CN107263000A CN201710524207.2A CN201710524207A CN107263000A CN 107263000 A CN107263000 A CN 107263000A CN 201710524207 A CN201710524207 A CN 201710524207A CN 107263000 A CN107263000 A CN 107263000A
Authority
CN
China
Prior art keywords
bend pipe
door frame
nozzle
wind tunnel
adjusting means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710524207.2A
Other languages
Chinese (zh)
Other versions
CN107263000B (en
Inventor
周红东
郭继舟
李少祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Wuhan Yiye Steel Structure Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Wuhan Yiye Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd, Wuhan Yiye Steel Structure Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201710524207.2A priority Critical patent/CN107263000B/en
Publication of CN107263000A publication Critical patent/CN107263000A/en
Application granted granted Critical
Publication of CN107263000B publication Critical patent/CN107263000B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jet Pumps And Other Pumps (AREA)

Abstract

The invention discloses a kind of assembling adjusting means for wind tunnel ejector nozzle and bend pipe, including bottom plate, first door frame, second door frame, prelocalization baffle plate and rear positioning baffle, wherein, first door frame and the second door frame are oppositely arranged and are both secured on bottom plate, first door frame is provided with the neck for being used for accommodating front flow guiding plate, the clasp that can be fastened is provided with first door frame and the second door frame with fixed nozzle or bend pipe, prelocalization baffle plate and rear positioning baffle are located at the both sides of the first door frame and the second door frame to realize overall positioning respectively, nozzle is abutted with rear positioning baffle, bend pipe is abutted with prelocalization baffle plate.Assembling adjusting means proposed by the present invention for wind tunnel ejector nozzle and bend pipe, facilitates assembling nozzle and bend pipe.

Description

Assembling adjusting means and its assemble method for wind tunnel ejector nozzle and bend pipe
Technical field
Technical field of auxiliary equipment is produced the present invention relates to wind tunnel ejector, more particularly to a kind of wind tunnel ejector that is used for sprays The assembling adjusting means and its assemble method of mouth and bend pipe.
Background technology
Wind tunnel ejector is the fluid delivery system being widely used in a kind of hypervelocity wind tunnel, and it relies on high pressure fluid stream The high velocity stream formed after nozzle, another low-pressure fluid of injection, and energy exchange and material blending are carried out, finally reach defeated Send purpose.Nozzle and winding pipe assembly are the key core parts of injector, as the drive device of ejection type wind tunnel, nozzle and curved Intracanalicular type face is formed through wire cutting and lathe finishing.Therefore its installation accuracy and the quality of welding control deformation will be directly affected To the performance of wind-tunnel.
The content of the invention
It is a primary object of the present invention to provide a kind of assembling adjusting means for wind tunnel ejector nozzle and bend pipe and Its assemble method, it is intended to ease of assembly nozzle and bend pipe.
To achieve the above object, the present invention provides a kind of assembling adjusting means for wind tunnel ejector nozzle and bend pipe, Including bottom plate, the first door frame, the second door frame, prelocalization baffle plate and rear positioning baffle, wherein,
First door frame and the second door frame are oppositely arranged and are both secured on bottom plate, and first door frame, which is provided with, to be used to accommodate The clasp that can be fastened is provided with the neck of front flow guiding plate, the first door frame and the second door frame with fixed nozzle or bend pipe, it is preceding fixed Position baffle plate and rear positioning baffle are located at the both sides of the first door frame and the second door frame to realize overall positioning respectively, and nozzle is determined with rear Position baffle plate is abutted, and bend pipe is abutted with prelocalization baffle plate.
Preferably, the bottom plate is provided with the positioning elliptical aperture for being used for accommodating bend pipe head end.
Preferably, drift is additionally provided between the clasp and nozzle and bend pipe, between the bend pipe and prelocalization baffle plate also Provided with drift.
Preferably, the prelocalization baffle plate is provided with gusset away from the first door frame side.
Preferably, the rear positioning baffle is provided with gusset away from the second door frame side.
Preferably, first door frame and the second door frame are provided with the semi-circular recesses for being used for accommodating nozzle or bend pipe, button Ring is provided with semi-circular recesses to coordinate the first door frame and the second door frame to be used for fixed nozzle or bend pipe.
Present invention further propose that a kind of based on the above-mentioned assembling adjusting means for wind tunnel ejector nozzle and bend pipe Assemble method, comprises the following steps:
First door frame and the clasp on the second door frame top are opened, front flow guiding plate is put into the first door frame in advance, is adjusted leading Flow the perpendicularity of plate;
The nozzle of injector is put into after the second door frame and buckles its clasp, and its front end face is fitted completely with rear positioning baffle;
By in one end insertion positioning elliptical aperture of bend pipe, the other end of bend pipe is positioned in the semi-circular recesses of the first door frame, is led to Crossing drift at prelocalization baffle plate and squeezing into makes bend pipe integral forward lead, is docked with nozzle seam;
The upper clasp of first door frame is adopted and is tightened by bolts, drift is squeezed into and compresses nozzle;
Adjustment front flow guiding plate makes its center line be overlapped with the position line on bend pipe and bottom plate, is adjusted using drift and compresses bend pipe;
Deflector after installation, makes the center line of rear deflector be overlapped with bend pipe center line, and using drift by rear deflector and curved Pipe is fixed;
Check bend pipe and nozzle package size it is errorless after, after welding front flow guiding plate, then welding tip and bend pipe butt weld, Deflector after finally welding.
Preferably, the upper clasp by the first door frame, which is adopted, is tightened by bolts, and squeezes into the step of drift compresses nozzle Also include before:
The situation of fitting of bend pipe and nozzle and the first door frame and the second door frame is checked, bend pipe and nozzle are checked using frame level Levelness, it is ensured that its axiality, checks that nozzle ensures that nozzle face is vertical with the gap of fitting of rear positioning baffle using clearance gauge.
Assembling adjusting means proposed by the present invention for wind tunnel ejector nozzle and bend pipe, the group for nozzle and bend pipe Fill size Control and weld industry, with simple in construction, convenient operation, it is repeatable utilize, it is with low cost the features such as.The dress Put using elliptical aperture, location-plate, drift and convertible clasp is positioned, realize that the quick positioning of nozzle and bend pipe is assembled and effective Welding deformation is controlled, nozzle is got a promotion with bend pipe postwelding precision controlling, and improve operating efficiency.
Brief description of the drawings
Structures of the Fig. 1 for the assembling adjusting means of the invention for wind tunnel ejector nozzle and bend pipe when installing nozzle is shown It is intended to;
Fig. 2 is the structural representation of wind tunnel ejector nozzle winding pipe assembly;
Fig. 3 is mplifying structure schematic diagram at the A shown in Fig. 2;
Structures of the Fig. 4 for the assembling adjusting means of the invention for wind tunnel ejector nozzle and bend pipe when installing nozzle and bend pipe Schematic diagram;
Stereochemical structures of the Fig. 5 for the assembling adjusting means of the invention for wind tunnel ejector nozzle and bend pipe when in use is illustrated Figure.
In figure, 1- bottom plates, the door frames of 2- first, the door frames of 3- second, 4- prelocalization baffle plates, positioning baffle after 5-, 6- positioning is ellipse Deflector after circular hole, 7- gussets, 8- drifts, 9- clasps, 10- nozzles, 11- bend pipes, 12- front flow guiding plates, 13-, 14- abutment joints.
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
It should be noted that in the description of the invention, term " transverse direction ", " longitudinal direction ", " on ", " under ", "front", "rear", The orientation or position relationship of the instruction such as "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " is based on accompanying drawing institutes The orientation or position relationship shown, is for only for ease of the description present invention and simplifies description, is not instruction or implies signified dress Put or element there must be specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to the limit of the present invention System.In addition, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating or implying relative importance.
Referring to figs. 1 to Fig. 5, in this preferred embodiment, a kind of assembling regulation for wind tunnel ejector nozzle and bend pipe is filled Put, including bottom plate 1, the first door frame 2, the second door frame 3, prelocalization baffle plate 4 and rear positioning baffle 5, wherein,
First door frame 2 and the second door frame 3 are oppositely arranged and are both secured on bottom plate 1, and the first door frame 2 is provided with leading for accommodating Flow and be provided with the clasp 9 that can be fastened on the neck of plate 12, the first door frame 2 and the second door frame 3 with fixed nozzle 10 or bend pipe 11, Prelocalization baffle plate 4 and rear positioning baffle 5 are located at the both sides of the first door frame 2 and the second door frame 3 to realize overall positioning respectively, spray Mouth 10 is abutted with rear positioning baffle 5, and bend pipe 11 is abutted with prelocalization baffle plate 4.
Further, bottom plate 1, which is provided with, is used to accommodate the positioning elliptical aperture 6 of the head end of bend pipe 11, prevent bend pipe 11 relative to Bottom plate 1 is moved, so as to ensure that the installation accuracy of bend pipe 11.
Further, drift 8 is additionally provided between clasp 9 and nozzle 10 and bend pipe 11, between bend pipe 11 and prelocalization baffle plate 4 Drift 8 is additionally provided with, so as to ensure the installation accuracy of nozzle 10 and bend pipe 11.
Further, prelocalization baffle plate 4 is provided with gusset 7 away from the side of the first door frame 2, so as to improve prelocalization baffle plate 4 structural strength.
Further, rear positioning baffle 5 is provided with gusset 7 away from the side of the second door frame 3, so as to improve rear positioning baffle 5 structural strength.
Specifically, the first door frame 2 and the second door frame 3 are provided with the semi-circular recesses for being used for accommodating nozzle 10 or bend pipe 11, Clasp 9 is provided with semi-circular recesses to coordinate the first door frame 2 and the second door frame 3 to be used for fixed nozzle 10 or bend pipe 11.
The workflow that this is used for the assembling adjusting means of wind tunnel ejector nozzle and bend pipe is as follows.
(1)After device regulation to be assembled is finished, the clasp 9 of the first door frame 2 and the top of the second door frame 3 is opened, will be leading Stream plate 12 is put into the first door frame 2 in advance, is carried out just successive step and is ensured its perpendicularity;
(2)In the semi-circular recesses that the nozzle 10 of injector is put into the second door frame 3(Groove is finished to be kissed with the external diameter of nozzle 10 Close), and its front end face is fitted completely with rear positioning baffle 5(Such as Fig. 1);
(3)In the positioning elliptical aperture 6 that one end of bend pipe 11 is inserted to bottom plate 1, the other end of bend pipe 11 is put into the semicircle of the first door frame 2 In connected in star, pass through bottom(Position at elliptical aperture 6)Drift, which is squeezed into, makes the integral forward lead of bend pipe 11, is docked with nozzle 10 " seam " (Such as Fig. 2 and Fig. 3);
(4)The situation of fitting of bend pipe 11 and nozzle 10 and door frame is checked, bend pipe 11 and the water of nozzle 10 are checked using frame level Pingdu, it is ensured that its axiality, checks that nozzle 10 ensures that the end face of nozzle 10 hangs down with the gap of fitting of prelocalization baffle plate 4 using clearance gauge Directly;
(5)The clasp 9 on the second door frame 3 is adopted after each inspection data fit requirement and is tightened by bolts, drift 8 is squeezed into by nozzle 10 Compress;
(6)Adjustment front flow guiding plate 12 makes its center line be overlapped with the position line on bend pipe 11 and bottom plate 1, is adjusted simultaneously using drift 8 Compress bend pipe 11;
(7)Deflector 13 after installation, make rear deflector center line be overlapped with the center line of bend pipe 11, the symmetrical spot welding in both sides, by door frame 1 Upper clasp 9, which is adopted, to be tightened by bolts, and is fixed rear deflector 13 and bend pipe 11 using drift 8;
(8)Check again bend pipe 11 and nozzle 10 package size it is errorless after, two welder's symmetrical weldings can be arranged.Weld first Connect front flow guiding plate 12, then welding tip 10 and bend pipe 11 butt weld, deflector 13 after finally welding(Such as Fig. 4 and Fig. 5).
Assembling adjusting means proposed by the present invention for wind tunnel ejector nozzle and bend pipe, for nozzle 10 and bend pipe 11 Package size control and weld industry, with simple in construction, convenient operation, it is repeatable utilize, it is with low cost the features such as. This assembling adjusting means realizes nozzle 10 and bend pipe 11 using elliptical aperture 6, location-plate, drift 8 and convertible clasp 9 is positioned Quick positioning assembles and effectively controls welding deformation, nozzle 10 is got a promotion with the postwelding precision controlling of bend pipe 11, and improve Operating efficiency.
Present invention further propose that a kind of for wind tunnel ejector nozzle and the assemble method of the assembling adjusting means of bend pipe.
It is a kind of based on the above-mentioned assembling adjusting means for being used for wind tunnel ejector nozzle and bend pipe in this preferred embodiment Assemble method, comprises the following steps:
First door frame and the clasp on the second door frame top are opened, front flow guiding plate is put into the first door frame in advance, is adjusted leading Flow the perpendicularity of plate;
The nozzle of injector is put into after the second door frame and buckles its clasp, and its front end face is fitted completely with rear positioning baffle;
By in one end insertion positioning elliptical aperture of bend pipe, the other end of bend pipe is positioned in the semi-circular recesses of the first door frame, is led to Crossing drift at prelocalization baffle plate and squeezing into makes bend pipe integral forward lead, is docked with nozzle seam;
The upper clasp of first door frame is adopted and is tightened by bolts, drift is squeezed into and compresses nozzle;
Adjustment front flow guiding plate makes its center line be overlapped with the position line on bend pipe and bottom plate, is adjusted using drift and compresses bend pipe;
Deflector after installation, makes the center line of rear deflector be overlapped with bend pipe center line, and using drift by rear deflector and curved Pipe is fixed;
Check bend pipe and nozzle package size it is errorless after, after welding front flow guiding plate, then welding tip and bend pipe butt weld, Deflector after finally welding.
Further, the upper clasp of the first door frame is adopted and is tightened by bolts, squeeze into the step of drift compresses nozzle it It is preceding also to include:
The situation of fitting of bend pipe and nozzle and the first door frame and the second door frame is checked, bend pipe and nozzle are checked using frame level Levelness, it is ensured that its axiality, checks that nozzle ensures that nozzle face is vertical with the gap of fitting of rear positioning baffle using clearance gauge.
The preferred embodiments of the present invention are these are only, are not intended to limit the scope of the invention, it is every to utilize this hair The equivalent structure transformation that bright specification and accompanying drawing content are made, or other related technical fields are directly or indirectly used in, Similarly it is included within the scope of the present invention.

Claims (8)

1. a kind of assembling adjusting means for wind tunnel ejector nozzle and bend pipe, it is characterised in that including bottom plate, first Frame, the second door frame, prelocalization baffle plate and rear positioning baffle, wherein,
First door frame and the second door frame are oppositely arranged and are both secured on bottom plate, and first door frame, which is provided with, to be used to accommodate The clasp that can be fastened is provided with the neck of front flow guiding plate, the first door frame and the second door frame with fixed nozzle or bend pipe, it is preceding fixed Position baffle plate and rear positioning baffle are located at the both sides of the first door frame and the second door frame to realize overall positioning respectively, and nozzle is determined with rear Position baffle plate is abutted, and bend pipe is abutted with prelocalization baffle plate.
2. it is used for the assembling adjusting means of wind tunnel ejector nozzle and bend pipe as claimed in claim 1, it is characterised in that described Bottom plate is provided with the positioning elliptical aperture for being used for accommodating bend pipe head end.
3. it is used for the assembling adjusting means of wind tunnel ejector nozzle and bend pipe as claimed in claim 1, it is characterised in that described Drift is additionally provided between clasp and nozzle and bend pipe, drift is additionally provided between the bend pipe and prelocalization baffle plate.
4. it is used for the assembling adjusting means of wind tunnel ejector nozzle and bend pipe as claimed in claim 1, it is characterised in that described Prelocalization baffle plate is provided with gusset away from the first door frame side.
5. it is used for the assembling adjusting means of wind tunnel ejector nozzle and bend pipe as claimed in claim 1, it is characterised in that described Positioning baffle is provided with gusset away from the second door frame side afterwards.
6. it is used for the assembling adjusting means of wind tunnel ejector nozzle and bend pipe as claimed in claim 1, it is characterised in that described First door frame and the second door frame are provided with the semi-circular recesses for being used for accommodating nozzle or bend pipe, clasp provided with semi-circular recesses with The first door frame and the second door frame is coordinated to be used for fixed nozzle or bend pipe.
7. a kind of assembling adjusting means for being used for wind tunnel ejector nozzle and bend pipe based on any one in claim 1 to 6 Assemble method, it is characterised in that comprise the following steps:
First door frame and the clasp on the second door frame top are opened, front flow guiding plate is put into the first door frame in advance, is adjusted leading Flow the perpendicularity of plate;
The nozzle of injector is put into after the second door frame and buckles its clasp, and its front end face is fitted completely with rear positioning baffle;
By in one end insertion positioning elliptical aperture of bend pipe, the other end of bend pipe is positioned in the semi-circular recesses of the first door frame, is led to Crossing drift at prelocalization baffle plate and squeezing into makes bend pipe integral forward lead, is docked with nozzle seam;
The upper clasp of first door frame is adopted and is tightened by bolts, drift is squeezed into and compresses nozzle;
Adjustment front flow guiding plate makes its center line be overlapped with the position line on bend pipe and bottom plate, is adjusted using drift and compresses bend pipe;
Deflector after installation, makes the center line of rear deflector be overlapped with bend pipe center line, and using drift by rear deflector and curved Pipe is fixed;
Check bend pipe and nozzle package size it is errorless after, after welding front flow guiding plate, then welding tip and bend pipe butt weld, Deflector after finally welding.
8. as claimed in claim 7 for wind tunnel ejector nozzle and the assemble method of the assembling adjusting means of bend pipe, it is special Levy and be, the upper clasp by the first door frame, which is adopted, to be tightened by bolts, and is also wrapped before squeezing into the step of drift compresses nozzle Include:
The situation of fitting of bend pipe and nozzle and the first door frame and the second door frame is checked, bend pipe and nozzle are checked using frame level Levelness, it is ensured that its axiality, checks that nozzle ensures that nozzle face is vertical with the gap of fitting of rear positioning baffle using clearance gauge.
CN201710524207.2A 2017-06-30 2017-06-30 Assembling regulating device and its assemble method for wind tunnel ejector nozzle and bend pipe Active CN107263000B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710524207.2A CN107263000B (en) 2017-06-30 2017-06-30 Assembling regulating device and its assemble method for wind tunnel ejector nozzle and bend pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710524207.2A CN107263000B (en) 2017-06-30 2017-06-30 Assembling regulating device and its assemble method for wind tunnel ejector nozzle and bend pipe

Publications (2)

Publication Number Publication Date
CN107263000A true CN107263000A (en) 2017-10-20
CN107263000B CN107263000B (en) 2019-01-25

Family

ID=60071485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710524207.2A Active CN107263000B (en) 2017-06-30 2017-06-30 Assembling regulating device and its assemble method for wind tunnel ejector nozzle and bend pipe

Country Status (1)

Country Link
CN (1) CN107263000B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107470821A (en) * 2017-07-25 2017-12-15 武汉冶钢结构有限责任公司 Assembling fixture and its installation Nozzle methods for wind tunnel ejector
CN107877072A (en) * 2017-12-06 2018-04-06 李广素 A kind of water conservancy construction union elbow welds clamping device
CN110779802A (en) * 2019-10-31 2020-02-11 武汉一冶钢结构有限责任公司 Plugging structure and method for hydraulic test of nozzle of wind tunnel ejector
CN111230381A (en) * 2020-02-18 2020-06-05 米伦医疗科技(苏州)有限公司 Splicing and fixing mechanism for welding middle support frame of walking aid frame
CN113953632A (en) * 2021-12-22 2022-01-21 江苏利柏特股份有限公司 Welding process method for large-diameter thick-pipe-wall elbow baffle plate

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4195828A (en) * 1979-01-19 1980-04-01 Peterson Donald M Boiler tube welding clamp
CN202877796U (en) * 2012-09-29 2013-04-17 南车戚墅堰机车有限公司 Bent pipe welding device
CN103662383A (en) * 2013-11-30 2014-03-26 成都科盛石油科技有限公司 Oil pipeline clamping fixture
CN205888462U (en) * 2016-06-24 2017-01-18 广州弘明汽车零部件有限公司 Welding device
CN106514106A (en) * 2016-12-23 2017-03-22 广东南海昌和模具有限公司 Welding device for special-shaped bent pipe
CN206263499U (en) * 2016-11-29 2017-06-20 维孚金属制品(上海)有限公司 A kind of servicing unit being connected with hard tube for exhaust hose

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4195828A (en) * 1979-01-19 1980-04-01 Peterson Donald M Boiler tube welding clamp
CN202877796U (en) * 2012-09-29 2013-04-17 南车戚墅堰机车有限公司 Bent pipe welding device
CN103662383A (en) * 2013-11-30 2014-03-26 成都科盛石油科技有限公司 Oil pipeline clamping fixture
CN205888462U (en) * 2016-06-24 2017-01-18 广州弘明汽车零部件有限公司 Welding device
CN206263499U (en) * 2016-11-29 2017-06-20 维孚金属制品(上海)有限公司 A kind of servicing unit being connected with hard tube for exhaust hose
CN106514106A (en) * 2016-12-23 2017-03-22 广东南海昌和模具有限公司 Welding device for special-shaped bent pipe

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107470821A (en) * 2017-07-25 2017-12-15 武汉冶钢结构有限责任公司 Assembling fixture and its installation Nozzle methods for wind tunnel ejector
CN107470821B (en) * 2017-07-25 2019-06-25 武汉一冶钢结构有限责任公司 Assembling fixture and its installation Nozzle methods for wind tunnel ejector
CN107877072A (en) * 2017-12-06 2018-04-06 李广素 A kind of water conservancy construction union elbow welds clamping device
CN110779802A (en) * 2019-10-31 2020-02-11 武汉一冶钢结构有限责任公司 Plugging structure and method for hydraulic test of nozzle of wind tunnel ejector
CN111230381A (en) * 2020-02-18 2020-06-05 米伦医疗科技(苏州)有限公司 Splicing and fixing mechanism for welding middle support frame of walking aid frame
CN113953632A (en) * 2021-12-22 2022-01-21 江苏利柏特股份有限公司 Welding process method for large-diameter thick-pipe-wall elbow baffle plate
CN113953632B (en) * 2021-12-22 2022-02-25 江苏利柏特股份有限公司 Welding process method for large-diameter thick-pipe-wall elbow baffle plate

Also Published As

Publication number Publication date
CN107263000B (en) 2019-01-25

Similar Documents

Publication Publication Date Title
CN107263000A (en) Assembling adjusting means and its assemble method for wind tunnel ejector nozzle and bend pipe
CN106271083B (en) A kind of soft-package battery pole ear welding method and welder
CN103978286A (en) Tubular part welding method and application thereof
CN104139229B (en) Form the welding method of T junction
CN205571712U (en) Laser welding gas protective device
CN105710532A (en) Powder-feeding welding device
CN209773717U (en) Battery tray lug connection structure
CN103659122A (en) Manifold nozzle welding method and nozzle positioning tool
CN206189745U (en) Housing construction steel bar connection structure
CN211539899U (en) Universal electrode cooling device
CN203649625U (en) CO2 gas shield welding gun
CN209578535U (en) A kind of argon gas part applicator
CN207349113U (en) A kind of jet pump
CN203566078U (en) Laser spot control device for laser welding OLED glass
CN207171180U (en) Argon arc welding argon filling instrument
CN206667494U (en) The node structure fixed in steel frame using cross crab bolt
CN205496788U (en) Joint construction of tube parts of endoscope
CN205694773U (en) The truss bindiny mechanism of truss-like irrigation sprinkler
CN205954834U (en) Combination framework and connecting piece of rack formula gable and main truss
CN205587904U (en) Heavy -calibre nonmetal pipeline device that is geared to needs of job
CN212868966U (en) Liquid pressure-reducing pressure-stabilizing adjusting pipeline connector
CN107685634A (en) A kind of gasbag-type pantograph welding of underframe structure
CN216056053U (en) Gas drive formula threading device
CN206811340U (en) A kind of strip solder shear with cooling system
CN106825972A (en) A kind of welding method of pipe fitting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant