CN107244619B - A kind of upper air installing equipment - Google Patents
A kind of upper air installing equipment Download PDFInfo
- Publication number
- CN107244619B CN107244619B CN201710593025.0A CN201710593025A CN107244619B CN 107244619 B CN107244619 B CN 107244619B CN 201710593025 A CN201710593025 A CN 201710593025A CN 107244619 B CN107244619 B CN 107244619B
- Authority
- CN
- China
- Prior art keywords
- connection sheet
- scarfer
- sheet
- backing
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007373 indentation Methods 0.000 claims abstract description 27
- 210000001503 joint Anatomy 0.000 claims description 30
- 239000007788 liquid Substances 0.000 claims description 21
- 239000000463 material Substances 0.000 claims description 9
- 239000011449 brick Substances 0.000 claims description 8
- 229910001220 stainless steel Inorganic materials 0.000 claims description 7
- 239000010935 stainless steel Substances 0.000 claims description 7
- 230000000694 effects Effects 0.000 abstract description 14
- 238000009434 installation Methods 0.000 abstract description 7
- 230000007547 defect Effects 0.000 abstract description 5
- 238000012423 maintenance Methods 0.000 abstract description 4
- 230000002441 reversible effect Effects 0.000 description 6
- 239000000725 suspension Substances 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 4
- 238000005452 bending Methods 0.000 description 4
- 230000006378 damage Effects 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 230000003628 erosive effect Effects 0.000 description 3
- 230000000149 penetrating effect Effects 0.000 description 3
- 208000027418 Wounds and injury Diseases 0.000 description 2
- 208000014674 injury Diseases 0.000 description 2
- 230000005404 monopole Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000021615 conjugation Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/16—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B7/00—Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
Abstract
A kind of upper air installing equipment, including horizontal base, horizontal base top are equipped with bearing block, are combined with column by flange on bearing block, the top of column is equipped with horizontal hanging arm;Structure of the top of the column equipped with horizontal hanging arm is that the column is connected by connecting piece with the horizontal hanging arm, the connecting piece includes connected the first connection sheet, the second connection sheet and the third connection sheet of sequence, first connection sheet and the third connection sheet are set in opposite directions, second connection sheet be equipped with indentations rabbet mouth, it is described interlocking mouth bottom wall towards the direction to be directed away from first connection sheet;Effectively reduce connecting piece in the prior art lose the effect of connection and erection, increase installation it is cumbersome, make the defect that is difficult to of maintenance.
Description
Technical field
The present invention relates to hoisting technology fields, and in particular to a kind of upper air installing equipment.
Background technique
When traditional service personnel replaces 110kV disconnecting switch, due to equipment installation in the battery limits 110kV is intensive,
Adjacent electrification spacing distance is close, disconnecting switch installation site is high: 10 meters of 1 disconnecting switch mounting height of first, therefore crane can not be into
Enter battery limits to construct.However 250 kilograms of weight of GW4-126 type disconnecting switch monopole, it is lifted after can only disintegrating by manpower.This
Sample not only service personnel's large labor intensity, replacement installation effectiveness is low, and be easy to cause personal injury and equipment damage.
Then portable overhead hoisting device special for transformer substation is just introduced, it includes horizontal base, horizontal base top
Equipped with bearing block, column is combined with by flange on bearing block, the top of column is equipped with horizontal hanging arm, is fixed on horizontal hanging arm
Electric block;Lacing wire is connected at the top of the column and the end of the horizontal hanging arm;It is hung in the column and the level
The corresponding other side of arm is radially secure reinforcing rib;The horizontal base be from two channel steels and thereon by bolt with
Support plate assembles.
Such structure has following effect:
1) unique structure: device provided by the invention it include horizontal base, it is characterised in that: it includes horizontal base,
Horizontal base top is equipped with bearing block, is combined with column by flange on bearing block, and the top of column is equipped with horizontal hanging arm, level
Electric block is fixed on boom.
2) flexible operation: the device is in order to improve the flexibility operated in hoisting machine tool hoisting process, on horizontal base
Bearing assembly has been installed, boom is enable to turn round freely within the scope of 360 degree with column.
3) whole device is light and handy: hoisting machine tool first must be hung on truck transom installation by staff before the device lifts,
So the lighter equipment quality itself the better in the case where meeting load, this requires must be stringent in the selection of stud materials
It is required that.
4) after special-purpose machines and tools production, we have carried out on-the-spot test examination in maintenance processing workshop, after tested should
Equipment is safe and reliable, load meets the requirements, is easy to operate, fully meets GW4-126 type disconnecting switch monopole integral hoisting, is not necessarily to
Disintegrate to single-pole isolator, has reached lifting effect safely, quickly, time saving and energy saving.
5) device greatly reduces intensity of workers, reduces personal injury and equipment damage accident, for electricity
Force system safety in production provides sound assurance.
On the other hand, structure of the top of the column equipped with horizontal hanging arm is the column by connecting piece and the water
What balanced suspension arm was connected, the connecting piece is connection horizontal hanging arm being mounted on the column and sets up part, in connection
One of border, the connecting piece is plugged in the column, and the wall surface close to the column of the horizontal hanging arm is equipped with same
The supporting member that the connecting piece is halved together is embedded on the connecting piece via supporting member, is reached with this and horizontal hanging arm is installed
Effect on the column.
But in further applying, there are the following problems for the connecting piece:
1. the horizontal hanging arm appearance twisted period usually involves connecting piece generation because the quality of horizontal hanging arm is not small
It is twisted, so that connecting piece loses the effect of connection and erection, it often must just safeguard, decouple again, replace other connection
Knot part is installed again, increases the cumbersome of installation.
2. often having droplets agglomerate on connecting piece, drop is usually via connection under the very big air conditions of humidity
Part flows to the column, not only usually connecting piece is suffered erosion, and the column is allowed to also tend to be reduced by droplet erosion
The column resists the performance destroyed, serious to will lead to the column and also suffer erosion, so that maintenance is difficult to.
Summary of the invention
To solve the above problems, effectively reducing and being coupled in the prior art the present invention provides a kind of upper air installing equipment
Part lose the effect of connection and erection, increase installation it is cumbersome, make the defect that is difficult to of maintenance.
A kind of solution of upper air installing equipment in order to overcome the deficiencies in the prior art, the present invention provides, specifically
It is as follows:
A kind of upper air installing equipment, including horizontal base 1,1 top of horizontal base are equipped with bearing block 2, pass through on bearing block 2
Flange 10 is combined with column 3, and the top of column 3 is equipped with horizontal hanging arm 4, wall of the horizontal hanging arm 4 close to 3 side wall of column
The built-in brick of protrusion is provided on face;
Structure of the top of the column 2 equipped with horizontal hanging arm 4 is the column by connecting piece A and the horizontal hanging arm
Connected, the connecting piece A includes sequence connected the first connection sheet A1, the second connection sheet A2 and third connection sheet A3, described
The first connection sheet A1 and third connection sheet A3 is opposite and sets, and the second connection sheet A2 is equipped with indentations and rabbets mouth A4,
The bottom wall of the interlocking mouth A4 towards the direction to be directed away from the first connection sheet A1, on the first connection sheet A1 away from
Second connection sheet A2 farther one described in a distance from farther one from the second connection sheet A2 and the third connection sheet A3
Head is designed with the grip tab A5 on sequentially connected grip tab A5 and gear liquid piece A6, the first connection sheet A1 towards described in
The direction of third connection sheet A3 is stretched, and the grip tab A5 on the third connection sheet A3 is towards close to the first connection sheet A1's
Direction stretching, extension, a pair of gear liquid piece A6 are stretched towards apart from the farther direction the second connection sheet A2, and described first
Gap size between sheeting A1 and the third connection sheet A3 is less than described described in distance in the pair of gear liquid piece A6
Gap size between second connection sheet A2 farther one;
And what the interlocking part B for being connected in the top of the column 2 can be moved is set on the connecting piece A, it is described embedding
Fitting B include sequence connected the first scarfer B1, the second scarfer B2 and third scarfer B3, the first scarfer B1 and
The third scarfer B3 is arranged face-to-face, on the first scarfer B1 described in distance the second scarfer B2 farther one set
There is on the first bent sheet B4, the third scarfer B3 described in distance the second scarfer B2 farther one to be equipped with the second bent sheet
B7, the first bent sheet B4 are stretched towards close to the direction of the third scarfer B3, and the second bent sheet B7 is towards connecing
The direction stretching, extension of the nearly first scarfer B1;The backing of the second scarfer B2 is equipped with the scarf joint B5 of protrusion, described
The backing of second scarfer B2 is backing of the second scarfer B2 towards the first scarfer B1, and the scarf joint B5 is embedding
It being connected in the indentations interlocking mouth A4, the backing of the first scarfer B1 connects with the outer wall of the first connection sheet A1,
The backing of the first scarfer B1 is the backing towards the third scarfer B3 on the first scarfer B1, described first
The outer wall of connection sheet A1 is the outer wall that the first connection sheet A1 facing away from the third connection sheet A3;The second scarfer B2
Backing and the outer wall of the second connection sheet A2 connect, the backing of the second scarfer B2 is the face the second scarfer B2
To the backing of the first scarfer B1, the outer wall of the second connection sheet A2 is the second connection sheet A2 back to described
The outer wall of third connection sheet A3;The backing of the backing of the first bent sheet B4 and the second bent sheet B7 are respectively the same as a pair of of institute
The outer wall for stating grip tab A5 connects, and the backing of the first bent sheet B4 is the first bent sheet B4 towards second bending
The backing of piece B7, the backing for stating the second bent sheet B7 are the second bent sheet B7 towards in the first bent sheet B4
Wall, the outer wall of the grip tab A5 are one of them described grip tab A5 that wall farthest apart from grip tab A5 described in another
Face.
The adjustment mouth for penetrating the second scarfer B2 and the scarf joint B5 together is provided on the second scarfer B2,
In addition the interlocking part 2 further includes the cylindric positioning sleeve B6 and lead screw being linked, and is fixed with screw in the adjustment mouth, described
Lead screw silk connects in the screw, and the positioning sleeve B6 connects with the outer wall of the second scarfer B2.
The quantity of the interlocking part B is two or more, and the quantity of the connecting piece A and the interlocking part B are corresponded.
The outer wall of the scarf joint B5 connects with the inner wall of indentations interlocking mouth A4.
The wall surface of the second scarfer B2 back to the scarf joint B5 are equipped with rectangular-shape adjusting seat B8, described
It adjusts mouth and penetrates the adjusting seat B8, the positioning sleeve B6 is connected on the adjusting seat B8 the second scarfer B2 described in distance most
Remote wall surface.
The horizontal span of the adjusting seat is less than the horizontal span of the positioning sleeve B6.
Square orifice is provided on the adjusting seat B8, the bottom wall of the square orifice is in the scarf joint B5.
90 degree of angles, the third connection sheet A3 are kept between the first connection sheet A1 and the second connection sheet A2
90 degree of angles are kept with the second connection sheet A2, the first scarfer B1 and the second scarfer B2 are kept for 90 degree
Angle, the third scarfer B3 and the second scarfer B2 keep 90 degree of angles.
Keep 90 degree angles with indentations interlocking mouth A4 and halve the indentations rabbet mouth A4 plane it is same
It is same plane with the second connection sheet A2 plane for keeping 90 degree of angles and halving the second connection sheet A2.
The first connection sheet A1 and third connection sheet A3 is to keep 90 degree of angles with the second connection sheet A2
And the plane for halving the second connection sheet A2 is benchmark mirror settings.
The grip tab A5 on the third connection sheet A3 keeps 90 degree of angles with the third connection sheet A3, described
Second bent sheet B7 keeps 90 degree of angles with the third scarfer B3.
The grip tab A5 on the first connection sheet A1 keeps 90 degree of angles with the first connection sheet A1, described
First bent sheet B4 and the first scarfer B1 keeps 90 degree of angles.
The connecting piece A can be stainless steel material, and the interlocking part can be stainless steel material.
The invention has the benefit that
Connecting piece provided by the invention and interlocking part, reduce the assembly difficulty of the horizontal hanging arm, improve the water
The assembling speed of balanced suspension arm.The connection effect of the connecting piece A is enhanced, improves liquid-proof performance, it is more convenient to allow operation
Person's operation.
Detailed description of the invention
Fig. 1 is overall schematic of the invention.
Fig. 2 is the floor map of connecting piece of the invention.
Fig. 3 is the structural schematic diagram of interlocking part of the invention.
Specific embodiment
The present invention is described further below in conjunction with embodiment.
Embodiment 1
As shown in Figure 1-Figure 3, the upper air installing equipment of the present embodiment, including horizontal base 1,1 top of horizontal base are equipped with
Bearing block 2, is combined with column 3 by flange 10 on bearing block 2, and the top of column 3 is equipped with horizontal hanging arm 4, the horizontal hanging arm 4
It is provided with the built-in brick of protrusion close on the wall surface of 3 side wall of column, electric block 11 is fixed on horizontal hanging arm 4, in institute
The end at the top and the horizontal hanging arm 4 of stating column 3 is connected with lacing wire 7, corresponding with the horizontal hanging arm 4 in the column 3
The other side is radially secure reinforcing rib 6;
The horizontal base 1 is to be assembled from two channel steels 8 and thereon by the support plate 9 with bolt;
Structure of the top of the column 2 equipped with horizontal hanging arm 4 is the column by connecting piece A and the horizontal hanging arm
Connected, the connecting piece A includes sequence connected the first connection sheet A1, the second connection sheet A2 and third connection sheet A3, described
The first connection sheet A1 and third connection sheet A3 is opposite and sets, and the second connection sheet A2 is equipped with indentations and rabbets mouth A4,
The bottom wall of the interlocking mouth A4 towards the direction to be directed away from the first connection sheet A1, on the first connection sheet A1 away from
Second connection sheet A2 farther one described in a distance from farther one from the second connection sheet A2 and the third connection sheet A3
Head is designed with the grip tab A5 on sequentially connected grip tab A5 and gear liquid piece A6, the first connection sheet A1 towards described in
The direction of third connection sheet A3 is stretched, and the grip tab A5 on the third connection sheet A3 is towards close to the first connection sheet A1's
Direction stretching, extension, a pair of gear liquid piece A6 are stretched towards apart from the farther direction the second connection sheet A2, and described first
Gap size between sheeting A1 and the third connection sheet A3 is less than described described in distance in the pair of gear liquid piece A6
Gap size between second connection sheet A2 farther one;
And what the interlocking part B for being connected in the top of the column 2 can be moved is set on the connecting piece A, it is described embedding
Fitting B include sequence connected the first scarfer B1, the second scarfer B2 and third scarfer B3, the first scarfer B1 and
The third scarfer B3 is arranged face-to-face, on the first scarfer B1 described in distance the second scarfer B2 farther one set
There is on the first bent sheet B4, the third scarfer B3 described in distance the second scarfer B2 farther one to be equipped with the second bent sheet
B7, the first bent sheet B4 are stretched towards close to the direction of the third scarfer B3, and the second bent sheet B7 is towards connecing
The direction stretching, extension of the nearly first scarfer B1;The backing of the second scarfer B2 is equipped with the scarf joint B5 of protrusion, described
The backing of second scarfer B2 is backing of the second scarfer B2 towards the first scarfer B1, and the scarf joint B5 is embedding
It being connected in the indentations interlocking mouth A4, the backing of the first scarfer B1 connects with the outer wall of the first connection sheet A1,
The backing of the first scarfer B1 is the backing towards the third scarfer B3 on the first scarfer B1, described first
The outer wall of connection sheet A1 is the outer wall that the first connection sheet A1 facing away from the third connection sheet A3;The second scarfer B2
Backing and the outer wall of the second connection sheet A2 connect, the backing of the second scarfer B2 is the face the second scarfer B2
To the backing of the first scarfer B1, the outer wall of the second connection sheet A2 is the second connection sheet A2 back to described
The outer wall of third connection sheet A3;The backing of the backing of the first bent sheet B4 and the second bent sheet B7 are respectively the same as a pair of of institute
The outer wall for stating grip tab A5 connects, and the backing of the first bent sheet B4 is the first bent sheet B4 towards second bending
The backing of piece B7, the backing for stating the second bent sheet B7 are the second bent sheet B7 towards in the first bent sheet B4
Wall, the outer wall of the grip tab A5 are one of them described grip tab A5 that wall farthest apart from grip tab A5 described in another
Face.
In this way, adjusting the gap size between the interlocking part B and the column, first to ensure that the level that must be coupled is hung
Arm 4 keeps neat with position to be mounted is set, this process can be via the second scarfer B2 in the interlocking part B
It is connected with the output shaft of reversible straight-line motor, the double-wire linear motor is fixed on the column, passes through reversible straight-line motor
Output shaft stretching or retraction, can adjust it is described interlocking part B and the column between interval;Have again the connecting piece A
It is embedded in the interlocking part B, after interlocking, the scarf joint B5 is allowed to be embedded in the indentations interlocking mouth A4, described first
The backing of scarfer B1 connects with the outer wall of the first connection sheet A1, the backing and described second of the second scarfer B2
The outer wall of sheeting A2 connects, and the backing of the backing of the first bent sheet B4 and the second bent sheet B7 are respectively the same as described in a pair
The outer wall of grip tab A5 connects, and allows the interlocking part B to play the connecting piece A and props up and stable effect.Then the water
The built-in brick for the protrusion that balanced suspension arm is arranged close on the wall surface of the column side wall by the connecting piece A a pair gear liquid piece
Rabbet into the connecting piece A in interval between A6, has reached the assembly of horizontal hanging arm.If the connection that the interlocking part B is propped up
Knot part A props up the horizontal hanging arm with better anti-damage performance and hardness, and the horizontal hanging arm is preferably prevented to go out
Assembly causes cumbersome problem again after now twisted, improves the assembly status of horizontal hanging arm, in addition the gear liquid piece A6 can be more
Reach gear fluidity energy well, more preferably avoids that the defect that column corrodes occurs.It improves between the column and the horizontal hanging arm
It dries efficiency, enhances the convenience of utilization.
Embodiment 2
The upper air installing equipment of the present embodiment, including horizontal base 1,1 top of horizontal base are equipped with bearing block 2, bearing block 2
Upper to be combined with column 3 by flange 10, the top of column 3 is equipped with horizontal hanging arm 4, and the horizontal hanging arm 4 is close to 3 side of column
Be provided with the built-in brick of protrusion on the wall surface of wall, electric block 11 be fixed on horizontal hanging arm 4, the column 3 top with
The end of the horizontal hanging arm 4 is connected with lacing wire 7, radially secure in the column 3 other side corresponding with the horizontal hanging arm 4
There is reinforcing rib 6;
The horizontal base 1 is to be assembled from two channel steels 8 and thereon by the support plate 9 with bolt;
Structure of the top of the column 2 equipped with horizontal hanging arm 4 is the column by connecting piece A and the horizontal hanging arm
Connected, the connecting piece A includes sequence connected the first connection sheet A1, the second connection sheet A2 and third connection sheet A3, described
The first connection sheet A1 and third connection sheet A3 is opposite and sets, and the second connection sheet A2 is equipped with indentations and rabbets mouth A4,
The bottom wall of the interlocking mouth A4 towards the direction to be directed away from the first connection sheet A1, on the first connection sheet A1 away from
Second connection sheet A2 farther one described in a distance from farther one from the second connection sheet A2 and the third connection sheet A3
Head is designed with the grip tab A5 on sequentially connected grip tab A5 and gear liquid piece A6, the first connection sheet A1 towards described in
The direction of third connection sheet A3 is stretched, and the grip tab A5 on the third connection sheet A3 is towards close to the first connection sheet A1's
Direction stretching, extension, a pair of gear liquid piece A6 are stretched towards apart from the farther direction the second connection sheet A2, and described first
Gap size between sheeting A1 and the third connection sheet A3 is less than described described in distance in the pair of gear liquid piece A6
Gap size between second connection sheet A2 farther one;
And what the interlocking part B for being connected in the top of the column 2 can be moved is set on the connecting piece A, it is described embedding
Fitting B include sequence connected the first scarfer B1, the second scarfer B2 and third scarfer B3, the first scarfer B1 and
The third scarfer B3 is arranged face-to-face, on the first scarfer B1 described in distance the second scarfer B2 farther one set
There is on the first bent sheet B4, the third scarfer B3 described in distance the second scarfer B2 farther one to be equipped with the second bent sheet
B7, the first bent sheet B4 are stretched towards close to the direction of the third scarfer B3, and the second bent sheet B7 is towards connecing
The direction stretching, extension of the nearly first scarfer B1;The backing of the second scarfer B2 is equipped with the scarf joint B5 of protrusion, described
The backing of second scarfer B2 is backing of the second scarfer B2 towards the first scarfer B1, and the scarf joint B5 is embedding
It being connected in the indentations interlocking mouth A4, the backing of the first scarfer B1 connects with the outer wall of the first connection sheet A1,
The backing of the first scarfer B1 is the backing towards the third scarfer B3 on the first scarfer B1, described first
The outer wall of connection sheet A1 is the outer wall that the first connection sheet A1 facing away from the third connection sheet A3;The second scarfer B2
Backing and the outer wall of the second connection sheet A2 connect, the backing of the second scarfer B2 is the face the second scarfer B2
To the backing of the first scarfer B1, the outer wall of the second connection sheet A2 is the second connection sheet A2 back to described
The outer wall of third connection sheet A3;The backing of the backing of the first bent sheet B4 and the second bent sheet B7 are respectively the same as a pair of of institute
The outer wall for stating grip tab A5 connects, and the backing of the first bent sheet B4 is the first bent sheet B4 towards second bending
The backing of piece B7, the backing for stating the second bent sheet B7 are the second bent sheet B7 towards in the first bent sheet B4
Wall, the outer wall of the grip tab A5 are one of them described grip tab A5 that wall farthest apart from grip tab A5 described in another
Face.
In this way, adjusting the gap size between the interlocking part B and the column, first to ensure that the level that must be coupled is hung
Arm 4 keeps neat with position to be mounted is set, this process can be via the second scarfer B2 in the interlocking part B
It is connected with the output shaft of reversible straight-line motor, the double-wire linear motor is fixed on the column, passes through reversible straight-line motor
Output shaft stretching or retraction, can adjust it is described interlocking part B and the column between interval;Have again the connecting piece A
It is embedded in the interlocking part B, after interlocking, the scarf joint B5 is allowed to be embedded in the indentations interlocking mouth A4, described first
The backing of scarfer B1 connects with the outer wall of the first connection sheet A1, the backing and described second of the second scarfer B2
The outer wall of sheeting A2 connects, and the backing of the backing of the first bent sheet B4 and the second bent sheet B7 are respectively the same as described in a pair
The outer wall of grip tab A5 connects, and allows the interlocking part B to play the connecting piece A and props up and stable effect.Then the water
The built-in brick for the protrusion that balanced suspension arm is arranged close on the wall surface of the column side wall by the connecting piece A a pair gear liquid piece
Rabbet into the connecting piece A in interval between A6, has reached the assembly of horizontal hanging arm.If the connection that the interlocking part B is propped up
Knot part A props up the horizontal hanging arm with better anti-damage performance and hardness, and the horizontal hanging arm is preferably prevented to go out
Assembly causes cumbersome problem again after now twisted, improves the assembly status of horizontal hanging arm, in addition the gear liquid piece A6 can be more
Reach gear fluidity energy well, more preferably avoids that the defect that column corrodes occurs.It improves between the column and the horizontal hanging arm
It dries efficiency, enhances the convenience of utilization.
The adjustment mouth for penetrating the second scarfer B2 and the scarf joint B5 together is provided on the second scarfer B2,
In addition the interlocking part 2 further includes the cylindric positioning sleeve B6 and lead screw being linked, and is fixed with screw in the adjustment mouth, described
Lead screw silk connects in the screw, and the positioning sleeve B6 connects with the outer wall of the second scarfer B2.Assembling the level
During boom, the stroke of screw is rotated into reach the interval between column and horizontal hanging arm via adjusting screw, can more coordinate level
Boom it is neat, that is to say, that rotational lead screw according to during rotating into close to the direction of the interlocking part B, hang by the level that can reduce
Interval between arm and column, it is on the contrary then increase the interval between horizontal hanging arm and column.
The quantity of the interlocking part B is two or more, and the quantity of the connecting piece A and the interlocking part B are corresponded, into
One step makes connecting piece have bigger survivability and hardness in the longitudinal direction, preferably avoids the connecting piece A and occurs
It is twisted, it more can ensure that and set up the neat of horizontal hanging arm 4.
The inner wall of the outer wall of the scarf joint B5 and the indentations interlocking mouth A4 connect, and can allow the scarf joint B5 and institute
State indentations interlocking mouth A4 between not will lead to relative motion, improve interlocking part B to connecting piece A prop up and stablizing effect.
The wall surface of the second scarfer B2 back to the scarf joint B5 are equipped with rectangular-shape adjusting seat B8, described
It adjusts mouth and penetrates the adjusting seat B8, the positioning sleeve B6 is connected on the adjusting seat B8 the second scarfer B2 described in distance most
Remote wall surface.The adjusting seat B8 is projected on the second scarfer B2 and sets, and increases the span that can be adjusted, can more add
The firm performance that the big adjusting seat is coupled with the interlocking part B part.
Also the horizontal span of the adjusting seat can be allowed to be less than the horizontal span of the positioning sleeve B6, it is described fixed to rotate in this way
When the set B6 of position, the range to connect with the positioning sleeve B6 can be increased, active force is reduced, enhances the convenience of assembly.
Embodiment 3
The upper air installing equipment of the present embodiment, including horizontal base 1,1 top of horizontal base are equipped with bearing block 2, bearing block 2
Upper to be combined with column 3 by flange 10, the top of column 3 is equipped with horizontal hanging arm 4, and the horizontal hanging arm 4 is close to 3 side of column
Be provided with the built-in brick of protrusion on the wall surface of wall, electric block 11 be fixed on horizontal hanging arm 4, the column 3 top with
The end of the horizontal hanging arm 4 is connected with lacing wire 7, radially secure in the column 3 other side corresponding with the horizontal hanging arm 4
There is reinforcing rib 6;
The horizontal base 1 is to be assembled from two channel steels 8 and thereon by the support plate 9 with bolt;
Structure of the top of the column 2 equipped with horizontal hanging arm 4 is the column by connecting piece A and the horizontal hanging arm
Connected, the connecting piece A includes sequence connected the first connection sheet A1, the second connection sheet A2 and third connection sheet A3, described
The first connection sheet A1 and third connection sheet A3 is opposite and sets, and the second connection sheet A2 is equipped with indentations and rabbets mouth A4,
The bottom wall of the interlocking mouth A4 towards the direction to be directed away from the first connection sheet A1, on the first connection sheet A1 away from
Second connection sheet A2 farther one described in a distance from farther one from the second connection sheet A2 and the third connection sheet A3
Head is designed with the grip tab A5 on sequentially connected grip tab A5 and gear liquid piece A6, the first connection sheet A1 towards described in
The direction of third connection sheet A3 is stretched, and the grip tab A5 on the third connection sheet A3 is towards close to the first connection sheet A1's
Direction stretching, extension, a pair of gear liquid piece A6 are stretched towards apart from the farther direction the second connection sheet A2, and described first
Gap size between sheeting A1 and the third connection sheet A3 is less than described described in distance in the pair of gear liquid piece A6
Gap size between second connection sheet A2 farther one;
And what the interlocking part B for being connected in the top of the column 2 can be moved is set on the connecting piece A, it is described embedding
Fitting B include sequence connected the first scarfer B1, the second scarfer B2 and third scarfer B3, the first scarfer B1 and
The third scarfer B3 is arranged face-to-face, on the first scarfer B1 described in distance the second scarfer B2 farther one set
There is on the first bent sheet B4, the third scarfer B3 described in distance the second scarfer B2 farther one to be equipped with the second bent sheet
B7, the first bent sheet B4 are stretched towards close to the direction of the third scarfer B3, and the second bent sheet B7 is towards connecing
The direction stretching, extension of the nearly first scarfer B1;The backing of the second scarfer B2 is equipped with the scarf joint B5 of protrusion, described
The backing of second scarfer B2 is backing of the second scarfer B2 towards the first scarfer B1, and the scarf joint B5 is embedding
It being connected in the indentations interlocking mouth A4, the backing of the first scarfer B1 connects with the outer wall of the first connection sheet A1,
The backing of the first scarfer B1 is the backing towards the third scarfer B3 on the first scarfer B1, described first
The outer wall of connection sheet A1 is the outer wall that the first connection sheet A1 facing away from the third connection sheet A3;The second scarfer B2
Backing and the outer wall of the second connection sheet A2 connect, the backing of the second scarfer B2 is the face the second scarfer B2
To the backing of the first scarfer B1, the outer wall of the second connection sheet A2 is the second connection sheet A2 back to described
The outer wall of third connection sheet A3;The backing of the backing of the first bent sheet B4 and the second bent sheet B7 are respectively the same as a pair of of institute
The outer wall for stating grip tab A5 connects, and the backing of the first bent sheet B4 is the first bent sheet B4 towards second bending
The backing of piece B7, the backing for stating the second bent sheet B7 are the second bent sheet B7 towards in the first bent sheet B4
Wall, the outer wall of the grip tab A5 are one of them described grip tab A5 that wall farthest apart from grip tab A5 described in another
Face.
In this way, adjusting the gap size between the interlocking part B and the column, first to ensure that the level that must be coupled is hung
Arm 4 keeps neat with position to be mounted is set, this process can be via the second scarfer B2 in the interlocking part B
It is connected with the output shaft of reversible straight-line motor, the double-wire linear motor is fixed on the column, passes through reversible straight-line motor
Output shaft stretching or retraction, can adjust it is described interlocking part B and the column between interval;Have again the connecting piece A
It is embedded in the interlocking part B, after interlocking, the scarf joint B5 is allowed to be embedded in the indentations interlocking mouth A4, described first
The backing of scarfer B1 connects with the outer wall of the first connection sheet A1, the backing and described second of the second scarfer B2
The outer wall of sheeting A2 connects, and the backing of the backing of the first bent sheet B4 and the second bent sheet B7 are respectively the same as described in a pair
The outer wall of grip tab A5 connects, and allows the interlocking part B to play the connecting piece A and props up and stable effect.Then the water
The built-in brick for the protrusion that balanced suspension arm is arranged close on the wall surface of the column side wall by the connecting piece A a pair gear liquid piece
Rabbet into the connecting piece A in interval between A6, has reached the assembly of horizontal hanging arm.If the connection that the interlocking part B is propped up
Knot part A props up the horizontal hanging arm with better anti-damage performance and hardness, and the horizontal hanging arm is preferably prevented to go out
Assembly causes cumbersome problem again after now twisted, improves the assembly status of horizontal hanging arm, in addition the gear liquid piece A6 can be more
Reach gear fluidity energy well, more preferably avoids that the defect that column corrodes occurs.It improves between the column and the horizontal hanging arm
It dries efficiency, enhances the convenience of utilization.
The adjustment mouth for penetrating the second scarfer B2 and the scarf joint B5 together is provided on the second scarfer B2,
In addition the interlocking part 2 further includes the cylindric positioning sleeve B6 and lead screw being linked, and is fixed with screw in the adjustment mouth, described
Lead screw silk connects in the screw, and the positioning sleeve B6 connects with the outer wall of the second scarfer B2.Assembling the level
During boom, the stroke of screw is rotated into reach the interval between column and horizontal hanging arm via adjusting screw, can more coordinate level
Boom it is neat, that is to say, that rotational lead screw according to during rotating into close to the direction of the interlocking part B, hang by the level that can reduce
Interval between arm and column, it is on the contrary then increase the interval between horizontal hanging arm and column.
The quantity of the interlocking part B is two or more, and the quantity of the connecting piece A and the interlocking part B are corresponded, into
One step makes connecting piece have bigger survivability and hardness in the longitudinal direction, preferably avoids the connecting piece A and occurs
It is twisted, it more can ensure that and set up the neat of horizontal hanging arm 4.
The inner wall of the outer wall of the scarf joint B5 and the indentations interlocking mouth A4 connect, and can allow the scarf joint B5 and institute
State indentations interlocking mouth A4 between not will lead to relative motion, improve interlocking part B to connecting piece A prop up and stablizing effect.
The wall surface of the second scarfer B2 back to the scarf joint B5 are equipped with rectangular-shape adjusting seat B8, described
It adjusts mouth and penetrates the adjusting seat B8, the positioning sleeve B6 is connected on the adjusting seat B8 the second scarfer B2 described in distance most
Remote wall surface.The adjusting seat B8 is projected on the second scarfer B2 and sets, and increases the span that can be adjusted, can more add
The firm performance that the big adjusting seat is coupled with the interlocking part B part.
Also the horizontal span of the adjusting seat can be allowed to be less than the horizontal span of the positioning sleeve B6, it is described fixed to rotate in this way
When the set B6 of position, the range to connect with the positioning sleeve B6 can be increased, active force is reduced, enhances the convenience of assembly.
Square orifice is provided on the adjusting seat B8, the bottom wall of the square orifice is in the scarf joint B5.Square orifice
Setting can reduce quality, improve the longitudinally disposed firm performance of connecting piece A, more horizontal hanging arm can be allowed firm, in addition can also
Enough reduce materials, saves expense.
90 degree of angles, the third connection sheet A3 are kept between the first connection sheet A1 and the second connection sheet A2
90 degree of angles are kept with the second connection sheet A2, the first scarfer B1 and the second scarfer B2 are kept for 90 degree
Angle, the third scarfer B3 and the second scarfer B2 keep 90 degree of angles.Such framework can improve connection
After part A is scarfed to the horizontal hanging arm, suffered active force is more equal between the first connection sheet A1 and the third connection sheet A3
Even, suffered active force is more uniform between the first scarfer B1 and the third scarfer B3, can more increase the connecting piece
With the uniformity of active force suffered by interlocking part entirety, the fixing for propping up the horizontal hanging arm can be more increased, the water is avoided
Balanced suspension arm generation is twisted, maintains the neat of the horizontal hanging arm.
Keep 90 degree angles with indentations interlocking mouth A4 and halve the indentations rabbet mouth A4 plane it is same
It is same plane with the second connection sheet A2 plane for keeping 90 degree of angles and halving the second connection sheet A2.It is described
Structure but also the interlocking part B with connecting piece A via the indentations rabbet mouth A4 and the scarf joint B5 interlocking after, meeting with
After by horizontal hanging arm effect, the first connection sheet A1 and second can be equably given via the second connection sheet A2
Connection sheet A2 is improved and is propped up performance to the horizontal hanging arm.
The first connection sheet A1 and third connection sheet A3 is to keep 90 degree of angles with the second connection sheet A2
And the plane for halving the second connection sheet A2 is benchmark mirror settings.Such structure is the same also to improve the connecting piece
The fixing of the horizontal hanging arm is propped up with the interlocking part.
The grip tab A5 on the third connection sheet A3 keeps 90 degree of angles with the third connection sheet A3, described
Second bent sheet B7 keeps 90 degree of angles with the third scarfer B3.The third connection sheet A3 is the same as between the grip tab A5
Angle it is consistent with the angle between the second bent sheet B7 with the third scarfer B3, the second bent sheet B7 latch
After on the grip tab A5, it can more improve the second bent sheet B7 with the conjugation between the grip tab A5, can more improve
Interlocking part B props up performance to connecting piece A.
The same, the grip tab A5 on the first connection sheet A1 keeps 90 degree of folders with the first connection sheet A1
Angle, the first bent sheet B4 and the first scarfer B1 keep 90 degree of angles.
The connecting piece A can be stainless steel material, and the interlocking part can be stainless steel material.Stainless steel material can
Keep enough big preventing destructing performances.
The present embodiment has the beneficial effect that
Connecting piece provided in this embodiment and interlocking part, reduce the assembly difficulty of the horizontal hanging arm, improve described
The assembling speed of horizontal hanging arm.The connection effect of the connecting piece A is enhanced, improves liquid-proof performance, it is more convenient to allow behaviour
Author's operation.
The present invention is described by way of examples above, it will be understood by those of skill in the art that the disclosure is not
It is limited to embodiments described above, in the case of without departing from the scope of the present invention, can makes a variety of changes, changes and replace
It changes.
Claims (7)
1. a kind of upper air installing equipment, which is characterized in that including horizontal base, horizontal base top is equipped with bearing block, bearing block
Upper to be combined with column by flange, the top of column is equipped with horizontal hanging arm, wall of the horizontal hanging arm close to the column side wall
The built-in brick of protrusion is provided on face;
Structure of the top of the column equipped with horizontal hanging arm is that the column is connected by connecting piece with the horizontal hanging arm,
The connecting piece includes connected the first connection sheet, the second connection sheet and the third connection sheet of sequence, first connection sheet and institute
It is opposite and set to state third connection sheet, second connection sheet is equipped with indentations and rabbets mouth, the bottom wall of the interlocking mouth towards
For the direction for being directed away from first connection sheet, on first connection sheet farther one of the second connection sheet described in distance and
The second connection sheet described in distance farther one is designed with the connected grip tab of sequence and gear liquid piece, institute on the third connection sheet
The grip tab stated on the first connection sheet is stretched towards close to the direction of the third connection sheet, the lock on the third connection sheet
Piece is stretched towards close to the direction of first connection sheet, and a pair of gear liquid piece is all towards farther apart from second connection sheet
Direction stretching, extension, gap size between first connection sheet and the third connection sheet is less than the pair of gear liquid piece
In gap size between farther one of second connection sheet described in distance;
And what the interlocking part B for being connected in the top of the column can be moved is set on the connecting piece, the interlocking part packet
Include sequence connected the first scarfer, the second scarfer and third scarfer, first scarfer and the third scarfer
Setting face-to-face, in first scarfer described in distance the second scarfer farther one be equipped with the first bent sheet, described the
The second scarfer described in distance farther one is equipped with the second bent sheet in three scarfers, and first bent sheet is towards close to institute
The direction stretching, extension of third scarfer is stated, second bent sheet is stretched towards close to the direction of first scarfer;Described
The backing of two scarfers is equipped with the scarf joint of protrusion, and the backing of second scarfer is second scarfer towards described
The backing of first scarfer, the scarf joint are embedded in the indentations interlocking mouth, the same institute of the backing of first scarfer
The outer wall for stating the first connection sheet connects, and the backing of first scarfer is to rabbet in first scarfer towards the third
The backing of piece, the outer wall of first connection sheet are the outer wall that first connection sheet facing away from the third connection sheet;It is described
The outer wall of the backing of second scarfer and second connection sheet connects, and the backing of second scarfer is second interlocking
Backing of the piece towards first scarfer, the outer wall of second connection sheet are second connection sheet back to described the
The outer wall of three connection sheets;The backing of first bent sheet and the backing of second bent sheet are respectively the same as a pair of grip tab
Outer wall connect, the backing of first bent sheet is backing of first bent sheet towards second bent sheet, described
The backing for stating the second bent sheet is backing of second bent sheet towards first bent sheet, and the outer wall of the grip tab is
One of them described grip tab that wall surface farthest apart from grip tab described in another is provided with together in second scarfer
Through the adjustment mouth of second scarfer and the scarf joint, in addition the interlocking part further includes the cylindric positioning being linked
Set and lead screw are fixed with screw in the adjustment mouth, and the lead screw silk connects in the screw, the positioning sleeve and described second
The outer wall of scarfer connects.
2. upper air installing equipment according to claim 1, which is characterized in that the quantity of the interlocking part B is two or more,
The quantity of the connecting piece and the interlocking part correspond.
3. upper air installing equipment according to claim 2, which is characterized in that the outer wall of the scarf joint and the indentations
The inner wall of interlocking mouth connects.
4. upper air installing equipment according to claim 3, which is characterized in that second scarfer is back to described embedding
The wall surface of connector is equipped with rectangular-shape adjusting seat, and the adjustment mouth penetrates the adjusting seat, and the positioning sleeve is connected on described
The farthest wall surface of second scarfer described in distance in adjusting seat.
5. upper air installing equipment according to claim 4, which is characterized in that the horizontal span of the adjusting seat is less than described
The horizontal span of positioning sleeve.
6. upper air installing equipment according to claim 5, which is characterized in that square orifice is provided in the adjusting seat, it is described
The bottom wall of square orifice is in the scarf joint.
7. upper air installing equipment according to claim 6, which is characterized in that first connection sheet and described second is coupled
90 degree of angles are kept between piece, the third connection sheet and second connection sheet keep 90 degree of angles, and described first is embedding
Contact pin and second scarfer keep 90 degree of angles, and the third scarfer and second scarfer keep 90 degree of folders
Angle;
It keeps 90 degree angles with indentations interlocking mouth and halves the indentations rabbeting the plane of mouth with described the
Two connection sheets keep 90 degree of angles and halve the plane of second connection sheet to be same plane;
First connection sheet and the third connection sheet are to keep 90 degree of angles with second connection sheet and halve institute
The plane for stating the second connection sheet is benchmark mirror settings;
The grip tab on the third connection sheet keeps 90 degree of angles, second bent sheet with the third connection sheet
90 degree of angles are kept with the third scarfer;
The grip tab on first connection sheet keeps 90 degree of angles, first bent sheet with first connection sheet
90 degree of angles are kept with first scarfer;
The connecting piece is stainless steel material, and the interlocking part is stainless steel material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710593025.0A CN107244619B (en) | 2017-07-19 | 2017-07-19 | A kind of upper air installing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710593025.0A CN107244619B (en) | 2017-07-19 | 2017-07-19 | A kind of upper air installing equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107244619A CN107244619A (en) | 2017-10-13 |
CN107244619B true CN107244619B (en) | 2019-03-26 |
Family
ID=60015391
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710593025.0A Active CN107244619B (en) | 2017-07-19 | 2017-07-19 | A kind of upper air installing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107244619B (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206915614U (en) * | 2017-07-19 | 2018-01-23 | 中国装饰股份有限公司 | A kind of upper air installing equipment |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE512411C2 (en) * | 1998-08-11 | 2000-03-13 | Aba Sweden Ab | Device for connecting two rigid tubular objects |
KR20080096143A (en) * | 2007-04-27 | 2008-10-30 | 케이엔에프중공업주식회사 | Jib for tower crane |
CN201183719Y (en) * | 2008-01-11 | 2009-01-21 | 张凤翔 | Revolving type mini single arm crane |
CN102001592B (en) * | 2010-12-01 | 2012-07-25 | 徐州重型机械有限公司 | Movable crane and balance weight connecting device thereof |
CN202924631U (en) * | 2012-11-07 | 2013-05-08 | 中联重科股份有限公司 | Connection structure and tower crane with same |
CN203222437U (en) * | 2013-03-19 | 2013-10-02 | 山东宁建建设集团有限公司 | Multifunctional connection base for building hoisting machinery |
CN205278027U (en) * | 2015-11-19 | 2016-06-01 | 广州市恒缘诚货架设备有限公司 | Stand of heavy goods shelves and connection structure of crossbeam |
-
2017
- 2017-07-19 CN CN201710593025.0A patent/CN107244619B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206915614U (en) * | 2017-07-19 | 2018-01-23 | 中国装饰股份有限公司 | A kind of upper air installing equipment |
Also Published As
Publication number | Publication date |
---|---|
CN107244619A (en) | 2017-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201376850Y (en) | Unitary curtain wall field lifting device | |
CN206225917U (en) | A kind of cable connector support frame | |
CN204571259U (en) | A kind of annular inspection platform being applicable to blower fan tower barrel maintenance | |
WO2019033477A1 (en) | High tensile strength aseismatic connector and aseismatic bracket support | |
CN107244619B (en) | A kind of upper air installing equipment | |
CN207634092U (en) | A kind of beat clamping device for the installation of constructing tunnel arch | |
CN206915614U (en) | A kind of upper air installing equipment | |
CN204858404U (en) | Transmission line electrified V -arrangement insulator chain that changes give round pin ware | |
CN113668937B (en) | Waist ring device and lifting system for inner suspension holding rod hoisting tower set | |
CN201334770Y (en) | Wall-attached supporting seat | |
CN207945443U (en) | A kind of mine electromechanical equipment job platform | |
CN211351626U (en) | Bus duct installation gallows | |
CN201980944U (en) | Hanging system of electric hanging basket capable of increasing loading capability and ascending system of electric hanging basket | |
CN115504364A (en) | Split type frock of curtain unit hoist and mount | |
CN208718082U (en) | A kind of adjustment device for overhanging steel structure | |
CN207907177U (en) | A kind of High-Pole Lamp takes off hooking device automatically | |
CN209385081U (en) | A kind of well drilling tool hanging apparatus | |
CN208869184U (en) | A kind of boom hoisting of gantry | |
CN205424362U (en) | Rotation type projecting apparatus gallows | |
CN108775075A (en) | A kind of adjusting apparatus for overhanging steel structure | |
CN204823925U (en) | Balance arm for hoist | |
CN211118024U (en) | Screw suspender support for building electromechanical engineering | |
CN219170837U (en) | Electromechanical maintenance device | |
CN203795819U (en) | Attached type lifting scaffold anti-inclination locking device | |
CN217741127U (en) | Rotary-twisting type protective umbrella for distribution network maintenance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |