state during coal mining, to meet angle and the thickness change requirement of bearing.
To meet cutting groove depth more than the situation for felling and transporting coal main frame width, it is ensured that the coal of rib is once opened in working face Completion is adopted, therefore, in rake coal formula coal mining step, in addition to level promotes and fells and transports coal main frame.
The beneficial effects of the invention are as follows mine based on felling and transporting coal main frame with elevating movement and movable compound motion Carry out, its coal seam recovery ratio is high, spoil is few in coal product, and quality is good.
Brief description of the drawings
Fig. 1 is the FB(flow block) for realizing the inventive method.
Fig. 2 is that the first structure type for realizing the inventive method use fells and transports the structural representation of coal all-in-one.
Fig. 3 is that second of structure type for realizing the inventive method use fells and transports the structural representation of coal all-in-one.
Fig. 4 is that the third structure type for realizing the inventive method use fells and transports the structural representation of coal all-in-one.
Embodiment
The present invention is further illustrated below in conjunction with the accompanying drawings, but does not therefore limit the present invention to described implementation Among example scope.
Referring to Fig. 1, a kind of mechanized coal mining method comprises the following steps:
The first step, working face arrangement:Be included in laid in the open-off cut in coal seam as shown in Figure 2 or Figure 3 fell and transport coal one Machine, and by support system control top, to form just mining face;Wherein, coal all-in-one is felled and transported by felling and transporting coal main frame and cantilever knot Structure support is constituted, and is felled and transported coal main frame and is connected to support free end, support free end has the compound of front and rear and oscillating lifting motion Movement locus, fells and transports coal main frame and is formed with slotting coal mining portion and rake coal coal mining portion;
Second step, slotting is mined:Adjusted including coal main frame will be felled and transported to rib, coal main frame is felled and transported in operation, and is passed through Support will fell and transport coal main frame and push ahead progress slotting formula coal mining, to form coal groove on rib top, and coal groove depth is not less than Fell and transport coal main frame width;When wherein, using coal all-in-one is felled and transported described in Fig. 2, coal groove depth, which is substantially equal to, fells and transports coal main frame width; During using felling and transporting coal all-in-one described in Fig. 3, coal groove depth, which is more than or equal to, fells and transports coal main frame width;
3rd step, rake coal formula is mined:The progress rake coal formula coal mining of coal main frame is felled and transported including being advanced downwardly by support, until coal Coal mining is finished below groove;
4th step, this seam mining completes to judge, is then to terminate to mine, no, then performs next step;
5th step, the advance of the face:Including promoting support system, second step and the 3rd step are repeated.
Wherein, before slotting is mined and during the formula coal mining of rake coal, in addition to the adjustment of coal perspective is felled and transported;So as to fell and transport Posture when coal formula is mined is mined and harrowed to coal main frame in slotting, meets angle and the thickness change requirement of bearing;In addition, working as During using felling and transporting coal all-in-one described in Fig. 3, and when the coal groove depth drawn out is more than and fells and transports coal main frame width, also level is needed to promote Fell and transport coal main frame.
Referring to Fig. 2, the first structure type that this method is used fells and transports coal all-in-one, by felling and transporting coal main frame and support Constitute, fell and transport coal main frame by frame 1, haulage chain 4, multiple transporting chain plates 2, and the coal cutting teeth 3 being distributed on transporting chain plate 2 Composition fells and transports integrative-structure;The support is in adjustable cantilever design, and support free end has the motion of front and rear and oscillating lifting Compound motion track, support free end is connected with the frame 1;The transporting chain plate 2, which has, stretches out the front wall of frame 1 The overhanging section of plate, barrier 1a direction extension of the overhanging section along the height of frame 1 to frame 1;Set on the transporting chain plate 2 of part There is an at least coal cutting teeth 3, continuous several transporting chain plates 2 provided with coal cutting teeth 3 constitute 3 points of coal cutting teeth in one group, any one group Cloth is on two adjacent edges of transporting chain plate 2, and the coal cutting teeth 3 on the adjacent conveyor carrier bar 2 provided with coal cutting teeth 3 is in coal-face Mutual dislocation on cross section.Coal cutting teeth 3 positioned at the front end of carrier bar 2 constitutes the main part in slotting coal mining portion, positioned at the main body of carrier bar 2 On coal cutting teeth 3 constitute the slave part in slotting coal mining portion;Rectangle is formed on rib to fell and transport coal main frame by Level Promoting Coal groove;When carrier bar 2 is run to 1 bottom of frame, the coal cutting teeth 3 in the main body of carrier bar 2 constitutes the main part in rake coal formula coal mining portion, position Coal cutting teeth 3 in the front end of carrier bar 2 constitutes the slave part in rake coal formula coal mining portion;To fell and transport coal main frame formation rake coal formula by pushing Mine.
Wherein, support includes the main paragraph 5 and telescopic section 6 for constituting stretching structure, is provided between main paragraph 5 and telescopic section 6 First hydraulic cylinder 7, the free end of main paragraph 5 is hinged by the first hold-down support 8, and the middle part of main paragraph 5 is hinged with second hydraulic cylinder 9, second hydraulic cylinder 9 is hinged by the second hold-down support 10;Telescopic section 6 is hinged with the frame 1 by pivot 11, telescopic section 6 Angle-adjusting mechanism is provided between the frame 1.The angle-adjusting mechanism is made up of worm couple, with by driving worm screw Worm gear wheel is realized in rotation, so as to realize angle adjustment.Worm gear 22 be fixed in frame 1 and with the coaxial line of pivot 11, worm screw 23 It is arranged in telescopic section 6, and passes through stepper motor or the formation driven by power of servomotor 24.Frame 1 is H-shaped, and frame 1 passes through The barrier 1a is separated into rectangular groove structure symmetrical above and below;The transporting chain plate 2 be provided with roller 12, roller 12 with it is described Barrier 1a formation rolls connection.Two medial surfaces of frame 1 are provided with the first wear rib 13, and the first wear rib 13 of both sides is used for To the transporting chain plate 2 formation horizontal looseness limitation.Transporting chain plate 2 limits its transverse direction by first wear rib 13 at two ends and altered Dynamic, the leading flank of frame 1 is provided with the second wear rib 14, and the second wear rib 14 is used to form the overhanging section of the transporting chain plate 2 Cross-brace;Wherein, the first wear rib 13 and the second wear rib 14 use half-round bar, and are welded in frame 1, and it leads to Arc surface is crossed to abut with transporting chain plate 2.The support is set by support system, and support system has from walking structure, and leads to Hydraulic prop 15 is crossed provided with supporting roof 16, hydraulic prop 15 is fixedly connected on supporting base 17;Support system includes side block Plate 21, side block, 21 are fixedly connected in the frame 1.
Originally fell and transport in coal all-in-one, the first wear rib 13 and the second wear rib 14 also can be using circular steel bars.
Referring to Fig. 3, second of structure type that this method is used fells and transports coal all-in-one, with the first structure type Fell and transport coal all-in-one essentially identical, institute's difference is only in that, side shield by mutual dislocation overhead gage 18 and lower baffle plate 19 Stretching structure is constituted, overhead gage 18 is fixedly connected on the supporting roof 16, and lower baffle plate 19 is fixedly connected on the branch river bottom protection On seat 17.
Referring to Fig. 4, the third structure type that this method is used fells and transports coal all-in-one, with the first structure type Fell and transport coal all-in-one essentially identical, institute's difference is only in that angle-adjusting mechanism is driven by angle adjustment hydraulic cylinder 25 Angle adjustment is formed, the two ends of angle adjustment hydraulic cylinder 25 are respectively hinged in the telescopic section 6 of frame 1 and support.
Preferred embodiment of the invention described in detail above.It should be appreciated that one of ordinary skill in the art without Need creative work just can make many modifications and variations according to the design of the present invention.Therefore, all technologies in the art Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea Technical scheme, all should be in the protection domain being defined in the patent claims.

Claims (3)

1. a kind of mechanized coal mining method, it is characterised in that comprise the following steps:
The first step, working face arrangement:It is included in lay in the open-off cut in coal seam and fells and transports coal all-in-one, and passes through support system control Top, to form just mining face;Wherein, fell and transport coal all-in-one and constituted by felling and transporting coal main frame and cantilever design support, fell and transport coal master Machine is connected to support free end, and support free end has the compound motion track that front and rear and oscillating lifting is moved, fells and transports coal main frame It is formed with slotting coal mining portion and rake coal coal mining portion;
Second step, slotting is mined:Adjusted including coal main frame will be felled and transported to rib, coal main frame is felled and transported in operation, and passes through support Coal main frame will be felled and transported and push ahead progress slotting formula coal mining, to form coal groove on rib top, and coal groove depth is not less than felling and transporting Coal main frame width;
3rd step, rake coal formula is mined:The progress rake coal formula coal mining of coal main frame is felled and transported including being pushed down on by support, until under coal groove Square coal mining is finished;
4th step, this seam mining completes to judge, is then to terminate to mine, no, then performs next step;
5th step, the advance of the face:Including promoting support system, second step and the 3rd step are repeated.
2. mechanized coal mining method according to claim 1, it is characterised in that in the step of slotting is mined, Before slotting is mined, in addition to fell and transport the adjustment of coal perspective.
3. mechanized coal mining method according to claim 1, it is characterised in that in the rake coal formula coal mining step, also Including felling and transporting the adjustment of coal perspective.
CN201710738547.5A 2017-08-24 2017-08-24 A kind of mechanized coal mining method Active CN107299834B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710738547.5A CN107299834B (en) 2017-08-24 2017-08-24 A kind of mechanized coal mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710738547.5A CN107299834B (en) 2017-08-24 2017-08-24 A kind of mechanized coal mining method

Publications (2)

Publication Number Publication Date
CN107299834A true CN107299834A (en) 2017-10-27
CN107299834B CN107299834B (en) 2019-04-23

Family

ID=60132212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710738547.5A Active CN107299834B (en) 2017-08-24 2017-08-24 A kind of mechanized coal mining method

Country Status (1)

Country Link
CN (1) CN107299834B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2761843Y (en) * 2005-01-17 2006-03-01 万再麟 Mini type coal cutting machine
RU2461710C2 (en) * 2008-04-21 2012-09-20 Валентин Витаутасович Сенкус Method for coal extraction using activated plough
CN103485813A (en) * 2013-10-11 2014-01-01 北京诚田恒业煤矿设备有限公司 Raking device of coal mining shielding support
CN104912553A (en) * 2015-05-14 2015-09-16 王丙成 Cutting hobbing cutter device and coal cutter employing the same
CN105443125A (en) * 2015-12-24 2016-03-30 王洁 Dragging type coal mining machine
CN205172574U (en) * 2015-11-02 2016-04-20 王洁 Inclined coal seams fells and transports coal device
CN105804743A (en) * 2016-04-11 2016-07-27 中南大学 Continuous rotating and vibrating cutting equipment realizing pregrooving and used for hard rock ore body and construction process of equipment
CN206419011U (en) * 2017-01-25 2017-08-18 大同市中科唯实矿山科技有限公司 A kind of boom-type roadheader with pre- cutting means

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2761843Y (en) * 2005-01-17 2006-03-01 万再麟 Mini type coal cutting machine
RU2461710C2 (en) * 2008-04-21 2012-09-20 Валентин Витаутасович Сенкус Method for coal extraction using activated plough
CN103485813A (en) * 2013-10-11 2014-01-01 北京诚田恒业煤矿设备有限公司 Raking device of coal mining shielding support
CN104912553A (en) * 2015-05-14 2015-09-16 王丙成 Cutting hobbing cutter device and coal cutter employing the same
CN205172574U (en) * 2015-11-02 2016-04-20 王洁 Inclined coal seams fells and transports coal device
CN105443125A (en) * 2015-12-24 2016-03-30 王洁 Dragging type coal mining machine
CN105804743A (en) * 2016-04-11 2016-07-27 中南大学 Continuous rotating and vibrating cutting equipment realizing pregrooving and used for hard rock ore body and construction process of equipment
CN206419011U (en) * 2017-01-25 2017-08-18 大同市中科唯实矿山科技有限公司 A kind of boom-type roadheader with pre- cutting means

Also Published As

Publication number Publication date
CN107299834B (en) 2019-04-23

Similar Documents

Publication Publication Date Title
CN101526001A (en) Comprehensive mining opposite-pull working face coal excavating process for thin coal bed
CN104500069A (en) Continuous coal mining machine top-coal mining process for extremely-thick coal seam bound coal
CN203796302U (en) Circulation self-moving type forepoling auxiliary rack moving device
CN203362198U (en) Track walking type immediate support device of fully-mechanized drivage roadway
CN203403900U (en) Hoisting self-moving type anchor-rod cable bolting equipment
CN204098910U (en) Novelly fell and transport coal all-in-one
CN102061922B (en) Method for carrying out comprehensive mechanical coal mining and continuous propulsion mining on split and merged coal beds
CN107299834A (en) A kind of mechanized coal mining method
CN110566199B (en) Matching device of downward mining type coal mining machine
CN202402030U (en) Rectangular full-face continuous miner
CN110118083B (en) Method for recycling coal pillar on fully-mechanized coal mining face
CN207194889U (en) Fell and transport coal all-in-one
CN104234712B (en) A kind of there is top coal recovery device fell and transport coal all-in-one
CN204126645U (en) What have top coal recovery device fells and transports coal all-in-one
CN102536287A (en) Novel hydraulic support at end part of fully mechanized caving face
CN107327300A (en) It is a kind of integrate slotting and rake coal mine adopt conveyer
CN115095386A (en) Continuous coal mining filling system and method
CN113586056A (en) Efficient mining method for long-wall type thin coal seam and medium-thickness coal seam
CN111734479B (en) Lapping material conveying system for lapping mining working face
CN114810204A (en) Slurry blocking equipment for short wall filling mining process and operation method
CN209010949U (en) Automatically can be advanced the inverted arch trestle of correction
CN210564526U (en) Downward mining coal mining machine and three-machine matched coal mining device
CN211474150U (en) Multifunctional tunneling support machine
CN204770085U (en) Festival fork side cut equipment with festival fork transport mechanism
CN107387078B (en) Coal collection and transportation integrated machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant