CN107277905A - Method for managing system and equipment - Google Patents
Method for managing system and equipment Download PDFInfo
- Publication number
- CN107277905A CN107277905A CN201710534956.3A CN201710534956A CN107277905A CN 107277905 A CN107277905 A CN 107277905A CN 201710534956 A CN201710534956 A CN 201710534956A CN 107277905 A CN107277905 A CN 107277905A
- Authority
- CN
- China
- Prior art keywords
- idle
- application
- power consumption
- big power
- consumption event
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0251—Power saving arrangements in terminal devices using monitoring of local events, e.g. events related to user activity
- H04W52/0258—Power saving arrangements in terminal devices using monitoring of local events, e.g. events related to user activity controlling an operation mode according to history or models of usage information, e.g. activity schedule or time of day
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/06—Selective distribution of broadcast services, e.g. multimedia broadcast multicast service [MBMS]; Services to user groups; One-way selective calling services
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0225—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal
- H04W52/0248—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal dependent on the time of the day, e.g. according to expected transmission activity
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Multimedia (AREA)
- Telephonic Communication Services (AREA)
- Power Sources (AREA)
Abstract
The disclosure provides a kind of method for managing system and equipment, and method for managing system includes:Setting system idle runs port, and idle operation port is used for the big power consumption event of processing that is called in the case where system meets idle condition;Whether monitoring system meets idle condition, if meeting idle condition, and idle broadcast is sent to the application of registered reception idle broadcast;The application call system idle operation port for receiving idle broadcast carries out big power consumption event handling.Big power consumption event handling is carried out when system is idle, user is not interfered with and normally uses, and it also avoid the when equipment not enough power supply that user wants to use.
Description
Technical field
This disclosure relates to technical field of electronic communication, more particularly to method for managing system and equipment.
Background technology
User is when using system management facility, it will usually install various application (English:Application, APP) meet
Various demands, such as, chat application, application of calling a taxi, browser application.These application meeting not timings voluntarily start, networking inspection
Message is surveyed, data etc. are exchanged.When the application installed on system management facility is voluntarily actuated for data transfer, such as download application,
When updating application, upgrade application, system management facility power consumption is higher, if when user uses system management facility, being
The application installed in system management equipment is downloaded, updates or upgraded, and can cause system management facility heating, not enough power supply, shadow
User is rung normally to use.
The content of the invention
The embodiment of the present disclosure provides a kind of method for managing system and equipment.Technical scheme is as follows:
, should applied to system management facility according to the first aspect of the embodiment of the present disclosure there is provided a kind of method for managing system
Method includes:
Setting system idle runs port, and idle operation port, which is used to be called in the case where system meets idle condition, handles big
Power consumption event;
Whether monitoring system meets idle condition, if meeting idle condition, to the application of registered reception idle broadcast
Send idle broadcast;
The application call system idle operation port for receiving idle broadcast carries out big power consumption event handling.
Big power consumption event handling is carried out when system is idle, user is not interfered with and normally uses, and it also avoid user
Want the when equipment not enough power supply used.
In one embodiment, this method also includes:
Receive registration request of the application to idle broadcast reception for having big power consumption event handling demand;It will connect using record
In the list of application for receiving idle broadcast.
In advance by the application record for having big power consumption event handling demand in the list of application for receiving idle broadcast, in system
These applications can be just directly initiated when idle and handle big power consumption event, normal on user generation influence will not be used.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is to have big power consumption event handling demand
Application, then the application call system idle operation port for receiving idle broadcast carries out big power consumption event handling, including:
The application for receiving idle broadcast is waken up, and calling system idle operation port loads and handles pending big work(
Consumption event.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is the pending big power consumption of application
Event, the then application call system idle operation port for receiving idle broadcast carries out big power consumption event handling, including:
The application call system idle for receiving idle broadcast runs port to registered pending big power consumption event
Handled.
In one embodiment, this method also includes:
It is in registered item that the corresponding record of the big power consumption event handled is clear after big power consumption event handling is complete
Remove.
In one embodiment, this method also includes:
It is pending if receiving the big power consumption event handling request of user, and opening idle and handle big power consumption Event Function
The application of big power consumption event sends the registration request broadcasted idle;
Perform and receive the registration request that the application for having big power consumption event handling demand is broadcasted idle, will connect using record
In the list of application for receiving idle broadcast.
When user's active control handles big power consumption event, still pass through its processing time of idle Broadcasting Control, it is ensured that
System carries out big power consumption event handling when meeting idle condition.
In one embodiment, judge whether monitoring system meets idle condition, including:
When judging that time conditions, battery condition, networking situation and/or operating conditions are met, the system of determination meets idle bar
Part.
Time conditions, battery condition, networking situation and/or operating conditions illustrate when meeting start application or process compared with
Few, now, user is not using, it may be determined that system meets idle condition.
In one embodiment, this method also includes:
If in the presence of the process for the big power consumption event being currently running when the system of monitoring does not meet idle condition, terminating process,
And by big power consumption logout in the list that idle is broadcasted;
Perform whether monitoring system meets idle condition, if meeting idle condition, to registered reception idle broadcast
Broadcasted using idle is sent.
If system does not meet idle condition, terminate the process of big power consumption event being currently running, in order to avoid influence user
Use, further increase Consumer's Experience.
According to the second aspect of the embodiment of the present disclosure there is provided a kind of system management facility, including:Setup module, monitoring mould
Block and processing module;
Setup module, for setting system idle to run port, idle operation port is used to meet idle condition in system
The lower called big power consumption event of processing;
Whether monitoring modular, meet idle condition for monitoring system, if meeting idle condition, receives not busy to registered
When broadcast application send idle broadcast;
Processing module, the application call system idle operation port for receiving idle broadcast is carried out at big power consumption event
Reason.
In one embodiment, system management facility also includes:Registering modules;
Registering modules, registration request of the application to idle broadcast reception for having big power consumption event handling demand for receiving;
By application record in the list of application for receiving idle broadcast.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is to have big power consumption event handling demand
Application, processing module include application wake up submodule;
Using submodule is waken up, the application for receiving idle broadcast is waken up, and calling system idle operation port
Load and handle pending big power consumption event.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is the pending big power consumption of application
Event, processing module includes event handling submodule;
Event handling submodule, port is run to registered for receiving the application call system idle of idle broadcast
Pending big power consumption event is handled.
In one embodiment, Registering modules, are additionally operable to after big power consumption event handling is complete, will place in registered item
The corresponding record purge of big power consumption event managed.
In one embodiment, Registering modules include request submodule and record sub module;
Submodule is asked, big power consumption is handled for receiving the big power consumption event handling request of user, and opening idle
During Event Function, the application of pending big power consumption event sends the registration request broadcasted idle;
Record sub module, the registration that the application for having big power consumption event handling demand for performing reception is broadcasted idle please
Ask, by application record in the list of application for receiving idle broadcast.
In one embodiment, monitoring modular includes judging submodule;
Judging submodule, during for judging that time conditions, battery condition, networking situation and/or operating conditions are met, it is determined that
System meets idle condition.
In one embodiment, system management facility also includes process manager module;
Process manager module, for when the system of monitoring does not meet idle condition in the presence of the big power consumption event being currently running
Process when, terminate process, and by big power consumption logout in the list that idle is broadcasted;Perform whether monitoring system meets sky
Not busy condition, if meeting idle condition, idle broadcast is sent to the application of registered reception idle broadcast.
According to the third aspect of the embodiment of the present disclosure there is provided a kind of system management facility, including:
Processor;
Memory for storing processor-executable instruction;
Wherein, processor is configured as:
Setting system idle runs port, and idle operation port, which is used to be called in the case where system meets idle condition, handles big
Power consumption event;
Whether monitoring system meets idle condition, if meeting idle condition, to the application of registered reception idle broadcast
Send idle broadcast;
The application call system idle operation port for receiving idle broadcast carries out big power consumption event handling.
In one embodiment, processor can be additionally configured to:
Receive registration request of the application to idle broadcast reception for having big power consumption event handling demand;It will connect using record
In the list of application for receiving idle broadcast.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is to have big power consumption event handling demand
Application, processor can be additionally configured to:
The application for receiving idle broadcast is waken up, and calling system idle operation port loads and handles pending big work(
Consumption event.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is the pending big power consumption of application
Event, processor can be additionally configured to:
The application call system idle for receiving idle broadcast runs port to registered pending big power consumption event
Handled.
In one embodiment, processor can be additionally configured to:
It is in registered item that the corresponding record of the big power consumption event handled is clear after big power consumption event handling is complete
Remove.
In one embodiment, processor can be additionally configured to:
It is pending if receiving the big power consumption event handling request of user, and opening idle and handle big power consumption Event Function
The application of big power consumption event sends the registration request broadcasted idle;
Perform and receive the registration request that the application for having big power consumption event handling demand is broadcasted idle, will connect using record
In the list of application for receiving idle broadcast.
In one embodiment, processor can be additionally configured to:
When judging that time conditions, battery condition, networking situation and/or operating conditions are met, the system of determination meets idle bar
Part.
In one embodiment, processor can be additionally configured to:
If in the presence of the process for the big power consumption event being currently running when the system of monitoring does not meet idle condition, terminating process,
And by big power consumption logout in the list that idle is broadcasted;
Perform whether monitoring system meets idle condition, if meeting idle condition, to registered reception idle broadcast
Broadcasted using idle is sent.
It should be appreciated that the general description of the above and detailed description hereinafter are only exemplary and explanatory, not
The disclosure can be limited.
Brief description of the drawings
Accompanying drawing herein is merged in specification and constitutes the part of this specification, shows the implementation for meeting the disclosure
Example, and be used to together with specification to explain the principle of the disclosure.
Fig. 1 is the flow chart of the method for managing system according to an exemplary embodiment;
Fig. 2 is the flow chart of the method for managing system according to an exemplary embodiment;
Fig. 3 is the block diagram of the system management facility according to an exemplary embodiment;
Fig. 4 is the block diagram of the system management facility according to an exemplary embodiment;
Fig. 5 is the block diagram of the system management facility according to an exemplary embodiment;
Fig. 6 is the block diagram of the system management facility according to an exemplary embodiment;
Fig. 7 is the block diagram of the system management facility according to an exemplary embodiment;
Fig. 8 is the block diagram of the system management facility according to an exemplary embodiment;
Fig. 9 is the block diagram of the system management facility according to an exemplary embodiment;
Figure 10 is the block diagram of the system management facility according to an exemplary embodiment;
Figure 11 is the block diagram of the terminal device according to an exemplary embodiment.
Embodiment
Here exemplary embodiment will be illustrated in detail, its example is illustrated in the accompanying drawings.Following description is related to
During accompanying drawing, unless otherwise indicated, the same numbers in different accompanying drawings represent same or analogous key element.Following exemplary embodiment
Described in embodiment do not represent all embodiments consistent with the disclosure.On the contrary, they be only with it is such as appended
The example of the consistent apparatus and method of some aspects be described in detail in claims, the disclosure.
When the application installed on system management facility is voluntarily actuated for data transfer, application is such as downloaded, application is updated, rises
When level is applied, system management facility power consumption is higher, if when user uses system management facility, on system management facility
The application of installation is downloaded, updates or upgraded, and can cause system management facility heating, not enough power supply, and influence user normally makes
With.The technical scheme that the embodiment of the present disclosure is provided, sets system idle operation port, and idle operation port is used to meet in system
Be called the big power consumption event of processing under idle condition;Whether monitoring system meets idle condition, if meeting idle condition, to
The application that registration receives idle broadcast sends idle broadcast;The application call system idle operation port for receiving idle broadcast is entered
The big power consumption event handling of row.Big power consumption event handling is carried out when system is idle, user is not interfered with and normally uses, and keep away
The when equipment not enough power supply that user wants to use is exempted from.
Fig. 1 is a kind of flow chart of method for managing system according to an exemplary embodiment, as shown in figure 1, this is
Management method of uniting includes step 101-103:
In a step 101, system idle operation port is set.
Idle operation port is used for the big power consumption event of processing that is called in the case where system meets idle condition.
Big power consumption event refers to that data processing amount is more than the event of preset data amount, for example, download, update, upgrading etc.,
When handling big power consumption event, system management facility heating can be caused and power consumption rate is very fast.
In a step 102, whether monitoring system meets idle condition, if meeting idle condition, receives not busy to registered
When broadcast application send idle broadcast.
Whether detecting system, which meets idle condition, periodically to monitor, and can also be monitored at default multiple time points,
Or in the monitoring of default period periodically, for the concrete form of monitoring, the disclosure is not limited.
In one embodiment, judge whether monitoring system meets idle condition, include but is not limited to:
When judging that time conditions, battery condition, networking situation and/or operating conditions are met, the system of determination meets idle bar
Part etc..In actual applications can according to set determine idle condition judgment principle, can time conditions, battery condition,
Installed System Memory occupancy when one or more of networking situation, operating conditions are met determines, specifically can be according to reality
Demand is set, and is not limited herein.Wherein, time conditions are to judge whether to meet preset time period, such as night (1:00—5:
00).Battery condition is to judge whether electricity is sufficient, such as mobile phone electricity>80%, and/or mobile phone is in charging.Networking situation is
Judge whether network connects or whether flow is sufficient, such as connects wifi.Operating conditions are the operation for judging user to mobile phone
Situation, can be selected under user's situation not to mobile phone operation, such as when screen locking was more than 30 minutes.
Time conditions, battery condition, networking situation and/or operating conditions illustrate when meeting start application or process compared with
Few, now, user is not using, it may be determined that system meets idle condition.Herein, three are enumerated to illustrate specifically such as
What determines whether system management facility is in idle condition, and certainly, this is exemplary illustration, does not represent the disclosure and is confined to
This:
In one embodiment, whether monitoring system meets idle condition, including:Exceed in the memory usage of system
During default occupancy, the system of determination meets idle condition.
The application or process that the low explanation of Installed System Memory occupancy starts are less, and now, user is not using, can be true
Determine system and meet idle condition.
In the second embodiment, whether monitoring system meets idle condition, including:It is determined that continuing the time span of screen locking
Whether default time span is exceeded;When the time span of lasting screen locking exceedes default time span, the system of determination meets
Idle condition.
Usual user can carry out screen locking when without using system management facility to system management facility, if system administration
The time span of equipment screen locking is longer, illustrates that user's longer period of time is likely to that system management facility will not be used, now may be used
To determine system management facility as idle condition.By taking smart mobile phone as an example, user is when without using smart mobile phone, it will usually actively
Lock-screen, also having many consumers to set locks screen automatically, therefore, and smart mobile phone is when the screen locking time is longer, it may be determined that use
Family does not use smart mobile phone.
In the 3rd embodiment, whether monitoring system meets idle condition, including:Determine whether current time belongs to pre-
If the period;When current time belongs to preset time period, the system of determination meets idle condition.
In some preset time periods, user will not typically use system management facility, for example, some users operationally between
Without using system management facility, some users are at night without using system management facility.Therefore, can be with preset time period
Determine that system management facility is in idle condition.For example, preset period of time can be morning 1:00 to 5:00, this period of time is usual
In the case of, user in sleep, will not use mobile phone.
It should be noted that time conditions, battery condition, networking situation, operating conditions these conditions can any groups
Close, for example, can determine that system meets idle condition when these conditions are all met, than as in the night (1:00—5:00)、
And mobile phone is in charging and connects wifi and mobile phone electricity>80% and screen locking more than 30 minutes when, the system of determination meets idle bar
Part.
In one embodiment, this method also includes:It is currently running if existing when the system of monitoring does not meet idle condition
Big power consumption event process, terminate process, and by big power consumption logout in the list that idle is broadcasted;Perform monitoring system
Whether meet idle condition, if meeting idle condition, idle broadcast is sent to the application of registered reception idle broadcast.
If system does not meet idle condition, terminate the process of big power consumption event being currently running, in order to avoid influence user
Use, further increase Consumer's Experience.
In step 103, the application call system idle operation port for receiving idle broadcast is carried out at big power consumption event
Reason.
Big power consumption event handling is carried out after the application startup for receiving idle broadcast, various ways can be had by starting application,
By taking the smart mobile phone for being provided with Android system as an example, in one embodiment, system broadcasts (English can be passed through:
Broadcast mode) starts default application, can also be by starting service (English:Startservice mode) is opened
It is dynamic, it is merely illustrative herein, the disclosure of not writing on one's behalf is confined to this.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is to have big power consumption event handling demand
Application, then the application call system idle operation port for receiving idle broadcast carries out big power consumption event handling, including:Receive
The application broadcasted to idle is waken up, and calling system idle operation port loads and handles pending big power consumption event.
It is illustrated below for epimere content combination practical application scene:
1) systems provide idle operation broadcast interface, the registrable reception idle broadcast of any application
2) is when night (1:00—5:And mobile phone is charging and connecting wifi and mobile phone electricity 00)>80% and screen locking
During more than 30 minutes, system sends idle broadcast by the broadcast modes of Android standard to the application for registering the broadcast,
These applications are waken up;
3) (such as time is not inconsistent, mobile phone lights screen) after 2 condition is unsatisfactory for, checks whether these applications still deposit
It is living, if still in running background, terminating the application process.
In another embodiment, if what is recorded in receiving the list of application that idle is broadcasted is the pending big work(of application
Consumption event, the then application call system idle operation port for receiving idle broadcast carries out big power consumption event handling, including:Receive
Registered pending big power consumption event is handled to the application call system idle operation port that idle is broadcasted.
It is illustrated below for epimere content combination practical application scene:
1) systems provide idle runnable interface, and any application can be called, it would be desirable to the service routine service of startup
(namely pending big power consumption event of some application) is incoming;
2) is when night (1:00—5:And mobile phone is charging and connecting wifi and mobile phone electricity 00)>80% and screen locking
During more than 30 minutes, system is by the startService modes of Android standard, and the application service registered in 1 starts once;
3) empties registered list of application after starting;
4) (such as time is not inconsistent, mobile phone lights screen) after 2 condition is unsatisfactory for, whether the service that inspection starts
Still survive, if still in running background, terminating the process.
In one embodiment, this method also includes:, will processing in registered item after big power consumption event handling is complete
The complete corresponding record purge of big power consumption event.
In one embodiment, whether user can handle big power consumption event with active control, and this method also includes:If receiving
To the big power consumption event handling request of user, and open idle and handle big power consumption Event Function, pending big power consumption event should
The registration request broadcasted with sending idle;
Perform and receive the registration request that the application for having big power consumption event handling demand is broadcasted idle, will connect using record
In the list of application for receiving idle broadcast.
When user's active control handles big power consumption event, still pass through its processing time of idle Broadcasting Control, it is ensured that
System carries out big power consumption event handling when meeting idle condition.
It should be noted that it is further, big power consumption event can be handled in the case where electricity is sufficient.For example, in electricity
When amount is more than default electricity, big power consumption event is handled.Default electricity can be a percentages, when system management facility electricity
When amount is more than default electricity, illustrate that system management facility comparision of quantity of electricity is sufficient.For example, default electricity can be 80% electricity,
When the electricity of system management facility is more than 80%, determine that the electricity of system management facility is more than default electricity, now, system pipes
Manage equipment electricity sufficient.
The method for managing system that the embodiment of the present disclosure is provided, sets system idle operation port, and idle operation port is used for
Be called the big power consumption event of processing in the case where system meets idle condition;Whether monitoring system meets idle condition, if meeting the free time
Condition, then send idle broadcast to the application of registered reception idle broadcast;The application call system for receiving idle broadcast is not busy
Shi Yunhang ports carry out big power consumption event handling.Big power consumption event handling is carried out when system is idle, user is not interfered with normal
Use, and it also avoid the when equipment not enough power supply that user wants to use.
The method for managing system provided based on the corresponding embodiments of above-mentioned Fig. 1, Fig. 2 is shown according to an exemplary embodiment
A kind of method for managing system flow chart, illustrate in the present embodiment, join so that system management facility is smart mobile phone as an example
According to shown in Fig. 2, the method for managing system that the present embodiment is provided includes step 201-205:
In step 201, system idle operation port is set.
Idle operation port is used for the big power consumption event of processing that is called in the case where system meets idle condition.
In step 202., registration request of the application to idle broadcast reception for having big power consumption event handling demand is received.
Various ways can be had by carrying out registration to idle broadcast reception, and by taking Android system as an example, application can pass through
Both modes of Broadcast or Startservice start, and system can provide corresponding default interface, and application can pass through
Corresponding mode is registered, the application after registration, is started in system by Broadcast or Startservice default interface
When, the application of registration will start, and the application do not registered can not then start.
In step 203, by application record in the list of application for receiving idle broadcast.
In advance by the application record for having big power consumption event handling demand in the list of application for receiving idle broadcast, in system
These applications can be just directly initiated when idle and handle big power consumption event, normal on user generation influence will not be used.
It should be noted that user can also voluntarily input the list of application for determining to receive idle broadcast, user is voluntarily true
Which is determined using needs in idle condition to start, these application records are in register list, and different user selects what is started to answer
With difference, user wishes that the application started be able to can also change in different scenes, just can be according to user during idle condition
The register list of determination starts default application, meets the different demand of user, very flexibly.
In step 204, whether monitoring system meets idle condition.
Determine whether system management facility meets idle condition and can include multiple conditions, in one embodiment, meet
The condition of idle condition can include following five:
Whether condition one, the memory usage of system exceed default occupancy;
Condition two, the time span of lasting screen locking exceed default time span;
Condition three, current time belong to preset time period;
Condition four, connected Wireless Fidelity (English:Wireless Fidelity, WiFi).
Condition five, electricity are more than default electricity;
When meeting one or more of above-mentioned five conditions, the system of determination meets idle condition.
It is preferred that, in one embodiment, when meeting above-mentioned five conditions at the same time, meet idle condition.Meet condition
One, illustrate that Installed System Memory occupancy is smaller;Condition two is met, illustrates that the screen locking time is very long, user does not use for a long time;
Condition three is met, it is preset time period to illustrate the current time, user unlikely uses system management facility;Meet condition
Four, illustrate, if downloading the tasks such as renewal, the data traffic of user will not be expended, condition five is met, illustrate that electricity is sufficient, no
Follow-up on user it can use generation influence.When meeting five conditions at the same time, starting default application will not normally make to user
Influence is produced with system management facility.
When system meets idle condition, step 205-207 is performed, when system does not meet idle condition, step is performed
208 and step 209:
In step 205, idle broadcast is sent to the application of registered reception idle broadcast.
In step 206, the application call system idle operation port for receiving idle broadcast is carried out at big power consumption event
Reason.
It is pending if receiving the big power consumption event handling request of user, and opening idle and handle big power consumption Event Function
The application of big power consumption event sends the registration request broadcasted idle;
Perform and receive the registration request that the application for having big power consumption event handling demand is broadcasted idle, will connect using record
In the list of application for receiving idle broadcast.
In step 207, after big power consumption event handling is complete, by the big power consumption event pair handled in registered item
The record purge answered.
For example, removing the record of the big power consumption event handled in the list of application for receiving idle broadcast.
In a step 208, the process for the big power consumption event being currently running is checked for.
In step 209, when there is the process for the big power consumption event being currently running, process is terminated.
The method for managing system that the embodiment of the present disclosure is provided, sets system idle operation port, and idle operation port is used for
Be called the big power consumption event of processing in the case where system meets idle condition;Whether monitoring system meets idle condition, if meeting the free time
Condition, then send idle broadcast to the application of registered reception idle broadcast;The application call system for receiving idle broadcast is not busy
Shi Yunhang ports carry out big power consumption event handling.Big power consumption event handling is carried out when system is idle, user is not interfered with normal
Use, and it also avoid the when equipment not enough power supply that user wants to use.
Following is disclosure apparatus embodiments, can be used for performing method of disclosure embodiment.
Fig. 3 is a kind of block diagram of system management facility according to an exemplary embodiment, and the equipment can be by soft
Being implemented in combination with for part, hardware or both is some or all of as system management facility, and the system management facility is used to hold
Method for managing system described in the corresponding embodiments of the above-mentioned Fig. 1-Fig. 2 of row.As shown in figure 3, the system management facility 30 is wrapped
Include:Setup module 301, monitoring modular 302 and processing module 303;
Setup module 301, for setting system idle to run port, idle operation port is used to meet idle bar in system
Be called the big power consumption event of processing under part;
Whether monitoring modular 302, meet idle condition for monitoring system, if meeting idle condition, is connect to registered
The application for receiving idle broadcast sends idle broadcast;
Processing module 303, the application call system idle operation port for receiving idle broadcast carries out big power consumption thing
Part processing.
In one embodiment, as shown in figure 4, system management facility 30 also includes:Registering modules 304;
Registering modules 304, have registration of the application of big power consumption event handling demand to idle broadcast reception please for receiving
Ask;By application record in the list of application for receiving idle broadcast.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is to have big power consumption event handling demand
Application, as shown in figure 5, processing module 303 include application wake up submodule 3031;
Using submodule 3031 is waken up, the application for receiving idle broadcast is waken up, and calling system idle is run
Port loads and handles pending big power consumption event.
In one embodiment, if as shown in fig. 6, receive idle broadcast list of application in record be application wait locate
The big power consumption event of reason, processing module 303 includes event handling submodule 3032;
Event handling submodule 3032, port is run to having noted for receiving the application call system idle of idle broadcast
The pending big power consumption event of volume is handled.
In one embodiment, Registering modules 304, are additionally operable to after big power consumption event handling is complete, in registered item
By the corresponding record purge of big power consumption event handled.
In one embodiment, as shown in fig. 7, Registering modules 304 include request submodule 3041 and record sub module
3042;
Submodule 3041 is asked, for receiving the big power consumption event handling request of user, and it is big to open idle processing
During power consumption Event Function, the application of pending big power consumption event sends the registration request broadcasted idle;
Record sub module 3042, the registration that the application for having big power consumption event handling demand is broadcasted idle is received for performing
Request, by application record in the list of application for receiving idle broadcast.
In one embodiment, as shown in figure 8, monitoring modular 302 includes judging submodule 3021;
Judging submodule 3021, during for judging that time conditions, battery condition, networking situation and/or operating conditions are met,
The system of determination meets idle condition.
In one embodiment, as shown in figure 9, system management facility 30 also includes process manager module 305;
Process manager module 305, for when the system of monitoring does not meet idle condition in the presence of the big power consumption being currently running
During the process of event, terminate process, and by big power consumption logout in the list that idle is broadcasted;Perform whether monitoring system accords with
Idle condition is closed, if meeting idle condition, idle broadcast is sent to the application of registered reception idle broadcast.
The system management facility that the embodiment of the present disclosure is provided, sets system idle operation port, and idle operation port is used for
Be called the big power consumption event of processing in the case where system meets idle condition;Whether monitoring system meets idle condition, if meeting the free time
Condition, then send idle broadcast to the application of registered reception idle broadcast;The application call system for receiving idle broadcast is not busy
Shi Yunhang ports carry out big power consumption event handling.Big power consumption event handling is carried out when system is idle, user is not interfered with normal
Use, and it also avoid the when equipment not enough power supply that user wants to use.
Figure 10 is a kind of block diagram of system management facility according to an exemplary embodiment, and the equipment can be by soft
Being implemented in combination with for part, hardware or both is some or all of as system management facility, and the system management facility is used to hold
Method for managing system described in the corresponding embodiments of the above-mentioned Fig. 1-Fig. 2 of row.As shown in Figure 10, the system management facility 100
Including:
Processor 1001;
Memory 1002 for storing the executable instruction of processor 1001;
Wherein, processor 1001 is configured as:
Setting system idle runs port, and idle operation port, which is used to be called in the case where system meets idle condition, handles big
Power consumption event;
Whether monitoring system meets idle condition, if meeting idle condition, to the application of registered reception idle broadcast
Send idle broadcast;
The application call system idle operation port for receiving idle broadcast carries out big power consumption event handling.
In one embodiment, processor 1001 can be additionally configured to:
Receive registration request of the application to idle broadcast reception for having big power consumption event handling demand;It will connect using record
In the list of application for receiving idle broadcast.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is to have big power consumption event handling demand
Application, processor 1001 can be additionally configured to:
The application for receiving idle broadcast is waken up, and calling system idle operation port loads and handles pending big work(
Consumption event.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is the pending big power consumption of application
Event, processor 1001 can be additionally configured to:
The application call system idle for receiving idle broadcast runs port to registered pending big power consumption event
Handled.
In one embodiment, processor 1001 can be additionally configured to:
It is in registered item that the corresponding record of the big power consumption event handled is clear after big power consumption event handling is complete
Remove.
In one embodiment, processor 1001 can be additionally configured to:
It is pending if receiving the big power consumption event handling request of user, and opening idle and handle big power consumption Event Function
The application of big power consumption event sends the registration request broadcasted idle;
Perform and receive the registration request that the application for having big power consumption event handling demand is broadcasted idle, will connect using record
In the list of application for receiving idle broadcast.
In one embodiment, processor 1001 can be additionally configured to:
When judging that time conditions, battery condition, networking situation and/or operating conditions are met, the system of determination meets idle bar
Part.
In one embodiment, processor 1001 can be additionally configured to:
If in the presence of the process for the big power consumption event being currently running when the system of monitoring does not meet idle condition, terminating process,
And by big power consumption logout in the list that idle is broadcasted;
Perform whether monitoring system meets idle condition, if meeting idle condition, to registered reception idle broadcast
Broadcasted using idle is sent.
The system management facility that the embodiment of the present disclosure is provided, sets system idle operation port, and idle operation port is used for
Be called the big power consumption event of processing in the case where system meets idle condition;Whether monitoring system meets idle condition, if meeting the free time
Condition, then send idle broadcast to the application of registered reception idle broadcast;The application call system for receiving idle broadcast is not busy
Shi Yunhang ports carry out big power consumption event handling.Big power consumption event handling is carried out when system is idle, user is not interfered with normal
Use, and it also avoid the when equipment not enough power supply that user wants to use.
The system management facility that the embodiment of the present disclosure is provided can be a terminal device as shown in figure 11, and Figure 11 is root
According to a kind of block diagram of terminal device shown in an exemplary embodiment, the terminal device 110 can be smart mobile phone, tablet personal computer
It is used to perform the method for managing system described in the corresponding embodiments of above-mentioned Fig. 1-Fig. 2 Deng, the terminal device 110.
Terminal device 110 can include following one or more assemblies:Processing assembly 1101, memory 1102, power supply group
Part 1103, multimedia groupware 1104, audio-frequency assembly 1105, the interface 1106 of input/output (I/O), sensor cluster 1107, with
And communication component 1108.
The integrated operation of the usual control terminal equipment 110 of processing assembly 1101, such as with display, call, data are led to
Letter, the camera operation operation associated with record operation.Processing assembly 1101 can include one or more processors 11011
Execute instruction, to complete all or part of step of above-mentioned method.In addition, processing assembly 1101 can include it is one or more
Module, is easy to the interaction between processing assembly 1101 and other assemblies.For example, processing assembly 1101 can include multimedia mould
Block, to facilitate the interaction between multimedia groupware 1104 and processing assembly 1101.
Memory 1102 is configured as storing various types of data supporting the operation in terminal device 110.These numbers
According to example include the instruction of any application program or method for being used to operate on terminal device 110, contact data, phone
Book data, message, picture, video etc..Memory 1102 can by any kind of volatibility or non-volatile memory device or
Person's combinations thereof realizes that such as static RAM is (English:Static Random Access Memory, SRAM),
Electrically Erasable Read Only Memory (English:Electrically Erasable Programmable Read Only
Memory, EEPROM), Erasable Programmable Read Only Memory EPROM (English:Erasable Programmable Read Only
Memory, EPROM), programmable read only memory (English:Programmable Read Only Memory, PROM), it is read-only
Memory (English:Read Only Memory, ROM), magnetic memory, flash memory, disk or CD.
Power supply module 1103 provides electric power for the various assemblies of terminal device 110.Power supply module 1103 can include power supply
Management system, one or more power supplys, and other components associated with generating, managing and distributing electric power for terminal device 110.
Multimedia groupware 1104 is included in the screen of one output interface of offer between terminal device 110 and user.
In some embodiments, screen can include liquid crystal display (English:Liquid Crystal Display, LCD) and touch surface
Plate (English:Touch Panel, TP).If screen includes touch panel, screen may be implemented as touch-screen, be come with receiving
From the input signal of user.Touch panel includes one or more touch sensors with sensing touch, slip and touch panel
Gesture.Touch sensor can not only sensing touch or sliding action border, but also detection is with touching or slide
Related duration and pressure.In certain embodiments, multimedia groupware 1104 includes a front camera and/or rearmounted
Camera.When terminal device 110 is in operator scheme, such as screening-mode or during video mode and/or rearmounted is taken the photograph front camera
As head can receive the multi-medium data of outside.Each front camera and rear camera can be a fixed optical lens
Mirror system or with focusing and optical zoom capabilities.
Audio-frequency assembly 1105 is configured as output and/or input audio signal.For example, audio-frequency assembly 1105 includes a wheat
Gram wind (English:Microphone, MIC), when terminal device 110 is in operator scheme, such as call model, logging mode and voice
During recognition mode, microphone is configured as receiving external audio signal.The audio signal received can be further stored
Memory 1102 is sent via communication component 1108.In certain embodiments, audio-frequency assembly 1105 also includes a loudspeaker,
For exports audio signal.
I/O interfaces 1106 are that interface, above-mentioned peripheral interface module are provided between processing assembly 1101 and peripheral interface module
Can be keyboard, click wheel, button etc..These buttons may include but be not limited to:Home button, volume button, start button and
Locking press button.
Sensor cluster 1107 includes one or more sensors, the shape for providing various aspects for terminal device 110
State is assessed.For example, sensor cluster 1107 can detect opening/closed mode of terminal device 110, component it is relatively fixed
Position, such as described component is the display and keypad of terminal device 110, and sensor cluster 1107 can also detect terminal device
110 or the position of 110 1 components of terminal device change, the existence or non-existence that user contacts with terminal device 110, terminal sets
Standby 110 orientation or acceleration/deceleration and the temperature change of terminal device 110.Sensor cluster 1107 can include proximity transducer,
It is configured to the presence of the object near detection in not any physical contact.Sensor cluster 1107 can also include light
Sensor, such as complementary metal oxide semiconductor (English:Complementary Metal Oxide Semiconductor,
CMOS) or charge coupled cell (English:Charge Coupled Device, CCD) imaging sensor, in imaging applications
In use.In certain embodiments, the sensor cluster 1107 can also include acceleration transducer, gyro sensor, magnetic
Sensor, pressure sensor or temperature sensor.
Communication component 1108 is configured to facilitate the logical of wired or wireless way between terminal device 110 and other equipment
Letter.Terminal device 110 can access the wireless network based on communication standard, such as Wireless Fidelity (English:Wireless-
Fidelity, WiFi), 2G or 3G, or combinations thereof.In one exemplary embodiment, communication component 1108 is via broadcast
Channel receives broadcast singal or broadcast related information from external broadcasting management system.In one exemplary embodiment, lead to
Believe that component 1108 also includes near-field communication (English:Near Field Communication, NFC) module, to promote short distance to lead to
Letter.For example, can be based on radio frequency identification (English in NFC module:Radio Frequency Identification, RFID) skill
Art, Infrared Data Association's (English:Infrared Data Association, IrDA) technology, ultra wide band (English:Ultra
Wideband, UWB) technology, bluetooth (English:Bluetooth, BT) technology and other technologies realize.
In the exemplary embodiment, terminal device 110 can be by one or more application specific integrated circuits (English:
Application Specific Integrated Circuit, ASIC), digital signal processor (English:Digital
Signal Processing, DSP), digital signal processing appts (English:Digital Signal Processing
Device, DSPD), PLD (English:Programmable Logic Device, PLD), field programmable gate
Array (English:Field Programmable Gate Array, FPGA), controller, microcontroller, microprocessor or other
Electronic component is realized, for performing the method for managing system described in the corresponding embodiments of above-mentioned Fig. 1-Fig. 2.
In the exemplary embodiment, a kind of non-transitorycomputer readable storage medium including instructing, example are additionally provided
Such as include the memory 1102 of instruction, above-mentioned instruction can be performed to complete above-mentioned side by the processing assembly 1101 of terminal device 110
Method.For example, non-transitorycomputer readable storage medium can be ROM, random access memory (English:Random Access
Memory, RAM), CD-ROM, tape, floppy disk and optical data storage devices etc..When the instruction in the storage medium is set by terminal
When standby 110 processing assembly 1101 is performed so that terminal device 110 is able to carry out institute in the corresponding embodiments of above-mentioned Fig. 1-Fig. 2
The method for managing system of description, this method includes:
Setting system idle runs port, and idle operation port, which is used to be called in the case where system meets idle condition, handles big
Power consumption event;
Whether monitoring system meets idle condition, if meeting idle condition, to the application of registered reception idle broadcast
Send idle broadcast;
The application call system idle operation port for receiving idle broadcast carries out big power consumption event handling.
In one embodiment, this method also includes:
Receive registration request of the application to idle broadcast reception for having big power consumption event handling demand;It will connect using record
In the list of application for receiving idle broadcast.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is to have big power consumption event handling demand
Application, then the application call system idle operation port for receiving idle broadcast carries out big power consumption event handling, including:
The application for receiving idle broadcast is waken up, and calling system idle operation port loads and handles pending big work(
Consumption event.
In one embodiment, if what is recorded in receiving the list of application that idle is broadcasted is the pending big power consumption of application
Event, the then application call system idle operation port for receiving idle broadcast carries out big power consumption event handling, including:
The application call system idle for receiving idle broadcast runs port to registered pending big power consumption event
Handled.
In one embodiment, this method also includes:
It is in registered item that the corresponding record of the big power consumption event handled is clear after big power consumption event handling is complete
Remove.
In one embodiment, this method also includes:
It is pending if receiving the big power consumption event handling request of user, and opening idle and handle big power consumption Event Function
The application of big power consumption event sends the registration request broadcasted idle;
Perform and receive the registration request that the application for having big power consumption event handling demand is broadcasted idle, will connect using record
In the list of application for receiving idle broadcast.
In one embodiment, judge whether monitoring system meets idle condition, including:
When judging that time conditions, battery condition, networking situation and/or operating conditions are met, the system of determination meets idle bar
Part.
In one embodiment, this method also includes:
If in the presence of the process for the big power consumption event being currently running when the system of monitoring does not meet idle condition, terminating process,
And by big power consumption logout in the list that idle is broadcasted;
Perform whether monitoring system meets idle condition, if meeting idle condition, to registered reception idle broadcast
Broadcasted using idle is sent.
The terminal device that the embodiment of the present disclosure is provided, sets system idle operation port, idle operation port is for being
System meets the big power consumption event of processing that is called under idle condition;Whether monitoring system meets idle condition, if meeting idle condition,
Then idle broadcast is sent to the application of registered reception idle broadcast;Receive the application call system idle operation of idle broadcast
Port carries out big power consumption event handling.Big power consumption event handling is carried out when system is idle, user is not interfered with and normally uses, and
And it also avoid the when equipment not enough power supply that user wants to use.
Those skilled in the art will readily occur to its of the disclosure after considering specification and putting into practice disclosure disclosed herein
Its embodiment.The application is intended to any modification, purposes or the adaptations of the disclosure, these modifications, purposes or
Person's adaptations follow the general principle of the disclosure and including the undocumented common knowledge in the art of the disclosure
Or conventional techniques.Description and embodiments are considered only as exemplary, and the true scope of the disclosure and spirit are by following
Claim is pointed out.
It should be appreciated that the precision architecture that the disclosure is not limited to be described above and is shown in the drawings, and
And various modifications and changes can be being carried out without departing from the scope.The scope of the present disclosure is only limited by appended claim.
Claims (17)
1. a kind of method for managing system, it is characterised in that methods described includes:
Setting system idle runs port, and the idle operation port, which is used to be called in the case where system meets idle condition, handles big
Power consumption event;
Whether monitoring system meets idle condition, if meeting idle condition, is sent to the application of registered reception idle broadcast
Idle is broadcasted;
Receive system idle operation port described in the application call of idle broadcast and carry out big power consumption event handling.
2. according to the method described in claim 1, it is characterised in that methods described also includes:
The registration request that the application that receiving has big power consumption event handling demand is broadcasted idle, is receiving not busy by application record
When the list of application broadcasted in.
3. method according to claim 2, it is characterised in that if recorded in the list of application for receiving idle broadcast
The application for having big power consumption event handling demand, then it is described to receive system idle operation end described in the application call that idle is broadcasted
Mouth carries out big power consumption event handling, including:
The application for receiving idle broadcast is waken up, and calls the system idle operation port to load and handle pending big work(
Consumption event.
4. method according to claim 2, it is characterised in that if recorded in the list of application for receiving idle broadcast
It is the pending big power consumption event of application, then system idle described in the application call for receiving idle broadcast runs port
Big power consumption event handling is carried out, including:
Receive system idle described in the application call of idle broadcast and run port to registered pending big power consumption event
Handled.
5. method according to claim 2, it is characterised in that methods described also includes:
If receiving the big power consumption event handling request of user, and opening idle and handle big power consumption Event Function, pending big work(
The application of consumption event sends the registration request broadcasted idle;
The registration request that the application that performing the reception has big power consumption event handling demand is broadcasted idle, the application is recorded
In the list of application for receiving idle broadcast.
6. according to the method described in claim 1, it is characterised in that methods described also includes:
After big power consumption event handling is complete, by the corresponding record purge of big power consumption event handled in registered item.
7. according to the method described in claim 1, it is characterised in that judge whether monitoring system meets idle condition, including:
When judging that time conditions, battery condition, networking situation and/or operating conditions are met, the system of determination meets idle condition.
8. the method according to claim any one of 1-7, it is characterised in that methods described also includes:
In the presence of the process for the big power consumption event being currently running when if the system of monitoring does not meet idle condition, terminate process, and will
The big power consumption logout is in the list that idle is broadcasted;
Perform whether the monitoring system meets idle condition, if meeting idle condition, to registered reception idle broadcast
Broadcasted using idle is sent.
9. a kind of system management facility, it is characterised in that including:Setup module, monitoring modular and processing module;
The setup module, for setting system idle to run port, the idle operation port is used to meet the free time in system
Under the conditions of be called the big power consumption event of processing;
Whether the monitoring modular, meet idle condition for monitoring system, if meeting idle condition, receives not busy to registered
When broadcast application send idle broadcast;
The processing module, big power consumption thing is carried out for receiving system idle operation port described in the application call of idle broadcast
Part processing.
10. equipment according to claim 9, it is characterised in that the system management facility also includes:Registering modules;
The Registering modules, registration request of the application to idle broadcast reception for having big power consumption event handling demand for receiving;
The application is recorded in the list of application for receiving idle broadcast.
11. equipment according to claim 10, it is characterised in that if being recorded in the list of application for receiving idle broadcast
Be the application for having big power consumption event handling demand, the processing module includes application and wakes up submodule;
The application wakes up submodule, and the application for receiving idle broadcast is waken up, and calls the system idle to run
Port loads and handles pending big power consumption event.
12. equipment according to claim 10, it is characterised in that if being recorded in the list of application for receiving idle broadcast
Be application pending big power consumption event, the processing module include event handling submodule;
The event handling submodule, port is run to having noted for receiving system idle described in the application call of idle broadcast
The pending big power consumption event of volume is handled.
13. equipment according to claim 10, it is characterised in that the Registering modules include request submodule and record
Module;
The request submodule, big power consumption is handled for receiving the big power consumption event handling request of user, and opening idle
During Event Function, the application of pending big power consumption event sends the registration request broadcasted idle;
The record sub module, the registration that the application for having big power consumption event handling demand for performing the reception is broadcasted idle
Request, the application is recorded in the list of application for receiving idle broadcast.
14. equipment according to claim 9, it is characterised in that
The Registering modules, are additionally operable to after big power consumption event handling is complete, by the big power consumption thing handled in registered item
The corresponding record purge of part.
15. equipment according to claim 9, it is characterised in that the monitoring modular includes judging submodule;
The judging submodule, during for judging that time conditions, battery condition, networking situation and/or operating conditions are met, it is determined that
System meets idle condition.
16. the equipment according to claim any one of 9-15, it is characterised in that the system management facility also includes:Enter
Thread management module;
The process manager module, for when the system of monitoring does not meet idle condition in the presence of the big power consumption event being currently running
Process when, terminate process, and by the big power consumption logout in the list that idle is broadcasted;Performing the monitoring system is
It is no to meet idle condition, if meeting idle condition, idle broadcast is sent to the application of registered reception idle broadcast.
17. a kind of system management facility, it is characterised in that including:
Processor;
Memory for storing processor-executable instruction;
Wherein, the processor is configured as:
Setting system idle runs port, and the idle operation port, which is used to be called in the case where system meets idle condition, handles big
Power consumption event;
Whether monitoring system meets idle condition, if meeting idle condition, is sent to the application of registered reception idle broadcast
Idle is broadcasted;
Receive system idle operation port described in the application call of idle broadcast and carry out big power consumption event handling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710534956.3A CN107277905B (en) | 2017-07-03 | 2017-07-03 | System management method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710534956.3A CN107277905B (en) | 2017-07-03 | 2017-07-03 | System management method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107277905A true CN107277905A (en) | 2017-10-20 |
CN107277905B CN107277905B (en) | 2021-03-30 |
Family
ID=60069804
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710534956.3A Active CN107277905B (en) | 2017-07-03 | 2017-07-03 | System management method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107277905B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108829732A (en) * | 2018-05-16 | 2018-11-16 | 阿里巴巴集团控股有限公司 | A kind of data processing method and device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102799447A (en) * | 2012-06-19 | 2012-11-28 | 优视科技有限公司 | Method and system for updating internal software of mobile terminal |
CN105045639A (en) * | 2015-08-25 | 2015-11-11 | 广东欧珀移动通信有限公司 | Mobile terminal downloading method and device and mobile terminal |
CN105786560A (en) * | 2016-01-25 | 2016-07-20 | 广东小天才科技有限公司 | Application program upgrading method and terminal application program upgrading system |
CN105824660A (en) * | 2015-08-10 | 2016-08-03 | 维沃移动通信有限公司 | Application program updating method and terminal |
CN106533763A (en) * | 2016-11-17 | 2017-03-22 | 广州优视网络科技有限公司 | Method and device for downloading application update package and user terminal |
CN106598646A (en) * | 2016-11-14 | 2017-04-26 | 深圳市金立通信设备有限公司 | Program update method and terminal |
US20170131995A1 (en) * | 2011-12-28 | 2017-05-11 | Microsoft Technology Licensing, Llc | Mobile terminal and control method thereof |
-
2017
- 2017-07-03 CN CN201710534956.3A patent/CN107277905B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170131995A1 (en) * | 2011-12-28 | 2017-05-11 | Microsoft Technology Licensing, Llc | Mobile terminal and control method thereof |
CN102799447A (en) * | 2012-06-19 | 2012-11-28 | 优视科技有限公司 | Method and system for updating internal software of mobile terminal |
CN105824660A (en) * | 2015-08-10 | 2016-08-03 | 维沃移动通信有限公司 | Application program updating method and terminal |
CN105045639A (en) * | 2015-08-25 | 2015-11-11 | 广东欧珀移动通信有限公司 | Mobile terminal downloading method and device and mobile terminal |
CN105786560A (en) * | 2016-01-25 | 2016-07-20 | 广东小天才科技有限公司 | Application program upgrading method and terminal application program upgrading system |
CN106598646A (en) * | 2016-11-14 | 2017-04-26 | 深圳市金立通信设备有限公司 | Program update method and terminal |
CN106533763A (en) * | 2016-11-17 | 2017-03-22 | 广州优视网络科技有限公司 | Method and device for downloading application update package and user terminal |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108829732A (en) * | 2018-05-16 | 2018-11-16 | 阿里巴巴集团控股有限公司 | A kind of data processing method and device |
CN108829732B (en) * | 2018-05-16 | 2021-10-19 | 创新先进技术有限公司 | Data processing method and device |
Also Published As
Publication number | Publication date |
---|---|
CN107277905B (en) | 2021-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105677460A (en) | Application processing method and apparatus | |
CN106970754A (en) | The method and device of screenshotss processing | |
CN105893129A (en) | Processing method and device for application programs in terminal | |
CN107783790B (en) | Terminal awakening method and device | |
CN105979088A (en) | Message pushing method and device | |
CN106095636B (en) | A kind of prompting continues the method, apparatus and mobile device of charging | |
CN103905653A (en) | Mobile equipment data service control method and device | |
CN105898032A (en) | Adjusting method and apparatus for warning tone | |
CN106371831A (en) | Awakening control method and device and terminal | |
CN106657645A (en) | Call request processing method and device, calling method and device, and related terminal | |
CN103905442A (en) | Wakeup method and device in data synchronization | |
CN105677548A (en) | Application management method and apparatus, and terminal | |
CN106455002A (en) | Wireless search method and device, and terminal | |
CN107436782A (en) | Application program silence installation method and device | |
CN105260221A (en) | Application installation method and device | |
CN107247735A (en) | Document transmission method and device | |
CN107277905A (en) | Method for managing system and equipment | |
CN107885308A (en) | Electricity saving method and device | |
CN106990984A (en) | The method and device of more new system | |
CN106550129A (en) | Communication means, device and mobile terminal under battery saving mode | |
CN106383856A (en) | Method and device for managing file system quota | |
CN106791169A (en) | Screen control method and device | |
CN105893128A (en) | Application program calling management method and device | |
CN105657199A (en) | Method and device for establishing talking connection and switching equipment | |
CN106502809B (en) | A kind of multi-platform application program adaptation method, device and terminal device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |