CN107295648A - A kind of ascending transmission method, UE, base station and system - Google Patents

A kind of ascending transmission method, UE, base station and system Download PDF

Info

Publication number
CN107295648A
CN107295648A CN201610197551.0A CN201610197551A CN107295648A CN 107295648 A CN107295648 A CN 107295648A CN 201610197551 A CN201610197551 A CN 201610197551A CN 107295648 A CN107295648 A CN 107295648A
Authority
CN
China
Prior art keywords
subframe
lbt
resource
scheduled
base station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610197551.0A
Other languages
Chinese (zh)
Other versions
CN107295648B (en
Inventor
王加庆
潘学明
司倩倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
China Academy of Telecommunications Technology CATT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Telecommunications Technology CATT filed Critical China Academy of Telecommunications Technology CATT
Priority to CN201610197551.0A priority Critical patent/CN107295648B/en
Priority to PCT/CN2017/078570 priority patent/WO2017167196A1/en
Priority to TW106110682A priority patent/TWI655852B/en
Publication of CN107295648A publication Critical patent/CN107295648A/en
Application granted granted Critical
Publication of CN107295648B publication Critical patent/CN107295648B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/14Spectrum sharing arrangements between different networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W74/00Wireless channel access
    • H04W74/002Transmission of channel access control information
    • H04W74/004Transmission of channel access control information in the uplink, i.e. towards network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/21Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W74/00Wireless channel access
    • H04W74/04Scheduled access

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention provides a kind of ascending transmission method, UE, base station and system, and this method may include:Receive the configured information that base station is sent;Determined to carry out the detection resource of LBT detections according to the configured information;The LBT detections access channel is carried out in the detection resource, and uplink is carried out to the base station using the channel in scheduled subframe.The embodiment of the present invention can save transfer resource.

Description

A kind of ascending transmission method, UE, base station and system
Technical field
The present invention relates to communication technical field, more particularly to a kind of ascending transmission method, user terminal (UE, User Equipment), base station and system.
Background technology
With the continuous growth of mobile data services amount, frequency spectrum resource is more and more nervous, using only mandate frequency spectrum Resource, which carries out network design and business transmission, possibly can not meet traffic needs.Therefore Long Term Evolution (LTE, Long Term Evolution) system consideration deployment transmission, i.e., unauthorized frequency range in unlicensed spectrum resource LTE (Unlicensed LTE, referred to as U-LTE or LTE-U), is covered with improving Consumer's Experience and extension Lid.
Currently in order to supporting to be configured with frequency selective scheduling during multiple UE uplink, LTE-U systems The subframe of detection reference signal (SRS, Sounding Reference Signal) is transmitted, UE is in the subframe Middle transmission SRS realizes frequency selective scheduling.However, transmitting SRS SRS symbols in actual transmissions Always on transmitting physical Uplink Shared Channel (PUSCH, Physical Uplink Shared Channel) After the meeting of row data.For example:Last symbol is SRS symbols in subframe.However, in reality In, may have UE just can not be in SRS the symbol transmissions SRS, such UE of subframe Next subframe access channel of the subframe, so as to vacate subframe, causes transmission resource waste.
The content of the invention
It is an object of the invention to provide a kind of ascending transmission method, UE, base station and system, biography is solved The problem of defeated wasting of resources.
In order to achieve the above object, the embodiment of the present invention provides a kind of ascending transmission method, including:
Receive the configured information that base station is sent;
Determined to carry out what listem-before-talk (LBT, Listen Before Talk) was detected according to the configured information Detect resource;
The LBT detections access channel is carried out in the detection resource, and institute is used in scheduled subframe State channel and carry out uplink to the base station.
Optionally, it is described to be determined to carry out the detection resource of LBT detections according to the configured information, including:
, will be described scheduled if the configured information indicates that the scheduled subframe is configured without LBT resources The resource of the previous subframe of subframe is used as the detection resource for carrying out the LBT detections.
Optionally, it regard the resource of the previous subframe of the scheduled subframe as the progress LBT detections Detection resource, including:
It regard the SRS symbols of the previous subframe of the scheduled subframe as the inspection for carrying out the LBT detections Survey resource;Or
It regard the idling-resource of the previous subframe of the scheduled subframe as the inspection for carrying out the LBT detections Survey resource.
Optionally, it is described to be determined to carry out the detection resource of LBT detections according to the configured information, including:
If the configured information indicates that the scheduled sub-frame configuration has LBT resources, by the scheduled son LBT resources described in frame is used as the detection resource for carrying out the LBT operations.
Optionally, methods described also includes:
Receive the signaling for the instruction occupancy SRS symbol progress uplink that the base station is sent;
It is described to carry out uplink to the base station using the channel in scheduled subframe, including:
The channel is used in the resource including scheduled subframe includes SRS symbols according to the signaling Uplink is carried out to the base station.
The embodiment of the present invention also provides a kind of ascending transmission method, including:
Configured information is sent to UE, so that the UE determines to carry out LBT detections according to the configured information Detection resource, carry out LBT detection access channel in the detection resource;
Receive the uplink that the UE is carried out in scheduled subframe using the channel.
Optionally, the configured information indicates that the scheduled subframe is configured without LBT resources, so that institute State UE and regard the resource of the previous subframe of the scheduled subframe as the detection for carrying out the LBT detections Resource.
Optionally, the detection resource is the SRS symbols of the previous subframe of the scheduled subframe;Or Person
The detection resource is the idling-resource of the previous subframe of the scheduled subframe.
Optionally, the configured information indicates that the scheduled sub-frame configuration has LBT resources, so that described UE regard LBT resources described in the scheduled subframe as the detection resource for carrying out the LBT operations.
Optionally, methods described also includes:
Sent to the UE and indicate to take the signaling that SRS symbols carry out uplink;
The uplink that the reception UE is carried out in scheduled subframe using the channel, including:
The UE is received according to the signaling in the resource including scheduled subframe includes SRS symbols The uplink carried out using the channel.
The embodiment of the present invention also provides a kind of UE, including:
First receiving module, the configured information for receiving base station transmission;
Determining module, for being determined to carry out the detection resource of LBT detections according to the configured information;
Transport module, for carrying out the LBT detections access channel in the detection resource, and is being adjusted Spending in subframe uses the channel to carry out uplink to the base station.
Optionally, if the determining module is used for the configured information and indicates that the scheduled subframe is configured without LBT resources, regard the resource of the previous subframe of the scheduled subframe as the progress LBT detections Detect resource.
Optionally, the determining module is used for the SRS symbols of the previous subframe of the scheduled subframe It is used as the detection resource for carrying out the LBT detections;Or
The determining module is used to regard the idling-resource of the previous subframe of the scheduled subframe as progress The detection resource of the LBT detections.
Optionally, if the determining module is used for the configured information and indicates that the scheduled sub-frame configuration has LBT resources, regard LBT resources described in the scheduled subframe as the detection for carrying out the LBT operations Resource.
Optionally, the UE also includes:
Second receiving module, the up biography of SRS symbols progress is taken for receiving the instruction that the base station is sent Defeated signaling;
The transport module is used for the money including scheduled subframe includes SRS symbols according to the signaling In source uplink is carried out using the channel to the base station.
The embodiment of the present invention also provides a kind of base station, including:
First sending module, for sending configured information to UE, so that the UE indicates to believe according to described Breath determines to carry out the detection resource of LBT detections, in the detection resource progress LBT detections access letter Road;
Receiving module, for receiving the up biography that the UE is carried out in scheduled subframe using the channel It is defeated.
Optionally, the configured information indicates that the scheduled subframe is configured without LBT resources, so that institute State UE and regard the resource of the previous subframe of the scheduled subframe as the detection for carrying out the LBT detections Resource.
Optionally, the detection resource is the SRS symbols of the previous subframe of the scheduled subframe;Or Person
The detection resource is the idling-resource of the previous subframe of the scheduled subframe.
Optionally, the configured information indicates that the scheduled sub-frame configuration has LBT resources, so that described UE regard LBT resources described in the scheduled subframe as the detection resource for carrying out the LBT operations.
Optionally, the base station also includes:
Second sending module, indicates that taking SRS symbols carries out uplink for being sent to the UE Signaling;
The receiving module includes SRS according to the signaling for receiving the UE in scheduled subframe The uplink carried out in resource including symbol using the channel.
The embodiment of the present invention also provides a kind of uplink system, including:
Base station, for sending configured information to UE;
The UE, the configured information for receiving base station transmission;
The UE is additionally operable to be determined to carry out the detection resource of LBT detections according to the configured information;
The UE is additionally operable to carry out the LBT detections access channel in the detection resource, and is being adjusted Spending in subframe uses the channel to carry out uplink to the base station;
The base station be additionally operable to receive the UE in the scheduled subframe using the channel carry out it is upper Row transmission.
The above-mentioned technical proposal of the present invention at least has the advantages that:
The embodiment of the present invention, receives the configured information that base station is sent, and determine progress according to the configured information The detection resource of LBT detections, the LBT detections access channel is carried out in the detection resource, and in quilt In scheduling subframe uplink is carried out using the channel to the base station.It can so realize according in instruction The detection resource that information is determined carries out LBT access channels, and channel can not be accessed so as to avoid the occurrence of Subframe, to save transfer resource, and then the problem of solve transmission resource waste.
Brief description of the drawings
Fig. 1 is schematic network structure provided in an embodiment of the present invention;
Fig. 2 is a kind of schematic flow sheet of ascending transmission method provided in an embodiment of the present invention;
Fig. 3 is a kind of schematic diagram of sub-frame transmission data provided in an embodiment of the present invention;
Fig. 4 is the schematic diagram of another sub-frame transmission data provided in an embodiment of the present invention;
Fig. 5 is the schematic flow sheet of another ascending transmission method provided in an embodiment of the present invention;
Fig. 6 is a kind of UE provided in an embodiment of the present invention structural representation;
Fig. 7 is another UE provided in an embodiment of the present invention structural representation;
Fig. 8 is a kind of structural representation of base station provided in an embodiment of the present invention;
Fig. 9 is the structural representation of another base station provided in an embodiment of the present invention;
Figure 10 is another UE provided in an embodiment of the present invention structural representation;
Figure 11 is the structural representation of another base station provided in an embodiment of the present invention;
Figure 12 is a kind of structural representation of uplink system provided in an embodiment of the present invention.
Embodiment
To make the technical problem to be solved in the present invention, technical scheme and advantage clearer, below in conjunction with attached Figure and specific embodiment are described in detail.
The embodiment of the present invention, not in the SRS symbol transmission SRS of subframe, makes for existing UE in the art UE can not access channel in next subframe of the subframe, so as to vacate subframe, cause transmission resource waste The problem of there is provided a kind of ascending transmission method, UE, base station and system.Pass through base in the embodiment of the present invention The configured information sent of standing determines to carry out the detection resource of LBT detections, so as to be carried out in the detection resource LBT detection access channels, and uplink is carried out to base station using the channel in scheduled subframe, To avoid the occurrence of the subframe that can not access channel, to save transfer resource.
Referring to Fig. 1, Fig. 1 is schematic network structure provided in an embodiment of the present invention, as shown in figure 1, bag Include UE11 and base station.Wherein, UE11 can be mobile phone, tablet personal computer, personal computer, notebook Computer, wearable device etc. can be with the terminal devices of access network, it is necessary to which explanation, implements in the present invention UE11 particular type is not limited in example.UE11 can set up with base station 12 and communicate, and base station 12 can To be evolved base station (eNB, evolved Node B) or other base stations, it is necessary to explanation, The particular type of base station 12 is not limited in the embodiment of the present invention.
Based on the network structure shown in Fig. 1, the embodiment of the present invention provides a kind of ascending transmission method, such as Fig. 2 It is shown, comprise the following steps:
201st, the configured information that base station is sent is received.
202nd, determined to carry out the detection resource of LBT detections according to the configured information.
203rd, the LBT detections access channel is carried out in the detection resource, and made in scheduled subframe With the channel uplink is carried out to the base station.
In the present embodiment, above-mentioned configured information can serve to indicate that the detection resource for determining to carry out LBT detections, So step 202 can just determine above-mentioned detection resource according to the configured information.Wherein, above-mentioned detection resource It can be understood as carrying out the starting resource of LBT detections, i.e. step 202 to can be understood as determining to carry out LBT The original position of detection.Or above-mentioned detection resource is also understood that to carry out the money required for LBT detections Source, i.e. step 202 can be understood as the test position for determining to carry out LBT detections.In addition, above-mentioned detection Resource can include one or more symbol, or above-mentioned detection resource can also include in single symbol Partial content etc., is not construed as limiting to this present embodiment.Wherein, above-mentioned symbol can be OFDM Technology (OFDM, Orthogonal Frequency Division Multiplexing) symbol, or can be Single-carrier frequency division multiple access (SC-FDMA, Single-carrier Frequency-Division Multiple Access) Symbol.In addition, above-mentioned uplink can transmit upstream data or up signaling etc., to this present embodiment It is not construed as limiting.
In the present embodiment, above-mentioned channel can be physical uplink channel, for example:Physical Uplink Shared Channel (PUSCH, Physical Uplink Shared Channel), certainly, above-mentioned channel is also in some scenes Can be other physical uplink channels, for example:Physical layer RACH (PRACH, Physical Random Access Channel) etc., this present embodiment is not construed as limiting.
Wherein, above-mentioned scheduled subframe can be the subframe dispatched by UE, or above-mentioned scheduled subframe is also It is appreciated that after present sub-frame, i.e. UE access channels, subframe currently used UE.In addition, above-mentioned quilt Scheduling subframe can be with the son in FDD (FDD, Frequency Division Duplexing) radio frames Frame, or above-mentioned scheduled subframe can be time division duplex (TDD, Time Division Duplexing) Subframe in radio frames etc..In addition, above-mentioned detection resource could also belong to same nothing with above-mentioned scheduled subframe Line frame, i.e. step 202 can be that above-mentioned detection resource is determined in the radio frames, and in the radio frames Uplink is carried out in scheduled subframe.
In addition, above-mentioned uplink can refer to carrying out progress after LBT detections are successfully accessed above-mentioned channel Uplink.
As an alternative embodiment, step 202 can include:
, will be described scheduled if the configured information indicates that the scheduled subframe is configured without LBT resources The resource of the previous subframe of subframe is used as the detection resource for carrying out the LBT detections.
Wherein, above-mentioned configured information can be that the above-mentioned scheduled subframe of explicit or implicit instruction is configured without LBT resources.Wherein, it explicitly can be understood as above-mentioned configured information and be explicitly indicated above-mentioned scheduled subframe not having There are configuration LBT resources, implicitly can be understood as the above-mentioned scheduled subframe of above-mentioned configured information implicit indication and do not have There are configuration LBT resources, for example:Above-mentioned configured information includes LBT resource distribution fields, but in the field Portion is 0, and this 0 can represent that 0 symbol as above-mentioned LBT resources, that is, is configured without LBT resources. In addition, the previous subframe of above-mentioned scheduled subframe can be scheduled in the radio frames belonging to subframe to be scheduled The previous subframe of subframe, is not construed as limiting to this present embodiment.
In the embodiment, due to that can realize the resource of the previous subframe of scheduled subframe as above-mentioned Detection resource, i.e. step 203 can be the resource progress LBT detections in the previous frame of scheduled subframe, LBT detections are carried out before the border of scheduled subframe to realize, and are opened on the border of scheduled subframe Beginning uplink, so that the resource of the previous frame of scheduled subframe is effectively utilized, to avoid previous subframe The wasting of resources.
Optionally, in the embodiment, the resource of the above-mentioned previous subframe using the scheduled subframe as The step of carrying out the detection resource of the LBT detections, can include:
It regard the SRS symbols of the previous subframe of the scheduled subframe as the inspection for carrying out the LBT detections Survey resource.
In the embodiment, it is possible to achieve carry out LBT detections in the SRS symbols of previous subframe, so Uplink just can be started on the border of scheduled subframe.For example:As shown in figure 3, UE1 and UE2 LBT detections can be carried out in the SRS symbols of subframe 1, so that UE1 and UE2 is on the border of subframe 2 Start uplink, wherein, it is illustrated in accompanying drawing with the up upstream data that is transmitted as.
In the embodiment, it is possible to achieve start uplink on the border of scheduled subframe, i.e., need not be Scheduled sub-frame configuration LBT resources, for example:It is not scheduled sub-frame configuration clear channel assessment (CCA) time slot (CCA gap, Clear Channel Assessment gap), because CCA gap expense is larger, so Base station avoids the need for reserving CCA gap for each subframe, to save network transmission resource.Further, since Unauthorized frequency range cell (small cell) channel becomes slowly, and base station is not necessarily to as each SRS SRS transmission is configured, therefore, the embodiment uses and completes SRS to the time-multiplexed mode of SRS symbols Transmission and channel access, any transfer resource is not wasted.Certainly, in the embodiment, UE is accorded with SRS Number perform LBT detection be only UE according to base station indicate before sub-frame boundary perform LBT detect one Individual special case, however not excluded that multiple SC-FDMA semiology analysis LBT detections that UE can be before sub-frame boundary Situation.
In addition, in the embodiment, above-mentioned LBT detections can be before scheduled sub-frame boundary extremely Few 25us starts to perform CCA, i.e., be at least separated by 25us between above-mentioned SRS symbols and scheduled subframe, If CCA results represent that channel is spare time, UE access channel up biographies since scheduled sub-frame boundary It is defeated.Or above-mentioned LBT detection can start to perform CCA detections in the original positions of empty SRS symbols, Random back (back off) counter starts execution and counted down, if channel is examined before scheduled sub-frame boundary Survey as the spare time, and (back off) the counter countdown that retracts is 0, then UE accesses channel from scheduled subframe Boundary uplink, otherwise this access failure of UE, abandons sending upstream data.Wherein, it is above-mentioned LBT detection modes can be allocated to UE by base station, be not excluded for UE in some scenes certainly actively The mode of LBT detections is selected, this is not construed as limiting as embodiment.
In addition, above-mentioned SRS symbols can be the last symbol in subframe, or SRS symbols can be with It is the other symbols of subframe, this present embodiment is not construed as limiting.
Optionally, in above-mentioned embodiment, the resource of the above-mentioned previous subframe by the scheduled subframe is made The step of detection resource to carry out the LBT detections, it can include:
It regard the idling-resource of the previous subframe of the scheduled subframe as the inspection for carrying out the LBT detections Survey resource.
In the embodiment, it is possible to achieve scheduled subframe previous subframe idling-resource as above-mentioned Resource is detected, for example:It regard symbol idle in previous subframe as above-mentioned detection resource.The embodiment In, it can equally realize and start uplink on the border of scheduled subframe, i.e., need not be scheduled subframe Configure LBT resources.In addition, the embodiment that LBT is detected in the embodiment may be referred to implementation above The LBT detections introduced in mode, are not repeated herein.
It is above-mentioned to be determined to carry out LBT detections according to the configured information as in a kind of optional embodiment Detection resource, including:
If the configured information indicates that the scheduled sub-frame configuration has LBT resources, by the scheduled son LBT resources described in frame is used as the detection resource for carrying out the LBT operations.
In the embodiment, above-mentioned configured information can be that the above-mentioned scheduled subframe of explicit or implicit instruction is matched somebody with somebody It is equipped with LBT resources.Wherein, it explicitly can be understood as above-mentioned configured information and be explicitly indicated above-mentioned scheduled son Frame is configured with LBT resources, implicitly can be understood as the above-mentioned scheduled subframe of above-mentioned configured information implicit indication LBT resources are configured with, for example:Above-mentioned configured information includes LBT resource distribution fields, but in the field Portion is 1 or 2, and this 1 or 2 can represent 1 or 2 symbol as above-mentioned LBT resources.
In the embodiment, above-mentioned LBT resources can be CCA gap, wherein, the CCA gap can be with It is 1-2 OFDM symbol, specific size needs base station to configure.Wherein, in the embodiment, step 203 can carry out LBT detections in above-mentioned CCA gap, to access channel.For example:UE can be in quilt CCA is performed for starting at least 25us before the border of the resource of uplink in scheduling subframe, this When CCA Origin And Destinations completely in a symbolic range before the resource starting point for uplink, If CCA results channel is the spare time, UE access channels are transmitted using imperfect (partial) subframe uplink is transmitted. Wherein, the resource in above-mentioned scheduled subframe for uplink can be understood as scheduled subframe physically Row channel resource, for example:PUSCH resources.In addition, above-mentioned LBT detections can also be UE from CCA Gap original position starts to perform LBT detections, performs rollback (back off) counter countdown, if It is the spare time to be used for Channel Detection before the border of the resource of uplink in scheduled subframe, and (the back that retracts Off) counter countdown is 0, then UE accesses channel and carries out uplink, and otherwise this access of UE is lost Lose, abandon sending upstream data.The embodiment can be realized in the CCA gap after sub-frame boundary LBT detections are performed, to avoid the wasting of resources caused by SRS obstruction transmitting uplink datas.Wherein, Above-mentioned LBT detection modes can be allocated to UE by base station, be not excluded for UE in some scenes certainly The mode for actively selecting LBT to detect, is not construed as limiting to this as embodiment.
In addition, in some scenes, if above-mentioned configured information indicates that above-mentioned scheduled sub-frame configuration has LBT It is not precluded from resource, the present embodiment, UE can also equally use the money of the previous frame of scheduled subframe Source is simply used as above-mentioned detection resource as the detection resource for carrying out LBT detections using above-mentioned LBT resources Embodiment be preferential embodiment.And in some scenes, above-mentioned configured information also can indicate that Established rules really by advance negotiation, determine above-mentioned detection resource, UE can be with using in determination rule determination State detection resource.Wherein, determination rule can UE and base station consult in advance, such as determine rule Can be the previous subframe for using scheduled subframe resource as above-mentioned detection resource, or determine rule Can be the previous or multiple resource for using scheduled subframe as above-mentioned detection resource.
Optionally, in the embodiment, the above method can also comprise the following steps
Receive the signaling for the instruction occupancy SRS symbol progress uplink that the base station is sent;
It is above-mentioned in scheduled subframe using the channel to the base station carry out uplink the step of, can be with Including:
The channel is used in the resource including scheduled subframe includes SRS symbols according to the signaling Uplink is carried out to the base station.
In embodiment, it is possible to achieve uplink is carried out using the SRS symbols of subframe, because some fields SRS symbols do not dispatch SRS transmission in scape, uplink are carried out thereby using the SRS symbols, to keep away Exempt to waste empty SRS symbols.In addition, in the embodiment, not having in the previous subframe of scheduled subframe When dispatching any SRS transmission, UE can also use the SRS symbols of previous subframe to carry out uplink, For example:As shown in figure 4, SRS symbol transmission SRS are not dispatched in base station in SRS, base station is in quilt Dispatching the reserved CCA gap of frame is used for LBT detection channel access, can so be indicated by above-mentioned signaling UE1 and UE2 carries out the SRS symbols that uplink takes SRS, so that SRS transmission Complete subframe, rather than imperfect (partial) subframe of 13 symbols of primary standard, wherein, in accompanying drawing with Uplink is illustrated for upstream data.
Equally, in the embodiment, above-mentioned SRS symbols can be the last symbol in subframe, or Person SRS symbols can be the other symbols of subframe, and this present embodiment is not construed as limiting.
The realization it should be noted that embodiment of the plurality of optional of above-mentioned introduction can be combined with each other, with can To be implemented separately, this is not construed as limiting.
It should be noted that the above method can apply to unauthorized frequency range LTE (i.e. LTE-U or U-LTE), i.e., above-mentioned channel can be the channel of unauthorized frequency range.In addition, the above method can apply to The UE in network structure shown in Fig. 1.
The present embodiment, receives the configured information that base station is sent, and determine progress LBT according to the configured information The detection resource of detection, the LBT detections access channel is carried out in the detection resource, and scheduled In subframe uplink is carried out using the channel to the base station.It can so realize according in configured information The detection resource of determination carries out LBT access channels, so as to avoid the occurrence of the subframe that can not access channel, To save transfer resource, and then the problem of solve transmission resource waste.
Based on the network structure shown in Fig. 1, the embodiment of the present invention provides another ascending transmission method, such as schemes Shown in 5, comprise the following steps:
501st, configured information is sent to UE, so that the UE determines to carry out LBT according to the configured information The detection resource of detection, the LBT detections access channel is carried out in the detection resource.
502nd, the uplink that the UE is carried out in scheduled subframe using the channel is received.
Wherein, step 501 and 502 embodiment may refer in embodiment illustrated in fig. 2 on step 201st, 202 and 203 embodiment, here is omitted.
As an alternative embodiment, the configured information can indicate that the scheduled subframe is not matched somebody with somebody LBT resources are put, so that the UE regard the resource of the previous subframe of the scheduled subframe as progress The detection resource of the LBT detections.
Optionally, in the embodiment, above-mentioned detection resource can be the previous height of the scheduled subframe The SRS symbols of frame;Or
Above-mentioned detection resource can be the idling-resource of the previous subframe of the scheduled subframe.
Wherein, the embodiment may refer in the embodiment shown in Fig. 2 on the configured information instruction quilt Scheduling subframe is configured without the embodiment of LBT resources, and here is omitted.
As an alternative embodiment, above-mentioned configured information can indicate that the scheduled sub-frame configuration has LBT resources, so that the UE regard LBT resources described in the scheduled subframe as the progress LBT The detection resource of operation.
Optionally, in the embodiment, the above method can also comprise the following steps:
Sent to the UE and indicate to take the signaling that SRS symbols carry out uplink;
The step of uplink that the above-mentioned reception UE is carried out in scheduled subframe using the channel, It can include:
The UE is received according to the signaling in the resource including scheduled subframe includes SRS symbols The uplink carried out using the channel.
Wherein, the embodiment may refer in the embodiment shown in Fig. 2 on the configured information instruction quilt The embodiment of the LBT resources of scheduling subframe configuration, here is omitted.
It should be noted that the above method can apply to unauthorized frequency range LTE (i.e. LTE-U or U-LTE), i.e., above-mentioned channel can be the channel of unauthorized frequency range.In addition, the above method can apply to The base station in network structure shown in Fig. 1.
The present embodiment, configured information is sent to UE, so that UE determines to carry out LBT according to the configured information The detection resource of detection, carries out the LBT detections access channel in the detection resource, receives the UE The uplink carried out in scheduled subframe using the channel.Can so realize is made by configured information The detection resource that UE is determined carries out LBT access channels, so as to avoid the occurrence of the son that can not access channel Frame, to save transfer resource, and then the problem of solve transmission resource waste.
Referring to Fig. 6, a kind of UE structure is shown in figure, the UE includes following module:
First receiving module 61, the configured information for receiving base station transmission;
Determining module 62, for being determined to carry out the detection resource of LBT detections according to the configured information;
Transport module 63, for carrying out the LBT detections access channel in the detection resource, and in quilt In scheduling subframe uplink is carried out using the channel to the base station.
If referring to as an alternative embodiment, the determining module 62 can be used for the configured information Show that the scheduled subframe is configured without LBT resources, by the money of the previous subframe of the scheduled subframe Source is used as the detection resource for carrying out the LBT detections.
Optionally, in the embodiment, determining module 62 is used for the previous height of the scheduled subframe The SRS symbols of frame are used as the detection resource for carrying out the LBT detections;Or
Determining module 62 can be used for the idling-resource of the previous subframe of the scheduled subframe as entering The detection resource of the row LBT detections.
If as an alternative embodiment, determining module 62, which can be used for the configured information, indicates institute Stating scheduled sub-frame configuration has LBT resources, regard LBT resources described in the scheduled subframe as progress The detection resource of the LBT operations.
Optionally, in the embodiment, as shown in fig. 7, the UE can also include:
Second receiving module 64, it is up that the instruction for receiving the base station transmission takes the progress of SRS symbols The signaling of transmission;
The transport module 63 can be used for including SRS symbols in scheduled subframe according to the signaling existing In interior resource uplink is carried out using the channel to the base station.
In the present embodiment, above-mentioned UE can be the UE in the embodiment shown in Fig. 1-Fig. 5, and Fig. 1-figure UE any embodiment can be realized by the UE in the present embodiment in embodiment shown in 5, this In repeat no more.Above-mentioned UE can save transfer resource.
Referring to Fig. 8, a kind of structure of base station is shown in figure, the base station includes following module:
First sending module 81, for sending configured information to UE, so that the UE is indicated according to described Information determines to carry out the detection resource of LBT detections, in the detection resource progress LBT detections access Channel.
Receiving module 82, for receive the UE in scheduled subframe using the channel carry out it is up Transmission.
As an alternative embodiment, above-mentioned configured information can indicate that the scheduled subframe is not matched somebody with somebody LBT resources are put, so that the UE regard the resource of the previous subframe of the scheduled subframe as progress The detection resource of the LBT detections.
Optionally, in the embodiment, above-mentioned detection resource can be the previous height of the scheduled subframe The SRS symbols of frame;Or
Above-mentioned detection resource can be the idling-resource of the previous subframe of the scheduled subframe.
As an alternative embodiment, above-mentioned configured information can indicate that the scheduled sub-frame configuration has LBT resources, so that the UE regard LBT resources described in the scheduled subframe as the progress LBT The detection resource of operation.
Optionally, embodiment, as shown in figure 9, above-mentioned base station can also include:
Second sending module 83, indicates that taking SRS symbols carries out uplink for being sent to the UE Signaling;
Receiving module 82 can be used for receiving the UE and be included according to the signaling in scheduled subframe The uplink carried out in resource including SRS symbols using the channel.
In the present embodiment, above-mentioned base station can be the base station in the embodiment shown in Fig. 1-Fig. 5, and Fig. 1- Any embodiment of base station can be realized by the base station in the present embodiment in embodiment shown in Fig. 5, Here repeat no more.Above-mentioned base station can save transfer resource.
Referring to Figure 10, a kind of UE structure is shown in figure, the UE includes:Processor 1000, transmitting-receiving Machine 1010, memory 1020, user interface 1030 and EBI, wherein:
Processor 1000, for reading the program in memory 1020, performs following process:
The configured information that base station is sent is received by transceiver 1010;
Determined to carry out the detection resource of LBT detections according to the configured information;
The LBT detections access channel is carried out in the detection resource, and institute is used in scheduled subframe State channel and carry out uplink to the base station.
Wherein, transceiver 1010, for data to be received and sent under the control of processor 1000.
In Fig. 10, bus architecture can include the bus and bridge of any number of interconnection, specifically by handling The various circuits link for the memory that the one or more processors and memory 1020 that device 1000 is represented are represented Together.Bus architecture can also be by each of such as ancillary equipment, voltage-stablizer and management circuit or the like Plant other circuits to link together, these are all it is known in the art, therefore, herein no longer carrying out it Further describe.EBI provides interface.Transceiver 1010 can be multiple element, i.e., including sending There is provided the unit for being communicated over a transmission medium with various other devices for machine and receiver.For different User equipment, user interface 1030 can also be can it is external it is inscribed need the interface of equipment, connection is set Standby including but not limited to keypad, display, loudspeaker, microphone, control stick etc..
Processor 1000 is responsible for bus architecture and common processing, and memory 1020 can store processing The used data when performing operation of device 1000.
As an alternative embodiment, the execution of processor 1000 is above-mentioned true according to the configured information Surely the detection resource of LBT detections is carried out, can be included:
, will be described scheduled if the configured information indicates that the scheduled subframe is configured without LBT resources The resource of the previous subframe of subframe is used as the detection resource for carrying out the LBT detections.
Optionally, in the embodiment, processor 1000 perform by the previous of the scheduled subframe The resource of subframe can include as the detection resource for carrying out the LBT detections:
The detection reference signal SRS symbols of the previous subframe of the scheduled subframe is described as carrying out The detection resource of LBT detections;Or
It regard the idling-resource of the previous subframe of the scheduled subframe as the inspection for carrying out the LBT detections Survey resource.
As an alternative embodiment, processor 1000 perform according to the configured information determine into The detection resource of row LBT detections, can include:
If the configured information indicates that the scheduled sub-frame configuration has LBT resources, by the scheduled son LBT resources described in frame is used as the detection resource for carrying out the LBT operations.
Optionally, in the embodiment, processor 1000 can also carry out following process:
Receive the signaling for the instruction occupancy SRS symbol progress uplink that the base station is sent;
What processor 1000 was performed uses the channel to carry out up pass to the base station in scheduled subframe It is defeated, it can include:
The channel is used in the resource including scheduled subframe includes SRS symbols according to the signaling Uplink is carried out to the base station.
In the present embodiment, above-mentioned UE can be the UE in the embodiment shown in Fig. 1-Fig. 5, and Fig. 1-figure UE any embodiment can be realized by the UE in the present embodiment in embodiment shown in 5, this In repeat no more.Above-mentioned UE can save transfer resource.
Referring to Figure 11, a kind of structure of base station is shown in figure, the base station includes:Processor 1100, transmitting-receiving Machine 1110, memory 1120, user interface 1130 and EBI, wherein:
Processor 1100, for reading the program in memory 1120, performs following process:
Configured information is sent to UE by transceiver 1110, so that the UE is true according to the configured information Surely the detection resource of LBT detections is carried out, the LBT detections access channel is carried out in the detection resource;
By transceiver 1110 receive the UE in scheduled subframe using the channel carry out it is up Transmission.
Transceiver 1110, for data to be received and sent under the control of processor 1100.
Wherein, in fig. 11, bus architecture can include the bus and bridge of any number of interconnection, specifically The various electricity for the memory that the one or more processors and memory 1120 represented by processor 1100 are represented Road is linked together.Bus architecture can also by ancillary equipment, voltage-stablizer and management circuit etc. it Various other circuits of class are linked together, these be all it is known in the art, therefore, it is no longer right herein It is described further.EBI provides interface.Transceiver 1110 can be multiple element, that is, wrap Including transmitter and transceiver, there is provided the unit for being communicated over a transmission medium with various other devices.Processing Device 1100 is responsible for bus architecture and common processing, and memory 1120 can store processor 1100 The used data when performing operation.
Processor 1100 is responsible for bus architecture and common processing, and memory 1120 can store processing The used data when performing operation of device 1100.
As an alternative embodiment, above-mentioned configured information can indicate that the scheduled subframe is not matched somebody with somebody LBT resources are put, so that the UE regard the resource of the previous subframe of the scheduled subframe as progress The detection resource of the LBT detections.
Optionally, in the embodiment, above-mentioned detection resource can be the previous height of the scheduled subframe The SRS symbols of frame;Or
Above-mentioned detection resource can be the idling-resource of the previous subframe of the scheduled subframe.
As an alternative embodiment, above-mentioned configured information can indicate that the scheduled sub-frame configuration has LBT resources, so that the UE regard LBT resources described in the scheduled subframe as the progress LBT The detection resource of operation.
Optionally, in the embodiment, processor 1100 can also carry out following process:
Sent to the UE and indicate to take the signaling that SRS symbols carry out uplink;
What processor 1100 was performed receive the UE by transceiver 1110 uses institute in scheduled subframe The uplink of channel progress is stated, including:
By transceiver 1110 receive the UE according to the signaling scheduled subframe include SRS symbol The uplink carried out in resource including number using the channel.
In the present embodiment, above-mentioned base station can be the base station in the embodiment shown in Fig. 1-Fig. 5, and Fig. 1- Any embodiment of base station can be realized by the base station in the present embodiment in embodiment shown in Fig. 5, Here repeat no more.Above-mentioned base station can save transfer resource.
Referring to Figure 12, a kind of structure of uplink system is shown in figure, the system includes:
Base station 121, for sending configured information to UE122;
UE122, the configured information for receiving base station transmission;
UE122 is additionally operable to be determined to carry out the detection resource of LBT detections according to the configured information;
UE122 is additionally operable to carry out the LBT detections access channel in the detection resource, and scheduled In subframe uplink is carried out using the channel to the base station;
Base station 121 be additionally operable to receive UE122 in the scheduled subframe using the channel carry out it is upper Row transmission.
In the present embodiment, base station 121 and UE122 can be the bases introduced in Fig. 1-embodiment illustrated in fig. 11 Stand and UE, embodiments thereof be able to can also reach identical referring to the embodiment shown in Fig. 1-Figure 11 Technique effect, will not be repeated here.
, can be with several embodiments provided herein, it should be understood that disclosed method and apparatus Realize by another way.For example, device embodiment described above is only schematical, for example, The division of the unit, only a kind of division of logic function, can there is other division side when actually realizing Formula, such as multiple units or component can combine or be desirably integrated into another system, or some features can To ignore, or do not perform.It is another, shown or discussed coupling or direct-coupling or logical each other Letter connection can be by some interfaces, the INDIRECT COUPLING or communication connection of device or unit, can be it is electrical, Machinery or other forms.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing unit, Can also be that the independent physics of unit includes, can also two or more units be integrated in a unit In.Above-mentioned integrated unit can both be realized in the form of hardware, it would however also be possible to employ hardware adds software function The form of unit is realized.
The above-mentioned integrated unit realized in the form of SFU software functional unit, can be stored in a computer can Read in storage medium.Above-mentioned SFU software functional unit is stored in a storage medium, including some instructions are used To cause a computer equipment (can be personal computer, server, or network equipment etc.) to perform The part steps of receiving/transmission method described in each embodiment of the invention.And foregoing storage medium includes:USB flash disk, Mobile hard disk, read-only storage (Read-Only Memory, abbreviation ROM), random access memory (Random Access Memory, abbreviation RAM), magnetic disc or CD etc. are various can be with storage program generation The medium of code.
Described above is the preferred embodiment of the present invention, it is noted that for the common skill of the art For art personnel, on the premise of principle of the present invention is not departed from, some improvements and modifications can also be made, These improvements and modifications also should be regarded as protection scope of the present invention.

Claims (21)

1. a kind of ascending transmission method, it is characterised in that including:
Receive the configured information that base station is sent;
Determined to carry out the detection resource of listem-before-talk LBT detections according to the configured information;
The LBT detections access channel is carried out in the detection resource, and institute is used in scheduled subframe State channel and carry out uplink to the base station.
2. the method as described in claim 1, it is characterised in that described to be determined according to the configured information The detection resource of LBT detections is carried out, including:
, will be described scheduled if the configured information indicates that the scheduled subframe is configured without LBT resources The resource of the previous subframe of subframe is used as the detection resource for carrying out the LBT detections.
3. method as claimed in claim 2, it is characterised in that described by before the scheduled subframe The resource of one subframe as the detection resource for carrying out the LBT detections, including:
The detection reference signal SRS symbols of the previous subframe of the scheduled subframe is described as carrying out The detection resource of LBT detections;Or
It regard the idling-resource of the previous subframe of the scheduled subframe as the inspection for carrying out the LBT detections Survey resource.
4. the method as any one of claim 1-3, it is characterised in that described to be referred to according to described Show that information determines to carry out the detection resource of LBT detections, including:
If the configured information indicates that the scheduled sub-frame configuration has LBT resources, by the scheduled son LBT resources described in frame is used as the detection resource for carrying out the LBT operations.
5. method as claimed in claim 4, it is characterised in that methods described also includes:
Receive the signaling for the instruction occupancy SRS symbol progress uplink that the base station is sent;
It is described to carry out uplink to the base station using the channel in scheduled subframe, including:
The channel is used in the resource including scheduled subframe includes SRS symbols according to the signaling Uplink is carried out to the base station.
6. a kind of ascending transmission method, it is characterised in that including:
Configured information is sent to UE, so that the UE determines to carry out LBT detections according to the configured information Detection resource, carry out LBT detection access channel in the detection resource;
Receive the uplink that the UE is carried out in scheduled subframe using the channel.
7. method as claimed in claim 6, it is characterised in that the configured information indicates described adjusted Degree subframe is configured without LBT resources, so that the UE is by the previous subframe of the scheduled subframe Resource is used as the detection resource for carrying out the LBT detections.
8. method as claimed in claim 7, it is characterised in that the detection resource is described scheduled The SRS symbols of the previous subframe of subframe;Or
The detection resource is the idling-resource of the previous subframe of the scheduled subframe.
9. method as claimed in claim 6, it is characterised in that the configured information indicates described adjusted Degree sub-frame configuration has LBT resources, so that the UE makees LBT resources described in the scheduled subframe To carry out the detection resource of the LBT operations.
10. method as claimed in claim 9, it is characterised in that methods described also includes:
Sent to the UE and indicate to take the signaling that SRS symbols carry out uplink;
The uplink that the reception UE is carried out in scheduled subframe using the channel, including:
The UE is received according to the signaling in the resource including scheduled subframe includes SRS symbols The uplink carried out using the channel.
11. a kind of UE, it is characterised in that including:
First receiving module, the configured information for receiving base station transmission;
Determining module, for being determined to carry out the detection resource of LBT detections according to the configured information;
Transport module, for carrying out the LBT detections access channel in the detection resource, and is being adjusted Spending in subframe uses the channel to carry out uplink to the base station.
12. UE as claimed in claim 11, it is characterised in that if the determining module is used for described refer to Show that information indicates that the scheduled subframe is configured without LBT resources, by the previous of the scheduled subframe The resource of subframe is used as the detection resource for carrying out the LBT detections.
13. UE as claimed in claim 12, it is characterised in that the determining module is used for the quilt The SRS symbols of the previous subframe of scheduling subframe are used as the detection resource for carrying out the LBT detections;Or
The determining module is used to regard the idling-resource of the previous subframe of the scheduled subframe as progress The detection resource of the LBT detections.
14. the UE as any one of claim 11-13, it is characterised in that the determining module If indicating that the scheduled sub-frame configuration has LBT resources for the configured information, by the scheduled son LBT resources described in frame is used as the detection resource for carrying out the LBT operations.
15. UE as claimed in claim 14, it is characterised in that the UE also includes:
Second receiving module, the up biography of SRS symbols progress is taken for receiving the instruction that the base station is sent Defeated signaling;
The transport module is used for the money including scheduled subframe includes SRS symbols according to the signaling In source uplink is carried out using the channel to the base station.
16. a kind of base station, it is characterised in that including:
First sending module, for sending configured information to UE, so that the UE indicates to believe according to described Breath determines to carry out the detection resource of LBT detections, in the detection resource progress LBT detections access letter Road;
Receiving module, for receiving the up biography that the UE is carried out in scheduled subframe using the channel It is defeated.
17. base station as claimed in claim 16, it is characterised in that the configured information indicates the quilt Scheduling subframe is configured without LBT resources, so that the UE is by the previous subframe of the scheduled subframe Resource be used as the detection resource for carrying out the LBT detections.
18. base station as claimed in claim 17, it is characterised in that the detection resource is adjusted to be described Spend the SRS symbols of the previous subframe of subframe;Or
The detection resource is the idling-resource of the previous subframe of the scheduled subframe.
19. base station as claimed in claim 16, it is characterised in that the configured information indicates the quilt Scheduling subframe is configured with LBT resources, so that the UE is by LBT resources described in the scheduled subframe It is used as the detection resource for carrying out the LBT operations.
20. base station as claimed in claim 19, it is characterised in that the base station also includes:
Second sending module, indicates that taking SRS symbols carries out uplink for being sent to the UE Signaling;
The receiving module includes SRS according to the signaling for receiving the UE in scheduled subframe The uplink carried out in resource including symbol using the channel.
21. a kind of uplink system, it is characterised in that including:
Base station, for sending configured information to UE;
The UE, the configured information for receiving base station transmission;
The UE is additionally operable to be determined to carry out the detection resource of LBT detections according to the configured information;
The UE is additionally operable to carry out the LBT detections access channel in the detection resource, and is being adjusted Spending in subframe uses the channel to carry out uplink to the base station;
The base station be additionally operable to receive the UE in the scheduled subframe using the channel carry out it is upper Row transmission.
CN201610197551.0A 2016-03-31 2016-03-31 Uplink transmission method, UE, base station and system Active CN107295648B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201610197551.0A CN107295648B (en) 2016-03-31 2016-03-31 Uplink transmission method, UE, base station and system
PCT/CN2017/078570 WO2017167196A1 (en) 2016-03-31 2017-03-29 Uplink transmission method, user equipment, base station and system
TW106110682A TWI655852B (en) 2016-03-31 2017-03-30 Uplink transmission method, user equipment, base station and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610197551.0A CN107295648B (en) 2016-03-31 2016-03-31 Uplink transmission method, UE, base station and system

Publications (2)

Publication Number Publication Date
CN107295648A true CN107295648A (en) 2017-10-24
CN107295648B CN107295648B (en) 2020-03-06

Family

ID=59962598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610197551.0A Active CN107295648B (en) 2016-03-31 2016-03-31 Uplink transmission method, UE, base station and system

Country Status (3)

Country Link
CN (1) CN107295648B (en)
TW (1) TWI655852B (en)
WO (1) WO2017167196A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110167187A (en) * 2018-02-13 2019-08-23 展讯通信(上海)有限公司 Configuration method, equipment and the readable medium of LBT strategy in unlicensed spectrum
WO2020143057A1 (en) * 2019-01-11 2020-07-16 Oppo广东移动通信有限公司 Method and apparatus for determining channel access scheme, terminal device, and network device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20230319932A1 (en) * 2020-08-07 2023-10-05 Lenovo (Beijing) Limited Methods and apparatus for providing assistant information for uplink scheduling

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104333902A (en) * 2014-11-06 2015-02-04 东莞宇龙通信科技有限公司 Data synchronization method, synchronization system, equipment having base station functions and terminal
CN105227282A (en) * 2014-07-04 2016-01-06 上海朗帛通信技术有限公司 A kind of method and apparatus of LAA Resourse Distribute

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7990944B2 (en) * 2007-09-06 2011-08-02 Wi-Lan, Inc. Contention-based communication
KR101099345B1 (en) * 2010-12-01 2011-12-26 엘지전자 주식회사 Method for channel sounding in wireless local area network and apparatus for the same
US9717071B2 (en) * 2013-08-16 2017-07-25 Qualcomm Incorporated Uplink procedures for LTE/LTE-A communication systems with unlicensed spectrum
US9681325B2 (en) * 2013-12-19 2017-06-13 Qualcomm Incorporated Channel and interference measurement in LTE/LTE-A networks including unlicensed spectrum
KR102247085B1 (en) * 2014-09-01 2021-04-30 삼성전자주식회사 Scheme for communcation in mobile communication system using unlicensed frequency band

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105227282A (en) * 2014-07-04 2016-01-06 上海朗帛通信技术有限公司 A kind of method and apparatus of LAA Resourse Distribute
CN104333902A (en) * 2014-11-06 2015-02-04 东莞宇龙通信科技有限公司 Data synchronization method, synchronization system, equipment having base station functions and terminal

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
HUAWEI, HISILICON: "UL transmission design for LAA", 《3GPP TSG RAN WG1 MEETING #81 R1-153228》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110167187A (en) * 2018-02-13 2019-08-23 展讯通信(上海)有限公司 Configuration method, equipment and the readable medium of LBT strategy in unlicensed spectrum
WO2020143057A1 (en) * 2019-01-11 2020-07-16 Oppo广东移动通信有限公司 Method and apparatus for determining channel access scheme, terminal device, and network device
CN113518470A (en) * 2019-01-11 2021-10-19 Oppo广东移动通信有限公司 Method and device for determining channel access scheme, terminal equipment and network equipment
US11737110B2 (en) 2019-01-11 2023-08-22 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Method and apparatus for determining channel access scheme, terminal device, and network device

Also Published As

Publication number Publication date
TWI655852B (en) 2019-04-01
TW201737668A (en) 2017-10-16
WO2017167196A1 (en) 2017-10-05
CN107295648B (en) 2020-03-06

Similar Documents

Publication Publication Date Title
CN104796920B (en) Data transmission method, base station and terminal device
CN106605441A (en) Low-latency, low-bandwidth and low duty cycle operation in a wireless communication system
CN109155726A (en) Information transferring method, device, system and storage medium
CN104871447B (en) Special subframe is mapped within a wireless communication network
CN108282895A (en) A kind of accidental access method and terminal
CN105940749A (en) Techniques for prioritizing the reporting of uplink control information for cells utilizing contention based radio frequency spectrum
CN107040953A (en) The transmission method and equipment of PRACH signals in a kind of unlicensed spectrum
CN107534637A (en) Method and apparatus for receiving control signaling in the SCELL that is operated on unauthorized carrier wave
CN106851822A (en) Transmission method and user terminal
CN105934921A (en) System and method for device-to-device synchronization
CN107041000A (en) The transmission method and device of ascending control information
CN107113832A (en) For first communication device, secondary communication device and the method therein of the instruction for sending and receiving subframe type respectively
CN105636223B (en) A kind of uplink dispatch method, apparatus and system
CN103476121A (en) Method and apparatus for bit-level PDSCH muting and/or receiver puncturing in LTE-advanced heterogeneous networks
CN107801243A (en) A kind of downlink transmission method and device
CN107294646A (en) A kind of information feedback method, base station and terminal
CN110505697A (en) A kind of transmission method of hybrid automatic repeat-request, terminal and base station
CN107040342A (en) A kind of method and apparatus of transmitting uplink control information
CN107197523A (en) A kind of method and apparatus for configuring and determining semi-continuous scheduling
CN105722222A (en) Method and apparatus for managing resources in non-authorized carrier waves
CN107294577A (en) Electronic equipment and wireless communications method in wireless communication system
CN103002477A (en) Scheduling information transmission method, user equipment and base station
CN110324898A (en) Physical Downlink Shared Channel receives and its time-domain resource indicating means, device, storage medium, base station, terminal
CN106789826A (en) Downlink transfer detection method, base station and terminal
CN108292981A (en) Mthods, systems and devices

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20210607

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right