CN107288342A - A kind of Super High core tube construction Multifunctional measuring tool carrying platform - Google Patents
A kind of Super High core tube construction Multifunctional measuring tool carrying platform Download PDFInfo
- Publication number
- CN107288342A CN107288342A CN201710368714.1A CN201710368714A CN107288342A CN 107288342 A CN107288342 A CN 107288342A CN 201710368714 A CN201710368714 A CN 201710368714A CN 107288342 A CN107288342 A CN 107288342A
- Authority
- CN
- China
- Prior art keywords
- reception device
- super high
- supporting leg
- carrying platform
- receiving port
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/002—Active optical surveying means
- G01C15/004—Reference lines, planes or sectors
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of Super High core tube construction Multifunctional measuring tool carrying platform, including:Reception device, the inside of reception device is provided with accommodating cavity, the bottom of reception device is provided with the first receiving port communicated with accommodating cavity, the top of reception device forms mounting surface and provided with the second receiving port communicated with accommodating cavity, and first receiving port be pointed to the second receiving port, the sidepiece of reception device is provided with placing port;Fixing device, the sidepiece of reception device is connected to by attachment means, and fixing device is provided with wall connecting piece.The present invention is during Super High Core Walls Structure wall construction, vertical structure construction speed top standard's structure, in the case where not laying floor plates, the platform can provide carrier and be used for installing various survey tools, realize the functions such as wall form positioning, control net are checked, wall body vertical degree is controlled, the correction of Core Walls Structure geometry, realize an instrument can multiple function while use, i.e. " multi-functional " feature.
Description
Technical field
A kind of Super High Core Walls Structure technical field of construction of the present invention, more particularly to a kind of Super High core tube construction are multi-functional
Survey tool carrying platform.
Background technology
The positioning of conventional wall construction is that setting-out goes out template and put down bottom line to come locating template position on floor.Because Super High core
Heart cylinder is general to be constructed using creeping formwork or backform, and Template Location deviation does not allow more than 3mm, and positioning accuracy request is high.General individual layer
The wall construction cycle is three days, and construction speed is fast.So Super High Core Walls Structure construction requirement Template Location will be promptly and accurately.But
Due to the vertical construction speed top standard structure of Core Walls Structure wall, when Core Walls Structure wall wants formwork, horizontal floor is not spread
If, without flat carrier mold loft template control line.Generally solving the method for this problem has two kinds:Messenger wire pendant method, laser pick-off target
Standardization.
1. messenger wire falls method, such a method is that setting-out goes out template control line on horizontal floor, is fallen with line by control line pilot measurement
To wall construction layer, positioned for Control architecture.Such a method opereating specification is limited, in vertical structure only top standard's structure
It can be tackled at 2~3 layers, but when vertical structure progress top standard's structure is too fast, wall construction layer distance controlling line mark
Given layer is too high, and the line pendant of suspension is influenceed constantly to swing by gravity, wind pendulum and extraneous various unfavorable factors, it is difficult to controlled.And surpass
The high-rise general vertical structure of core tube construction all can top standard layer 7~10 layers or so, institute enter in this way in agent structure
The excess of imports Construction of High-rise stage can not use at all.
2. laser pick-off target standardization, such a method is more commonly used in current Super High work progress, and it is by mould
The plate control point vertical pilot measurement of plumb aligner to wall construction layer, target is received in wall outward flange reinforcing bar or angle bar fixed laser
For calibration point position, then with plumbing method, pilot measurement goes out big angle control line, Control architecture positioning on lower floor's wall.But such a side
Method is due to that can not set up measuring instrument, it is impossible to which whether the wall control net form for checking pilot measurement is correct, for Core Walls Structure wall section
Geometry whether be distorted, wall body vertical degree whether meet construction quality requirement can not judge.So needing design one
The problem of new equipment is planted to solve a bit identification and set up instrument.
The content of the invention
It is an object of the invention to the defect for overcoming prior art, there is provided a kind of Super High core tube construction multifunctional measuring
Instrument carrying platform, its is light firm, and whole instrument carrying platform is fixed on Core Walls Structure wall, it is ensured that stabilization when using
Property.
To achieve the above object, the present invention uses following technical scheme:A kind of Super High core tube construction multifunctional measuring
Instrument carrying platform, including:
Reception device, the inside of the reception device is provided with accommodating cavity, and the bottom of the reception device is provided with to hold with described
The first receiving port that chamber is communicated is put, the top of the reception device forms mounting surface and provided with second communicated with the accommodating cavity
Receiving port, and first receiving port is pointed to second receiving port, the sidepiece of the reception device is provided with placing port;
Fixing device, the sidepiece of the reception device is connected to by attachment means, and the fixing device is provided with wall
Connector.
In certain embodiments, the attachment means are adjustable connector, including are connected to the reception device
First supporting leg of sidepiece and the second supporting leg for being connected to the fixing device, first supporting leg slide phase with second supporting leg
Even.
In certain embodiments, first supporting leg has been internally formed sliding chamber, and second supporting leg is inserted in described
Slide in chamber and slided along the sliding chamber.
In certain embodiments, spacing guide rod is provided with the sliding chamber, second supporting leg is provided with regulation guide rail, institute
Spacing guide rod is stated to plug and slide in the regulation guide rail.
In certain embodiments, one end of the close reception device of the regulation guide rail is provided with stopper section, described
Stopper section is located at the side of the close reception device of the spacing guide rod.
In certain embodiments, the sidepiece of the reception device is formed with supporting leg mounting surface, and multiple first supporting legs are equal
It is distributed in the outer of the supporting leg mounting surface.
In certain embodiments, the reception device is that control line receives box, and first receiving port and described second connects
Closing in is pointed to wall control line.
In certain embodiments, the wall control line is laser controlling line, and described the first of the reception device receives
Mouth is provided with laser pick-off target.
In certain embodiments, in addition to for installing the carrying fixed seat of survey tool, located at second receiving port
On.
In certain embodiments, the fixing device is provided with mounting hole, and the wall connecting piece is arranged in the installation
Hole is simultaneously connected to Core Walls Structure wall.
Using above-mentioned technical proposal, during Super High Core Walls Structure wall construction, the leading water of vertical structure construction speed
Flat structure, in the case where not laying floor plates, the platform can provide carrier and be used for installing various survey tools, realize wall mould
The functions such as plate positioning, control net are checked, the control of wall body vertical degree, the correction of Core Walls Structure geometry, realize that an instrument can be multinomial
Function is used simultaneously, i.e. " multi-functional " feature.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment
Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for
For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings
Accompanying drawing.
Fig. 1 shows for a kind of Super High core tube construction Multifunctional measuring tool carrying platform in embodiments of the invention
It is intended to.
Fig. 2 be embodiments of the invention in reception device schematic diagram.
Fig. 3 be embodiments of the invention in reception device bottom schematic view.
Fig. 4 be embodiments of the invention in laser pick-off target schematic diagram.
Fig. 5 be embodiments of the invention in reception device schematical top view.
Fig. 6 be embodiments of the invention in carrying fixed seat schematic diagram.
Fig. 7 be embodiments of the invention in attachment means schematic diagram.
Fig. 8 is the schematic diagram of the first supporting leg of the attachment means of attachment means.
Fig. 9 is the side schematic view of the first supporting leg of the attachment means of attachment means.
Figure 10 is the schematic diagram of the second supporting leg of the attachment means of attachment means.
Embodiment
Illustrate embodiments of the present invention below by way of specific instantiation, those skilled in the art can be by this specification
Disclosed content understands other advantages and effect of the present invention easily.The present invention can also pass through specific realities different in addition
The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints with application, without departing from
Various modifications or alterations are carried out under the spirit of the present invention.
The invention provides one kind during Super High Core Walls Structure wall construction, it can be used to receive template contral line, together
When can install again check institute's pilot measurement control net need various measuring instruments a kind of Multifunctional measuring tool carrying platform.
During Super High Core Walls Structure wall construction, vertical structure construction speed top standard's structure is not laying the feelings of floor plates
Under condition, the platform can provide carrier and be used for installing various survey tools, realize that wall form positioning, control net are checked, wall hangs down
The functions such as straight degree control, the correction of Core Walls Structure geometry, realize an instrument can multiple function while using.It is i.e. " multi-functional " special
Levy.
Below in conjunction with the accompanying drawings and specific embodiment is described in further detail to specific embodiments of the present invention.
First, refering to shown in Fig. 1 and Fig. 2, a kind of Super High core tube construction in embodiments of the invention is multi-functional to be surveyed
Amount instrument carrying platform is mainly made up of reception device 11, fixing device 12 and the part of attachment means 13 3.Wherein, reception device
11 inside is provided with accommodating cavity 110, and the bottom of reception device 11 is provided with the first receiving port 111 communicated with the accommodating cavity 110, connect
The top of receiving apparatus 11 forms mounting surface and is provided with the second receiving port 112 communicated with the accommodating cavity 110, and first receiving port
111 are pointed to second receiving port 112.Placing port 113 is additionally provided with the sidepiece of reception device 11.Fixing device 12 passes through connection
Device 13 is connected to the sidepiece of reception device 11, and the fixing device 12 is provided with wall connecting piece, for connecting with Core Walls Structure wall
Connect.
Reception device 11 in the present embodiment receives box for control line.Specifically, using 400mm × 400mm aluminium alloy
Plate weld stays mouth formation placing port 113 into a square case, wherein one side, is respectively opened in the center at bottom and top
Go out a diameter of 100mm circular hole, as the first receiving port 111 and the second receiving port 112.Laser below cooperation
When plumb aligner carries out the reception of wall control line and checked, the laser below the first receiving port 111 and the alignment of the second receiving port 112
Laser controlling line emitted by plumb aligner, a laser pick-off target 14 is disposed on the first receiving port 111 of reception device 11, is such as schemed
Shown in 3 and Fig. 4 so that laser controlling line is located in the specified range of laser pick-off target 14, that is, representing the installation of reception device expires
Sufficient position accuracy demand, reception device is fixed by fixing device with Core Walls Structure wall, completes the location and installation of reception device.So
Afterwards again by survey tool, such as total powerstation, prism base, 360 ° small prism equipment are placed in the mounting surface at the top of reception device
On, because the second receiving port 112 in mounting surface is relative with the position of the first receiving port 112 of bottom, now, it can be connect by second
Close up and 112 position the horizontal level of the survey tool above it.
Further, coordinate shown in Fig. 5 and Fig. 6, one can be set between the second receiving port 112 and the survey tool of top
Fixed seat 15 is carried, is padded between the second receiving port 112 and survey tool, the Outside Dimensions of the carrying fixed seat 15 are more than second
The bore of receiving port 112, that is, ride upon in the mounting surface at the second receiving port 112.On the one hand may be used using the carrying fixed seat 15
Avoid survey tool from being absorbed in the second receiving port 112, on the other hand may also function as the effect of friction protection.In the present embodiment,
Carry fixed seat 15 and use set square, three angles of the set square are shelved in the mounting surface of the surrounding of the second receiving port 112, and this three
The center of gusset is provided with a screw 151, and the screw thread direction of screw 151 is connected for the bottom with the survey tool carried.
Certainly it can also be selected using other shapes, the carrying fixed seat of construction according to the survey tool that need to specifically carry, not even
It is applicable and carries fixed seat, the substantial effective of the Multifunctional measuring tool carrying platform of the present invention is not interfered with equally.
Fixing device 12 in the present embodiment is made using 500mm × 500mm × 30mm aluminium sheets, and mounting hole is offered thereon
121, wall connecting piece, such as bolt, screw, expansion bolt etc. are installed in mounting hole, wall connecting piece is arranged in mounting hole 121
In and be connected to Core Walls Structure wall, so as to realize being fixedly connected for fixing device 12 and Core Walls Structure wall.In the present embodiment, solid
Four corners for determining device 12 respectively set a mounting hole 121 to install wall connecting piece, to strengthen fixing device and Core Walls Structure
The bonding strength of wall.
As the better embodiment of the present invention, coordinate shown in Fig. 1, attachment means 13 use adjustable connector, its
Main the first supporting leg 131 for including being connected to the sidepiece of reception device 11 and the second supporting leg 132 for being connected to fixing device 12, should
First supporting leg 131 is slided with second supporting leg 132 to be connected, to realize that reception device 11 and the distance between fixing device 12 are adjustable
Save function.Wherein, the sidepiece of reception device 11 is formed with supporting leg mounting surface, and multiple first supporting legs 131 are distributed in supporting leg mounting surface
Outer.
Specifically, coordinate shown in Fig. 7~10, the first supporting leg 131 uses the rectangular steel pipe of inner hollow, both ends open is interior
Portion forms elongated sliding chamber 133, and the second supporting leg 132 is inserted in sliding chamber 133 and slided along sliding chamber 133, to realize the
One supporting leg 131 and the relative slip of the second supporting leg 132, and then play regulation reception device 11 and the distance between fixing device 12
Effect.As shown in figure 1, four the first supporting legs 131 are welded in four corners of reception device 11, the second supporting leg 132 is welded in solid
Determine four corners of device 12.Wherein, the second supporting leg 132 also can be the rectangular steel pipe of inner hollow, and the first supporting leg 131 is sheathed on
The outside of second supporting leg 132.
Further, coordinate shown in Fig. 7~10, be provided with spacing guide rod 134 in sliding chamber 133, the second supporting leg 132 is provided with
Guide rail 135 is adjusted, spacing guide rod 134 is plugged and slided in regulation guide rail 135, and regulation guide rail 135 is preset along reception device
Glide direction is set, and can play the glide direction of the Relative sliding between guiding and the first supporting leg 131 of limitation and the second supporting leg 132
Effect.Regulation guide rail 135 is the bar shaped elongated hole being opened on the both sides side wall of the second supporting leg 132, as shown in Figure 10, the bar shaped
Elongated hole is located at the middle part of the side wall of the second supporting leg 132, and its two ends does not penetrate the two ends of the side wall of the second supporting leg 132, i.e., at this
One end of the close reception device of shape elongated hole is provided with stopper section 136, and the close reception that the stopper section 136 is located at spacing guide rod is filled
The side put, so as to play a part of limit stops, it is to avoid the first supporting leg 131 is slipped each other with the second supporting leg 132.
Further, spacing guide rod 134 uses fixing bolt, through sliding chamber 133 both sides side wall and extend to side wall
Outside, fixation is tightened by the nut for the end for being screwed together in spacing guide rod 134, being resisted against the both sides inside of the first supporting leg 131
The second supporting leg apply compress power, play fixation.
Below to a kind of Super High core tube construction Multifunctional measuring tool carrying platform in embodiments of the invention
Install and using being described in detail.
First fixing device for installing.The center of fixing device is gone out by the big angle control line setting-out of lower floor's wall, in core
Demarcated, fixed fixing device by the reserving installation hole in fixing device on heart cylinder wall using expansion bolt, then will
Reception device is enclosed in the attachment means of fixing device, by the first supporting leg and the second supporting leg of attachment means come adjustable range,
Reception device axis is set with measuring lead wire outlet center superposition, afterwards to tighten the fixing bolt of attachment means as far as possible.Receive dress
The the first receiving port placement laser pick-off target for the bottom put is used for receiving to be received with calibration point position, the second of the top of reception device
Mouth, which is installed, carries fixed seat, for fixing the survey tools such as total powerstation and prism base.
During pilot measurement wall control line, axial line control point laser plummet apparatus being placed on horizontal floor with laying is corresponding,
Launch vertical laser beam by control point pilot measurement to laser pick-off target, demarcated.Total powerstation is placed in the of reception device
The control point demarcated on two receiving port centering laser pick-off targets, is fixed after essence is flat using carrying fixed seat, in another two phase
Control point is received using same method in adjacent reception device and prism group centering control point is disposed, checked after being oriented with total powerstation
Apart from dimensional discrepancy, 90 ° of corner checks angular deviation, it is errorless after wall control line is being demarcated on wall by square, it is complete
Into control net check and template contral line staking-out work.
The invention discloses one kind during Super High Core Walls Structure wall construction, it can be used to receive template contral line, together
When can install again check institute's pilot measurement control net need various measuring instruments a kind of Multifunctional measuring tool carrying platform
And its application method.The carrying platform is made up of reception device and fixing device, two kinds of devices by attachment means connect and away from
From adjustable.The strong point that the carrying platform of the present invention is installed is attached on core drum outer wall, it is ensured that the stability of device, and
Equally received vector can be provided in the case where horizontal floor is not laid for the template contral line of pilot measurement.The carrying platform connects
Receiving apparatus can install the equipment such as laser pick-off target, total powerstation, prism base, 360 ° of small prisms, realize using a carrying
Platform can be carried out the function that control point receives and checked.
Installation requirement:First fixing device for installing, fixing device is fixed on wall by expansion bolt by bolt hole.Again will
Reception device is fitted together by attachment means with fixing device, and dress is received by adjusting the first supporting leg and the control of the second supporting leg
The distance with wall is put, makes the center of reception device as far as possible with measuring lead wire outlet center superposition, then by apart from attachment means
Fixing bolt is tightened.The first receiving port placement laser pick-off target of reception device is used for receiving and calibration point position, the first receiving port
Install instruments pedestal fixation set square, for fixing the measuring instruments such as total powerstation and prism base.The carrying platform of the present invention
Design is simple, and convenient disassembly, maneuverability can realize Template Location, Core Walls Structure deformation measurement and control on the carrying platform
Point such as checks at the multiple function, substantially increases measurement accuracy, simplifies process, improves operating efficiency.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only to coordinate
Content disclosed in bright book, so that those skilled in the art understands and reads, is not limited to the enforceable limit of the present invention
Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not
Under influence effect of the invention that can be generated and the purpose that can reach, it all should still fall and be obtained in disclosed technology contents
In the range of covering.Meanwhile, it is cited such as " on ", " under ", "left", "right", " centre " and " one " etc. in this specification
Term, is merely convenient to understanding for narration, and is not used to limit enforceable scope of the invention, the change of its relativeness or tune
It is whole, under without essence change technology contents, when being also considered as enforceable category of the invention.
Described above is only presently preferred embodiments of the present invention, not does any formal limitation to the present invention, though
So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people
Member, in the range of technical solution of the present invention is not departed from, when the technology contents using the disclosure above make a little change or repair
The equivalent embodiment for equivalent variations is adornd, as long as being the content without departing from technical solution of the present invention, the technology according to the present invention is real
Any simple modification, equivalent variations and modification that confrontation above example is made, still fall within the scope of technical solution of the present invention
It is interior.
Claims (10)
1. a kind of Super High core tube construction Multifunctional measuring tool carrying platform, it is characterised in that including:
Reception device, the inside of the reception device is provided with accommodating cavity, and the bottom of the reception device is provided with and the accommodating cavity
The first receiving port communicated, the top of the reception device forms mounting surface and received provided with second communicated with the accommodating cavity
Mouthful, and first receiving port is pointed to second receiving port, the sidepiece of the reception device is provided with placing port;
Fixing device, the sidepiece of the reception device is connected to by attachment means, and the fixing device is provided with wall connecting
Part.
2. Super High core tube construction Multifunctional measuring tool carrying platform as claimed in claim 1, it is characterised in that:It is described
Attachment means are adjustable connector, including are connected to the first supporting leg of the sidepiece of the reception device and are connected to described solid
Determine the second supporting leg of device, first supporting leg is slided with second supporting leg to be connected.
3. Super High core tube construction Multifunctional measuring tool carrying platform as claimed in claim 2, it is characterised in that:It is described
First supporting leg has been internally formed sliding chamber, and second supporting leg is inserted in the sliding chamber and slided along the sliding chamber.
4. Super High core tube construction Multifunctional measuring tool carrying platform as claimed in claim 3, it is characterised in that:It is described
Slide and spacing guide rod is provided with chamber, second supporting leg is provided with regulation guide rail, and the spacing guide rod is plugged and slided on described
Adjust in guide rail.
5. Super High core tube construction Multifunctional measuring tool carrying platform as claimed in claim 4, it is characterised in that:It is described
The one end for adjusting the close reception device of guide rail is provided with stopper section, and the stopper section is located at the close of the spacing guide rod
The side of the reception device.
6. such as Super High core tube construction Multifunctional measuring tool carrying platform according to any one of claims 1 to 5, it is special
Levy and be:The sidepiece of the reception device is formed with supporting leg mounting surface, and multiple first supporting legs are distributed in the supporting leg and installed
The outer in face.
7. Super High core tube construction Multifunctional measuring tool carrying platform as claimed in claim 1, it is characterised in that:It is described
Reception device is that control line receives box, and first receiving port and second receiving port are pointed to wall control line.
8. Super High core tube construction Multifunctional measuring tool carrying platform as claimed in claim 7, it is characterised in that:It is described
Wall control line is laser controlling line, and first receiving port of the reception device is provided with laser pick-off target.
9. Super High core tube construction Multifunctional measuring tool carrying platform as claimed in claim 1, it is characterised in that:Also wrap
The carrying fixed seat for installing survey tool is included, on second receiving port.
10. Super High core tube construction Multifunctional measuring tool carrying platform as claimed in claim 1, it is characterised in that:Institute
Fixing device is stated provided with mounting hole, the wall connecting piece is arranged in the mounting hole and is connected to Core Walls Structure wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710368714.1A CN107288342A (en) | 2017-05-23 | 2017-05-23 | A kind of Super High core tube construction Multifunctional measuring tool carrying platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710368714.1A CN107288342A (en) | 2017-05-23 | 2017-05-23 | A kind of Super High core tube construction Multifunctional measuring tool carrying platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107288342A true CN107288342A (en) | 2017-10-24 |
Family
ID=60095424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710368714.1A Pending CN107288342A (en) | 2017-05-23 | 2017-05-23 | A kind of Super High core tube construction Multifunctional measuring tool carrying platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107288342A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797998A (en) * | 2018-09-28 | 2018-11-13 | 上海建工集团股份有限公司 | Integral steel platform mould bases plumbing device and method for curved surface core tube construction |
CN113008976A (en) * | 2021-03-30 | 2021-06-22 | 浙江工业大学 | Steel bar corrosion device suitable for three magnetic sensors and calibration method |
CN109162455B (en) * | 2018-09-12 | 2021-06-29 | 广东博智林机器人有限公司 | Aluminum template installation quick connecting piece and installation method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203837707U (en) * | 2014-04-02 | 2014-09-17 | 中天建设集团有限公司 | Construction measurement device for super high-rise building core tube |
CN104596488A (en) * | 2015-01-28 | 2015-05-06 | 中国建筑一局(集团)有限公司 | Support device for building construction measurement and method for controlling vertical direction of wall |
CN204664813U (en) * | 2015-04-21 | 2015-09-23 | 中建六局建设发展有限公司 | Based on the adhesion type surveying instrument construction of platform of Super High Core Walls Structure construction |
CN104949661A (en) * | 2015-07-01 | 2015-09-30 | 中建一局集团建设发展有限公司 | Super high-rise building core tube template positioning measuring control method |
CN205077893U (en) * | 2015-10-15 | 2016-03-09 | 杭州博舟装饰工程有限公司 | A support frame for building decoration |
CN206110674U (en) * | 2016-11-01 | 2017-04-19 | 中国建筑第四工程局有限公司 | Transit platform is measured to a superelevation layer core section of thick bamboo |
-
2017
- 2017-05-23 CN CN201710368714.1A patent/CN107288342A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203837707U (en) * | 2014-04-02 | 2014-09-17 | 中天建设集团有限公司 | Construction measurement device for super high-rise building core tube |
CN104596488A (en) * | 2015-01-28 | 2015-05-06 | 中国建筑一局(集团)有限公司 | Support device for building construction measurement and method for controlling vertical direction of wall |
CN204664813U (en) * | 2015-04-21 | 2015-09-23 | 中建六局建设发展有限公司 | Based on the adhesion type surveying instrument construction of platform of Super High Core Walls Structure construction |
CN104949661A (en) * | 2015-07-01 | 2015-09-30 | 中建一局集团建设发展有限公司 | Super high-rise building core tube template positioning measuring control method |
CN205077893U (en) * | 2015-10-15 | 2016-03-09 | 杭州博舟装饰工程有限公司 | A support frame for building decoration |
CN206110674U (en) * | 2016-11-01 | 2017-04-19 | 中国建筑第四工程局有限公司 | Transit platform is measured to a superelevation layer core section of thick bamboo |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109162455B (en) * | 2018-09-12 | 2021-06-29 | 广东博智林机器人有限公司 | Aluminum template installation quick connecting piece and installation method thereof |
CN108797998A (en) * | 2018-09-28 | 2018-11-13 | 上海建工集团股份有限公司 | Integral steel platform mould bases plumbing device and method for curved surface core tube construction |
CN113008976A (en) * | 2021-03-30 | 2021-06-22 | 浙江工业大学 | Steel bar corrosion device suitable for three magnetic sensors and calibration method |
CN113008976B (en) * | 2021-03-30 | 2024-04-16 | 浙江工业大学 | Reinforcing steel bar corrosion calibration device and method suitable for three magnetic sensors |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107288342A (en) | A kind of Super High core tube construction Multifunctional measuring tool carrying platform | |
CN107090775B (en) | A kind of full framing space beam-ends cable guide pipe construction localization method | |
CN104264588B (en) | Cable guide pipe positioner | |
CN107130809A (en) | A kind of Super High Core Walls Structure wall construction measurement and positioning method and system | |
CN103410322A (en) | Large-span parallel truss steel connective corridor construction method | |
CN104060839A (en) | Construction control method special for steel-structure vertical keels of metal curtain wall of large gymnasium | |
CN206971771U (en) | A kind of Super High Core Walls Structure wall construction measurement and positioning system | |
CN205713160U (en) | A kind of perpendicularity regulating device of orthogonal prefabricated panel | |
CN108560369A (en) | Lofting construction method for high-speed loop curved surface paving | |
CN104895340B (en) | Floor elevation pay-off rechecking device | |
CN109778607B (en) | Accurate measurement and positioning device and erection and positioning method for continuous rigid frame PC track beam | |
CN115821753A (en) | Precision positioning method for main tower cable guide pipe of cable-stayed bridge | |
CN209722608U (en) | Continuous rigid frame PC track girder precise measurement positioning device | |
CN207585609U (en) | A kind of stent of measuring instrument | |
CN105804039B (en) | A kind of vertical ship lift balance weight track Fast Installation adjusting apparatus and its application process | |
CN111347240B (en) | Installation and centering tool for converter mouth, vaporization flue and oxygen lance and use method thereof | |
CN212453099U (en) | Embedded part for connecting unit type glass curtain wall and main body structure | |
CN104989101B (en) | Discharging platform construction method | |
CN101298564B (en) | Localization method of coke oven lower jet branch pipe | |
CN210400255U (en) | Rechecking measuring device | |
CN107414376A (en) | A kind of steel construction cydariform solder sphere positions adjusting method | |
CN108915263B (en) | Method for building reference line | |
CN103967038B (en) | A kind of cavern-pile method steel pipe column pedestal embedded board and construction method thereof | |
CN101994389B (en) | Method for constructing high template | |
CN206959837U (en) | A kind of scalable, removable tool-type wrap attachment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171024 |
|
RJ01 | Rejection of invention patent application after publication |