CN107256577A - Fitting-up BIM, its construction method, device and electronic equipment - Google Patents

Fitting-up BIM, its construction method, device and electronic equipment Download PDF

Info

Publication number
CN107256577A
CN107256577A CN201710467193.5A CN201710467193A CN107256577A CN 107256577 A CN107256577 A CN 107256577A CN 201710467193 A CN201710467193 A CN 201710467193A CN 107256577 A CN107256577 A CN 107256577A
Authority
CN
China
Prior art keywords
dimensional
ornament materials
modeling
fitting
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710467193.5A
Other languages
Chinese (zh)
Inventor
陈成华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seize Heavenly Palace (shenzhen) Technology Co Ltd
Original Assignee
Seize Heavenly Palace (shenzhen) Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seize Heavenly Palace (shenzhen) Technology Co Ltd filed Critical Seize Heavenly Palace (shenzhen) Technology Co Ltd
Priority to CN201710467193.5A priority Critical patent/CN107256577A/en
Publication of CN107256577A publication Critical patent/CN107256577A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/10Constructive solid geometry [CSG] using solid primitives, e.g. cylinders, cubes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • G06T19/006Mixed reality

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Geometry (AREA)
  • Computer Graphics (AREA)
  • Software Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The embodiment of the invention discloses a kind of fitting-up BIM, its construction method, device and electronic equipment.Methods described includes:By the display properties of ornament materials, the ornament materials is divided into several modeling type;According to the modeling type of the ornament materials, the three-dimensional display component of the ornament materials is set up using corresponding modeling method;Set and the corresponding construction parameter of decoration construction operation for the three-dimensional display component;According to the edit instruction from user, based on the three-dimensional display component and construction parameter, the fitting-up BIM is set up;The fitting-up BIM is used to show the dimensional preview effect performed after the operation of one or more decoration construction.

Description

Fitting-up BIM, its construction method, device and electronic equipment
Technical field
The present invention relates to BIM technical field, more particularly to a kind of fitting-up BIM, its structure Construction method, device and electronic equipment.
Background technology
BIM(BIM)It is to set up three based on every relevant information data of construction-engineering project Tie up BUILDINGS MODELS.Its real information having by digital information analogue simulation building, so as to realize construction-engineering project Visualization and the construction that becomes more meticulous.Each side in process of architecture design can be simultaneously added to by the BIM In design or construction.
Existing main flow BIM classes software or modeling class instrument, attention is that the digitlization of threedimensional model shows function, example Such as it is skillful in displaying and the component of model library, the picture of designer can be improved, go out figure or go out the efficiency of design sketch.Existing market Upper to also have many 3 d modeling softwares and platform, effect still completes displaying and data storage, simply a Visualization Model, Rather than informationization model.
In process of the present invention is realized, inventor has found that correlation technique has problems with:Build and believe for decorations The real target of breath model is to fit up project by solving traditional decoration(Using two-dimentional layout design)Information distortion, asymmetric institute Caused poorly efficient, low-quality problem.
But in existing 3 d modeling software, design is existed with actual work progress and separated, and does not get through design To the integration of construction, that is, it is designed into the information asymmetry of construction.Such model can not complete construction in the design phase Deployment, can not actually complete the real target of above-mentioned decorations BIM.
In order to realize above-mentioned target, the existing release also directed to property has some materials to promote software and platform, but it belongs to House ornamentation designer talks single tool, the characteristics of without BIM.
The content of the invention
For above-mentioned technical problem, the embodiments of the invention provide a kind of fitting-up BIM, its structure side Method, device and electronic equipment, the real target of decorations, the problem of three-dimensional modeling is higher can not be completed to solve existing BIM.
The first aspect of the embodiment of the present invention provides a kind of construction method of fitting-up BIM.Methods described Including:By the display properties of ornament materials, the ornament materials is divided into several modeling type;According to the decoration material The modeling type of material, the three-dimensional display component of the ornament materials is set up using corresponding modeling method;For the three-dimensional display Component is set and the corresponding construction parameter of decoration construction operation;According to the edit instruction from user, based on the three-dimensional display Component and construction parameter, set up the fitting-up BIM;The fitting-up BIM is used to show Perform the dimensional preview effect after the operation of one or more decoration construction.
Alternatively, the modeling type includes:In the dimensional preview design sketch, the two dimension modeling class of display plane The three-dimensional modeling type of type, half three-dimensional modeling type of display portion stereochemical structure and the whole stereochemical structures of display.
Alternatively, the modeling type according to the ornament materials, the decoration is set up using corresponding modeling method The three-dimensional display component of material, is specifically included:When the modeling type of the ornament materials is two dimension modeling type, obtain described The plan and thickness data of ornament materials;The three-dimensional display group is used as using the plan that is marked with the thickness data Part;
Or when the modeling type of the ornament materials is half three-dimensional modeling type, obtain the plane picture of the ornament materials And corresponding general three-dimensional model;The pattern of the plane picture is filled into the general three-dimensional model, described three are set up Tie up component exhibiting;
Or when the modeling type of the ornament materials is three-dimensional modeling type, extract the three-dimensional data of the ornament materials; According to the three-dimensional data, with default three-dimensional modeling method, the three-dimensional display component is set up.
Alternatively, edit instruction of the basis from user, based on the three-dimensional display component and construction parameter, sets up The fitting-up BIM, is specifically included:
Receive the edit instruction from user;It is determined that with the ornament materials of edit instruction sensing and to the ornament materials Decoration construction operation;Choose the three-dimensional display component of the ornament materials;The three-dimensional display component has and the decoration The corresponding construction parameter of constructing operation;By three-dimensional display component generation corresponding dimensional preview is operated with the decoration construction Model;Several dimensional preview model groups are built up into the fitting-up BIM.
The second aspect of the embodiment of the present invention provides a kind of construction device of fitting-up BIM, its feature It is, including:Sort module, for the display properties by ornament materials, several modeling is divided into by the ornament materials Type;Three-dimensional modeling module, for the modeling type according to the ornament materials, the dress is set up using corresponding modeling method The three-dimensional display component of exterior material;Adjusting module, for setting corresponding with decoration construction operation for the three-dimensional display component Construction parameter;Display module, for according to the edit instruction from user, based on the three-dimensional display component and construction parameter, Set up the fitting-up BIM;The fitting-up BIM, which is used to show, performs one or more Dimensional preview design sketch after decoration construction operation
Alternatively, the modeling type includes:In the dimensional preview design sketch, the two dimension of display plane models type, shown Show half three-dimensional modeling type of part isometric structure and the three-dimensional modeling type of the whole stereochemical structures of display.
Alternatively, the three-dimensional modeling module specifically for:When the modeling type of the ornament materials is two dimension modeling class During type, the plan and thickness data of the ornament materials are obtained;Institute is used as using the plan that is marked with the thickness data State three-dimensional display component;
Or when the modeling type of the ornament materials is half three-dimensional modeling type, obtain the plane picture of the ornament materials And corresponding general three-dimensional model;The pattern of the plane picture is filled into the general three-dimensional model, described three are set up Tie up component exhibiting;
Or when the modeling type of the ornament materials is three-dimensional modeling type, extract the three-dimensional data of the ornament materials; According to the three-dimensional data, with default three-dimensional modeling method, the three-dimensional display component is set up.
Alternatively, the display module specifically for:Receive the edit instruction from user;It is determined that with the edit instruction The ornament materials of sensing and the decoration construction operation to the ornament materials;Choose the three-dimensional display group of the ornament materials Part;The three-dimensional display component has and the corresponding construction parameter of decoration construction operation;Given birth to by the three-dimensional display component Into dimensional preview model corresponding with decoration construction operation;Several dimensional preview model groups are built up into the fitting-up BIM.
Third aspect present invention provides a kind of fitting-up BIM, applied to fitting-up design.It is described Fitting-up BIM is built using construction method as described above, so that according to the fitting-up architecture information mould The construction drawing of type generation is applied to fitting-up site operation.
Fourth aspect present invention provides a kind of electronic equipment.The electronic equipment includes:At least one processor and institute State the memory and display device of at least one processor communication connection;Wherein, the memory storage have can by it is described extremely The instruction repertorie of a few computing device, the instruction repertorie by least one described computing device so that it is described at least One computing device method as described above, displaying performs the operation of one or more decoration construction in the display device Dimensional preview effect afterwards.
In technical scheme provided in an embodiment of the present invention, for ornament materials difference the characteristics of, to different types of dress Exterior material carries out three-dimensional modeling using different modeling methods, effectively reduces the cost of modeling and improves the effect of modeling Rate.Decoration construction Process fusion is realized into the integration for being designed into job site into model building method simultaneously, construction with Design information is symmetrical.
Brief description of the drawings
Fig. 1 is one embodiment schematic diagram of the construction method of the fitting-up BIM of the embodiment of the present invention;
Fig. 2 is another embodiment schematic diagram of the construction method of the fitting-up BIM of the embodiment of the present invention;
Fig. 3 is one embodiment schematic diagram of the construction device of the fitting-up BIM of the embodiment of the present invention;
Fig. 4 is one embodiment schematic diagram of the electronic equipment of the embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, the every other implementation that those skilled in the art are obtained under the premise of creative work is not made Example, belongs to the scope of protection of the invention.
It should be noted that when element is expressed " being fixed on " another element, it can directly on another element, Or there may be one or more elements placed in the middle therebetween.When an element is expressed " connection " another element, it can be with It is directly to another element or there may be one or more elements placed in the middle therebetween.Used in this specification The orientation or position of the instruction such as term " vertical ", " level ", "left", "right", " on ", " under ", " interior ", " outer ", " bottom " Relation is, based on orientation shown in the drawings or position relationship, to be for only for ease of the description present invention and simplify description, without referring to Show or imply that the device or element of meaning there must be specific orientation, with specific azimuth configuration and operation, therefore can not manage Solve as limitation of the present invention.In addition, term " first ", " second " etc. be only used for describe purpose, and it is not intended that indicate or Imply relative importance.
Unless otherwise defined, technology all used in this specification and scientific terminology are led with belonging to the technology of the present invention The implication that the technical staff in domain is generally understood that is identical.Used term is to be in the description of the invention in this specification The purpose of description specific embodiment, is not intended to the limitation present invention.Term "and/or" includes used in this specification The arbitrary and all combination of one or more related Listed Items.In addition, invention described below difference is implemented As long as involved technical characteristic does not constitute conflict and can just be combined with each other each other in mode.
Fitting-up refers in the basic space of building, using a series of buildings or finishing material, makes building Possess performance and aesthetic feeling, meet the work of user's request.During fitting-up, design can be typically divided between and existing Field two different stages of construction.The task of design phase is to construct suitable fitting-up effect on paper.And it is live Construction stage is then the achievement according to the design phase, and it is realized in actual building.
There is closely contact, workmen is led to the designer for being responsible for design between design and two stages of site operation Often needs enable building finally to show and meet expected fitting-up effect by repeatedly exchange.In order to strengthen two ranks Information interchange and contact between section, mitigate the work load of each side such as designer, in certain embodiments, enter in designer Luggage is repaiied in decoration process, can use fitting-up BIM provided in an embodiment of the present invention, and rapidly generation is closed Suitable, the construction drawing of each different phase, the site operation applied to fitting-up(Realize the integration of design and construction), Ensure the orderly progress of site operation, reduce the workload of designer.
Fig. 1 is the construction method of the fitting-up BIM provided in an embodiment of the present invention.As shown in figure 1, The construction method specifically may include steps of:
101st, by the display properties of ornament materials, the ornament materials is divided into several modeling type.The display category Property refers to display requirement of the ornament materials in 3 d effect graph.In actual 3 d effect graph, different ornament materials lead to Different display properties are often had, ornament materials can be classified accordingly.
102nd, according to the modeling type of the ornament materials, the three of the ornament materials are set up using corresponding modeling method Tie up component exhibiting.
In BIM building process, the three-dimensional micromodule for forming modules or certain material is extremely important step. These components may be constructed specific Component Gallery, be used during for work such as daily model mappings.And in the present embodiment, according to step Classification results in rapid 101, can use adaptable modeling method to be built to complete the three-dimensional micromodule of different ornament materials Journey, so as to save unnecessary data processing or data collection task.
Specifically, the modeling type can include:In the dimensional preview design sketch, the two dimension modeling of display plane The three-dimensional modeling type of type, half three-dimensional modeling type of display portion stereochemical structure and the whole stereochemical structures of display.
For example, the two dimension modeling type can be sheet material, coating, coiled material etc., the half three-dimensional class modeling type can be with It is the ornament materials of some general or hiding types(Such as accessory, conventional common apparatus, door handle, light fixture)Deng.The three-dimensional is built Mould type can then include sanitary equipment, furniture, hardware, ornaments, section bar class(Such as basic unit's keel, aluminium alloy extrusions, decorative thread).
Accordingly, for above-mentioned three kinds different modeling types, in certain embodiments, can specifically be respectively adopted as Under mode, set up corresponding three-dimensional display component.
1), when the ornament materials modeling type for two dimension modeling type when:First, the flat of the ornament materials is obtained Face figure and thickness data.Then, the three-dimensional display component is used as using the plan that is marked with the thickness data.
The plan can be ornament materials, the positive fine definition of such as sheet material, no shadow picture.The three-dimensional display Component is stretched then by the thickness data of mark in corresponding design sketch, forms most these sheet materials, coating corresponding three finally Tie up effect.
2)When the modeling type of the ornament materials is half three-dimensional modeling type:First, the ornament materials is obtained Plane picture and corresponding general three-dimensional model.Then, the pattern of the plane picture is filled into the general three-dimensional model In, set up the three-dimensional display component.
Because half three-dimensional modeling type is the ornament materials of a display portion in 3 d effect graph.It belongs to some and led to , accessory used in everyday.Therefore, it is possible to use the general three-dimensional model provided from various types of database (Threedimensional model for example on door handle)Based on.
3)When the modeling type of the ornament materials is three-dimensional modeling type:First, the three of the ornament materials is extracted Dimension data.Then, according to the three-dimensional data, with default three-dimensional modeling method, the three-dimensional display component is set up.Extract three The mode of dimension data can specifically be completed using the suitable three-dimensional data extracting method of prior art, for example, pass through laser scanning Or the mode such as multi-angled shooting photo.
After extraction three-dimensional data is finished, adaptable three-dimensional modeling side can be selected according to the three-dimensional data extracted Method carries out three-dimensional modeling, constitutes component corresponding with ornament materials.
It should be understood that due to using different three-dimensional modeling methods to different types of ornament materials respectively, ensureing In the case of enough accuracy, the modeling cost and required data of the ornament materials of two-dimentional class and half three-dimensional class can be caused Amount is greatly reduced, and effectively raises the modeling efficiency of threedimensional model.
103rd, set and the corresponding construction parameter of decoration construction operation for the three-dimensional display component.
During three-dimensional modeling, in order to closely contact site operation and two stages of design, can further it exist Different levels are added in three-dimensional display component, to strengthen such contact.
The construction parameter refers to that some are closely connected with having during site operation, with the flow of construction, technique, Some related data such as standard or specification, it is a class parameter relative with simple design shape or appearance data, It can represent or be operated corresponding to some live decoration constructions.
Below by taking furred ceiling as an example, the content that the detailed statement construction parameter can specifically include:
The classification of furred ceiling can be set first:Spraying, paper, stickup, hanging or finished product customization.And in the classification of each furred ceiling Under, corresponding parameter setting can also be included, such as furred ceiling absolute altitude, material, color, surface treatment are Yuan Ding, upper people, not upper people Or ceiling, vertical suspension rod, suspension rod spacing, main joist, keelson, the sheet material type of bottom plate, profile receive side, surface treatment, peace Dress mode, surface treatment mode, priming paint type etc..
104th, according to the edit instruction from user, based on the three-dimensional display component and construction parameter, the dress is set up Repair decorative architecture information model.The fitting-up BIM, which is used to show, performs one or more decoration construction behaviour Dimensional preview effect after work.
The edit instruction refers to that in actual design process the design that designer is carried out builds corresponding fitting-up The operation of BIM.Due to having level as construction parameter under three-dimensional display component.Therefore, the finishing dress of establishment Decorations BIM can be merged with site operation, show the dimensional preview effect under different construction progresses.One can also be entered The corresponding design sketch of generation or construction drawing of step, instruct the progress of site operation.
Fig. 2 is the method flow diagram of step 104 provided in an embodiment of the present invention.As shown in Fig. 2 the step 104 is specific It can include:
201st, the edit instruction from user is received.The edit instruction is made by designer, can include some dress Exterior material and accordingly, the decoration construction operation related to this ornament materials(For example for the installation of furred ceiling, coating Application mode etc.).
202nd, the ornament materials with edit instruction sensing and the decoration construction operation to the ornament materials are determined.
203rd, the three-dimensional display component of the ornament materials is chosen.The three-dimensional display component has and the decoration construction Operate corresponding construction parameter.The edit instruction provided according to designer, can take out related three-dimensional from existing database Component exhibiting.Certainly, when the three-dimensional display component is not yet set up, it can also select first to go to set up corresponding with the ornament materials Three-dimensional display component.
204th, corresponding dimensional preview model is operated with the decoration construction by three-dimensional display component generation.Described three Dimension preview model is can to reflect the three-dimensional display component of different decoration construction operations.Regarding for ornament materials is concerned only with traditional Feel form(The lines of such as furred ceiling, shape)Deng three-dimensional display component except that, dimensional preview model is to contain tool The component of body construction operation, it has many levels corresponding from different constructing operations.
205th, several dimensional preview model groups are built up into the fitting-up BIM.It is understood that Due to using dimensional preview model.Therefore, can be completely according to fitting-up architecture information at the scene in work progress The drawing or preview design sketch that are exported in model is carried out, and realizes the integration of design and construction.
In summary, fitting-up BIM construction methods provided in an embodiment of the present invention can not only solve fitting-up Three-dimensional modeling problem in journey, also achieves the information symmetrical for being designed into construction, can just be incorporated in the design phase construction process, Technique, specification etc., really instruct on-site construction operations.
And in modeling process, the useful information in ornament materials is only obtained, High Efficiency Modeling is realized, do not influenceing design In the case of effect and construction quality, model accuracy is balanced well with building speed.
Fig. 3 is BIM construction devices provided in an embodiment of the present invention, corresponding with the construction method.As shown in figure 3, Described device can include:Sort module 301, three-dimensional modeling module 302, adjusting module 303 and display module 304.
Wherein, the sort module 301 is used for the display properties by ornament materials, if the ornament materials is divided into Dry kind of modeling type.After the completion of classification, the three-dimensional modeling module 302 is used for the modeling type according to the ornament materials, The three-dimensional display component of the ornament materials is set up using corresponding modeling method.Then, it is institute by the adjusting module 303 Three-dimensional display component is stated to set and the corresponding construction parameter of decoration construction operation.Finally, by display module 304 according to from user Edit instruction, based on the three-dimensional display component and construction parameter, set up the fitting-up BIM;The dress Repair decorative architecture information model be used for show perform one or more decoration construction operate after dimensional preview design sketch.
Specifically, the modeling type can include:In the dimensional preview design sketch, the two dimension modeling of display plane The three-dimensional modeling type of type, half three-dimensional modeling type of display portion stereochemical structure and the whole stereochemical structures of display.
In certain embodiments, the three-dimensional modeling module 302 specifically can be used for:When the modeling class of the ornament materials When type is two dimension modeling type, the plan and thickness data of the ornament materials are obtained;To be marked with the thickness data Plan as the three-dimensional display component or when the ornament materials modeling type be half three-dimensional modeling type when, obtain Take the plane picture and corresponding general three-dimensional model of the ornament materials;The pattern of the plane picture is filled into described logical With in threedimensional model, set up the three-dimensional display component or when the ornament materials modeling type be three-dimensional modeling type When, extract the three-dimensional data of the ornament materials;According to the three-dimensional data, with default three-dimensional modeling method, set up described Three-dimensional display component.
In further embodiments, the display module 304 specifically can be used for:The display module specifically for:Connect Receive the edit instruction from user;It is determined that the ornament materials and the decoration to the ornament materials that are pointed to the edit instruction Constructing operation;Choose the three-dimensional display component of the ornament materials;The three-dimensional display component has to be grasped with the decoration construction Make corresponding construction parameter;By three-dimensional display component generation corresponding dimensional preview model is operated with the decoration construction; Several dimensional preview model groups are built up into the fitting-up BIM.
It should be noted that the fitting-up BIM provided in above-described embodiment construction method and construction device are bases In identical inventive concept.Therefore, can be by corresponding functional module institute the step of each specific embodiment in construction method Perform, specific function there can also be corresponding method and step in the construction method in functional module, no longer go to live in the household of one's in-laws on getting married herein State.
The hardware architecture diagram for the electronic equipment that Fig. 4 provides for the embodiment of the present application.As shown in figure 4, the equipment 40 is wrapped Include:In one or more processors 401, memory 402 and display device 403, Fig. 4 exemplified by one.
Wherein, processor 401, memory 402 and display device 403 can be connected by bus or other modes, In Fig. 4 exemplified by being connected by bus.
Memory 402 is as a kind of non-volatile computer readable storage medium storing program for executing, available for storage non-volatile software journey Fitting-up BIM construction methods correspondence in sequence, non-volatile computer executable program and module, such as the embodiment of the present application Programmed instruction/module(For example, sort module 301, three-dimensional modeling module 302, adjusting module 303 and displaying shown in Fig. 3 Module 304).Processor 401 is stored in non-volatile software program, instruction and module in memory 402 by operation, from And various function application and the data processing of execute server, that is, realize that the fitting-up BIM of above method embodiment is built Method.
Memory 402 can include storing program area and storage data field, wherein, storing program area can store operation system Application program required for system, at least one function;Storage data field can store the use according to fitting-up BIM construction devices Data created etc..In addition, memory 402 can include high-speed random access memory, non-volatile deposit can also be included Reservoir, for example, at least one disk memory, flush memory device or other non-volatile solid state memory parts.In some implementations In example, memory 402 is optional including the memory remotely located relative to processor 401, and these remote memories can pass through Network connection is to fitting-up BIM construction devices.The example of above-mentioned network includes but is not limited to internet, intranet, office Domain net, mobile radio communication and combinations thereof.
Display device 403 can be specifically any suitable, for showing the BIM models or from described to user Two-dimensional effects figure, such as image display of construction drawing, display of BIM models.In certain embodiments, the display dress Put 403 and can also be printer, there is provided used to designer or workmen to export corresponding paper drawing
One or more of modules are stored in the memory 402, are held when by one or more of processors 401 During row, the fitting-up BIM construction methods in above-mentioned any means embodiment are performed, displaying performs one in the display device Dimensional preview effect after individual or multiple decoration construction operations.
The said goods can perform the method that the embodiment of the present application is provided, and possesses the corresponding functional module of execution method and has Beneficial effect.Not ins and outs of detailed description in the present embodiment, reference can be made to the method that the embodiment of the present application is provided.
Device embodiment described above is only schematical, wherein the unit illustrated as separating component can To be or may not be physically separate, the part shown as unit can be or may not be physics list Member, you can with positioned at a place, or can also be distributed on multiple NEs.It can be selected according to the actual needs In some or all of module realize the purpose of this embodiment scheme.
Through the above description of the embodiments, those of ordinary skill in the art can be understood that each embodiment The mode of general hardware platform can be added to realize by software, naturally it is also possible to pass through hardware.Those of ordinary skill in the art can Realize that all or part of flow in above-described embodiment method can be by computer program to instruct the hard of correlation with understanding Part is completed, and described program can be stored in a computer read/write memory medium, the program is upon execution, it may include as above State the flow of the embodiment of each method.Wherein, described storage medium can be magnetic disc, CD, read-only memory (Read- Only Memory, ROM) or random access memory (Random Access Memory, RAM) etc..
It is understood that for those of ordinary skills, can be with technique according to the invention scheme and this hair Bright design is subject to equivalent substitution or change, and all these changes or replacement should all belong to the guarantor of appended claims of the invention Protect scope.

Claims (10)

1. a kind of construction method of fitting-up BIM, it is characterised in that including:
By the display properties of ornament materials, the ornament materials is divided into several modeling type;
According to the modeling type of the ornament materials, the three-dimensional display group of the ornament materials is set up using corresponding modeling method Part;
Set and the corresponding construction parameter of decoration construction operation for the three-dimensional display component;
According to the edit instruction from user, based on the three-dimensional display component and construction parameter, set up the fitting-up and build Build information model;The fitting-up BIM is used to show three performed after the operation of one or more decoration construction Tie up preview effect.
2. according to the method described in claim 1, it is characterised in that the modeling type includes:In the dimensional preview effect In figure, two dimension modeling type, half three-dimensional modeling type of display portion stereochemical structure and the whole solids of display of display plane The three-dimensional modeling type of structure.
3. method according to claim 2, it is characterised in that the modeling type according to the ornament materials, is used Corresponding modeling method sets up the three-dimensional display component of the ornament materials, specifically includes:
When the modeling type of the ornament materials is two dimension modeling type, the plan and thickness of the ornament materials are obtained Data;
The three-dimensional display component is used as using the plan that is marked with the thickness data;Or
When the modeling type of the ornament materials is half three-dimensional modeling type, the plane picture of the ornament materials is obtained and right The general three-dimensional model answered;
The pattern of the plane picture is filled into the general three-dimensional model, the three-dimensional display component is set up;Or
When the modeling type of the ornament materials is three-dimensional modeling type, the three-dimensional data of the ornament materials is extracted;
According to the three-dimensional data, with default three-dimensional modeling method, the three-dimensional display component is set up.
4. according to the method described in claim 1, it is characterised in that edit instruction of the basis from user, based on described Three-dimensional display component and construction parameter, set up the fitting-up BIM, specifically include:
Receive the edit instruction from user;
It is determined that the ornament materials pointed to the edit instruction and the decoration construction operation to the ornament materials;
Choose the three-dimensional display component of the ornament materials;The three-dimensional display component has corresponding with decoration construction operation Construction parameter;
By three-dimensional display component generation corresponding dimensional preview model is operated with the decoration construction;
Several dimensional preview model groups are built up into the fitting-up BIM.
5. a kind of construction device of fitting-up BIM, it is characterised in that including:
Sort module, for the display properties by ornament materials, several modeling type is divided into by the ornament materials;
Three-dimensional modeling module, for the modeling type according to the ornament materials, the dress is set up using corresponding modeling method The three-dimensional display component of exterior material;
Adjusting module, for being set and the corresponding construction parameter of decoration construction operation for the three-dimensional display component;
Display module, for according to the edit instruction from user, based on the three-dimensional display component and construction parameter, sets up institute State fitting-up BIM;The fitting-up BIM is used to show that performing one or more decoration to apply Dimensional preview design sketch after work operation.
6. device according to claim 5, it is characterised in that the modeling type includes:In the dimensional preview effect In figure, two dimension modeling type, half three-dimensional modeling type of display portion stereochemical structure and the whole solids of display of display plane The three-dimensional modeling type of structure.
7. device according to claim 6, it is characterised in that the three-dimensional modeling module specifically for:
When the modeling type of the ornament materials is two dimension modeling type, the plan and thickness of the ornament materials are obtained Data;
The three-dimensional display component is used as using the plan that is marked with the thickness data;Or
When the modeling type of the ornament materials is half three-dimensional modeling type, the plane picture of the ornament materials is obtained and right The general three-dimensional model answered;
The pattern of the plane picture is filled into the general three-dimensional model, the three-dimensional display component is set up;Or
When the modeling type of the ornament materials is three-dimensional modeling type, the three-dimensional data of the ornament materials is extracted;
According to the three-dimensional data, with default three-dimensional modeling method, the three-dimensional display component is set up.
8. device according to claim 6, it is characterised in that the display module specifically for:
Receive the edit instruction from user;
It is determined that the ornament materials pointed to the edit instruction and the decoration construction operation to the ornament materials;
Choose the three-dimensional display component of the ornament materials;The three-dimensional display component has corresponding with decoration construction operation Construction parameter;
By three-dimensional display component generation corresponding dimensional preview model is operated with the decoration construction;
Several dimensional preview model groups are built up into the fitting-up BIM.
9. a kind of fitting-up BIM, applied to fitting-up design, it is characterised in that the fitting-up building Information model is built using the construction method as described in claim 1-5 is any, so that according to the fitting-up architecture information The construction drawing of model generation is applied to fitting-up site operation.
10. a kind of electronic equipment, it is characterised in that including:
At least one processor, the memory and display device being connected with least one described processor communication;
Wherein, have can be by the instruction repertorie of at least one computing device, the instruction repertorie quilt for the memory storage At least one described computing device, so that side of at least one the described computing device as described in any one of claim 1 to 5 Method, displaying performs the dimensional preview effect after the operation of one or more decoration construction in the display device.
CN201710467193.5A 2017-06-19 2017-06-19 Fitting-up BIM, its construction method, device and electronic equipment Withdrawn CN107256577A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710467193.5A CN107256577A (en) 2017-06-19 2017-06-19 Fitting-up BIM, its construction method, device and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710467193.5A CN107256577A (en) 2017-06-19 2017-06-19 Fitting-up BIM, its construction method, device and electronic equipment

Publications (1)

Publication Number Publication Date
CN107256577A true CN107256577A (en) 2017-10-17

Family

ID=60023272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710467193.5A Withdrawn CN107256577A (en) 2017-06-19 2017-06-19 Fitting-up BIM, its construction method, device and electronic equipment

Country Status (1)

Country Link
CN (1) CN107256577A (en)

Cited By (62)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107563109A (en) * 2017-10-30 2018-01-09 巧夺天宫(深圳)科技有限公司 A kind of plumbing squatting pan engineering design method, design system and electronic equipment
CN107590355A (en) * 2017-10-27 2018-01-16 巧夺天宫(深圳)科技有限公司 Architectural design method, design system and electronic equipment based on BIM
CN107657139A (en) * 2017-11-18 2018-02-02 巧夺天宫(深圳)科技有限公司 A kind of indoor lightgage steel joist levelling analogy method, equipment, system and storage medium
CN107729669A (en) * 2017-10-27 2018-02-23 巧夺天宫(深圳)科技有限公司 Ceiling lamp engineering design system, design method, electronic equipment and computer program product
CN107784186A (en) * 2017-11-18 2018-03-09 巧夺天宫(深圳)科技有限公司 A kind of quick leveling method, system and the electronic equipment of indoor wooden splint
CN107808052A (en) * 2017-10-27 2018-03-16 巧夺天宫(深圳)科技有限公司 A kind of plumbing toilet seat engineering design system, design method and electronic equipment
CN107808051A (en) * 2017-10-27 2018-03-16 巧夺天宫(深圳)科技有限公司 Pendent lamp engineering design system, design method, electronic equipment and computer program product
CN107808050A (en) * 2017-10-27 2018-03-16 巧夺天宫(深圳)科技有限公司 Light current panel design system, design method, electronic equipment and computer program product
CN107832538A (en) * 2017-11-18 2018-03-23 巧夺天宫(深圳)科技有限公司 A kind of hanger tool defines system, definition method and electronic equipment
CN107833105A (en) * 2017-11-14 2018-03-23 青岛理工大学 Shopping mall visual lease management method and system based on building information model
CN107832548A (en) * 2017-11-24 2018-03-23 巧夺天宫(深圳)科技有限公司 Circle logical furred ceiling design system, its method, electronic equipment and computer program
CN107832539A (en) * 2017-11-18 2018-03-23 巧夺天宫(深圳)科技有限公司 A kind of stretching adjustment system, method of adjustment and electronic equipment based on suspension rod
CN107862149A (en) * 2017-11-18 2018-03-30 巧夺天宫(深圳)科技有限公司 A kind of interior decoration View Manager defines system, definition method and electronic equipment
CN107885944A (en) * 2017-11-20 2018-04-06 巧夺天宫(深圳)科技有限公司 A kind of indoor rough ground levelling analogy method, equipment, system and storage medium
CN107895085A (en) * 2017-11-24 2018-04-10 巧夺天宫(深圳)科技有限公司 Suspended ceiling member adding set, its method, electronic equipment and computer program product
CN107918601A (en) * 2017-11-18 2018-04-17 巧夺天宫(深圳)科技有限公司 The report attribute definition system of indoor hardware fitting, define method and electronic equipment
CN107944120A (en) * 2017-11-18 2018-04-20 巧夺天宫(深圳)科技有限公司 Furred ceiling engineering generation method, system and electronic equipment based on Building Information Model
CN107944144A (en) * 2017-11-24 2018-04-20 巧夺天宫(深圳)科技有限公司 One kind optimization lifting three-dimensional wall edit tool, method and electronic equipment
CN107944121A (en) * 2017-11-18 2018-04-20 巧夺天宫(深圳)科技有限公司 One kind gangs up with formula furred ceiling model method to set up, system and electronic equipment
CN107977532A (en) * 2017-12-21 2018-05-01 巧夺天宫(深圳)科技有限公司 Wall hole design method, storage device and system based on BIM technology
CN108009333A (en) * 2017-11-24 2018-05-08 巧夺天宫(深圳)科技有限公司 Interior decoration level sets system, method, equipment and computer program product
CN108009332A (en) * 2017-11-24 2018-05-08 巧夺天宫(深圳)科技有限公司 Suspended ceiling member adding set, its method, electronic equipment and computer program
CN108009331A (en) * 2017-11-24 2018-05-08 巧夺天宫(深圳)科技有限公司 Furred ceiling design system, its method, electronic equipment and computer program
CN108022296A (en) * 2017-11-24 2018-05-11 巧夺天宫(深圳)科技有限公司 A kind of BIM interior decorations current floor and region design system and method
CN108021745A (en) * 2017-11-24 2018-05-11 巧夺天宫(深圳)科技有限公司 Furred ceiling design system, its method, electronic equipment and computer program
CN108021744A (en) * 2017-11-24 2018-05-11 巧夺天宫(深圳)科技有限公司 Construction and decoration design method, design system and terminal based on Building Information Model
CN108153953A (en) * 2017-12-18 2018-06-12 巧夺天宫(深圳)科技有限公司 A kind of BIM materials plant design CAD and method based on mapping software exploitation
CN108153959A (en) * 2017-12-21 2018-06-12 巧夺天宫(深圳)科技有限公司 A kind of interior decoration ceiling method, system and electronic equipment
CN108153971A (en) * 2017-12-22 2018-06-12 巧夺天宫(深圳)科技有限公司 Furred ceiling leaf pattern setting system, method, equipment and computer program product
CN108153975A (en) * 2017-12-25 2018-06-12 巧夺天宫(深圳)科技有限公司 Surplus setting system, setting method and electronic equipment
CN108153951A (en) * 2017-12-18 2018-06-12 巧夺天宫(深圳)科技有限公司 Modularization S type draught excluders buckle smallpox generation system, generation method and electronic equipment
CN108153952A (en) * 2017-12-18 2018-06-12 巧夺天宫(深圳)科技有限公司 Ceiling engineering ceiling generation system, generation method and electronic equipment
CN108170938A (en) * 2017-12-26 2018-06-15 巧夺天宫(深圳)科技有限公司 A kind of method, system and electronic equipment drawn and change the wall containing attribute
CN108170930A (en) * 2017-12-22 2018-06-15 巧夺天宫(深圳)科技有限公司 Mineral wool board oblique angle drop level furred ceiling design system, method, terminal and medium
CN108170928A (en) * 2017-12-22 2018-06-15 巧夺天宫(深圳)科技有限公司 A kind of blade furred ceiling design system and method, terminal, storage medium
CN108170919A (en) * 2017-12-20 2018-06-15 巧夺天宫(深圳)科技有限公司 A kind of indoor hardware fitting mounting design system, design method and electronic equipment
CN108170932A (en) * 2017-12-22 2018-06-15 巧夺天宫(深圳)科技有限公司 A kind of stair step paving design system, method, terminal and medium
CN108170917A (en) * 2017-12-20 2018-06-15 巧夺天宫(深圳)科技有限公司 A kind of furred ceiling threedimensional model drawing system, method, terminal and medium
CN108197357A (en) * 2017-12-20 2018-06-22 巧夺天宫(深圳)科技有限公司 The automatic fenestration system of furred ceiling, boring method, electronic equipment and computer program
CN108228982A (en) * 2017-12-20 2018-06-29 巧夺天宫(深圳)科技有限公司 A kind of aluminium furred ceiling design system and method, terminal, storage medium
CN108228983A (en) * 2017-12-20 2018-06-29 巧夺天宫(深圳)科技有限公司 Ceiling method, system and electronic equipment are covered with paint, lacquer, colour wash, etc. in a kind of simulation
CN108229014A (en) * 2017-12-30 2018-06-29 浙江亚厦装饰股份有限公司 Building ground decoration industrialization data processing method, electronic equipment and storage medium
CN108228985A (en) * 2017-12-20 2018-06-29 巧夺天宫(深圳)科技有限公司 Drawing practice and relevant device based on Building Information Model
CN108256167A (en) * 2017-12-25 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of floating layers design system, design method and electronic equipment
CN108256171A (en) * 2017-12-26 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of c-type item button smallpox setting method, system and electronic equipment
CN108256165A (en) * 2017-12-25 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of hanging simulation system, design method and the electronic equipment of interior decoration furred ceiling
CN108256148A (en) * 2017-12-18 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of wall attribute definition system defines method and electronic equipment
CN108256162A (en) * 2017-12-22 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of aluminium smallpox adjustment distribution design system and method, terminal, storage medium
CN108256157A (en) * 2017-12-20 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of levelling drafting design system, design method and electronic equipment
CN108268699A (en) * 2017-12-22 2018-07-10 巧夺天宫(深圳)科技有限公司 Interior decoration furred ceiling setting system, method, equipment and computer program product
CN108280262A (en) * 2017-12-26 2018-07-13 巧夺天宫(深圳)科技有限公司 A kind of R types round edge item buckles smallpox setting method, system and electronic equipment
CN108280252A (en) * 2017-12-20 2018-07-13 巧夺天宫(深圳)科技有限公司 A kind of mineral wool board ceiling design system and method, terminal, storage medium
CN108280260A (en) * 2017-12-25 2018-07-13 巧夺天宫(深圳)科技有限公司 A kind of stickup furred ceiling simulation system, design method and the electronic equipment of interior decoration
CN108280255A (en) * 2017-12-22 2018-07-13 巧夺天宫(深圳)科技有限公司 A kind of ceiling joist accessory moving method, system and electronic equipment
CN108520081A (en) * 2017-12-20 2018-09-11 巧夺天宫(深圳)科技有限公司 A kind of interior decoration paper furred ceiling drawing system, method, terminal and medium
CN109408907A (en) * 2018-09-30 2019-03-01 夏阳 A kind of method and apparatus manufacturing three-dimensional building mock-up
CN109992806A (en) * 2017-12-30 2019-07-09 浙江亚厦装饰股份有限公司 Building decoration base industrializes data processing method, electronic equipment and storage medium
CN110751715A (en) * 2018-07-23 2020-02-04 西安海平方网络科技有限公司 Model processing method and device, computer equipment and readable storage medium
CN110909401A (en) * 2019-10-30 2020-03-24 广东优世联合控股集团股份有限公司 Building information control method and device based on three-dimensional model and storage medium
CN112000029A (en) * 2020-08-17 2020-11-27 江苏建筑职业技术学院 Integrated ceiling structure system for interior decoration and control method thereof
CN112540962A (en) * 2019-09-20 2021-03-23 久瓴(上海)智能科技有限公司 Model data merging method and device, computer equipment and storage medium
CN114637562A (en) * 2022-03-01 2022-06-17 杭州优工品科技有限公司 Visual display processing method and device for glued parts, terminal and storage medium

Cited By (70)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107590355A (en) * 2017-10-27 2018-01-16 巧夺天宫(深圳)科技有限公司 Architectural design method, design system and electronic equipment based on BIM
CN107808050B (en) * 2017-10-27 2021-03-23 巧夺天宫(深圳)科技有限公司 Weak current panel design system, design method and electronic equipment
CN107729669A (en) * 2017-10-27 2018-02-23 巧夺天宫(深圳)科技有限公司 Ceiling lamp engineering design system, design method, electronic equipment and computer program product
CN107808052A (en) * 2017-10-27 2018-03-16 巧夺天宫(深圳)科技有限公司 A kind of plumbing toilet seat engineering design system, design method and electronic equipment
CN107808051A (en) * 2017-10-27 2018-03-16 巧夺天宫(深圳)科技有限公司 Pendent lamp engineering design system, design method, electronic equipment and computer program product
CN107808050A (en) * 2017-10-27 2018-03-16 巧夺天宫(深圳)科技有限公司 Light current panel design system, design method, electronic equipment and computer program product
CN107563109A (en) * 2017-10-30 2018-01-09 巧夺天宫(深圳)科技有限公司 A kind of plumbing squatting pan engineering design method, design system and electronic equipment
CN107833105A (en) * 2017-11-14 2018-03-23 青岛理工大学 Shopping mall visual lease management method and system based on building information model
CN107833105B (en) * 2017-11-14 2021-05-11 青岛理工大学 Shopping mall visual lease management method and system based on building information model
CN107832539A (en) * 2017-11-18 2018-03-23 巧夺天宫(深圳)科技有限公司 A kind of stretching adjustment system, method of adjustment and electronic equipment based on suspension rod
CN107657139A (en) * 2017-11-18 2018-02-02 巧夺天宫(深圳)科技有限公司 A kind of indoor lightgage steel joist levelling analogy method, equipment, system and storage medium
CN107784186A (en) * 2017-11-18 2018-03-09 巧夺天宫(深圳)科技有限公司 A kind of quick leveling method, system and the electronic equipment of indoor wooden splint
CN107862149A (en) * 2017-11-18 2018-03-30 巧夺天宫(深圳)科技有限公司 A kind of interior decoration View Manager defines system, definition method and electronic equipment
CN107832538A (en) * 2017-11-18 2018-03-23 巧夺天宫(深圳)科技有限公司 A kind of hanger tool defines system, definition method and electronic equipment
CN107784186B (en) * 2017-11-18 2021-07-16 巧夺天宫(深圳)科技有限公司 Rapid leveling method and system for indoor wood clamping plate and electronic equipment
CN107918601A (en) * 2017-11-18 2018-04-17 巧夺天宫(深圳)科技有限公司 The report attribute definition system of indoor hardware fitting, define method and electronic equipment
CN107944120A (en) * 2017-11-18 2018-04-20 巧夺天宫(深圳)科技有限公司 Furred ceiling engineering generation method, system and electronic equipment based on Building Information Model
CN107944121A (en) * 2017-11-18 2018-04-20 巧夺天宫(深圳)科技有限公司 One kind gangs up with formula furred ceiling model method to set up, system and electronic equipment
CN107885944B (en) * 2017-11-20 2021-06-22 巧夺天宫(深圳)科技有限公司 Indoor wood keel leveling simulation method, equipment, system and storage medium
CN107885944A (en) * 2017-11-20 2018-04-06 巧夺天宫(深圳)科技有限公司 A kind of indoor rough ground levelling analogy method, equipment, system and storage medium
CN107832548A (en) * 2017-11-24 2018-03-23 巧夺天宫(深圳)科技有限公司 Circle logical furred ceiling design system, its method, electronic equipment and computer program
CN108009333A (en) * 2017-11-24 2018-05-08 巧夺天宫(深圳)科技有限公司 Interior decoration level sets system, method, equipment and computer program product
CN108009332A (en) * 2017-11-24 2018-05-08 巧夺天宫(深圳)科技有限公司 Suspended ceiling member adding set, its method, electronic equipment and computer program
CN108009331A (en) * 2017-11-24 2018-05-08 巧夺天宫(深圳)科技有限公司 Furred ceiling design system, its method, electronic equipment and computer program
CN108022296A (en) * 2017-11-24 2018-05-11 巧夺天宫(深圳)科技有限公司 A kind of BIM interior decorations current floor and region design system and method
CN108021745A (en) * 2017-11-24 2018-05-11 巧夺天宫(深圳)科技有限公司 Furred ceiling design system, its method, electronic equipment and computer program
CN108021744A (en) * 2017-11-24 2018-05-11 巧夺天宫(深圳)科技有限公司 Construction and decoration design method, design system and terminal based on Building Information Model
CN107944144A (en) * 2017-11-24 2018-04-20 巧夺天宫(深圳)科技有限公司 One kind optimization lifting three-dimensional wall edit tool, method and electronic equipment
CN107895085A (en) * 2017-11-24 2018-04-10 巧夺天宫(深圳)科技有限公司 Suspended ceiling member adding set, its method, electronic equipment and computer program product
CN108153951A (en) * 2017-12-18 2018-06-12 巧夺天宫(深圳)科技有限公司 Modularization S type draught excluders buckle smallpox generation system, generation method and electronic equipment
CN108256148A (en) * 2017-12-18 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of wall attribute definition system defines method and electronic equipment
CN108153952A (en) * 2017-12-18 2018-06-12 巧夺天宫(深圳)科技有限公司 Ceiling engineering ceiling generation system, generation method and electronic equipment
CN108153953A (en) * 2017-12-18 2018-06-12 巧夺天宫(深圳)科技有限公司 A kind of BIM materials plant design CAD and method based on mapping software exploitation
CN108228985B (en) * 2017-12-20 2021-03-02 巧夺天宫(深圳)科技有限公司 Drawing method based on building information model and related equipment
CN108170919A (en) * 2017-12-20 2018-06-15 巧夺天宫(深圳)科技有限公司 A kind of indoor hardware fitting mounting design system, design method and electronic equipment
CN108170917A (en) * 2017-12-20 2018-06-15 巧夺天宫(深圳)科技有限公司 A kind of furred ceiling threedimensional model drawing system, method, terminal and medium
CN108197357A (en) * 2017-12-20 2018-06-22 巧夺天宫(深圳)科技有限公司 The automatic fenestration system of furred ceiling, boring method, electronic equipment and computer program
CN108228982A (en) * 2017-12-20 2018-06-29 巧夺天宫(深圳)科技有限公司 A kind of aluminium furred ceiling design system and method, terminal, storage medium
CN108228983A (en) * 2017-12-20 2018-06-29 巧夺天宫(深圳)科技有限公司 Ceiling method, system and electronic equipment are covered with paint, lacquer, colour wash, etc. in a kind of simulation
CN108520081A (en) * 2017-12-20 2018-09-11 巧夺天宫(深圳)科技有限公司 A kind of interior decoration paper furred ceiling drawing system, method, terminal and medium
CN108228985A (en) * 2017-12-20 2018-06-29 巧夺天宫(深圳)科技有限公司 Drawing practice and relevant device based on Building Information Model
CN108280252A (en) * 2017-12-20 2018-07-13 巧夺天宫(深圳)科技有限公司 A kind of mineral wool board ceiling design system and method, terminal, storage medium
CN108256157A (en) * 2017-12-20 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of levelling drafting design system, design method and electronic equipment
CN107977532A (en) * 2017-12-21 2018-05-01 巧夺天宫(深圳)科技有限公司 Wall hole design method, storage device and system based on BIM technology
CN108153959A (en) * 2017-12-21 2018-06-12 巧夺天宫(深圳)科技有限公司 A kind of interior decoration ceiling method, system and electronic equipment
CN108170930A (en) * 2017-12-22 2018-06-15 巧夺天宫(深圳)科技有限公司 Mineral wool board oblique angle drop level furred ceiling design system, method, terminal and medium
CN108170932A (en) * 2017-12-22 2018-06-15 巧夺天宫(深圳)科技有限公司 A kind of stair step paving design system, method, terminal and medium
CN108256162A (en) * 2017-12-22 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of aluminium smallpox adjustment distribution design system and method, terminal, storage medium
CN108153971A (en) * 2017-12-22 2018-06-12 巧夺天宫(深圳)科技有限公司 Furred ceiling leaf pattern setting system, method, equipment and computer program product
CN108268699A (en) * 2017-12-22 2018-07-10 巧夺天宫(深圳)科技有限公司 Interior decoration furred ceiling setting system, method, equipment and computer program product
CN108280255A (en) * 2017-12-22 2018-07-13 巧夺天宫(深圳)科技有限公司 A kind of ceiling joist accessory moving method, system and electronic equipment
CN108170928A (en) * 2017-12-22 2018-06-15 巧夺天宫(深圳)科技有限公司 A kind of blade furred ceiling design system and method, terminal, storage medium
CN108153975A (en) * 2017-12-25 2018-06-12 巧夺天宫(深圳)科技有限公司 Surplus setting system, setting method and electronic equipment
CN108256167A (en) * 2017-12-25 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of floating layers design system, design method and electronic equipment
CN108280260A (en) * 2017-12-25 2018-07-13 巧夺天宫(深圳)科技有限公司 A kind of stickup furred ceiling simulation system, design method and the electronic equipment of interior decoration
CN108256165A (en) * 2017-12-25 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of hanging simulation system, design method and the electronic equipment of interior decoration furred ceiling
CN108170938A (en) * 2017-12-26 2018-06-15 巧夺天宫(深圳)科技有限公司 A kind of method, system and electronic equipment drawn and change the wall containing attribute
CN108256171A (en) * 2017-12-26 2018-07-06 巧夺天宫(深圳)科技有限公司 A kind of c-type item button smallpox setting method, system and electronic equipment
CN108280262A (en) * 2017-12-26 2018-07-13 巧夺天宫(深圳)科技有限公司 A kind of R types round edge item buckles smallpox setting method, system and electronic equipment
CN108229014A (en) * 2017-12-30 2018-06-29 浙江亚厦装饰股份有限公司 Building ground decoration industrialization data processing method, electronic equipment and storage medium
CN109992806A (en) * 2017-12-30 2019-07-09 浙江亚厦装饰股份有限公司 Building decoration base industrializes data processing method, electronic equipment and storage medium
CN110751715A (en) * 2018-07-23 2020-02-04 西安海平方网络科技有限公司 Model processing method and device, computer equipment and readable storage medium
CN110751715B (en) * 2018-07-23 2024-02-09 南京润世景环境工程有限公司 Model processing method, device, computer equipment and readable storage medium
CN109408907A (en) * 2018-09-30 2019-03-01 夏阳 A kind of method and apparatus manufacturing three-dimensional building mock-up
CN109408907B (en) * 2018-09-30 2020-01-07 夏阳 Method and device for manufacturing three-dimensional building physical model
CN112540962A (en) * 2019-09-20 2021-03-23 久瓴(上海)智能科技有限公司 Model data merging method and device, computer equipment and storage medium
CN110909401A (en) * 2019-10-30 2020-03-24 广东优世联合控股集团股份有限公司 Building information control method and device based on three-dimensional model and storage medium
CN112000029A (en) * 2020-08-17 2020-11-27 江苏建筑职业技术学院 Integrated ceiling structure system for interior decoration and control method thereof
CN114637562A (en) * 2022-03-01 2022-06-17 杭州优工品科技有限公司 Visual display processing method and device for glued parts, terminal and storage medium
CN114637562B (en) * 2022-03-01 2024-02-02 杭州优工品科技有限公司 Visual display processing method and device for gluing parts, terminal and storage medium

Similar Documents

Publication Publication Date Title
CN107256577A (en) Fitting-up BIM, its construction method, device and electronic equipment
CN107103638A (en) A kind of Fast rendering method of virtual scene and model
CN111612880B (en) Three-dimensional model construction method based on two-dimensional drawing, electronic equipment and storage medium
CN109408954A (en) A kind of indoor design method and device applied to electric business
CN110197007A (en) A method of automatically generating light steel keel gypsum board Wall model
CN107918689A (en) Ground surface finishing design system, design method, electronic equipment and computer program product
Wenji et al. The innovative practice of artificial intelligence in the inheritance of chinese xiangjin art
CN108170917A (en) A kind of furred ceiling threedimensional model drawing system, method, terminal and medium
CN108256162A (en) A kind of aluminium smallpox adjustment distribution design system and method, terminal, storage medium
CN109903141A (en) VR virtual reality client
CN107832548A (en) Circle logical furred ceiling design system, its method, electronic equipment and computer program
CN108009333A (en) Interior decoration level sets system, method, equipment and computer program product
CN108228982A (en) A kind of aluminium furred ceiling design system and method, terminal, storage medium
CN107679296A (en) Metope paving Finish System, coating method, electronic equipment and computer program product
Ma et al. Multilayered stitch generating for random-needle embroidery
CN108170928A (en) A kind of blade furred ceiling design system and method, terminal, storage medium
Vilbrandt et al. Digitally interpreting traditional folk crafts
Wang Construction of the Three-dimensional Virtual Campus Scenes’ Problems and Solutions
Reissner Ways of making: practice and innovation in Cézanne’s paintings in the National Gallery
Tang A Case Study of Glass Art Marketization Under the Background of Creative Industry
Ago Alt-Form: Indeterminacy and Disorder
Zappulla Connections Between Architectural Design and Mathematical Patterns
Anderson Two-dimensional Computer-generated Ornamentation Using a User-driven global planning strategy
Bloom Art Markets in the Early Modern Netherlands
Peng et al. Research on Digital Animation Performance of Guanzhong Architectural Stone Carving

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171017

WW01 Invention patent application withdrawn after publication