CN107271727A - A kind of control recorder tested based on voltage ride-through - Google Patents

A kind of control recorder tested based on voltage ride-through Download PDF

Info

Publication number
CN107271727A
CN107271727A CN201710640707.2A CN201710640707A CN107271727A CN 107271727 A CN107271727 A CN 107271727A CN 201710640707 A CN201710640707 A CN 201710640707A CN 107271727 A CN107271727 A CN 107271727A
Authority
CN
China
Prior art keywords
voltage
frequency converter
input
central controller
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710640707.2A
Other languages
Chinese (zh)
Other versions
CN107271727B (en
Inventor
李福兴
杜洋
刘琦
魏本刚
李腾飞
朱妍文
陈洪涛
李驹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd, East China Power Test and Research Institute Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201710640707.2A priority Critical patent/CN107271727B/en
Publication of CN107271727A publication Critical patent/CN107271727A/en
Application granted granted Critical
Publication of CN107271727B publication Critical patent/CN107271727B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

A kind of control recorder tested based on voltage ride-through, the voltage x current value for exporting and gathering adjustable transformer and transformer load in real time of control adjustable transformer, comprising:Central controller, is connected with adjustable transformer and load, controls the output voltage size of adjustable transformer and holds time, assesses the voltage ride through ability of frequency converter;Signal sampling and processing module, input is connected respectively with central controller and adjustable transformer;Waveform analysis module, input is connected respectively with central controller and Signal sampling and processing module;Image display module, input is connected respectively with central controller and signal acquisition and waveform analysis module;Memory module is compressed, input is connected respectively with central controller and Signal sampling and processing module.It is an advantage of the invention that automatic test, saves human cost.

Description

A kind of control recorder tested based on voltage ride-through
Technical field
The present invention relates to grid generation technical field, and in particular to a kind of control recorder tested based on voltage ride-through.
Background technology
With vigorously implementing for national energy-saving policy, power station auxiliary system carries out a large amount of frequency converter transformations, to reduce machine Group station service.But, the subsidiary engine frequency converter voltage ride-through capability of current most of fired power generating units does not wait until checking, has not even Possess voltage ride through ability, occur in that the problem of instantaneous voltage fluctuation causes generating set chaser occurs for power network;Due to frequency converter Without voltage ride-through functional test, once there is Voltage Drop or too high, frequency converter can trigger the protection such as low-voltage and excessively stream, Frequency converter locking is caused to export, for high voltage converter, supply is all Important Auxiliary equipment, once frequency converter locking, Important Auxiliary equipment Stoppage in transit can ultimately result in the generation of unit tripping accident.
Tested to detect frequency converter voltage ride-through capability, it is necessary to carry out high-low voltage ride-through capability to frequency converter, But lack corresponding high voltage converter detection device at present.Voltage ride through ability test is carried out to high voltage converter, it is necessary to grind A set of voltage dip device is made, to verify frequency converter ride-through capability in Voltage Drop.
Frequency converter voltage passes through experimental rig and is made up of testing transformer, fast incision pass, tunable load, control recorder. Pass through experiment to output voltage height, the voltage switching time be distinctly claimed, the parameters such as voltage, electric current, power are also needed into Row monitoring in real time, it is therefore desirable to design an instrumentation implementation process control and acquisition parameter function.
The content of the invention
It is an object of the invention to provide a kind of control recorder tested based on voltage ride-through, applied to frequency converter voltage Pass through in experiment, Control experiment whole process.
A kind of control recorder tested based on voltage ride-through, is controlled the output of adjustable transformer and collection can modulation in real time The voltage x current value of depressor and transformer load, comprising:
Central controller, is connected with adjustable transformer and transformer load, when controlling the output voltage size of transformer and maintaining Between;
Signal sampling and processing module, input is connected respectively with central controller and adjustable transformer, by central controller control Make and gather the concrete numerical value of the output voltage, electric current and frequency of adjustable transformer;
Waveform analysis module, input is connected respectively with central controller and Signal sampling and processing module;
Image display module, input is connected respectively with central controller and signal acquisition and waveform analysis module;
Memory module is compressed, input is connected respectively with central controller and Signal sampling and processing module;
Voltage, electric current, frequency and waveform analysis that the central controller is gathered according to the Signal sampling and processing module Power, power factor, rotating speed, switching time information obtained from module is calculated, assess the voltage ride through ability of frequency converter.
A kind of above-mentioned control recorder tested based on voltage ride-through, wherein, in the Signal sampling and processing module From 8 channel isolations, 16 high-speed a/d converter collection voltages of synchronized sampling and current signal.
A kind of above-mentioned control recorder tested based on voltage ride-through, wherein, the voltage signal acquisition error< 0.2V, the current signal Acquisition Error<0.02mA, frequency calculates measurement error<0.01Hz.
A kind of above-mentioned control recorder tested based on voltage ride-through, wherein, the compression memory module supports movement Storage device.
A kind of above-mentioned control recorder tested based on voltage ride-through, wherein, in the Signal sampling and processing module Sampling channel it is mutually isolated.
A kind of above-mentioned control recorder tested based on voltage ride-through, wherein, the image display module selects figure Touch-screen.
A kind of above-mentioned control recorder tested based on voltage ride-through, wherein, the control recorder is connected point respectively Switch and frequency converter are connect, an adjustable transformer is sequentially connected with the shunting switch and frequency converter, 8 inputs of shunting switch Connect with multiple voltage, it is related that magnitude of voltage passes through voltage U to frequency converter voltage;Recorder is controlled to control the shunting switch successively Switch different voltages, and record data simultaneously, step is as follows:
S1, the shunting switch output end are arranged at the 8th input, and output voltage is 100%U, and wherein U represents frequency converter Rated voltage;
S2, the shunting switch output end switch to the 1st input, and output voltage is 130%U, 0.5 second retention time;
S3, the shunting switch output end switch to the 2nd input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S4, the shunting switch output end switch to the 3rd input, and output voltage is 90%U, and the retention time is more than 5 seconds, treated Frequency converter is run to stable, reads frequency converter working condition;
S5, the shunting switch output end switch to the 4th input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S6, the shunting switch output end switch to the 5th input, and output voltage is 60%U, and the retention time is 5 seconds;
S7, the shunting switch output end switch to the 6th input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S8, the shunting switch output end switch to the 7th input, and output voltage is 20%U, are kept for 0.5 second;
S9, the shunting switch output end switch to the 8th input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S10, the control recorder judge whether frequency converter normal operation and records all test parameters and waveform, process of the test In such as a certain project test failure, then be directly entered next pilot project;
S11, the control recorder assess the voltage ride through ability of system under test (SUT), generate analysis report.
The advantages of the present invention are to introduce automatic test, save human cost.
Brief description of the drawings
Fig. 1 is the module map of the present invention.
Embodiment
Below in conjunction with accompanying drawing, by describing a preferably specific embodiment in detail, the present invention is further elaborated.
Special control recorder as shown in Figure 1, shows and records transformer output and the voltage electricity of load end in real time Signal is flowed, the comprehensive monitoring to parameters such as associated voltage, electric current, frequency, power and power factors is realized.
A kind of control recorder tested based on voltage ride-through, is controlled the output of adjustable transformer and collection can modulation in real time The voltage current waveform of depressor and transformer load, includes central controller 1, Signal sampling and processing module 2, waveform analysis mould Block 3, image display module 4 and compression memory module 5.
Central controller 1, is connected with adjustable transformer and transformer load, controls the output voltage size and dimension of transformer Hold the time.
Signal sampling and processing module 2, input is connected respectively with central controller 1 and adjustable transformer, is controlled by center The concrete numerical value of output voltage, electric current and frequency that device 1 processed controls and gathers adjustable transformer.
Waveform analysis module 3, input is connected respectively with central controller 1 and Signal sampling and processing module 2.
Image display module 4, input is connected respectively with central controller 1 and signal acquisition and waveform analysis module 3.
Memory module 5 is compressed, input is connected respectively with central controller 1 and Signal sampling and processing module 2.
Voltage, electric current, frequency and ripple that the central controller 1 is gathered according to the Signal sampling and processing module 2 Power, power factor, rotating speed, switching time information obtained from conformal analysis module 3 is calculated, the voltage for assessing the frequency converter are worn More ability.
Further, from 8 channel isolations, 16 high speeds of synchronized sampling in the Signal sampling and processing module 2 A/D converter collection voltages and current signal.
Further, the voltage signal acquisition error<0.2V, the current signal Acquisition Error<0.02mA, frequency meter Calculate measurement error<0.01Hz.
Further, the compression memory module 5 supports movable storage device.
Further, the sampling channel in the Signal sampling and processing module 2 is mutually isolated.
Further, the image display module 4 selects pattern touch screen.
When carrying out testing experiment, the control recorder control transformer switching output electricity tested based on voltage ride-through Pressure, and keep each output voltage to maintain certain time, control recorder judges to become according to the voltage x current information collected The operation of frequency device is reached after stable state, then controls transformer to be switched to next output voltage, repeats next circulation.If Frequency converter operation can't reach stable state after the time limit, then control after recorder record miss data, under proceeding One step is tested, until pilot project is fully completed.
After off-test, control recorder records and calculates mains side and the voltage of load-side, electric current, frequency in process of the test Situations such as rate, power, power factor, switching time and protection signal, and transient signal is recorded, food preservation test mistake Voltage waveform in journey, is analyzed waveform, the voltage ride through ability of the frequency converter of evaluation test process, generation analysis report Accuse.
Control recorder connects shunting switch and frequency converter, an adjustable transformer and the shunting switch and frequency converter respectively It is sequentially connected, 8 inputs of shunting switch connect with multiple voltage, and it is related that magnitude of voltage passes through voltage to frequency converter voltage;Control Recorder processed controls the shunting switch to switch different voltages, and record data simultaneously successively, and step is as follows:
S1, the shunting switch output end are arranged at the 8th input, and output voltage is 100%U, and wherein U represents frequency converter Rated voltage;
S2, the shunting switch output end switch to the 1st input, and output voltage is 130%U, 0.5 second retention time;
S3, the shunting switch output end switch to the 2nd input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S4, the shunting switch output end switch to the 3rd input, and output voltage is 90%U, and the retention time is more than 5 seconds, treated Frequency converter is run to stable, reads frequency converter working condition;
S5, the shunting switch output end switch to the 4th input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S6, the shunting switch output end switch to the 5th input, and output voltage is 60%U, and the retention time is 5 seconds;
S7, the shunting switch output end switch to the 6th input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S8, the shunting switch output end switch to the 7th input, and output voltage is 20%U, are kept for 0.5 second;
S9, the shunting switch output end switch to the 8th input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S10, the control recorder judge whether frequency converter normal operation and records all test parameters and waveform, process of the test In such as a certain project test failure, then be directly entered next pilot project;
S11, the control recorder assess the voltage ride through ability of tested frequency convertor system, generate analysis report.
Although present disclosure is discussed in detail by above preferred embodiment, but it should be appreciated that above-mentioned Description is not considered as limitation of the present invention.After those skilled in the art have read the above, for the present invention's A variety of modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (7)

1. a kind of control recorder tested based on voltage ride-through, is controlled the output of adjustable transformer and gathers adjustable transformation in real time The voltage x current value of device and transformer load, it is characterised in that include:
Central controller(1), be connected with adjustable transformer and transformer load, control adjustable transformer output voltage size and Hold time;
Signal sampling and processing module(2), input and central controller(1)Connect, controlled by center respectively with adjustable transformer Device processed(1)Control and gather the concrete numerical value of the output voltage, electric current and frequency of adjustable transformer;
Waveform analysis module(3), input and central controller(1)With Signal sampling and processing module(2)Connect respectively;
Image display module(4), input and central controller(1)With signal acquisition and waveform analysis module(3)Connect respectively;
Compress memory module(5), input and central controller(1)With Signal sampling and processing module(2)Connect respectively;
The central controller(1)According to the Signal sampling and processing module(2)Voltage, electric current, frequency and the ripple of collection Conformal analysis module(3)The information such as the power, rotating speed, power factor, switching time and the protection signal that calculate, assess described The voltage ride through ability of adjustable transformer.
2. a kind of control recorder tested based on voltage ride-through as claimed in claim 1, it is characterised in that the signal is adopted Collection and processing module(2)It is middle to be believed from 8 channel isolations, 16 high-speed a/d converter collection voltages of synchronized sampling and electric current Number.
3. a kind of control recorder tested based on voltage ride-through as claimed in claim 2, it is characterised in that the voltage letter Number Acquisition Error<0.2V, the current signal Acquisition Error<0.02mA, frequency calculates measurement error<0.01Hz.
4. a kind of control recorder tested based on voltage ride-through as claimed in claim 1, it is characterised in that the compression is deposited Store up module(5)Support movable storage device.
5. a kind of control recorder tested based on voltage ride-through as claimed in claim 1, it is characterised in that the signal is adopted Collection and processing module(2)In sampling channel it is mutually isolated.
6. a kind of control recorder tested based on voltage ride-through as claimed in claim 1, it is characterised in that the figure shows Show module(4)From pattern touch screen.
7. a kind of control recorder tested based on voltage ride-through as claimed in claim 1, it is characterised in that the control note Record instrument connects shunting switch and frequency converter respectively, and an adjustable transformer is sequentially connected with the shunting switch and frequency converter, tap 8 inputs of switch connect with multiple voltage, and it is related that magnitude of voltage passes through voltage U to frequency converter voltage;Control recorder control The shunting switch switches different voltages, and record data simultaneously successively, and step is as follows:
S1, the shunting switch output end are arranged at the 8th input, and output voltage is 100%U, and wherein U represents frequency converter Rated voltage;
S2, the shunting switch output end switch to the 1st input, and output voltage is 130%U, 0.5 second retention time;
S3, the shunting switch output end switch to the 2nd input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S4, the shunting switch output end switch to the 3rd input, and output voltage is 90%U, and the retention time is more than 5 seconds, treated Frequency converter is run to stable, reads frequency converter working condition;
S5, the shunting switch output end switch to the 4th input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S6, the shunting switch output end switch to the 5th input, and output voltage is 60%U, and the retention time is 5 seconds;
S7, the shunting switch output end switch to the 6th input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S8, the shunting switch output end switch to the 7th input, and output voltage is 20%U, are kept for 0.5 second;
S9, the shunting switch output end switch to the 8th input, and output voltage is 100%U, treat that frequency converter is run to steady It is fixed, read frequency converter working condition;
S10, the control recorder judge whether frequency converter normal operation and records all test parameters and waveform, process of the test In such as a certain project test failure, then be directly entered next pilot project;
S11, the control recorder assess the voltage ride through ability of system under test (SUT), generate analysis report.
CN201710640707.2A 2017-07-31 2017-07-31 Control recorder based on voltage ride through test Active CN107271727B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710640707.2A CN107271727B (en) 2017-07-31 2017-07-31 Control recorder based on voltage ride through test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710640707.2A CN107271727B (en) 2017-07-31 2017-07-31 Control recorder based on voltage ride through test

Publications (2)

Publication Number Publication Date
CN107271727A true CN107271727A (en) 2017-10-20
CN107271727B CN107271727B (en) 2023-08-29

Family

ID=60075113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710640707.2A Active CN107271727B (en) 2017-07-31 2017-07-31 Control recorder based on voltage ride through test

Country Status (1)

Country Link
CN (1) CN107271727B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110276189A1 (en) * 2009-12-23 2011-11-10 China Electric Power Research Institute Control and Protection System of Converter Valve Operation Test Equipment
CN102565717A (en) * 2012-01-18 2012-07-11 哈尔滨建成集团有限公司 Thermal battery test system
CN205507033U (en) * 2016-02-02 2016-08-24 保定华创电气有限公司 Transformer on -load tap -changer alternating current -direct current parameter testing appearance
CN106597181A (en) * 2017-02-13 2017-04-26 云南电网有限责任公司电力科学研究院 Operation monitoring system and method of high-voltage power transformer
CN207096276U (en) * 2017-07-31 2018-03-13 国网上海市电力公司 A kind of control recorder based on voltage ride-through test

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110276189A1 (en) * 2009-12-23 2011-11-10 China Electric Power Research Institute Control and Protection System of Converter Valve Operation Test Equipment
CN102565717A (en) * 2012-01-18 2012-07-11 哈尔滨建成集团有限公司 Thermal battery test system
CN205507033U (en) * 2016-02-02 2016-08-24 保定华创电气有限公司 Transformer on -load tap -changer alternating current -direct current parameter testing appearance
CN106597181A (en) * 2017-02-13 2017-04-26 云南电网有限责任公司电力科学研究院 Operation monitoring system and method of high-voltage power transformer
CN207096276U (en) * 2017-07-31 2018-03-13 国网上海市电力公司 A kind of control recorder based on voltage ride-through test

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴跨宇;蔡慧;卢岑岑;阎晗;: "变频器测试用模拟电子负载设计研究及仿真验证" *

Also Published As

Publication number Publication date
CN107271727B (en) 2023-08-29

Similar Documents

Publication Publication Date Title
CN103744396B (en) A kind of device being applied to SVG, APF cooperation control
CN107833643A (en) Totally digitilized rod position measuring device and its method
CN101294999B (en) AC/DC arrester team-work tester
CN105548943B (en) A kind of CVT capacitance on-line monitoring methods based on the monitoring of CVT secondary voltages
CN103983880A (en) Anti-islanding protection capability detection device and testing method of grid-connected inverter
CN104764952B (en) A kind of the STATCOM detection platforms and detection method of 10kV voltage class
CN103616660B (en) The testing arrangement of power down process reliability and method under intelligent electric energy meter interference environment
CN103149486A (en) Function and performance testing method of low-voltage complete reactive power compensation device
CN108196187A (en) Double-fed wind power generator rotor winding three-phase asymmetric load method for diagnosing faults
CN108037429A (en) A kind of direct current arrester long wave screening test device and method
CN108169604A (en) Distributed generation resource electricity generation grid-connecting safety monitoring method and monitoring system
CN104133463A (en) Terminal injection-type feeder automation uninterrupted power test method
CN207096276U (en) A kind of control recorder based on voltage ride-through test
CN104569801A (en) Characteristic test device and method for alternating-and-direct-current dual-purpose low-voltage circuit breaker
CN113253079A (en) Microcomputer type direct current system insulation monitoring test device and method
CN202903892U (en) A transformer station capacitance on-line monitoring device based on a wireless mode
CN106546854A (en) A kind of combining unit for supporting to record wave energy
CN113447856A (en) Automatic quality inspection testing device and method for transformer
CN105827017B (en) A kind of intelligent recording and network analysis system of intelligent substation
CN107271727A (en) A kind of control recorder tested based on voltage ride-through
CN206945865U (en) A kind of voltage ride-through test system
CN112213633B (en) Automatic testing device and method for life test of phase change switch
CN202870213U (en) Live testing device for feeder automation system
CN108663592A (en) It is a kind of to towed SVG modular debuggings platform and method
CN201226018Y (en) AC/DC arrester team-work tester

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Fuxing

Inventor after: Du Yang

Inventor after: Liu Qi

Inventor after: Wei Bengang

Inventor after: Li Tengfei

Inventor after: Zhu Yanwen

Inventor after: Chen Hongtao

Inventor after: Li Ju

Inventor before: Li Fuxing

Inventor before: Du Yang

Inventor before: Liu Qi

Inventor before: Wei Bengang

Inventor before: Li Tengfei

Inventor before: Zhu Yanwen

Inventor before: Chen Hongtao

Inventor before: Li Ju

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant