CN107295699A - The terminating approach and device of application example, using, edge calculations platform, node - Google Patents
The terminating approach and device of application example, using, edge calculations platform, node Download PDFInfo
- Publication number
- CN107295699A CN107295699A CN201610194601.XA CN201610194601A CN107295699A CN 107295699 A CN107295699 A CN 107295699A CN 201610194601 A CN201610194601 A CN 201610194601A CN 107295699 A CN107295699 A CN 107295699A
- Authority
- CN
- China
- Prior art keywords
- application example
- termination
- edge calculations
- termination mode
- mode
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/18—Network planning tools
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The invention provides a kind of terminating approach of application example and device, using, edge calculations platform, node;Wherein, this method includes:Determine that the application example in edge calculations node needs termination;The ending message for indicating application example termination is sent to application example.By the present invention, the problem of solving the technical scheme for the life cycle for not having edge calculations platform how to control application example in correlation technique.
Description
Technical field
The present invention relates to the communications field, terminating approach and device in particular to a kind of application example, using, side
Edge calculating platform, node.
Background technology
GSM can divide into second generation communication system, third generation communication system, forth generation communication system by technology
System and the 5th generation communication system, generally with 2G, 3G, 4G, 5G come nominal.It is essential in GSM
Part includes wireless access mesh portions (Radio Access Network) and core network part (Core Network).Its
In, Radio Access Network is used to handle all to wireless related function, and speech all in core net processing system is exhaled
Cry and exchanged and route with data cube computation and external network.Said two units and user equipment (User Equipment,
Abbreviation UE) it together form whole system.The NE of Radio Access Network includes transceiver base station.Transceiver base station
Constitute the edge of GSM.
Edge calculations node (Edge Computing Node, abbreviation ECN) is to be deployed in transceiver base station or transmitting-receiving base
The convergent point or the functional node of core net stood.Its specific effect is processing business data, reduces deployed position to core
The portfolio of net and external network, reduction user equipment obtains the time delay of business, lifting user's impression.
Edge calculations intra-node structure includes edge calculations platform (Edge Computing Platform), application.ETSI
Framework in MEC ISG Group Specification (GS) 003 may be considered a kind of frame of reference.
It is third party (3rd party) journey for being deployed in processing business on edge calculations node using (Application)
Sequence.The example (Instance) that specific end user provides special services is generated as using by instantiating (Instantiation).
The special services that specific end user needs have time restriction, and it is exactly that example has life cycle to be embodied in application upper.
, it is necessary to (Termination) example that terminates after service ending, but do not have edge calculations platform such as in correlation technique
The technical scheme of the life cycle of what control application example.
For the above mentioned problem in correlation technique, effective solution is not yet proposed at present.
The content of the invention
The invention provides a kind of terminating approach of application example and device, using, edge calculations platform, node so that
Solve there is no the problem of how edge calculations platform controls the technical scheme of life cycle of application example in correlation technique less.
According to an aspect of the invention, there is provided a kind of terminating approach of application example, including:Determine edge calculations section
Application example in point needs termination;The ending message for indicating application example termination is sent to application example.
Further, the instruction parameter for indicating termination mode is also carried in ending message;Wherein, terminate mode bag
Include:Force termination mode and graceful termination mode;It is that application example is directly discharged shared by application example to force termination mode
Whole resources;Graceful termination mode progressively discharges the resource shared by application example for application example.
Further, sending ending message to application example includes:It is real to application by the reference point in edge calculations node
Example sends ending message.
Further, after the ending message terminated for indicating application example to need is sent to application example, method is also
Including:Receive the response message that application example is sent;Wherein, response message is used to indicate that application example has terminated;More
The status information of new opplication example.
Further, method also includes:Response message is not received in the given time, directly removes application example and more
The status information of new opplication example.
According to an aspect of the invention, there is provided a kind of terminating approach of application example, including:Receive edge calculations section
The ending message that edge calculations platform in point is sent;Wherein, the ending message is carried for indicating edge calculations node
In the instruction parameter of termination mode that is terminated of application example;The termination mode that parameter is indicated as indicated, termination should
Use example.
Further, when the termination mode for indicating that parameter is indicated is to force termination mode, termination application example includes:Directly
Connect the resource shared by release application example;When the termination mode for indicating that parameter is indicated is graceful termination mode, termination should
Included with example:Progressively discharge the resource shared by application example.
Further, the resource progressively shared by release application example includes:Judge whether current business permits on application example
Perhaps interrupt;In the case where current business allows interruption, the resource shared by release application example.
Further, receiving the ending message of edge calculations platform transmission includes:Pass through the reference point in edge calculations node
Receive ending message.
Further, after the termination mode indicated in parameter as indicated, termination application example, method also includes:To
Edge calculations platform sends response message;Wherein, response message is used to indicate that application example has terminated.
According to an aspect of the invention, there is provided a kind of terminating equipment of application example, including:Determining module, is used for
Determine that the application example in edge calculations node needs termination;Sending module, for being sent to application example for indicating to answer
The ending message terminated with example.
Further, the instruction parameter for indicating termination mode is also carried in ending message;Wherein, terminate mode bag
Include:Force termination mode and graceful termination mode;It is that application example is directly discharged shared by application example to force termination mode
Whole resources;Graceful termination mode progressively discharges the resource shared by application example for application example.
Further, sending module, is additionally operable to application example transmission termination disappear by the reference point in edge calculations node
Breath.
Further, device also includes:Receiving module, the response message for receiving application example transmission;Wherein, ring
Message is answered to be used to indicate that application example has terminated;Update module, the status information for updating application example.
Further, device also includes:Module is removed, it is directly clear for not receiving response message in the given time
Except application example and update the status information of application example.
According to an aspect of the invention, there is provided a kind of terminating equipment of application example, including:Receiving module, is used for
Receive the ending message that the edge calculations platform in edge calculations node is sent;Wherein, the ending message is carried for referring to
Show the instruction parameter for the termination mode that the application example in edge calculations node terminates;Termination block, for joining as indicated
The termination mode that number is indicated, terminate application example.
Further, when the termination mode for indicating that parameter is indicated is to force termination mode, termination block is used to directly discharge
Resource shared by application example;When the termination mode for indicating that parameter is indicated is graceful termination mode, termination block is used for
Progressively discharge the resource shared by application example.
Further, when the termination mode for indicating that parameter is indicated is graceful termination mode, termination block is additionally operable to judgement should
Whether allowed to interrupt with current business on example;In the case where current business allows interruption, shared by release application example
Resource.
Further, receiving module is additionally operable to receive ending message by the reference point in edge calculations node.
Further, device also includes:Sending module, for the termination mode indicated in parameter as indicated, termination should
After example, response message is sent to edge calculations platform;Wherein, response message is used to indicate application example eventually
Knot.
According to an aspect of the invention, there is provided a kind of edge calculations platform, including above-mentioned device.
According to an aspect of the invention, there is provided a kind of application, including above-mentioned device.
According to an aspect of the invention, there is provided a kind of edge calculations node, including above-mentioned edge calculations platform and above-mentioned
Using.
By the present invention there is provided a kind of technical scheme of the life cycle of control application example, i.e., using in application example
In the case of needing termination, the ending message for indicating application example termination is sent to application example so that application example
Know that it needs termination, it is thus achieved that the control of the life cycle of application example, and then solve in correlation technique and do not have
The problem of how edge calculations platform controls the technical scheme of the life cycle of application example.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, the present invention
Schematic description and description be used for explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart one of the terminating approach of application example according to embodiments of the present invention;
Fig. 2 is the flowchart 2 of the terminating approach of application example according to embodiments of the present invention;
Fig. 3 is a kind of configuration diagram of the edge calculations node provided according to the preferred embodiment of the present invention;
Fig. 4 is a kind of direct terminating procedures after the edge calculations node deployment application provided according to the preferred embodiment of the present invention
Schematic diagram;
Fig. 5 is the graceful terminating procedures signal after the edge calculations node deployment application provided according to the preferred embodiment of the present invention
Figure;
Fig. 6 is the structured flowchart one of the terminating equipment of application example according to embodiments of the present invention;
Fig. 7 is the structured flowchart two of the terminating equipment of application example according to embodiments of the present invention;
Fig. 8 is the structured flowchart three of the terminating equipment of application example according to embodiments of the present invention;
Fig. 9 is the structured flowchart four of the terminating equipment of application example according to embodiments of the present invention.
Embodiment
Describe the present invention in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that in the feelings not conflicted
Under condition, the feature in embodiment and embodiment in the application can be mutually combined.
It should be noted that term " first ", " second " in description and claims of this specification and above-mentioned accompanying drawing
Etc. being for distinguishing similar object, without for describing specific order or precedence.
A kind of terminating approach of application example is provided in the present embodiment, and Fig. 1 is that application according to embodiments of the present invention is real
The flow chart one of the terminating approach of example, as shown in figure 1, the flow comprises the following steps:
Step S102, determines that the application example in edge calculations node needs termination;
Step S104, the ending message for indicating application example termination is sent to application example.
By the present invention there is provided a kind of technical scheme of the life cycle of control application example, i.e., using in application example
In the case of needing termination, the ending message for indicating application example termination is sent to application example so that application example
Know that it needs termination, it is thus achieved that the control of the life cycle of application example, and then solve in correlation technique and do not have
The problem of how edge calculations platform controls the technical scheme of the life cycle of application example.
Produced it should be noted that the life cycle of an application example can be an application example to the period terminated,
By controlling the finish time of application example, and then the life cycle of application example can be controlled.
It should be noted that also carrying the instruction parameter for indicating termination mode in above-mentioned ending message;Wherein, eventually
Knot mode includes:Force termination mode and graceful termination mode;It is that application example is directly discharged using real to force termination mode
Whole resources shared by example;Graceful termination mode progressively discharges the resource shared by application example for application example.Need
Illustrate, above-mentioned pressure termination mode is referred to as terminating immediately, and above-mentioned graceful termination mode is referred to as non-vertical
Terminate.
For above-mentioned graceful termination mode, when the resource occupied progressively is discharged, terminal to be notified also is considered whether,
But it is not limited to this.
In one embodiment of the invention, above-mentioned steps S104 can be shown as by the reference in edge calculations node
Point sends ending message to application example.
In one embodiment of the invention, after above-mentioned steps S104, the above method can also include:Receiving should
The response message sent with example;Wherein, response message is used to indicate that application example has terminated;Update application example
Status information.
In one embodiment of the invention, the above method can also include:Response message is not received in the given time,
Directly remove application example and update the status information of application example.
It should be noted that the above-mentioned scheduled time can be realized by setting timer, do not received after timer expiry
To response message, then the application example is actively understood, now the application example also just terminates.
It should be noted that the executive agent of the above method can be the edge calculations platform in edge calculations node, but simultaneously
Not limited to this.
A kind of terminating approach of application example is provided in the present embodiment, and Fig. 2 is that application according to embodiments of the present invention is real
The flowchart 2 of the terminating approach of example, as shown in Fig. 2 the flow comprises the following steps:
Step S202, receives the ending message that the edge calculations platform in edge calculations node is sent;Wherein, the termination
Message carries the instruction parameter for indicating the termination mode that the application example in edge calculations node is terminated;
Step S204, the termination mode that parameter is indicated as indicated, terminate application example.
By the present invention there is provided a kind of technical scheme of the life cycle of control application example, i.e., using reception edge meter
Calculate the ending message that platform is sent;According to carried in ending message be used for indicate indicated by the instruction parameter of termination mode
Termination mode, terminate application example, and then solve in correlation technique and do not have how edge calculations platform controls application example
Life cycle technical scheme the problem of.
Produced it should be noted that the life cycle of an application example can be an application example to the period terminated,
By controlling the finish time of application example, and then the life cycle of application example can be controlled.
It should be noted that when indicating termination mode that parameter is indicated to force termination mode, termination application example can be with
Show as:Resource directly shared by release application example;Indicating that the termination mode that parameter is indicated is graceful termination mode
When, termination application example can be shown as:Progressively discharge the resource shared by application example.It should be noted that above-mentioned
Termination mode is forced to be referred to as terminating immediately, above-mentioned graceful termination mode is referred to as non-immediate termination.
For above-mentioned graceful termination mode, when the resource occupied progressively is discharged, terminal to be notified also is considered whether,
But it is not limited to this.
In one embodiment of the invention, the resource progressively shared by release application example can be shown as:Judge application
Whether current business allows to interrupt on example;In the case where current business allows interruption, shared by release application example
Resource.
In one embodiment of the invention, above-mentioned steps S202 can be expressed as by the reference in edge calculations node
Point receives ending message.
In one embodiment of the invention, after above-mentioned steps S204, the above method can also include:To edge
Calculating platform sends response message;Wherein, response message is used to indicate that application example has terminated.
It should be noted that the executive agent of the above method can be the application example in edge calculations node, but do not limit
In this.
In order to be better understood from the present invention, the present invention is further explained below in conjunction with preferred embodiment.
The preferred embodiment of the present invention provide scheme be:When edge calculations node needs to terminate some example, pass through
Edge calculations platform and application example interact to achieve the goal.Edge calculations platform needs photos and sending messages to notify application example to need
Terminate.Notification Method is not limited.Application example is received after information, according to the content and application oneself carried in information
The method for realizing selection termination.Start terminating procedures afterwards:Correspondence application example is notified, resource is discharged.Finally notifying should
Edge calculations platform.
For example, in framework specified in GS003 in ETSI MEC ISG in embodiment, whole process be as
What what was realized.Wherein, interaction is realized by reference to point (Reference Point) MP1.Mobile Edge
Platform sends Terminate message to application example by MP1.Wherein, parameter carries end in Terminate
Knot mode selects information.Termination mode can be that termination or non-immediate terminate immediately.Non-immediate termination mode needs application
Consider whether to notify terminal and progressively discharge the resource occupied.Terminate then directly release immediately.Terminate in this example
Message can be asynchronous message.Example can select the release process that system is provided after message is received, and reply platform
Whether termination is successful.Platform waits for a period of time after Terminate message is sent, and is still deposited if detecting example
It can select to remove example and related resource immediately.
Fig. 3 is a kind of configuration diagram of the edge calculations node provided according to the preferred embodiment of the present invention, as shown in figure 3,
Specifically include following structure:Structure Mobile Edge Platform:Platform in edge calculations node;Structure ME app:
The application disposed in edge calculations node;Structure MP1:Reference point (Reference Point) in edge calculations node,
Edge calculations platform and application are interacted by this reference point.
Fig. 4 is a kind of direct terminating procedures after the edge calculations node deployment application provided according to the preferred embodiment of the present invention
Schematic diagram.It should be noted that in the preferred embodiment, illustrated using the edge calculations node architecture in Fig. 3,
The terminating procedures comprise the following steps:
Step S401:Mobile edge platform (edge calculations node) (are applied by MP1 to APP Instance
Example) hair termination (Terminate) message.And set protection timer.Parameter is included wherein in Terminate message
Field indicates Terminate mode to force termination mode (terminating immediately);
Step S402:APP Instance notify terminal according to Terminate message, the resource of release busy;Concurrently
Response message is to platform;
Step S403:Platform receives APP Instance response message and updates application example status information.If platform
APP Instance response is not received after protection timer expiry, then actively removes APP Instance and updates and answer
Use example state information.
Fig. 5 is the graceful terminating procedures signal after the edge calculations node deployment application provided according to the preferred embodiment of the present invention
Figure.It should be noted that in the preferred embodiment, illustrated using the edge calculations node architecture in Fig. 3, should
Terminating procedures comprise the following steps:
Step S501:Mobile edge platform send out Terminate message by MP1 to APP Instance.And set
Surely timer is protected.Indicate that Terminate mode is graceful termination side comprising parameter field wherein in Terminate message
Formula;
Step S502:APP Instance judge whether current service logic can discharge according to Terminate message
The resource of occupancy, and notify terminal.When current business allows to interrupt, release resource concurrence response message is to platform;
Step S503:Platform receives APP Instance response message and updates application example status information.If platform
APP Instance response is not received after protection timer expiry, then actively removes APP Instance and updates and answer
Use example state information.
Through the above description of the embodiments, those skilled in the art can be understood that according to above-described embodiment
Method the mode of required general hardware platform can be added to realize by software, naturally it is also possible to by hardware, but a lot
In the case of the former be more preferably embodiment.Understood based on such, technical scheme is substantially in other words to existing
The part for having technology to contribute can be embodied in the form of software product, and the computer software product is stored in one
In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions are make it that a station terminal equipment (can
To be mobile phone, computer, server, or network equipment etc.) perform method described in each embodiment of the invention.
A kind of terminating equipment of application example is additionally provided in the present embodiment, and the device is used to realize above-described embodiment and excellent
Embodiment is selected, repeating no more for explanation had been carried out.As used below, term " module " can be realized pre-
Determine the combination of the software and/or hardware of function.Although the device described by following examples is preferably realized with software,
But hardware, or the realization of the combination of software and hardware is also that may and be contemplated.
Fig. 6 is the structured flowchart one of the terminating equipment of application example according to embodiments of the present invention, as shown in fig. 6, the dress
Put including:
Determining module 62, for determining that the application example in edge calculations node needs termination;
Sending module 64, is connected with above-mentioned determining module 62, for being sent to application example for indicating that application example is whole
The ending message of knot.
By said apparatus there is provided a kind of technical scheme of the life cycle of control application example, i.e., using real in application
Example is needed in the case of terminating, and the ending message for indicating application example termination is sent to application example so that application is real
Example knows that it needs termination, it is thus achieved that the control of the life cycle of application example, and then solves in correlation technique and do not have
There is the problem of how edge calculations platform controls the technical scheme of the life cycle of application example.
Produced it should be noted that the life cycle of an application example can be an application example to the period terminated,
By controlling the finish time of application example, and then the life cycle of application example can be controlled.
It should be noted that also carrying the instruction parameter for indicating termination mode in above-mentioned ending message;Wherein, eventually
Knot mode includes:Force termination mode and graceful termination mode;It is that application example is directly discharged using real to force termination mode
Whole resources shared by example;Graceful termination mode progressively discharges the resource shared by application example for application example.Need
Illustrate, above-mentioned pressure termination mode is referred to as terminating immediately, and above-mentioned graceful termination mode is referred to as non-vertical
Terminate.
For above-mentioned graceful termination mode, when the resource occupied progressively is discharged, terminal to be notified also is considered whether,
But it is not limited to this.
In one embodiment of the invention, above-mentioned sending module 64, can be also used for by the ginseng in edge calculations node
Examination point sends ending message to application example.
In one embodiment of the invention, Fig. 7 is the structure of the terminating equipment of application example according to embodiments of the present invention
Block diagram two, as shown in fig. 7, stating device can also include:
Receiving module 72, is connected with above-mentioned sending module 64, the response message for receiving application example transmission;Wherein,
Response message is used to indicate that application example has terminated;
Update module 74, is connected with above-mentioned receiving module 72, the status information for updating application example.
In one embodiment of the invention, said apparatus can also include:Module is removed, for not having in the given time
Response message is received, directly application example is removed and updates the status information of application example.
It should be noted that the above-mentioned scheduled time can be realized by setting timer, do not received after timer expiry
To response message, then above-mentioned removing module actively understands the application example, and now the application example also just terminates.
A kind of terminating equipment of application example is additionally provided in the present embodiment, and Fig. 8 is application according to embodiments of the present invention
The structured flowchart three of the terminating equipment of example, as shown in figure 8, said apparatus includes:
Receiving module 82, the ending message for receiving the transmission of the edge calculations platform in edge calculations node;Wherein, should
Ending message carries the instruction parameter for indicating the termination mode that the application example in edge calculations node is terminated;
Termination block 84, is connected with above-mentioned receiving module 82, the termination mode indicated for parameter as indicated, termination
Application example.
By said apparatus there is provided a kind of technical scheme of the life cycle of control application example, i.e., using reception edge
The ending message that calculating platform is sent;According to carried in ending message be used for indicate indicated by the instruction parameter of termination mode
Termination mode, terminate application example, and then solve in correlation technique and do not have how edge calculations platform is controlled using real
The problem of technical scheme of the life cycle of example.
Produced it should be noted that the life cycle of an application example can be an application example to the period terminated,
By controlling the finish time of application example, and then the life cycle of application example can be controlled.
It should be noted that when indicating termination mode that parameter is indicated to force termination mode, termination application example can be with
Show as:Resource directly shared by release application example;Indicating that the termination mode that parameter is indicated is graceful termination mode
When, termination application example can be shown as:Progressively discharge the resource shared by application example.It should be noted that above-mentioned
Termination mode is forced to be referred to as terminating immediately, above-mentioned graceful termination mode is referred to as non-immediate termination.
For above-mentioned graceful termination mode, when the resource occupied progressively is discharged, terminal to be notified also is considered whether,
But it is not limited to this.
It should be noted that above-mentioned termination block 84 is additionally operable to indicating that the termination mode that parameter is indicated is graceful termination side
During formula, judge whether current business allows to interrupt on application example;In the case where current business allows interruption, release should
With the resource shared by example.Above-mentioned receiving module 82 is additionally operable to receive termination by the reference point in edge calculations node
Message.
Fig. 9 is the structured flowchart four of the terminating equipment of application example according to embodiments of the present invention, as shown in figure 9, above-mentioned
Device also includes:
Sending module 92, is connected with above-mentioned termination block 84, for sending response message to edge calculations platform;Wherein,
Response message is used to indicate that application example has terminated.
A kind of edge calculations platform, including Fig. 6 or the device of embodiment illustrated in fig. 7 are additionally provided in the present embodiment.
A kind of application, including Fig. 8 or the device of embodiment illustrated in fig. 9 are additionally provided in the present embodiment.
A kind of edge calculations node, including above-mentioned edge calculations platform and above-mentioned application are additionally provided in the present embodiment.
It should be noted that above-mentioned modules can be by software or hardware to realize, for the latter, Ke Yitong
Cross in the following manner realization, but not limited to this:Above-mentioned module is respectively positioned in same processor;Or, above-mentioned module distinguishes position
In multiple processors.
Embodiments of the invention additionally provide a kind of storage medium.Alternatively, in the present embodiment, above-mentioned storage medium can
The program code for performing following steps to be arranged to storage to be used for:
S1, determines that the application example in edge calculations node needs termination;
S2, the ending message for indicating application example termination is sent to application example.
Alternatively, in the present embodiment, above-mentioned storage medium can include but is not limited to:USB flash disk, read-only storage (ROM,
Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk,
Magnetic disc or CD etc. are various can be with the medium of store program codes.
Alternatively, the specific example in the present embodiment may be referred to showing described in above-described embodiment and optional embodiment
Example, the present embodiment will not be repeated here.
Obviously, those skilled in the art should be understood that above-mentioned each module of the invention or each step can be with general
Computing device realizes that they can be concentrated on single computing device, or is distributed in multiple computing devices and is constituted
Network on, alternatively, the program code that they can be can perform with computing device be realized, it is thus possible to by they
Storage is performed by computing device in the storage device, and in some cases, can be to be held different from order herein
They, are either fabricated to each integrated circuit modules or will be many in them by the shown or described step of row respectively
Individual module or step are fabricated to single integrated circuit module to realize.So, the present invention is not restricted to any specific hardware
Combined with software.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the technology of this area
For personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made is any
Modification, equivalent substitution, improvement etc., should be included in the scope of the protection.
Claims (23)
1. a kind of terminating approach of application example, it is characterised in that including:
Determine that the application example in edge calculations node needs termination;
The ending message for indicating the application example termination is sent to the application example.
2. according to the method described in claim 1, it is characterised in that also carried in the ending message for indicating termination
The instruction parameter of mode;Wherein, the termination mode includes:Force termination mode and graceful termination mode;It is described
Termination mode is forced directly to discharge whole resources shared by the application example for the application example;The gracefulness
Termination mode progressively discharges the resource shared by the application example for the application example.
3. according to the method described in claim 1, it is characterised in that sending the ending message to application example includes:
The ending message is sent to the application example by the reference point in edge calculations node.
4. according to the method in any one of claims 1 to 3, it is characterised in that sent to application example for referring to
After the ending message for showing the application example needs termination, methods described also includes:
Receive the response message that the application example is sent;Wherein, the response message is used to indicate that the application is real
Example has terminated;
Update the status information of the application example.
5. method according to claim 4, it is characterised in that methods described also includes:
The response message is not received in the given time, is directly removed the application example and is updated the application
The status information of example.
6. a kind of terminating approach of application example, it is characterised in that including:
Receive the ending message that the edge calculations platform in edge calculations node is sent;Wherein, the ending message is carried
There is the instruction parameter for indicating the termination mode that the application example in edge calculations node is terminated;
The termination mode indicated according to the instruction parameter, terminate the application example.
7. method according to claim 6, it is characterised in that the termination mode indicated in the instruction parameter is pressure
During termination mode, the application example that terminates includes:Directly discharge the resource shared by the application example;Institute
When the termination mode for stating instruction parameter instruction is graceful termination mode, the application example that terminates includes:Progressively discharge
Resource shared by the application example.
8. method according to claim 7, it is characterised in that progressively discharge the resource bag shared by the application example
Include:
Judge whether current business allows to interrupt on the application example;The situation for allowing to interrupt in the current business
Under, discharge the resource shared by the application example.
9. method according to claim 7, it is characterised in that receiving the ending message of edge calculations platform transmission includes:
The ending message is received by the reference point in edge calculations node.
10. the method according to any one of claim 6 to 9, it is characterised in that indicated according to the instruction parameter
Termination mode, terminate after the application example, methods described also includes:
Response message is sent to the edge calculations platform;Wherein, the response message is used to indicate that the application is real
Example has terminated.
11. a kind of terminating equipment of application example, it is characterised in that including:
Determining module, for determining that the application example in edge calculations node needs termination;
Sending module, for sending the ending message for indicating the application example termination to the application example.
12. device according to claim 11, it is characterised in that also carried in the ending message for indicating end
The instruction parameter of knot mode;Wherein, the termination mode includes:Force termination mode and graceful termination mode;Institute
State and force termination mode directly to discharge whole resources shared by the application example for the application example;It is described excellent
Refined termination mode progressively discharges the resource shared by the application example for the application example.
13. device according to claim 11, it is characterised in that the sending module, is additionally operable to by edge calculations
Reference point in node sends the ending message to the application example.
14. the device according to any one of claim 11 to 13, it is characterised in that described device also includes:
Receiving module, for receiving the response message that the application example is sent;Wherein, the response message is used for
Indicate that the application example has terminated;
Update module, the status information for updating the application example.
15. device according to claim 14, it is characterised in that described device also includes:
Module is removed, for not receiving the response message in the given time, the application example is directly removed
And update the status information of the application example.
16. a kind of terminating equipment of application example, it is characterised in that including:
Receiving module, the ending message for receiving the transmission of the edge calculations platform in edge calculations node;Wherein,
The ending message carries the instruction ginseng of the termination mode for indicating the termination of the application example in edge calculations node
Number;
Termination block, for the termination mode indicated according to the instruction parameter, terminate the application example.
17. device according to claim 16, it is characterised in that the termination mode indicated in the instruction parameter is strong
During termination mode processed, the termination block is used to directly discharge the resource shared by the application example;Refer to described
When the termination mode for showing parameter instruction is graceful termination mode, the termination block is used to progressively discharge the application in fact
Resource shared by example.
18. device according to claim 17, it is characterised in that the termination mode indicated in the instruction parameter is excellent
During refined termination mode, the termination block is additionally operable to judge on the application example whether current business allows to interrupt;
In the case where the current business allows interruption, the resource shared by the application example is discharged.
19. device according to claim 17, it is characterised in that the receiving module is additionally operable to by edge calculations section
Reference point in point receives the ending message.
20. the device according to any one of claim 16 to 19, it is characterised in that described device also includes:
Sending module, for indicating the termination mode that parameter is indicated according to described, after the application example that terminates,
Response message is sent to the edge calculations platform;Wherein, the response message is used to indicate the application example
Through termination.
21. a kind of edge calculations platform, it is characterised in that including any one of claim 11 to claim 15
Device.
22. one kind application, it is characterised in that including the device any one of claim 16 to claim 20.
23. a kind of edge calculations node, it is characterised in that will including the edge calculations platform and right described in claim 21
Ask the application described in 22.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610194601.XA CN107295699A (en) | 2016-03-30 | 2016-03-30 | The terminating approach and device of application example, using, edge calculations platform, node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610194601.XA CN107295699A (en) | 2016-03-30 | 2016-03-30 | The terminating approach and device of application example, using, edge calculations platform, node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107295699A true CN107295699A (en) | 2017-10-24 |
Family
ID=60086565
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610194601.XA Pending CN107295699A (en) | 2016-03-30 | 2016-03-30 | The terminating approach and device of application example, using, edge calculations platform, node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107295699A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020098663A1 (en) * | 2018-11-18 | 2020-05-22 | 华为技术有限公司 | Method and device for internet of vehicles message notification |
CN111800282A (en) * | 2019-04-08 | 2020-10-20 | 阿里巴巴集团控股有限公司 | Network system, instance management and control method, device and storage medium |
CN112486666A (en) * | 2020-11-03 | 2021-03-12 | 深圳市中博科创信息技术有限公司 | Model-driven reference architecture method and platform |
-
2016
- 2016-03-30 CN CN201610194601.XA patent/CN107295699A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020098663A1 (en) * | 2018-11-18 | 2020-05-22 | 华为技术有限公司 | Method and device for internet of vehicles message notification |
US12101700B2 (en) | 2018-11-18 | 2024-09-24 | Huawei Technologies Co., Ltd. | Internet of vehicles message notification method and apparatus |
CN111800282A (en) * | 2019-04-08 | 2020-10-20 | 阿里巴巴集团控股有限公司 | Network system, instance management and control method, device and storage medium |
CN112486666A (en) * | 2020-11-03 | 2021-03-12 | 深圳市中博科创信息技术有限公司 | Model-driven reference architecture method and platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107919969B (en) | Policy control method and device | |
CN107306438A (en) | A kind of generation method of wireless access network section, wireless access network and section manager | |
CN103368930B (en) | The method and user equipment of core net are accessed for controlling | |
CN107360557A (en) | A kind of system message notice, sending method and device | |
CN110381532A (en) | Measure the configuration method and device, storage medium, electronic device at interval | |
CN107666692A (en) | A kind of state transition method, user terminal and base station | |
CN108632910A (en) | A kind of QoS processing methods and equipment | |
CN110366208A (en) | A kind of information processing method and equipment | |
EP4274294A1 (en) | Data transmission method, terminal and network side device | |
CN104581652A (en) | Message processing method as well as method and device for selecting MME (mobility management entity) | |
CN113596804A (en) | State indication method, device and system | |
CN107295699A (en) | The terminating approach and device of application example, using, edge calculations platform, node | |
CN109392096A (en) | A kind of resource allocation method and device | |
CN107770826A (en) | A kind of network section system of selection and relevant device | |
CN108696911A (en) | A kind of selection method and device of data transmission of internet of things mode | |
CN106209409B (en) | A kind of scheduling message processing method and processing device based on virtual network function VNF | |
CN107231826A (en) | Radio configuration method, relevant device and the base station of a kind of wearable device | |
CN112203330A (en) | QoS flow control method and communication device | |
CN104968017B (en) | A kind of method and relevant device of load balancing | |
CN107454274A (en) | Method and apparatus for distributing seat | |
CN107493312A (en) | A kind of service calling method and device | |
CN109392048A (en) | Signal sending method, receiving method and device | |
CN108574964B (en) | A kind of jamming control method and device controlling face data | |
CN110087225A (en) | Message treatment method and relevant apparatus | |
Nishiyama et al. | A probabilistic approach to deploying disaster response network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171016 Address after: 201203 China (Shanghai) free trade experimentation area No. 889 B, 205 blue wave road Applicant after: Shanghai Zhongxing Software Co., Ltd. Address before: 518057 Nanshan District science and technology, Guangdong Province, South Road, No. 55, No. Applicant before: ZTE Corporation |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171024 |