CN107269897A - For the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper - Google Patents
For the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper Download PDFInfo
- Publication number
- CN107269897A CN107269897A CN201710576250.3A CN201710576250A CN107269897A CN 107269897 A CN107269897 A CN 107269897A CN 201710576250 A CN201710576250 A CN 201710576250A CN 107269897 A CN107269897 A CN 107269897A
- Authority
- CN
- China
- Prior art keywords
- ash
- dust
- bonnet
- dust collector
- dust stratification
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16K—VALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
- F16K17/00—Safety valves; Equalising valves, e.g. pressure relief valves
- F16K17/02—Safety valves; Equalising valves, e.g. pressure relief valves opening on surplus pressure on one side; closing on insufficient pressure on one side
- F16K17/04—Safety valves; Equalising valves, e.g. pressure relief valves opening on surplus pressure on one side; closing on insufficient pressure on one side spring-loaded
- F16K17/0413—Safety valves; Equalising valves, e.g. pressure relief valves opening on surplus pressure on one side; closing on insufficient pressure on one side spring-loaded in the form of closure plates
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Refuse-Collection Vehicles (AREA)
Abstract
The present invention provides a kind of safety signal valve for being used under the serious dust stratification state of dust collector ash hopper put ash automatically, is installed on a dust leg road, the dust leg road has the ash inlet tube for stretching into a pipeful of internal portion and the ash releasing tube stretched out outside bucket body;The bucket body has a design carrying material position and high charge level early warning material position;The ash inlet tube is located between the design carrying material position and high charge level early warning material position;The safety signal valve includes:It is fixedly arranged on a detection mouth flange of the mouth of pipe of ash releasing tube;An elastic pressure assembly affixed with the detection mouth flange;One door rod, its one end connects the bonnet to close the mouth of pipe, and the other end is connected with the elastic pressure assembly.Dust leg road can be coordinated easily to judge that dust collector ash hopper is to be in normal condition or abnormality.And can be in the automatic removing dust after the grey bearing capacity of deduster design storage, while realizing the sound and light alarm under the accident dust stratification state of deduster.
Description
Technical field
The present invention relates to environmental technology field, more particularly to cleaner, and in particular to it is tight that one kind is used for dust collector ash hopper
The automatic safety signal valve for putting ash under weight dust stratification state.
Background technology
Showing for the of short duration dust stratification of ash bucket occurs often because of ash discharge failure in the dust collector ash hopper that thermal power plant is equipped with often
As this belongs to normal phenomenon, as long as general dust stratification is in the grey capacity of storage that dust collector ash hopper allows, and dust stratification duration correspondence is extensive
In the time range of multiple normal ash disposal, deduster would not be caused harm.Therefore dust collector ash hopper dust stratification causes to endanger to deduster
Harmful case, is entirely because failture evacuation not in time, makes dust stratification inside dust collector ash hopper exceed deduster design permission
Storage capacity.
It is domestic repeatedly to occur the security incident caused by the serious dust stratification of dust collector ash hopper.Such as:Hubei Pu in 2005
No. 2 electric cleaner " 1.1 " total collapse accidents of boundary Power Plant No.1 unit (300,000 kilowatts);The second thermoelectricity of the packet header of the Inner Mongol in 2005
Electric field " 3.20 " the ash bucket total collapse accident of factory No. 2 units (200,000 kilowatts) electric cleaner one;Inner Mongol Huo Mei groups in 2005
No. 3 unit " 4.9 " ash bucket case accidents of one phase of power plant for self-supply of Hong Junlv electricity companies;The grey hair of 2006 time electricity international Anhui Chizhou City nine
Electric No. 2 unit electric cleaner " 3.14 " cave-in accidents of Co., Ltd;The safe and sound Iron And Steel Co., Ltd in Tangshan " 9.23 " electricity is removed within 2014
Dirt device ash bucket cave-in accident etc..Above-mentioned its inducement of startling accident can all be attributed to the accident dust stratification of deduster and not and
When deashing.
Current domestic thermal power plant deduster judges whether the technological means of dust stratification mainly has three aspects for inside:Deduster ash
The high charge level switch that struggles against judges;Deduster ash disposal system operational factor indirect discrimination;Measure checking is disassembled in maintenance.
The factor of ash disposal system operational factor indirect discrimination influence is a lot, and needs the comparison of longtime running parameter, has
There is very big hysteresis quality, it is impossible to find dust stratification hidden danger in time.The feelings that measure checking often has occurred and that in accident are disassembled in maintenance
Under condition, that takes has the interim measure of certain risk and damaging, is not the technical measures that equipment is normally run.So,
At present in the industry it is main choose ash bucket high charge level switch judge measure judge inside deduster whether dust stratification.
Generally judge to coordinate artificial accident cinerary device to handle inside deduster seriously using high charge level switch at this stage
Dust stratification failure, the premise of such a mode is will be using ash bucket high charge level switching signal as operation foundation, if high charge level switch letter
Number go wrong, then this mode just can not normal work.In addition, when high charge level switching signal fails, not only can not and
When process accident hidden danger, accident potential can not be judged whether in time by also resulting in staff, and this is also to cause domestic hair
The key technology factor of the serious dust stratification accident of raw deduster.
As shown in figure 1, existing dust collector ash hopper when on ash bucket high charge level switch 01 alarm when, it is necessary to which ash bucket is opened manually
The urgent cinerary device 02 of bottom accident, carries out urgent ash discharge, if carry out accident promptly puts ash and fully relies on high charge level switch 01
Single source signal.
In ash bucket high charge level switch type selecting, because radio frequency admittance material level indicator is relatively economical, reliable, therefore, general
Time design selection use radio frequency admittance material level indicator.Theoretically, radio frequency admittance material level indicator is used in design
Advanced anti-adhesive circuit, using the measurement of many reference amounts, wherein by using exchange phase demodulation sampler, being solved from mathematical theory
Bridging problem on switch.But, in dust collector ash hopper in adverse circumstances, radio frequency admittance material level indicator still goes out unavoidably
Existing false alarm and damage, exactly because also radio frequency admittance material level indicator false alarm takes place frequently in actual applications, it is easy to operation
Administrative staff produce the misleading in understanding.In addition, radio frequency admittance level-sensing device is needed by having using debugging is preceding needed during debugging
Grey and ashless two states, ability accurate calibration level-sensing device, so, in deduster ash disposal system existing defects, such as ash disposal
When design conveying capacity is not enough, deduster air flow method is uneven, it will make the presence of very big wind in ash disposal system running
Dangerous hidden danger.If deduster is run in the case where there is hidden danger for a long time, maintainer can not in time have found and exclude again to ask
Topic, the accumulation of problem for a long time finally will result in serious harm.The country has many dedusters serious product occur going into operation in 1 year
Grey failure, is exactly mainly caused by above-mentioned reason.
With the constantly improve of passive nucleon material-level measure technological means, passive nuclear level sensing device has obtained more and more wider
General use.But, for passive nuclear level sensing device, equally there is also the possibility for breaking down and failing, in addition, passive nucleon
Test and checking that level-sensing device does not also pass through under the state of emergency, so, even if being led using passive nuclear level sensing device instead of radio frequency
Stuff level switch of receiving can not avoid deduster to occur serious dust stratification harm completely.
Thus, ash bucket dust stratification can be judged accurately, conveniently, reliably, in time by how realizing, and safe and simple, effective
The serious dust stratification accident potential of processing deduster is the important topic of urgent need to resolve in the industry.
The content of the invention
The deficiency existed for above-mentioned prior art, is seriously accumulated it is an object of the invention to provide one kind for dust collector ash hopper
The automatic safety signal valve for putting ash under grey state, can be with device in the detection mouth of the lower end in a special dust leg road, Combined with Radiotherapy
Grey pipeline easily judges that dust collector ash hopper is to be in normal condition or abnormality.And it can be designed beyond deduster
After the grey bearing capacity of storage, dust is higher by after normal reservoir ash quantity in ash bucket, dust stratification is achieved in automatic removing dust to dedusting
The defencive function of device;Meanwhile, during ash discharge, also switching value electric signal can be transmitted to related Control System by touching contact-making switch,
Realize the sound and light alarm under the accident dust stratification state of deduster.
For up to above-mentioned purpose, the present invention is adopted the technical scheme that:
For the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper, a dust leg road is installed on, should
Dust leg road has the ash inlet tube for stretching into a pipeful of internal portion and the ash releasing tube stretched out outside bucket body;The bucket body has one to set
Meter carrying material position and high charge level early warning material position;The ash inlet tube be located at design carrying material position and the high charge level early warning material position it
Between;
The safety signal valve includes:
It is fixedly arranged on a detection mouth flange of the mouth of pipe of ash releasing tube;
An elastic pressure assembly affixed with the detection mouth flange;
One door rod, its one end connects the bonnet to close the mouth of pipe, and the other end connects with the elastic pressure assembly
Connect.
Further, the elastic pressure assembly includes a spring support and a spring;
The spring support includes some installation vertical rods of a bonnet and connection bonnet and detection mouth flange;The bonnet with
Fixed one is oriented to and limiting plate between detection mouth flange;It is oriented to and limiting plate is formed with a pilot hole, the door rod has one the
One retainer, the door rod passes through the pilot hole, and first retainer is located between guiding and limiting plate and bonnet;Cap-shaped afterwards
The retainers of Cheng Youyi second;The spring housing is located at door rod, and two ends are stopped at foregoing first retainer and the second stop respectively
Portion.
Further, the bonnet, detection mouth flange, guiding and limiting plate are parallel each other.
Further, second retainer is an adjustment circle, and the adjustment snare is located at the door rod, and outside passes through spiral shell
Line structure is connected with the mounting hole that bonnet is formed, and has been internally formed spring locking groove.
Further, it is described guiding and limiting plate on be provided with can by first retainer a mobile-initiated contact
Switch.
Further, the spring is stage clip.
Further, first retainer is an annular protrusion.
Further, the door rod, pilot hole and mounting hole are coaxial.
By taking above-mentioned technical proposal, ash inlet tube is highly less than ash bucket design carrying material position, i.e., grey position limiting altitude is high
In high charge level early warning material position, i.e. high charge level switch height.It is under normal circumstances, high after dust stratification first reaches high charge level switch height
Stuff level switch is alarmed, at this point it is possible to pass through conventional meanses ash discharge.Once high charge level switch fault, fails alarm, grey position continues to rise
Height, reaches the nozzle position of ash inlet tube, in the presence of dust stratification tension force, you can dust stratification is discharged by dust leg road, touches simultaneously
Send out contact-making switch alarm.
In this way, the safety signal valve of the present invention is with a unification pipeline structure, but can play very reliable fault exclude and
Forewarning function, greatly improves the safety and stability of ash bucket, and low cost, can't additionally increase excessive load, it is to avoid because
Excessive overweight failture evacuation element is added, increase existing equipment loading effect equipment is normally run.In addition, the ash bucket of the present invention
The ash discharge pre-alarming system of formation has high stability in itself, is not in failure substantially, and because its working condition can
Easy inspection, therefore the possibility broken down can be eliminated by periodic inspection.
Brief description of the drawings
Fig. 1 is the structural representation of existing dust collector ash hopper in background technology.
Fig. 2 is the structural representation of ash bucket in one embodiment of the invention.
Fig. 3 is the installation direction schematic diagram of the ash inlet tube of ash bucket in one embodiment of the invention.
Fig. 4 is the structural representation of ash releasing tube and safety signal valve in one embodiment of the invention.
Fig. 5 is the front view structure figure of bonnet in safety signal valve in one embodiment of the invention.
Fig. 6 is the side block diagram of bonnet in safety signal valve in one embodiment of the invention.
Fig. 7 is the structural representation for installing vertical rod in one embodiment of the invention in safety signal valve.
Fig. 8 is the structural representation of door rod in safety signal valve in one embodiment of the invention.
Fig. 9 is the sectional structure chart for adjusting circle in one embodiment of the invention in safety signal valve.
Figure 10 is the front view structure figure for adjusting circle in one embodiment of the invention in safety signal valve.
Figure 11 is the side block diagram of bonnet in safety signal valve in one embodiment of the invention.
Figure 12 is the front view structure figure of bonnet in safety signal valve in one embodiment of the invention.
Figure 13 be oriented in safety signal valve in one embodiment of the invention and limiting plate side block diagram.
Figure 14 be oriented in safety signal valve in one embodiment of the invention and limiting plate front view structure figure.
Embodiment
Illustrate the operation principle of the present invention first:
Dust collector ash hopper is as follows with characteristic by its structure and working environment:Be first deduster in operation, such as ash bucket
When belonging to ashless empty bucket-shaped state, negative pressure state can be in inside ash bucket, if this, which is also implied that, now opens ash bucket and outer
The hole that portion air is connected, extraneous air can be entered inside ash bucket by hole under suction function.Next to that dust collector ash hopper
During in dust stratification state, because the mobility of ash is larger, with certain fluid properties, grey tension force promotes grey from ash bucket and outer
What the hole that portion's air is connected outwards sprayed, and ash accumulation more than hole is higher, and grey injection power is also bigger.
Using the characteristic of above-mentioned dust collector ash hopper, highly exceed normal reservoir in the mouth of pipe of one ash inlet tube of ash bucket indoor design
The dust leg road of grey height, when dust accretions highly exceed the mouth of pipe height of dust leg road ash inlet tube, dust can pass through import
The mouth of pipe of pipe automatically flows into dust leg road, with piling height increase grey in dust leg road, by the accumulation pressure of ash, bonnet
Promote door rod to open bonnet, start automatic removing dust.After dust stratification is disposed in ash bucket, by the thrust and ash bucket of spring
The suction of interior negative pressure can be such that bonnet closes automatically.When bonnet is being automatically turned in the presence of dust, door rod movement, door rod are driven
On the first retainer (can be considered a projection) touch contact-making switch, contact-making switch to a control system transmit switching value telecommunications
Number, control system is, for example, dcs (DCS), and control system points out work on the spot people in time by sound and light alarm
There is serious dust stratification failure, it is necessary to be handled immediately in member's ash bucket.Thus the function of alarm and extension processing time can be achieved,
Staff receives the report for police service, and can adjust ash disposal system or take urgent artificial ash discharge to remove a hidden danger.
As described above, normal ash bucket storage ash is that deduster runs necessary function, but the deduster of improper storage ash is serious
Dust stratification is the accident for needing to take precautions against, therefore, when ash bucket storage ash reaches improper storage ash condition, grey storing highly in ash bucket
(ash position height), typically designer carry out load, the design input condition of structure design, utilize the side of this design input
Boundary's condition, sets high grey position ash exhauster on ash bucket.Improved on basis herein of the invention.Below in conjunction with the present invention
Accompanying drawing in embodiment, clear, complete description is carried out to the technical scheme in the embodiment of the present invention.
As shown in Fig. 2 ash bucket in one embodiment, including:
Bucket body 1, with ash bucket design carrying material position and high charge level early warning material position, the two material positions are all known design ginsengs
The two material positions can be determined during number, each ash bucket redesign, corresponding device is then arranged;
Dust leg road 2, with the ash inlet tube 21 stretched into inside bucket body and the ash releasing tube 22 stretched out outside bucket body;Dust leg leads to
2 can be fixedly arranged on bucket body 1 by flange arrangement, can also be fixedly arranged on bucket body for example, by the mode of welding.
Wherein, ash inlet tube 21 is located between ash bucket design carrying material position and high charge level early warning material position;The mouth of pipe of ash releasing tube 22
Closed by safety signal valve 3.The mouth of pipe height ash bucket design carrying material position of ash inlet tube, it is high that dust stratification first reaches high charge level switch
Degree, high charge level alarm, if high charge level switch fault, grey position continues to raise, and reaches ash inlet tube position, there is foregoing operation principle
Understand, dust stratification can be discharged by dust leg road, in discharge process, the mouth of pipe of the ash releasing tube by safety signal valve closure is opened on top.Separately
Outside, ash releasing tube major requirement is tried one's best attenuating airborne dust, while away from the appropriate height in ground, being easy to observe, overhaul and ship ash.
Ash releasing tube can use horizontally disposed mode as shown in the figure, in a further embodiment, it would however also be possible to employ with level
Direction forms 0 ° of downward mode to 30 ° of angles and arranged, dust stratification is discharged simultaneously by deadweight.
As shown in figure 4, this application claims safety signal valve specifically include:
It is fixedly arranged on the detection mouth flange 31 of the mouth of pipe of ash releasing tube 22;
The affixed elastic pressure assembly with detection mouth flange 31;
Door rod 34, its one end connects the bonnet 31 to close the mouth of pipe, and the other end is connected with elastic pressure assembly.
Specifically, elastic pressure assembly includes spring support and spring 33;
Spring support includes some installation vertical rods 37 of bonnet 35 and connection bonnet 35 and detection mouth flange 31;Bonnet 35 with
Fixed guiding and limiting plate 36 between detection mouth flange 31;It is oriented to and limiting plate 36 is formed with a pilot hole, door rod 34 has one
First retainer, door rod 34 passes through the pilot hole, and the first retainer is located between guiding and limiting plate 36 and bonnet 35;Bonnet 35
It is formed with one second retainer;Spring 33 is sheathed on door rod 34, and two ends are stopped at foregoing first retainer and second stopped respectively
Dynamic portion.
As schemed, bonnet 35, detection mouth flange 31, guiding and limiting plate 36 are parallel each other.
Second retainer is preferably adjustment circle 39, and adjustment circle 39 is sheathed on door rod 34, and outside passes through helicitic texture and bonnet
35 mounting holes formed screw connection, have been internally formed spring locking groove.The pressure that adjustment circle 39 passes through the adjustable spring 33 of rotation
Contracting degree, thus adjusts force of the door rod 34 to bonnet 31.
Be oriented to and limiting plate 36 on be provided with can by the first retainer mobile-initiated contact-making switch 38.Connect to protect
Switch 38 is touched, in addition to is fixedly arranged on the protecting cover 310 of guiding and limiting plate 36, thus completely cuts off contact-making switch and external environment condition,
Avoid reporting by mistake and damage.
Wherein, spring is stage clip.First retainer is an annular protrusion.Door rod, pilot hole and mounting hole are coaxial.
In order that those skilled in the art become apparent from understanding the concrete structure of safety signal valve in the present embodiment, pass through Fig. 5
Each part is illustrated to Figure 14.
In addition, with reference to Fig. 3, the mouth of pipe direction direction that dorsad ash bucket inside smoke flows of ash inlet tube;The mouth of pipe of ash inlet tube
For downward inclined tube mouthful.It can thus prevent the mouth of pipe of ash inlet tube from causing coal ash directly because air-flow enters ash in face of flue gas
Pipe, angle be downwards in order to prevent deduster fall ash fall directly into ash inlet tube, can be to greatest extent by this structure design
Ground allows ash accumulation to flow into ash inlet tube after getting up, and avoids dust stratification height from not yet reaching that high charge level switch alarm height has grey entrance
Ash inlet tube.
Structure with reference to described by above-described embodiment and relevant drawings is very big one due in deduster steel construction load
Divide is to design the grey load of storage under the conditions of the limiting altitude of grey position.The mouth of pipe of ash inlet tube is highly less than grey position limiting altitude, and it is located at
Between high charge level switch height and grey position limiting altitude.Process is first to reach high charge level switch height, high charge level alarm, if high
Stuff level switch failure, grey position continues to raise, and reaches ash inlet, device ash discharge is simultaneously alarmed, if still exclude not in time, then ash
Position will reach and exceed the given grey position limiting altitude of design, will now overload, accident just occurs.
When being not reaching to high charge level switch in the grey position of normal condition ash bucket, by pulling door rod to drive bonnet to make inside ash bucket
It is in communication with the outside by dust leg road, can substantially observes that extraneous air, to air draught inside ash bucket, now may determine that ash bucket
It is internal normal.When dust stratification exceedes the limiting altitude of the grey height of normal reservoir, ash meeting nature is flowed into dust leg road, with dust
Accumulation, promote bonnet open, while touch contact-making switch, while ash bucket realizes automatic removing dust, be remote monitoring transmission
Signal, ash and warning function are put so as to realize automatically under the serious dust stratification state of deduster.
In the state of bonnet is not automatically turned on, Daily Round Check can cut off contact-making switch power supply on the spot, artificial to pull
Door rod, checks the grey state of ash bucket inner product, such as extraneous air because suction function is the air-breathing into ash bucket, then may determine that ash bucket
Storage grey state in inside is normal.Inspection resumes contacts Switching Power Supply after finishing.
Obviously, described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Based on this hair
Embodiment in bright, the every other implementation that those of ordinary skill in the art are obtained under the premise of creative work is not made
Example, belongs to the scope of protection of the invention.
Claims (8)
1. for the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper, a dust leg road is installed on, this is put
Ash pipe road has the ash inlet tube for stretching into a pipeful of internal portion and the ash releasing tube stretched out outside bucket body;The bucket body has a design
Carry material position and high charge level early warning material position;The ash inlet tube is located between the design carrying material position and high charge level early warning material position;
It is characterised in that it includes:
It is fixedly arranged on a detection mouth flange of the mouth of pipe of ash releasing tube;
An elastic pressure assembly affixed with the detection mouth flange;
One door rod, its one end connects the bonnet to close the mouth of pipe, and the other end is connected with the elastic pressure assembly.
2. being used for the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper as claimed in claim 1, it is special
Levy and be, the elastic pressure assembly includes a spring support and a spring;
The spring support includes some installation vertical rods of a bonnet and connection bonnet and detection mouth flange;The bonnet and detection
Fixed one is oriented to and limiting plate between mouth flange;It is oriented to and limiting plate is formed with a pilot hole, the door rod has one first to stop
Dynamic portion, the door rod passes through the pilot hole, and first retainer is located between guiding and limiting plate and bonnet;Bonnet is formed with
One second retainer;The spring housing is located at door rod, and two ends are stopped at foregoing first retainer and the second retainer respectively.
3. being used for the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper as claimed in claim 2, it is special
Levy and be, the bonnet, detection mouth flange, guiding and limiting plate are parallel each other.
4. being used for the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper as claimed in claim 2, it is special
Levy and be, second retainer is an adjustment circle, the adjustment snare is located at the door rod, and outside is by helicitic texture with after
Cap-shaped into a mounting hole connection, be internally formed spring locking groove.
5. being used for the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper as claimed in claim 2, it is special
Levy and be, it is described guiding and limiting plate on be provided with can by first retainer a mobile-initiated contact-making switch.
6. being used for the automatic safety valve for putting ash under the serious dust stratification state of dust collector ash hopper as claimed in claim 2, its feature exists
In the spring is stage clip.
7. being used for the automatic safety valve for putting ash under the serious dust stratification state of dust collector ash hopper as claimed in claim 2, its feature exists
In first retainer is an annular protrusion.
8. being used for the automatic safety valve for putting ash under the serious dust stratification state of dust collector ash hopper as claimed in claim 2, its feature exists
In the door rod, pilot hole and mounting hole are coaxial.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710576250.3A CN107269897A (en) | 2017-07-14 | 2017-07-14 | For the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710576250.3A CN107269897A (en) | 2017-07-14 | 2017-07-14 | For the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107269897A true CN107269897A (en) | 2017-10-20 |
Family
ID=60072068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710576250.3A Pending CN107269897A (en) | 2017-07-14 | 2017-07-14 | For the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107269897A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0550262U (en) * | 1991-12-06 | 1993-07-02 | 日本バルカー工業株式会社 | safety valve |
CN2636020Y (en) * | 2003-06-27 | 2004-08-25 | 新疆特变电工股份有限公司 | Pressure indicated pressure releasing valve for transformer |
CN201354873Y (en) * | 2009-02-26 | 2009-12-02 | 王华铭 | E series safety relief valve used for aluminium manufacturer channelization digestion system |
CN201757415U (en) * | 2009-12-07 | 2011-03-09 | 朱根龙 | Automatic on-off constant pressure air door |
US20110265652A1 (en) * | 2008-05-27 | 2011-11-03 | Synthesis Engery Systems, Inc | Dust Removal Method Using Baghouse Filters And Dust Removal Apparatus Therefor |
CN104645535A (en) * | 2013-11-17 | 2015-05-27 | 盐城市瑞恒电力石化设备制造有限公司 | Intelligent fire-fighting pressure-release explosion relief valve |
CN205781148U (en) * | 2016-07-11 | 2016-12-07 | 国电清航瑞恒江苏环保科技有限公司 | A kind of automatic open close pressure release safety anti-explosive door |
CN207229852U (en) * | 2017-07-14 | 2018-04-13 | 大唐环境产业集团股份有限公司 | For the safety signal valve of ash to be put under the serious dust stratification state of dust collector ash hopper automatically |
-
2017
- 2017-07-14 CN CN201710576250.3A patent/CN107269897A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0550262U (en) * | 1991-12-06 | 1993-07-02 | 日本バルカー工業株式会社 | safety valve |
CN2636020Y (en) * | 2003-06-27 | 2004-08-25 | 新疆特变电工股份有限公司 | Pressure indicated pressure releasing valve for transformer |
US20110265652A1 (en) * | 2008-05-27 | 2011-11-03 | Synthesis Engery Systems, Inc | Dust Removal Method Using Baghouse Filters And Dust Removal Apparatus Therefor |
CN201354873Y (en) * | 2009-02-26 | 2009-12-02 | 王华铭 | E series safety relief valve used for aluminium manufacturer channelization digestion system |
CN201757415U (en) * | 2009-12-07 | 2011-03-09 | 朱根龙 | Automatic on-off constant pressure air door |
CN104645535A (en) * | 2013-11-17 | 2015-05-27 | 盐城市瑞恒电力石化设备制造有限公司 | Intelligent fire-fighting pressure-release explosion relief valve |
CN205781148U (en) * | 2016-07-11 | 2016-12-07 | 国电清航瑞恒江苏环保科技有限公司 | A kind of automatic open close pressure release safety anti-explosive door |
CN207229852U (en) * | 2017-07-14 | 2018-04-13 | 大唐环境产业集团股份有限公司 | For the safety signal valve of ash to be put under the serious dust stratification state of dust collector ash hopper automatically |
Non-Patent Citations (1)
Title |
---|
梁国柱;: "670MW机组电除尘器存在问题及对策" * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109210269B (en) | Take monitoring system's water hammer air valve | |
KR101837911B1 (en) | A smart aseismatic water tank | |
CN207191990U (en) | Automatic removing dust ash bucket under the accident dust stratification state of deduster | |
CN207229852U (en) | For the safety signal valve of ash to be put under the serious dust stratification state of dust collector ash hopper automatically | |
CN206904320U (en) | For the safety valve of ash to be put under the serious dust stratification state of dust collector ash hopper automatically | |
CN209302527U (en) | A kind of detection device of semi-dry desulphurization dust collector ash hopper material position | |
CN203655344U (en) | Mining water-seal fire retardance and explosion venting apparatus | |
CN102914345A (en) | Material level switch and method for monitoring material level of material cabin | |
CN107269898A (en) | For the automatic safety valve for putting ash under the serious dust stratification state of dust collector ash hopper | |
CN107269897A (en) | For the automatic safety signal valve for putting ash under the serious dust stratification state of dust collector ash hopper | |
CN106969889B (en) | Transformer oil droplet rate detection device | |
CN207293124U (en) | Accurate judgement and the ash hopper device of the accident dust stratification of deduster can be alleviated | |
CN207275451U (en) | It can determine whether and the safe and simple device for putting ash is carried out to the accident dust stratification of deduster | |
CN107310876A (en) | Automatic removing dust ash bucket under the accident dust stratification state of deduster | |
CN210071237U (en) | Pump suction type hazardous gas monitoring system | |
CN103090072B (en) | Baffle-type one-way overspeed cut-off valve | |
CN112392124A (en) | Wisdom drainage inspection shaft | |
CN107380782A (en) | Accurate judgement and the ash hopper device of the accident dust stratification of deduster can be alleviated | |
CN201732300U (en) | Safety control device of electrical equipment room | |
CN201397314Y (en) | PH meter protector with function of automatic cleaning | |
CN206974631U (en) | Transformer oil drop rate-measuring device | |
CN107380783A (en) | It can determine whether and the safe and simple device for putting ash is carried out to the accident dust stratification of deduster | |
CN208902219U (en) | Electric precipitation ash bucket level measurement warning device | |
CN209548962U (en) | Bag filter monitoring and alarming system | |
RU184075U1 (en) | Piping of the main pumping unit for leakage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |