CN107288609A - A kind of fracture technology suitable for high-dip structure coal seam - Google Patents

A kind of fracture technology suitable for high-dip structure coal seam Download PDF

Info

Publication number
CN107288609A
CN107288609A CN201710697552.6A CN201710697552A CN107288609A CN 107288609 A CN107288609 A CN 107288609A CN 201710697552 A CN201710697552 A CN 201710697552A CN 107288609 A CN107288609 A CN 107288609A
Authority
CN
China
Prior art keywords
fluid
fracturing
fracturing fluid
coal seam
stage load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710697552.6A
Other languages
Chinese (zh)
Inventor
李特社
王理国
唐兆青
张建龙
胡刚
张义
杨晓盈
吴轩宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Unconventional Natural Gas Exploration And Utilization Engineering Research Center Co Ltd
Original Assignee
Guizhou Unconventional Natural Gas Exploration And Utilization Engineering Research Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Unconventional Natural Gas Exploration And Utilization Engineering Research Center Co Ltd filed Critical Guizhou Unconventional Natural Gas Exploration And Utilization Engineering Research Center Co Ltd
Priority to CN201710697552.6A priority Critical patent/CN107288609A/en
Publication of CN107288609A publication Critical patent/CN107288609A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Solid Fuels And Fuel-Associated Substances (AREA)

Abstract

The invention belongs to coal bed fracturing renovation technique field, in particular to a kind of fracture technology suitable for high-dip structure coal seam, comprise the following steps:A, it is pumped into prepad fluid;Prepad fluid includes prepad fluid proppant and prepad fluid fracturing fluid, and prepad fluid proppant is the quartzy flour sand of 70 100 mesh, and prepad fluid fracturing fluid is active water fracturing fluid;B, it is pumped into load fluid;Early stage load fluid proppant is 40 70 mesh low-density fine sands, and early stage load fluid fracturing fluid is active water fracturing fluid;Later stage load fluid proppant is sand in 20 40 mesh quartz, and later stage load fluid fracturing fluid includes linear fracturing fluid and biology enzyme low temperature gel breaker;C, it is pumped into displacement fluid;Displacement fluid is active water fracturing fluid.The high-dip structure coal bed fracturing renovation technique that the present invention is provided is using change particle diameter proppant combination technique and active water fracturing fluid+linear fracturing fluid combination technique, the problem such as easy sand plug, supporting crack radius are short when solving high steep coal bed fracturing, coal seam transformation is insufficient, improves coal bed gas well gas production.

Description

A kind of fracture technology suitable for high-dip structure coal seam
Technical field
The present invention relates to a kind of fracture technology suitable for high-dip structure coal seam, belong to coal bed fracturing renovation technique neck Domain.
Background technology
China's cbm development is still in exploratory stage, the still prematurity of correlation theory technology.There is low hole because of coal seam, it is ultralow Ooze, the features such as anisotropism is strong, so coal bed gas well improves coal bed gas oozing in well only by artificial hydraulic fracturing technology Circulation road, could obtain the industrial production capacity with extraction value.And in south China, especially Guizhou In The Northwest Guizhou, ground end The Coal bed gas project very abundant contained in coal seam, but this area because tectonic movement is formd substantial amounts of high-dip structure coal Layer, makes the exploitation faces enormous challenge of this area's coal bed gas.Compared with conventional coal seam, high-dip structure coal seam, which generally has, buries Deeply, the characteristics of inclination angle is big, anisotropy is strong, therefore there are larger technological difficulties for the fracturing reform in high-dip structure coal seam.
Active water sand fracturing, proppant grain are typically used currently for the artificial hydraulic fracturing renovation technique in common coal seam Footpath is that 70~40 mesh and 40~20 mesh mixing particle diameters are constituted, and sand accounts for more than the 70% of proppant total amount in quartz.But for For the fracturing reform in high-dip structure coal seam, due to being influenceed by gravity, near wellbore zone being gathered in high density proppants, if should more With the artificial hydraulic fracturing renovation technique in common coal seam fracturing fluid leak can be caused serious, sand plug occur, cause supporting crack half Footpath is short, and is unfavorable for effective support in secondary crack, makes coal bed fracturing correctional effect undesirable.
The content of the invention
The invention provides a kind of fracture technology suitable for high-dip structure coal seam, it is intended that solving existing The above mentioned problem that technology is present.
Technical scheme is as follows:
The invention provides a kind of fracture technology suitable for high-dip structure coal seam, comprise the following steps:
A, prepad fluid of the sand than 3%-9% is injected into coal bed gas well using pressure break pump truck;Prepad fluid includes prepad fluid branch Agent and prepad fluid fracturing fluid are supportted, prepad fluid proppant is the quartzy flour sand of 70-100 mesh, and prepad fluid fracturing fluid is active water fracturing fluid, The wherein quartzy flour sand weight ratio of 70-100 mesh is 20%-30%;
B, load fluid of the sand than 8%-15% is injected into coal bed gas well using pressure break pump truck;Load fluid is divided into early stage and taken again Sand liquid and later stage load fluid, early stage load fluid include early stage load fluid proppant and early stage load fluid fracturing fluid, later stage load fluid Including later stage load fluid proppant and later stage load fluid fracturing fluid;
Early stage load fluid proppant is 40-70 mesh low-density fine sands, and early stage load fluid fracturing fluid is active water fracturing fluid, its Middle 40-70 mesh low-density fine sand weight ratio is 30%-40%;
Later stage load fluid proppant be 20-40 mesh quartz in sand, later stage load fluid fracturing fluid include linear fracturing fluid and Sand weight ratio is 40%-50% in biology enzyme low temperature gel breaker, wherein 20-40 mesh quartz;
C, using pressure break pump truck displacement fluid is injected into coal bed gas well;Displacement fluid is active water fracturing fluid.
In the embodiment that the present invention is provided, in above-mentioned steps A, prepad fluid accounts for the 50%-60% for being pumped into total liquid measure.
In the embodiment that the present invention is provided, in above-mentioned steps A, active water fracturing fluid includes clear water, expansion-resisting agent KCL and (contained Measure as 1%-2%) and cleanup additive (content is 0.2%-0.3%).
In the embodiment that the present invention is provided, in above-mentioned steps B, into coal bed gas well, injection load fluid is divided into following two again Step:
(1) early stage load fluid is injected, for supporting secondary crack;
(2) later stage load fluid is injected, for supporting waterpower major fracture.
In the embodiment that the present invention is provided, in above-mentioned steps B, linear fracturing fluid includes clear water, expansion-resisting agent KCL and (contained Measure as 1%-2%), cleanup additive (content is 0.2%-0.3%) and hydroxypropyl guanidine your glue (content is 0.3%-0.35%), linearly The viscosity of fracturing fluid is 30-35cp, and it accounts for the 20%-25% for being pumped into total liquid measure.
In the embodiment that the present invention is provided, in above-mentioned steps B, biology enzyme low temperature gel breaker concentration is 0.0005%- 0.0005%.
In the embodiment that the present invention is provided, expansion-resisting agent KCL's contains in above-mentioned active water fracturing fluid and linear fracturing fluid Measure and determined by the natural gamma value (GR) of coal seam well fracturing section:
If GR≤45API, KCL content are 1%;
If 45API < GR≤60API, KCL contents are 1.5%;
If 60API < GR, KCL content are 2%.
In the embodiment that the present invention is provided, the discharge capacity of above-mentioned fracturing pump is 6m3/min-8m3/min。
In the embodiment that the present invention is provided, every meter of coal seam thickness sand feeding amount is 9m3-10m3, pressurize and split liquid measure (active water Fracturing fluid and linear fracturing fluid) it is 200m3-250m3
Beneficial effects of the present invention are:The present invention is using particle diameter proppant combination technique is become, and quartzy flour sand, which is used to reduce, presses Liquid leak-off, Kong Zhaoxia and support microcrack are split, low-density fine sand is used to support sand in secondary crack, quartz to be used to support waterpower Major fracture, improves fracture condudtiviy, and multistage when solving high-dip structure coal bed gas well pressure break crack is effectively supported, coal seam changes Make insufficient technological difficulties;Fracturing fluid of the present invention is using active water fracturing fluid+linear fracturing fluid combination technique, in maximum limit Under conditions of degree reduces fracturing fluid to coal seam pollution, the prop-carrying capacity of fracturing fluid is improved, the leak-off of fracturing fluid is reduced, solves coal Layer gas well short technological difficulties of easy sand plug, supporting crack radius in fracturing reform.
Embodiment
Based on the embodiment in the present invention, those of ordinary skill in the art institute under the premise of creative work is not made The all other embodiment obtained, belongs to the scope of protection of the invention.
The invention provides a kind of fracture technology suitable for high-dip structure coal seam, comprise the following steps:
A, prepad fluid of the sand than 3%-9% is injected into coal bed gas well using pressure break pump truck;Prepad fluid includes prepad fluid branch Agent and prepad fluid fracturing fluid are supportted, prepad fluid proppant is the quartzy flour sand of 70-100 mesh, and prepad fluid fracturing fluid is active water fracturing fluid, The wherein quartzy flour sand weight ratio of 70-100 mesh is 20%-30%;
B, load fluid of the sand than 8%-15% is injected into coal bed gas well using pressure break pump truck;Load fluid is divided into early stage and taken again Sand liquid and later stage load fluid, early stage load fluid include early stage load fluid proppant and early stage load fluid fracturing fluid, later stage load fluid Including later stage load fluid proppant and later stage load fluid fracturing fluid;
Early stage load fluid proppant is 40-70 mesh low-density fine sands, and early stage load fluid fracturing fluid is active water fracturing fluid, its Middle 40-70 mesh low-density fine sand weight ratio is 30%-40%;
Later stage load fluid proppant be 20-40 mesh quartz in sand, later stage load fluid fracturing fluid include linear fracturing fluid and Sand weight ratio is 40%-50% in biology enzyme low temperature gel breaker, wherein 20-40 mesh quartz;
C, using pressure break pump truck displacement fluid is injected into coal bed gas well;Displacement fluid is active water fracturing fluid.
Specifically, in the embodiment that the present invention is provided, the quartzy flour sand of above-mentioned 70-100 mesh rubs for reducing leak-off, eyelet Resistance and support microcrack;Above-mentioned 40-70 mesh low-density fine sand is used to support secondary crack;Sand is used to support in 20-40 mesh quartz Waterpower major fracture and the flow conductivity for improving nearly well crack.
In the embodiment that the present invention is provided, in above-mentioned steps A, prepad fluid accounts for the 50%-60% for being pumped into total liquid measure.
In the embodiment that the present invention is provided, in above-mentioned steps B, into coal bed gas well, injection load fluid is divided into following two again Step:
(1) early stage load fluid is injected, for supporting secondary crack;
(2) later stage load fluid is injected, for supporting waterpower major fracture.
In the embodiment that the present invention is provided, above-mentioned active water fracturing fluid includes clear water, (content is 1%- to expansion-resisting agent KCL 2%) with cleanup additive (content is 0.2%-0.3%).
In the embodiment that the present invention is provided, above-mentioned linear fracturing fluid includes clear water, (content is 1%- to expansion-resisting agent KCL 2%), cleanup additive (content is 0.2%-0.3%) and hydroxypropyl guanidine that glue (content is 0.3%-0.35%), linear fracturing fluid Viscosity be 30-35cp, and account for the 20%-25% for being pumped into total liquid measure.
In the embodiment that the present invention is provided, above-mentioned biology enzyme low temperature gel breaker concentration is 0.0005%-0.0006%.It is raw Thing enzyme low temperature gel breaker is used to ensure that linear fracturing fluid is the low viscous body of low temperature, is led with the row of returning for improving linear fracturing fluid, most Limits reduce injury of the linear fracturing fluid to coal seam.
In the embodiment that the present invention is provided, cleanup additive is anion surfactant.
In the embodiment that the present invention is provided, expansion-resisting agent KCL's contains in above-mentioned active water fracturing fluid and linear fracturing fluid Measure and determined by the natural gamma value (GR) of coal seam well fracturing section:
If GR≤45API, KCL content are 1%;
If 45API < GR≤60API, KCL contents are 1.5%;
If 60API < GR, KCL content are 2%.
In the embodiment that the present invention is provided, above-mentioned pressing crack construction discharge capacity is 6m3/min-8m3/min。
In the embodiment that the present invention is provided, every meter of coal seam thickness sand feeding amount is 9m3-10m3, pressurize and split liquid measure (active water Fracturing fluid and linear fracturing fluid) it is 200m3-250m3
It is also understood that above-mentioned total liquid measure be the total liquid measure of fracturing fluid, as prepad fluid fracturing fluid, load fluid fracturing fluid and Displacement fluid three's volume sum.
With reference to embodiment, the present invention is further described.
Embodiment
Guizhou In The Northwest Guizhou W wells are the coal bed gas well of high-dip structure, about 68 ° of seam inclination.Fracturing section coal seam thickness For 6.0m, nature of coal seam gamma value average (GR) is 65API.The high-dip structure then provided using the present invention the W wells fracturing section What coal bed fracturing renovation technique was constructed comprises the following steps that:
Because coal seam thickness is 6.0m, every meter of design sand feeding amount 9.5m3, common 57m3, it is pumped into fracturing fluid 1200m3, wherein living Property water fracturing fluid 900m3, linear fracturing fluid 300m3
A, prepad fluid of the sand than 3%-9% is injected into coal bed gas well using pressure break pump truck;Wherein 70-100 mesh silica flour Sand proppant 13.5m3, active water fracturing fluid 690m in prepad fluid3, prepad fluid, which is accounted for, is pumped into the 57.5% of total liquid measure.
B, load fluid of the sand than 8%-15% is injected into coal bed gas well using pressure break pump truck;
In early stage load fluid, 40-70 mesh low-density fine sand proppants 20.5m3, active water fracturing fluid 221.3m3
In later stage load fluid, sand proppant 23m in 20-40 mesh quartz3, linear fracturing fluid 280m3;Linear glue laminated is split Fluid viscosity 35cp, linear fracturing fluid, which is accounted for, is pumped into the 25% of total liquid measure.
C, using fracturing pump displacement fluid is injected into coal bed gas well;Displacement fluid is active water fracturing fluid, common 8.7m3
Specifically, in the embodiment that the present invention is provided, above-mentioned pressing crack construction discharge capacity is 8m3/min。
Due to coal seam in the present embodiment natural gamma value average be 65API, i.e. 60API < GR, then KCL contents should be 2%.So the formula of above-mentioned active water fracturing fluid and linear fracturing fluid is as follows:
Specifically, in the present embodiment, above-mentioned active water fracturing fluid includes clear water, KCL (content is 2%) and cleanup additive (content is 0.2%);
Specifically, in the present embodiment, above-mentioned linear fracturing fluid includes clear water, KCL (content is 2%), cleanup additive and (contained 0.2%) and hydroxypropyl guanidine your glue measure as (content is 0.30%).
Specifically, in this embodiment, the biology enzyme low temperature gel breaker concentration added in linear fracturing fluid is 0.0006%.
This well stable gas production after above method fracturing reform reaches 2000m3/ d, it may be said that bright to use the technology High-dip structure coal seam artificial fracturing crack is effectively supported, fully transformation is realized.
Beneficial effects of the present invention are:The present invention is using particle diameter proppant combination technique is become, and quartzy flour sand, which is used to reduce, presses Liquid leak-off, Kong Zhaoxia and support microcrack are split, low-density fine sand is used to support sand in secondary crack, quartz to be used to support waterpower Major fracture, improves fracture condudtiviy, and multistage when solving high-dip structure coal bed gas well pressure break crack is effectively supported, coal seam changes Make insufficient technological difficulties;Fracturing fluid of the present invention is using active water fracturing fluid+linear fracturing fluid combination technique, in maximum limit Under conditions of degree reduces fracturing fluid to coal seam pollution, the prop-carrying capacity of fracturing fluid is improved, the leak-off of fracturing fluid is reduced, solves coal Layer gas well short technological difficulties of easy sand plug, supporting crack radius in fracturing reform.
It is described above, any formal limitation not is made to the present invention, although the present invention is disclosed such as by embodiment On, but the present invention is not limited to, any those skilled in the art are not departing from technical solution of the present invention scope It is interior, when the technology contents using the disclosure above make a little change or are modified to the equivalent embodiment of equivalent variations, as long as being Without departing from the content of technical solution of the present invention, what the technical spirit according to the present invention was made to above example any simply repaiies Change, equivalent variations and modification, in the range of still falling within technical solution of the present invention.

Claims (9)

1. a kind of fracture technology suitable for high-dip structure coal seam, it is characterised in that comprise the following steps:
A, prepad fluid of the sand than 3%-9% is injected into coal bed gas well using pressure break pump truck;The prepad fluid includes prepad fluid branch Agent and prepad fluid fracturing fluid are supportted, the prepad fluid proppant is the quartzy flour sand of 70-100 mesh, and the prepad fluid fracturing fluid is activity Water fracturing fluid, wherein 70-100 mesh quartz flour sand weight ratio is 20%-30%;
B, load fluid of the sand than 8%-15% is injected into coal bed gas well using pressure break pump truck;The load fluid is divided into early stage and taken again Sand liquid and later stage load fluid, the early stage load fluid include early stage load fluid proppant and early stage load fluid fracturing fluid, it is described after Phase load fluid includes later stage load fluid proppant and later stage load fluid fracturing fluid;
The early stage load fluid proppant is 40-70 mesh low-density fine sands, and the early stage load fluid fracturing fluid is the active water Fracturing fluid, wherein the 40-70 mesh low-density fine sand weight ratio is 30%-40%;
The later stage load fluid proppant is sand in 20-40 mesh quartz, and the later stage load fluid fracturing fluid splits including linear glue laminated Liquid and biology enzyme low temperature gel breaker, wherein sand weight ratio is 40%-50% in 20-40 mesh quartz;
C, using pressure break pump truck displacement fluid is injected into coal bed gas well;The displacement fluid is the active water fracturing fluid.
2. the fracture technology according to claim 1 suitable for high-dip structure coal seam, it is characterised in that above-mentioned steps In A, the prepad fluid accounts for the 50%-60% for being pumped into total liquid measure.
3. the fracture technology according to claim 1 suitable for high-dip structure coal seam, it is characterised in that above-mentioned steps In A, the active water fracturing fluid includes clear water, expansion-resisting agent KCL (content is 1%-2%) and cleanup additive, and (content is 0.2%- 0.3%).
4. the fracture technology according to claim 1 suitable for high-dip structure coal seam, it is characterised in that above-mentioned steps In B, into coal bed gas well, injection load fluid is divided into following steps again:
(1) the early stage load fluid is injected, for supporting secondary crack;
(2) the later stage load fluid is injected, for supporting waterpower major fracture.
5. the fracture technology according to claim 1 suitable for high-dip structure coal seam, it is characterised in that above-mentioned steps In B, the linear fracturing fluid includes clear water, expansion-resisting agent KCL (content is 1%-2%), (content is 0.2%- to cleanup additive 0.3%) with hydroxypropyl guanidine that glue (content is 0.30%-0.35%), the viscosity of the linear fracturing fluid is 30cp-35cp, Account for the 20%-25% for being pumped into total liquid measure.
6. the fracture technology according to claim 1 suitable for high-dip structure coal seam, it is characterised in that above-mentioned steps In B, the biology enzyme low temperature gel breaker concentration is 0.0005%-0.0006%.
7. the fracture technology suitable for high-dip structure coal seam according to claim 3 or 5, it is characterised in that described Expansion-resisting agent KCL content is determined by the natural gamma value (GR) of coal seam well fracturing section:
If GR≤45API, KCL content are 1%;
If 45API < GR≤60API, KCL contents are 1.5%;
If 60API < GR, KCL content are 2%.
8. the fracture technology suitable for high-dip structure coal seam according to claim any one of 1-6, it is characterised in that The discharge capacity of the fracturing pump is 6m3/min-8m3/min。
9. the fracture technology according to claim 1 suitable for high-dip structure coal seam, it is characterised in that every meter of coal seam Thickness sand feeding amount is 9m3-10m3, plus fracturing fluid (active water fracturing fluid and linear fracturing fluid) amount is 200m3-250m3
CN201710697552.6A 2017-08-15 2017-08-15 A kind of fracture technology suitable for high-dip structure coal seam Pending CN107288609A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710697552.6A CN107288609A (en) 2017-08-15 2017-08-15 A kind of fracture technology suitable for high-dip structure coal seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710697552.6A CN107288609A (en) 2017-08-15 2017-08-15 A kind of fracture technology suitable for high-dip structure coal seam

Publications (1)

Publication Number Publication Date
CN107288609A true CN107288609A (en) 2017-10-24

Family

ID=60106952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710697552.6A Pending CN107288609A (en) 2017-08-15 2017-08-15 A kind of fracture technology suitable for high-dip structure coal seam

Country Status (1)

Country Link
CN (1) CN107288609A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107676072A (en) * 2017-11-06 2018-02-09 北京九尊能源技术股份有限公司 A kind of CBM Fracturing technique for being applied to high steep coal seam
CN108843292A (en) * 2018-05-25 2018-11-20 贵州省非常规天然气勘探开发利用工程研究中心有限公司 A kind of super high seam fracturing yield increasing technique
CN109138958A (en) * 2018-07-26 2019-01-04 安东石油技术(集团)有限公司 A kind of fracturing process of the complicated seam of tight sand gas reservoir
CN113236219A (en) * 2021-05-31 2021-08-10 重庆地质矿产研究院 Coal bed gas fracturing method suitable for multiple sets of high and steep crushed coal beds
CN113550717A (en) * 2020-04-23 2021-10-26 尹祖龙 Coal bed gas fracturing device and using method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094612A (en) * 2010-12-21 2011-06-15 山西晋城无烟煤矿业集团有限责任公司 Active water fracturing technology of coal-bed gas well
CN104088616A (en) * 2014-07-09 2014-10-08 中国科学院武汉岩土力学研究所 Coal bed methane hydrofracture method
WO2015134022A1 (en) * 2014-03-06 2015-09-11 Halliburton Energy Services, Inc. Far-field diversion with pulsed proppant in subterranean fracturing operations
CN105604534A (en) * 2016-01-24 2016-05-25 廊坊开发区中油化油气技术服务有限公司 Hydraulically affected fracturing process method for increasing production of coal-bed gas reservoir
CN106703775A (en) * 2016-12-16 2017-05-24 中国石油天然气股份有限公司 Coal bed gas fracturing method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094612A (en) * 2010-12-21 2011-06-15 山西晋城无烟煤矿业集团有限责任公司 Active water fracturing technology of coal-bed gas well
WO2015134022A1 (en) * 2014-03-06 2015-09-11 Halliburton Energy Services, Inc. Far-field diversion with pulsed proppant in subterranean fracturing operations
CN104088616A (en) * 2014-07-09 2014-10-08 中国科学院武汉岩土力学研究所 Coal bed methane hydrofracture method
CN105604534A (en) * 2016-01-24 2016-05-25 廊坊开发区中油化油气技术服务有限公司 Hydraulically affected fracturing process method for increasing production of coal-bed gas reservoir
CN106703775A (en) * 2016-12-16 2017-05-24 中国石油天然气股份有限公司 Coal bed gas fracturing method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107676072A (en) * 2017-11-06 2018-02-09 北京九尊能源技术股份有限公司 A kind of CBM Fracturing technique for being applied to high steep coal seam
CN108843292A (en) * 2018-05-25 2018-11-20 贵州省非常规天然气勘探开发利用工程研究中心有限公司 A kind of super high seam fracturing yield increasing technique
CN109138958A (en) * 2018-07-26 2019-01-04 安东石油技术(集团)有限公司 A kind of fracturing process of the complicated seam of tight sand gas reservoir
CN113550717A (en) * 2020-04-23 2021-10-26 尹祖龙 Coal bed gas fracturing device and using method thereof
CN113236219A (en) * 2021-05-31 2021-08-10 重庆地质矿产研究院 Coal bed gas fracturing method suitable for multiple sets of high and steep crushed coal beds

Similar Documents

Publication Publication Date Title
CN107288609A (en) A kind of fracture technology suitable for high-dip structure coal seam
CN104405360A (en) Fracturing method capable of improving sand-carrying performance of fracturing liquid
CN104879113A (en) Compound acid fracturing method for carbonate reservoir
CN102071919B (en) Oil-gas well fiber assisted water control fracturing method
CN104232039A (en) Multi-element synergic plugging agent and application thereof
CN102287176B (en) Coal bed pressing crack liquid method
CN104629697B (en) A kind of heatproof frozen glue
WO2021196740A1 (en) Temporary plugging agent and preparation method therefor, and temporary plugging deflection fracturing method for high temperature reservoir
CN103911134B (en) Compound profile-controlling and plugging agent
CN103615228A (en) Temporary plugging and fracturing process in degradable fiber clearance
CN102181274B (en) Thixotropic chemical sealing channeling agent
CN113337266B (en) Fracturing fluid system for enhancing pressure bearing capacity of proppant and application method thereof
US9752072B2 (en) Propping compositions for enhancing fracture conductivity
CN102942334A (en) Film-coated modified propping agent, and preparation method and application thereof
CN107288610A (en) A kind of microcrack support fracturing technique in suitable cranny development coal seam
CN102926701B (en) A kind of mixed matching water-plugging technology method continuously
CN103670359A (en) Method for nondegradable gel breaking of vegetable gelatin fracturing fluid
CN106958438B (en) A kind of method for removing blockage of polymer flooding blocking well
CN107090287B (en) Low-viscosity mixed fracturing fluid, application thereof and oil-gas reservoir transformation method
CN102002356B (en) Petroleum propping agent with ultra-low density and high strength
CN106761651B (en) A kind of fracturing process of coal bed gas well Low Damage high flow conductivity man-made fracture
CN101824315B (en) Super-low-density proppant and preparation method thereof
CN102910897B (en) Medium density propping agent used in waste ceramsite recycling production and preparation method thereof
Zhang et al. Evaluation of ceramsite loss control agent in acid fracturing of naturally fractured carbonate reservoir
CN102865061A (en) Honeycomb type paving method of propping agent and application thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171024