CN107288142A - A kind of structure foundation package assembly - Google Patents
A kind of structure foundation package assembly Download PDFInfo
- Publication number
- CN107288142A CN107288142A CN201610189674.XA CN201610189674A CN107288142A CN 107288142 A CN107288142 A CN 107288142A CN 201610189674 A CN201610189674 A CN 201610189674A CN 107288142 A CN107288142 A CN 107288142A
- Authority
- CN
- China
- Prior art keywords
- plate
- pour
- rod
- pours
- combined
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
The invention discloses a kind of structure foundation package assembly, including four symmetrically arranged right-angle connectors, and it is connected laterally at the head rod between the right-angle connector, and vertically it is connected to the second connecting rod between the right-angle connector, first is combined between two head rods and pours plate, described first pour plate be provided at both ends with the first connecting plate for coordinating the head rod, second, which is combined with, between two second connecting rods pours plate, described second pour plate be provided at both ends with the second connecting plate for coordinating second connecting rod, described first pours plate pours plate in spatial vertical setting with described second;The present apparatus can realize first pour plate and second pour plate spatial intersecting set, after completing to pour, Concrete Filled is in the framework that head rod and the second connecting rod are formed, first pour plate and second simultaneously and pour plate and poured, the globality of resulting ground is preferable, with preferably shock resistance.
Description
Technical field
The present invention relates to a kind of structure foundation package assembly.
Background technology
The ground of building after the completion of piling, it is necessary to assemble the pedestal of steel construction, the then casting concrete on pedestal, finally complete pouring for ground, the globality of the pedestal of steel construction of the prior art is poor, is mostly the simple connection of many reinforcing bars, and globality is poor.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of structure foundation package assembly, the present apparatus can realize first pour plate and second pour plate spatial intersecting set, after completing to pour, Concrete Filled is in the framework that head rod and the second connecting rod are formed, first pour plate and second simultaneously and pour plate and poured, the globality of resulting ground is preferable, with preferably shock resistance.
To solve the above problems, the present invention is adopted the following technical scheme that:
A kind of structure foundation package assembly, including four symmetrically arranged right-angle connectors, and it is connected laterally at the head rod between the right-angle connector, and vertically it is connected to the second connecting rod between the right-angle connector, first is combined between two head rods and pours plate, described first pour plate be provided at both ends with the first connecting plate for coordinating the head rod, the first screw is combined between first connecting plate and the head rod, second, which is combined with, between two second connecting rods pours plate, described second pour plate be provided at both ends with the second connecting plate for coordinating second connecting rod, the second screw is combined between second connecting plate and second connecting rod, described first pours plate pours plate in spatial vertical setting with described second.
Preferably, the jack being provided with the shaft of second connecting rod in more than two jacks, two second connecting rods is oppositely arranged, and reinforcement rod is combined between two jacks being oppositely arranged.
Preferably, it is welded and fixed between the head rod and the right-angle connector.
Preferably, it is welded and fixed between second connecting rod and the right-angle connector.
The beneficial effects of the invention are as follows:The present apparatus can realize first pour plate and second pour plate spatial intersecting set, after completing to pour, Concrete Filled is in the framework that head rod and the second connecting rod are formed, first pour plate and second simultaneously and pour plate and poured, preferably, with preferably shock resistance, the structure of the present apparatus is relatively simple for the globality of resulting ground, cost is more cheap, is adapted to promote the use of.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, the required accompanying drawing used in embodiment or description of the prior art will be briefly described below, apparently, drawings in the following description are only some embodiments of the present invention, for those of ordinary skill in the art, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is front view of the invention;
Fig. 2 is the side view of the second connecting rod.
Embodiment
The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention can be easier to be readily appreciated by one skilled in the art, apparent clearly defined so as to be made to protection scope of the present invention.
Refering to a kind of structure foundation package assembly shown in Fig. 1 and Fig. 2, including four symmetrically arranged right-angle connectors 1, and it is connected laterally at the head rod 2 between the right-angle connector 1, and vertically it is connected to the second connecting rod 3 between the right-angle connector 1, first, which is combined with, between two head rods 2 pours plate 4, described first pour plate 4 be provided at both ends with the first connecting plate 401 for coordinating the head rod 2, the first screw 411 is combined between first connecting plate 401 and the head rod 2, second, which is combined with, between two second connecting rods 3 pours plate 5, described second pour plate 5 be provided at both ends with the second connecting plate 501 for coordinating second connecting rod 3, the second screw 511 is combined between second connecting plate 501 and second connecting rod 3, described first pours plate 4 pours plate 5 in spatial vertical setting with described second.
A preferred embodiment in the present invention, more than two jacks 311 are provided with the shaft of second connecting rod 3, the jack 311 in two second connecting rods 3 is oppositely arranged, and reinforcement rod 312 is combined between two jacks 311 being oppositely arranged.
A preferred embodiment in the present invention, is welded and fixed between the head rod 2 and the right-angle connector 1.
A preferred embodiment in the present invention, is welded and fixed between second connecting rod 3 and the right-angle connector 1.
The beneficial effects of the invention are as follows:The present apparatus can realize first pour plate and second pour plate spatial intersecting set, after completing to pour, Concrete Filled is in the framework that head rod and the second connecting rod are formed, first pour plate and second simultaneously and pour plate and poured, preferably, with preferably shock resistance, the structure of the present apparatus is relatively simple for the globality of resulting ground, cost is more cheap, is adapted to promote the use of.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.It should be understood by those skilled in the art that; the present invention is not limited to the above embodiments; merely illustrating the principles of the invention described in above-described embodiment and specification; various changes and modifications of the present invention are possible without departing from the spirit and scope of the present invention, and these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention is defined by appended claims and its equivalent.
Claims (4)
1. a kind of structure foundation package assembly, it is characterised in that:Including four symmetrically arranged right-angle connectors, and it is connected laterally at the head rod between the right-angle connector, and vertically it is connected to the second connecting rod between the right-angle connector, first is combined between two head rods and pours plate, described first pour plate be provided at both ends with the first connecting plate for coordinating the head rod, the first screw is combined between first connecting plate and the head rod, second, which is combined with, between two second connecting rods pours plate, described second pour plate be provided at both ends with the second connecting plate for coordinating second connecting rod, the second screw is combined between second connecting plate and second connecting rod, described first pours plate pours plate in spatial vertical setting with described second.
2. structure foundation package assembly according to claim 1, it is characterised in that:The jack being provided with the shaft of second connecting rod in more than two jacks, two second connecting rods is oppositely arranged, and reinforcement rod is combined between two jacks being oppositely arranged.
3. structure foundation package assembly according to claim 1, it is characterised in that:It is welded and fixed between the head rod and the right-angle connector.
4. structure foundation package assembly according to claim 1, it is characterised in that:It is welded and fixed between second connecting rod and the right-angle connector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610189674.XA CN107288142A (en) | 2016-03-30 | 2016-03-30 | A kind of structure foundation package assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610189674.XA CN107288142A (en) | 2016-03-30 | 2016-03-30 | A kind of structure foundation package assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107288142A true CN107288142A (en) | 2017-10-24 |
Family
ID=60086602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610189674.XA Pending CN107288142A (en) | 2016-03-30 | 2016-03-30 | A kind of structure foundation package assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107288142A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111705829A (en) * | 2020-05-27 | 2020-09-25 | 中博建设工程集团有限公司 | Building foundation structure and construction process thereof |
-
2016
- 2016-03-30 CN CN201610189674.XA patent/CN107288142A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111705829A (en) * | 2020-05-27 | 2020-09-25 | 中博建设工程集团有限公司 | Building foundation structure and construction process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207597284U (en) | Road and bridge crack bracing means | |
CN106968381A (en) | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection | |
CN204059957U (en) | A kind of formwork reinforcement structure | |
CN208518076U (en) | Support column suspension column anti-seismic structure | |
CN105239724B (en) | A kind of huge concrete filled steel rectangular tubes post | |
CN107288142A (en) | A kind of structure foundation package assembly | |
CN103866866B (en) | Super High Core Walls Structure and housing water node after setting a roof beam in place | |
CN203007935U (en) | Concrete pile joint with variable cross-sections | |
CN104196023A (en) | Precast concrete tubular pile tip with mechanical connection device and using method of precast concrete tubular pile tip | |
CN205654090U (en) | Entrance to a cave strutting arrangement is reserved to floor | |
CN103195079B (en) | Installing type template, installing type template group and complete installing type plate device | |
CN205636768U (en) | Building foundation assembly structure | |
CN204186004U (en) | Multifunctional concrete split heads | |
CN206859684U (en) | A kind of support frame structure of reinforcing template connection | |
CN206337653U (en) | A kind of building beam column structure | |
CN207032572U (en) | Self-insulating brick passive type architectural construction constructing structure | |
CN212772789U (en) | Assembled building reinforced concrete member | |
CN205171684U (en) | Connecting piece is used to precast concrete spare | |
CN206707030U (en) | A kind of eccentric joint of cross steel concrete column and steel framed concrete beam | |
CN203654709U (en) | Side slope scaffold connecting part | |
CN209760830U (en) | Prevent framework of steel reinforcement skew structure | |
CN207846656U (en) | A kind of strong ties construction of assembled vertical member and basis | |
CN205857419U (en) | A kind of pouring after settlement supporting construction | |
CN206752448U (en) | Combination against seepage wall construction | |
CN207314327U (en) | One kind building building built pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171024 |
|
WD01 | Invention patent application deemed withdrawn after publication |