CN107244312A - Electrical changing station and controller for electric consumption, method are changed in order - Google Patents
Electrical changing station and controller for electric consumption, method are changed in order Download PDFInfo
- Publication number
- CN107244312A CN107244312A CN201710368050.9A CN201710368050A CN107244312A CN 107244312 A CN107244312 A CN 107244312A CN 201710368050 A CN201710368050 A CN 201710368050A CN 107244312 A CN107244312 A CN 107244312A
- Authority
- CN
- China
- Prior art keywords
- mtr
- mtd
- mrow
- battery
- msub
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 62
- 238000005457 optimization Methods 0.000 claims abstract description 71
- 238000004422 calculation algorithm Methods 0.000 claims description 20
- 238000004364 calculation method Methods 0.000 claims description 18
- 238000012508 change request Methods 0.000 claims description 10
- 239000011159 matrix material Substances 0.000 claims description 5
- 230000002068 genetic effect Effects 0.000 claims description 3
- 239000002245 particle Substances 0.000 claims description 3
- 238000002922 simulated annealing Methods 0.000 claims description 3
- 230000005611 electricity Effects 0.000 abstract 2
- 238000000205 computational method Methods 0.000 abstract 1
- 230000006870 function Effects 0.000 description 5
- 230000006399 behavior Effects 0.000 description 3
- 238000004088 simulation Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 238000000429 assembly Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000004146 energy storage Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60S—SERVICING, CLEANING, REPAIRING, SUPPORTING, LIFTING, OR MANOEUVRING OF VEHICLES, NOT OTHERWISE PROVIDED FOR
- B60S5/00—Servicing, maintaining, repairing, or refitting of vehicles
- B60S5/06—Supplying batteries to, or removing batteries from, vehicles
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
技术领域technical field
本发明涉及电动汽车换电技术领域,具体涉及换电站及有序换电控制装置、方法。The invention relates to the technical field of electric vehicle battery swapping, in particular to a battery swapping station and an orderly battery swapping control device and method.
背景技术Background technique
换电站是为电动汽车的动力电池提供充电和动力电池快速更换的能源站,其可以实现电动汽车的快速补能,也可以将替换下来的动力电池可以作为储能节点。但是,电动汽车的换电需求存在时间和空间的不确定性,当大量电动汽车进入换电站进行无序换电时,大规模换电电池的充电负荷值很高,将会对电网造成较大冲击,增大电网运行控制的难度。同时,也会影响换电站的正常运行。The battery swapping station is an energy station that provides charging and quick replacement of the power battery of the electric vehicle. It can realize the rapid energy replenishment of the electric vehicle, and the replaced power battery can also be used as an energy storage node. However, there are time and space uncertainties in the demand for battery swapping of electric vehicles. When a large number of electric vehicles enter the swapping station for disorderly swapping, the charging load of large-scale swapping batteries will be very high, which will cause great damage to the power grid. impact, increasing the difficulty of power grid operation control. At the same time, it will also affect the normal operation of the power station.
发明内容Contents of the invention
为了解决现有技术中的上述问题,即为了解决电动汽车无序换电方式影响换电站和电网正常运行的技术问题,本发明提供了一种有序换电控制方法和装置,同时还提供了一种包括该有序换电控制装置的换电站。In order to solve the above-mentioned problems in the prior art, that is, to solve the technical problem that the disorderly battery swap mode of electric vehicles affects the normal operation of the power swap station and the power grid, the present invention provides a method and device for orderly battery swap control, and also provides A power exchange station including the orderly power exchange control device.
第一方面,本发明中一种有序换电控制方法的技术方案是:In the first aspect, the technical solution of an orderly battery replacement control method in the present invention is:
所述方法包括:The methods include:
获取特定时间段内电动汽车的换电请求;Obtain the battery replacement request of electric vehicles within a specific time period;
依据所预设的各预设细分时段换电站中各载能电池的电量计算方法,基于预设的约束条件和预设的优化目标,采用启发式算法生成最优的换电请求分配方案;According to the power calculation method of each energy-carrying battery in the power-swapping station in each preset subdivision period, and based on the preset constraint conditions and preset optimization goals, a heuristic algorithm is used to generate the optimal power-swapping request allocation scheme;
其中:in:
所述换电请求包括设定的最晚换电时间和期望更换载能电池的电量下限;The power change request includes the set latest time for power change and the lower limit of the battery power expected to be replaced;
所述各预设细分时段为按照设定时段时长对所述特定时间段进行划分的各时间段;The preset subdivided time periods are each time period divided into the specific time period according to the length of the set time period;
所述换电站中各载能电池的电量计算方法为依据前一细分时段换电站中所有载能电池状态以及各充电工位的充电倍率计算当前细分时段换电站所有载能电池状态的方法;The power calculation method of each energy-carrying battery in the power-swapping station is a method of calculating the state of all energy-carrying batteries in the power-swapping station in the current subdivision period based on the state of all the energy-carrying batteries in the power-swapping station in the previous subdivision period and the charging rate of each charging station ;
所述换电请求分配方案包括所分配的换电请求分配换电时刻、所分配载能电池的充电工位和所述各预设细分时段中各充电工位的充电倍率。The battery swap request allocation scheme includes the allocated battery swap time, the allocated charging station of the energy-carrying battery, and the charging rate of each charging station in each preset subdivision period.
进一步地,本发明提供的一个优选技术方案为:Further, a preferred technical solution provided by the present invention is:
所述启发式算法包括蒙特卡洛树搜索法、或粒子群算法、或遗传算法、或模拟退火算法。The heuristic algorithm includes a Monte Carlo tree search method, or a particle swarm algorithm, or a genetic algorithm, or a simulated annealing algorithm.
进一步地,本发明提供的一个优选技术方案为:Further, a preferred technical solution provided by the present invention is:
所述换电站中各载能电池的电量计算方法为:The method for calculating the electric quantity of each energy-carrying battery in the power exchange station is:
当换电站在特定时间段的t时刻没有发生换电时,各载能电池的电量计算公式如下式所示:When the power exchange station does not change power at time t in a specific period of time, the calculation formula for the power of each energy-carrying battery is as follows:
其中,SOCb(t)为t时刻第b个充电工位上载能电池的荷电状态;SOCb(t-1)为t-1时刻第b个充电工位上载能电池的荷电状态;Rcb(t-1)为t-1时刻第b个充电工位的充电倍率,1≤b≤No_bat,t≥1;Δt为充电倍率的变化时间间隔;Among them, SOC b (t) is the state of charge of the energy-carrying battery on the b-th charging station at time t; SOC b (t-1) is the state of charge of the energy-carrying battery on the b-th charging station at time t-1; Rc b (t-1) is the charging rate of the bth charging station at time t-1, 1≤b≤No_bat, t≥1; Δt is the change time interval of the charging rate;
当换电站在特定时间段的t时刻发生换电时,各载能电池的电量计算公式如下式所示:When the battery swap occurs at time t in a specific period of time, the calculation formula for the power of each energy-carrying battery is shown in the following formula:
其中,swapreq(n).SOCempty为特定时间段内第n个换电请求被满足后从电动汽车上替换下的载能电池的荷电状态,n≥1;J为第b个对角线元素为0,其余对角线元素为1的单位对角矩阵;J′为b个对角线第元素为1,其余对角线元素为0的单位对角矩阵。Among them, swap req (n).SOC empty is the state of charge of the energy-carrying battery replaced from the electric vehicle after the nth battery swap request is satisfied within a specific time period, n≥1; J is the bth diagonal The unit diagonal matrix whose line elements are 0 and the rest of the diagonal elements are 1; J′ is the unit diagonal matrix whose bth diagonal elements are 1 and the rest of the diagonal elements are 0.
进一步地,本发明提供的一个优选技术方案为:Further, a preferred technical solution provided by the present invention is:
所述预设优化目标为单一优化目标Gs或组合优化目标Gc;其中,所述组合优化目标包括多个单一优化目标,所述组合优化目标Gc如下式所示:The preset optimization goal is a single optimization goal G s or a combined optimization goal G c ; wherein, the combined optimization goal includes a plurality of single optimization goals, and the combined optimization goal G c is shown in the following formula:
Gc=w1G1s+...wiGis...+wmGms G c =w 1 G 1s +...w i G is ...+w m G ms
其中,所述Gis为组合优化目标Gc的第i个单一优化目标,所述wi为所述单一优化目标Gis的权重。Wherein, the G is is the i-th single optimization goal of the combined optimization goal G c , and the w i is the weight of the single optimization goal G is .
进一步地,本发明提供的一个优选技术方案为:Further, a preferred technical solution provided by the present invention is:
所述单一优化目标为换电请求中包含的最晚换电时间,及该换电请求对应的换电请求分配换电时刻的时间差值最大;或者,The single optimization goal is the latest battery change time included in the battery change request, and the time difference between the power change request corresponding to the power change request and the power change time is the largest; or,
所述单一优化目标为换电请求分配方案中所分配载能电池的荷电状态裕度最大;或者,The single optimization goal is to maximize the state of charge margin of the allocated energy-carrying battery in the power exchange request allocation scheme; or,
所述单一优化目标为换电站对电动汽车替换下的载能电池充电后,电网的负荷曲线方差最小。The single optimization objective is to minimize the variance of the load curve of the power grid after the power-swapping station charges the energy-carrying battery replaced by the electric vehicle.
进一步地,本发明提供的一个优选技术方案为:Further, a preferred technical solution provided by the present invention is:
所述预设的约束条件包括最晚换电时间、期望更换载能电池的电量下限和充电倍率约束条件。The preset constraint conditions include the latest battery replacement time, the lower limit of the battery power expected to be replaced and the constraint condition of charging rate.
进一步地,本发明提供的一个优选技术方案为:Further, a preferred technical solution provided by the present invention is:
所述充电倍率约束条件如下式所示:The charging rate constraints are shown in the following formula:
其中,所述Rcb(t)为特定时间段的t时刻时第b个充电工位对应的电池充电倍率,1≤b≤No_bat,No_bat为充电工位的总数,t≥1;Wherein, the Rc b (t) is the battery charging rate corresponding to the bth charging station at time t of a specific time period, 1≤b≤No_bat, No_bat is the total number of charging stations, t≥1;
所述BC为载能电池的容量;所述Rpower为预设额定功率;所述Rcth为预设电池充电倍率阈值。The B C is the capacity of the energy-carrying battery; the Rpower is the preset rated power; the Rc th is the preset battery charge rate threshold.
第二方面,本发明中一种有序换电控制装置的技术方案是:In the second aspect, the technical solution of an orderly battery replacement control device in the present invention is:
所述装置包括:The devices include:
换电请求获取模块,配置为获取特定时间段内电动汽车的换电请求;The battery replacement request acquisition module is configured to obtain the battery replacement request of the electric vehicle within a specific time period;
换电请求分配方案生成模块,配置为依据所预设的各预设细分时段换电站中各载能电池的电量计算方法,基于预设的约束条件和预设的优化目标,采用启发式算法生成最优的换电请求分配方案;The power swap request allocation scheme generation module is configured to use a heuristic algorithm based on the power calculation method of each energy-carrying battery in the swap station in each preset subdivision period, based on preset constraints and preset optimization goals Generate the optimal power replacement request allocation scheme;
其中:in:
所述换电请求包括设定的最晚换电时间和期望更换载能电池的电量下限;The power change request includes the set latest time for power change and the lower limit of the battery power expected to be replaced;
所述各预设细分时段为按照设定时段时长对所述特定时间段进行划分的各时间段;The preset subdivided time periods are each time period divided into the specific time period according to the length of the set time period;
所述换电站中各载能电池的电量计算方法为依据前一细分时段换电站中所有载能电池状态以及各充电工位的充电倍率计算当前细分时段换电站所有载能电池状态的方法;The power calculation method of each energy-carrying battery in the power-swapping station is a method of calculating the state of all energy-carrying batteries in the power-swapping station in the current subdivision period based on the state of all the energy-carrying batteries in the power-swapping station in the previous subdivision period and the charging rate of each charging station ;
所述换电请求分配方案包括所分配的换电请求分配换电时刻、所分配载能电池的充电工位和所述各预设细分时段中各充电工位的充电倍率。The battery swap request allocation scheme includes the allocated battery swap time, the allocated charging station of the energy-carrying battery, and the charging rate of each charging station in each preset subdivision period.
第三方面,本发明中一种有序换电控制装置的技术方案是:In the third aspect, the technical solution of an orderly battery replacement control device in the present invention is:
所述装置包括:The devices include:
处理器,用于执行各指令;a processor, configured to execute instructions;
存储设备,用于存储多条指令;所述指令适用于由处理器加载并执行上述技术方案所述的有序换电控制方法中的各步骤。The storage device is used to store a plurality of instructions; the instructions are suitable for being loaded by the processor and executing each step in the method for controlling battery replacement in order described in the above technical solution.
第四方面,本发明中一种换电站的技术方案是:In the fourth aspect, a technical solution of a power station replacement in the present invention is:
所述换电站包括动力电池更换系统,所述动力电池更换系统包括上述技术方案所述的有序换电控制装置。The switching station includes a power battery replacement system, and the power battery replacement system includes the orderly battery replacement control device described in the above technical solution.
与现有技术相比,上述技术方案至少具有以下有益效果:Compared with the prior art, the above technical solution has at least the following beneficial effects:
1、本发明提供的一种有序换电控制方法,依据所预设的各预设细分时段换电站中各载能电池的电量计算方法,基于预设的约束条件和预设的优化目标,采用启发式算法生成最优的换电请求分配方案,可以避免发生大规模电动汽车同时换电等无序充电行为。1. An orderly battery replacement control method provided by the present invention is based on the calculation method of the power of each energy-carrying battery in the battery replacement station in each preset subdivision period, based on preset constraints and preset optimization goals , using a heuristic algorithm to generate the optimal battery swap request allocation scheme, which can avoid disorderly charging behaviors such as simultaneous battery swaps of large-scale electric vehicles.
2、本发明提供的一种有序换电控制装置,其换电请求分配方案生成模块可以依据所预设的各预设细分时段换电站中各载能电池的电量计算方法,基于预设的约束条件和预设的优化目标,采用启发式算法生成最优的换电请求分配方案,从而实现对电动汽车进行有序换电。2. In the orderly battery swap control device provided by the present invention, its power swap request allocation plan generation module can calculate the power of each energy-carrying battery in the swap station according to the preset subdivision periods, based on the preset Based on the constraint conditions and preset optimization goals, the heuristic algorithm is used to generate the optimal battery replacement request allocation scheme, so as to realize the orderly battery replacement of electric vehicles.
3、本发明提供的另一种有序换电控制装置,其处理器可以执行上述有序换电控制方法的各步骤,有利于有序换电控制方法的实施和应用。3. In another sequential battery swap control device provided by the present invention, its processor can execute each step of the above sequential battery swap control method, which is beneficial to the implementation and application of the sequential battery swap control method.
4、本发明提供的一种换电站,该换电站包括上述技术方案所述的有序换电控制装置,可以对进入该换电站的电动汽车进行有序换电。4. A power exchange station provided by the present invention, which includes the orderly battery exchange control device described in the above technical solution, which can perform orderly battery exchange for electric vehicles entering the exchange station.
附图说明Description of drawings
图1是本发明实施例中有序换电控制方法的实施流程图;Fig. 1 is an implementation flow chart of an orderly battery replacement control method in an embodiment of the present invention;
图2是本发明实施例中有序换电控制装置的结构示意图;Fig. 2 is a schematic structural diagram of an orderly battery replacement control device in an embodiment of the present invention;
其中,11:换电请求获取模块;12:换电请求分配方案生成模块。Among them, 11: battery replacement request acquisition module; 12: battery replacement request allocation scheme generation module.
具体实施方式detailed description
下面参照附图来描述本发明的优选实施方式。本领域技术人员应当理解的是,这些实施方式仅仅用于解释本发明的技术原理,并非旨在限制本发明的保护范围。Preferred embodiments of the present invention are described below with reference to the accompanying drawings. Those skilled in the art should understand that these embodiments are only used to explain the technical principles of the present invention, and are not intended to limit the protection scope of the present invention.
换电站对大规模电动汽车进行无序换电,不仅会影响换电站规划过程中额定功率和占地面积等方面的设计裕度,及换电站的运营管理能力,还会对电网造成比较大的负荷冲击。因此,对电动汽车进行有序换电已成为电动汽车换电技术领域亟待解决的技术问题,考虑到电动汽车的换电需求,如电池更换时间和更换后电池的荷电状态等,存在一定的灵活性,可以为电动汽车的有序换电提供可调度空间。基于此,本发明提供了一种有序换电控制方法,可以在满足电动汽车换电需求的前提下,维持换电站稳定运行并降低电网负荷冲击。同时,为了便于区分描述,电动汽车车载动力电池本文中用“动力电池”进行表述,从电动汽车上更换下来进行独立充电的动力电池用“载能电池”进行表述。The disorderly swapping of large-scale electric vehicles by the swap station will not only affect the design margins of rated power and floor space in the planning process of the swap station, as well as the operation and management capabilities of the swap station, but will also cause relatively large damage to the power grid. load shock. Therefore, the orderly battery replacement of electric vehicles has become an urgent technical problem in the field of battery replacement technology for electric vehicles. Considering the battery replacement requirements of electric vehicles, such as battery replacement time and the state of charge of the battery after replacement, there are certain limitations. Flexibility can provide a schedulable space for the orderly replacement of electric vehicles. Based on this, the present invention provides an orderly battery swap control method, which can maintain the stable operation of the swap station and reduce the load impact of the power grid on the premise of meeting the battery swap requirements of electric vehicles. At the same time, in order to facilitate the distinction and description, the vehicle-mounted power battery of an electric vehicle is expressed as a "power battery" in this paper, and the power battery replaced from an electric vehicle for independent charging is expressed as an "energy-carrying battery".
下面结合附图,对本发明实施例中一种有序换电控制方法进行说明,具体为:An orderly battery replacement control method in the embodiment of the present invention will be described below in conjunction with the accompanying drawings, specifically:
图1示例性示出了本实施例中有序换电控制方法的实施流程,如图所示,本实施例中可以按照下述步骤对电动汽车进行有序换电:Figure 1 exemplarily shows the implementation process of the method for orderly battery replacement control in this embodiment. As shown in the figure, in this embodiment, orderly battery replacement of electric vehicles can be performed according to the following steps:
步骤S101:获取特定时间段内电动汽车的换电请求。Step S101: Obtain the battery replacement request of the electric vehicle within a specific time period.
本实施例中特定时间段可以为任意时间长度的时间段,例如特定时间段可以为中国标准时间的06~18时或00~24时。电动汽车的换电请求指的是在预设区域的特定时间段内电动汽车发起的换电请求,其可以包括设定的最晚换电时间和期望更换载能电池的电量下限。其中,预设区域可以为换电站可提供的最大服务区域,即处于该最大服务区域的电动汽车均可以向该最大服务区域对应的换电站发起电池更换请求,并在该换电站进行动力电池更换。In this embodiment, the specific time period may be a time period of any length, for example, the specific time period may be 06-18 o'clock or 00-24 o'clock in China Standard Time. The battery replacement request of an electric vehicle refers to a battery replacement request initiated by an electric vehicle within a specific time period in a preset area, which may include the set latest battery replacement time and the lower limit of the battery power expected to be replaced. Among them, the preset area can be the largest service area that the battery swapping station can provide, that is, electric vehicles in the largest service area can initiate a battery replacement request to the battery swapping station corresponding to the largest service area, and perform power battery replacement at the battery swapping station .
步骤S102:依据所预设的各预设细分时段换电站中各载能电池的电量计算方法,基于预设的约束条件和预设的优化目标,采用启发式算法生成最优的换电请求分配方案。Step S102: According to the power calculation method of each energy-carrying battery in the power-swapping station in each preset subdivision period, based on the preset constraint conditions and preset optimization goals, use a heuristic algorithm to generate the optimal power-swapping request distribution plan.
本实施例中各预设细分时段为按照设定时段时长对特定时间段进行划分的各时间段,例如,设定时段时长可以为1min,则在特定时间段为中国标准时间的00~24时的情况下,该特定时间段包括1440个时长为1min的细分时段。In this embodiment, each preset subdivision time period is each time period that is divided into specific time periods according to the length of the set time period. For example, the length of the set time period can be 1 minute, and then the specific time period is 00-24 of China Standard Time. In the case of hours, the specific time period includes 1440 subdivided periods with a duration of 1 minute.
本实施例中各载能电池的电量计算方法为依据前一细分时段换电站中所有载能电池状态以及各充电工位的充电倍率计算当前细分时段换电站所有载能电池状态的方法。其中,充电工位指的是向载能电池充电的区域,该区域内设置有充电设施,可以向载能电池充电。同时,换电站内可以包括一个或多个充电工位。The method for calculating the power of each energy-carrying battery in this embodiment is a method of calculating the state of all energy-carrying batteries in the substation in the current subdivision period based on the state of all the energy-carrying batteries in the substation in the previous subdivision period and the charging rate of each charging station. Wherein, the charging station refers to an area where the energy-carrying battery is charged, and charging facilities are arranged in the area to charge the energy-carrying battery. At the same time, one or more charging stations may be included in the battery swapping station.
具体地,当换电站在特定时间段的t时刻没有发生换电时,各载能电池的电量计算公式如下式(1)所示:Specifically, when the power exchange station does not change power at time t in a specific period of time, the calculation formula for the power of each energy-carrying battery is shown in the following formula (1):
公式(1)中各参数含义为:The meanings of the parameters in formula (1) are:
SOCb(t)为第t个细分时段第b个充电工位上载能电池的荷电状态;SOCb(t-1)为第t-1个细分时段第b个充电工位上载能电池的荷电状态;Rcb(t-1)为第t-1个细分时段第b个充电工位的充电倍率,1≤b≤No_bat,t≥1;Δt为充电倍率的变化时间间隔。SOC b (t) is the state of charge of the battery on the b -th charging station in the t-th subdivision period; The state of charge of the battery; Rc b (t-1) is the charging rate of the bth charging station in the t-1th subdivision period, 1≤b≤No_bat, t≥1; Δt is the change time interval of the charging rate .
当换电站在特定时间段的第t个细分时段发生换电时,各载能电池的电量计算公式如下式(2)所示:When the battery swap occurs in the t-th subdivision period of a specific time period, the calculation formula of the power of each energy-carrying battery is shown in the following formula (2):
公式(2)中各参数含义为:The meanings of the parameters in formula (2) are:
swapreq(n).SOCempty为特定时间段内第n个换电请求被满足后从电动汽车上替换下的载能电池的荷电状态,n≥1;J为第b个对角线元素为0,其余对角线元素为1的单位对角矩阵;J′为b个对角线第元素为1,其余对角线元素为0的单位对角矩阵。此时,第t个细分时段即为电动汽车的动力电池实际更换时间tswap,SOCb(t-1)即为更换到电动汽车上的载能电池的荷电状态实际值。swap req(n) .SOC empty is the state of charge of the energy-carrying battery replaced from the electric vehicle after the nth battery swap request is satisfied within a specific time period, n≥1; J is the bth diagonal element is 0, and the other diagonal elements are 1; J′ is a unit diagonal matrix whose b diagonal elements are 1, and the rest of the diagonal elements are 0. At this time, the tth subdivision period is the actual replacement time t swap of the power battery of the electric vehicle, and SOC b (t-1) is the actual value of the state of charge of the energy-carrying battery replaced on the electric vehicle.
本实施例中采用公式(1)和(2)所示的空间状态方程,可以描述在预设区域的特定时间段内发生的电动汽车换电行为,即可以描述换电站在特定时间段内发生的电池更换行为的动态过程。In this embodiment, the space state equations shown in formulas (1) and (2) can be used to describe the battery swapping behavior of electric vehicles that occurs within a specific time period in the preset area, that is, it can be described that the battery swapping station occurs within a specific time period The dynamic process of battery replacement behavior.
进一步地,本实施例中预设的约束条件可以包括最晚换电时间、期望更换载能电池的电量下限和充电倍率约束条件。Further, the preset constraint conditions in this embodiment may include the latest battery replacement time, the lower limit of the battery power expected to be replaced, and the constraint conditions of charging rate.
其中:in:
最晚换电时间指的是对电动汽车进行电池更换的最晚时间,其可以如下式(3)所示:The latest battery replacement time refers to the latest time for battery replacement of electric vehicles, which can be shown in the following formula (3):
tswap<treq_deadline (3)t swap < t req_deadline (3)
公式(3)中各参数含义为:The meanings of the parameters in formula (3) are:
tswap为电动汽车的动力电池实际更换时间,treq_deadline为换电请求所包含的最晚换电时间。t swap is the actual replacement time of the power battery of the electric vehicle, and t req_deadline is the latest battery replacement time included in the battery replacement request.
期望更换载能电池的电量下限指的是更换到电动汽车上的载能电池的电量最低值,其可以如下式(4)所示:The lower limit of the power expected to replace the energy-carrying battery refers to the minimum value of the power of the energy-carrying battery replaced on the electric vehicle, which can be shown in the following formula (4):
SOCfull>SOCreq (4)SOC full >SOC req (4)
公式(4)中各参数含义为:The meanings of the parameters in formula (4) are:
SOCfull为更换到电动汽车上的载能电池的荷电状态实际值,SOCreq为换电请求所包含的更换到电动汽车上的载能电池的期望更换载能电池的电量下限。SOC full is the actual value of the state of charge of the energy-carrying battery replaced on the electric vehicle, and SOC req is the lower limit of the expected energy of the energy-carrying battery replaced on the electric vehicle contained in the power-swapping request.
充电倍率约束条件指的是载能电池的充电倍率之和,及载能电池的电池容量的乘积不大于换电站的额定功率。同时,载能电池的充电倍率小于预设充电倍率阈值,且充电倍率的取值为有限个离散的数值。具体地,可以如下式(5)所示:The charging rate constraint condition means that the sum of the charging rate of the energy-carrying battery and the product of the battery capacity of the energy-carrying battery is not greater than the rated power of the power station. At the same time, the charge rate of the energy-carrying battery is less than the preset charge rate threshold, and the value of the charge rate is a limited number of discrete values. Specifically, it can be shown in the following formula (5):
公式(5)中各参数含义为:The meanings of the parameters in formula (5) are:
Rcb(t)为特定时间段的t时刻时第b个充电工位对应的电池充电倍率,1≤b≤No_bat,No_bat为充电工位的总数,t≥1;BC为载能电池的容量;Rpower为预设额定功率;Rcth为预设电池充电倍率阈值。Rc b (t) is the charging rate of the battery corresponding to the bth charging station at time t of a specific period of time, 1≤b≤No_bat, No_bat is the total number of charging stations, t≥1; B C is the energy-carrying battery Capacity; Rpower is the preset rated power; Rc th is the preset battery charge rate threshold.
进一步地,本实施例中预设的优化目标可以为单一优化目标Gs,也可以为组合优化目标Gc。其中,组合优化目标可以包括多个单一优化目标,如下式(6)所示:Further, the preset optimization goal in this embodiment may be a single optimization goal G s , or a combined optimization goal G c . Among them, the combined optimization objective can include multiple single optimization objectives, as shown in the following formula (6):
Gc=w1G1s+,...,wiGis,...,+wmGms (6)G c =w 1 G 1s +,...,w i G is ,...,+w m G ms (6)
公式(6)中各参数含义为:The meanings of the parameters in formula (6) are:
Gis为组合优化目标Gc的第i个单一优化目标,wi为单一优化目标Gis的权重。其中,任意两个单一优化目标的权重可以相同也可以不同。G is the i-th single optimization objective of the combined optimization objective G c , and wi is the weight of the single optimization objective G is . Wherein, the weights of any two single optimization objectives may be the same or different.
本实施例中单一优化目标可以为第一优化目标、第二优化目标或第三优化目标。相应地,组合优化目标可以为第一优化目标和第二优化目标的组合,也可以为第一优化目标和第三优化目标的组合,也可以为第二优化目标和第三优化目标的组合。In this embodiment, the single optimization objective may be the first optimization objective, the second optimization objective or the third optimization objective. Correspondingly, the combined optimization objective may be a combination of the first optimization objective and the second optimization objective, or a combination of the first optimization objective and the third optimization objective, or a combination of the second optimization objective and the third optimization objective.
其中:in:
第一优化目标为换电请求中包含的最晚换电时间,及该换电请求对应的换电请求分配换电时刻的时间差值最大,即用户的平均等待时间最短。具体地,本实施例中第一优化目标可以为多个换电请求中包含的各最晚换电时间,及各换电请求对应的换电请求分配换电时刻的时间的差值之和最大,其可以如下式(7)所示:The first optimization goal is that the time difference between the latest battery swap time contained in the battery swap request and the battery swap request corresponding to the battery swap request is the largest, that is, the average waiting time of users is the shortest. Specifically, in this embodiment, the first optimization objective may be that the sum of the time differences between the latest battery replacement time contained in multiple battery replacement requests and the power replacement request corresponding to each power replacement request is the largest. , which can be shown in the following formula (7):
公式(7)中各参数含义为:The meanings of the parameters in formula (7) are:
tswap_m和treq_deadline_m分别为第m个换电请求对应的换电请求分配换电时刻和所包含的最晚换电时间,Sum为换电请求的总数。t swap_m and t req_deadline_m are respectively the battery swap request corresponding to the mth battery swap request and the latest battery swap time included, and Sum is the total number of battery swap requests.
第二优化目标为换电请求分配方案中所分配载能电池的荷电状态裕度最大。具体地,本实施例中第二优化目标可以为针对多个换电请求的换电请求分配方案中所分配载能电池的荷电状态裕度之和最大,其可以如下式(8)所示:The second optimization objective is to maximize the SOC margin of the energy-carrying battery allocated in the power swap request allocation scheme. Specifically, the second optimization goal in this embodiment may be the maximum sum of the state-of-charge margins of the allocated energy-carrying batteries in the power-swap request allocation scheme for multiple power-swap requests, which may be shown in the following formula (8): :
公式(8)中各参数含义为:The meanings of the parameters in formula (8) are:
Msoc_c为第c个更换到电动汽车的载能电池的荷电状态裕度,1≤c≤R,R为更换到电动汽车的载能电池的总数。M soc_c is the state-of-charge margin of the c-th energy-carrying battery replaced to an electric vehicle, 1≤c≤R, and R is the total number of energy-carrying batteries replaced to an electric vehicle.
第三优化目标为换电站对电动汽车替换下的载能电池充电后,电网的负荷曲线方差最小。具体地,本实施例中第三优化目标可以为针对多个换电请求对应的电动汽车替换下的载能电池充电后,电网的负荷曲线方差最小。The third optimization objective is to minimize the variance of the load curve of the power grid after the power station charges the energy-carrying battery replaced by the electric vehicle. Specifically, the third optimization objective in this embodiment may be to minimize the variance of the load curve of the power grid after the energy-carrying batteries replaced by the electric vehicles corresponding to the multiple power replacement requests are charged.
本实施例中换电请求分配方案包括所分配的换电请求分配换电时刻、所分配载能电池的充电工位和各预设细分时段中各充电工位的充电倍率。其中,换电请求分配换电时刻为响应换电请求后,对电动汽车进行动力电池更换的实际更换时刻。所分配载能电池的充电工位指的是对电动汽车替换下来的电池进行充电的充电工位。The battery swap request allocation scheme in this embodiment includes the allocated battery swap time, the allocated charging station of the energy-carrying battery, and the charging rate of each charging station in each preset subdivision period. Wherein, the battery replacement request allocation battery replacement time is the actual power battery replacement time of the electric vehicle after responding to the battery replacement request. The charging station of the allocated energy-carrying battery refers to the charging station for charging the battery replaced by the electric vehicle.
本实施例中针对特定时间段内的N个换电请求,获取最优的换电请求分配方案的问题复杂度为MNo_bat×K×N,其中,K为特定时间段内细分时段的总数,No_bat为充电工位的总数。例如,设定特定时间段为中国标准时间00~24时共24个小时,各细分时段的时间长度为1分钟,则该特定时间段内细分时间段的总数K=60×24=1440。同时,设定充电工位的数量No_bat=5,每个载能电池充电倍率的离散度为3,则5个充电工位对应的载能电池充电倍率包括35=243个组合形式。综上所述,当换电请求的个数N=100时可以得到获取最优的换电请求分配方案的问题复杂度为243×1440×100=34992000。在上述复杂度巨大的情况下,将会大大降低获取最优的换电请求分配方案的效率和准确性,因此本实施例中采用启发式算法获取最优的换电请求分配方案,具体地,可以采用蒙特卡洛树搜索法、或粒子群算法、或遗传算法、或模拟退火算法。In this embodiment, for N battery replacement requests within a specific time period, the complexity of obtaining the optimal power replacement request allocation scheme is M No_bat × K × N, where K is the total number of subdivided periods within a specific time period , No_bat is the total number of charging stations. For example, if the specific time period is set as 24 hours in total from 00 to 24:00 China standard time, and the time length of each subdivided period is 1 minute, then the total number of subdivided time periods in this specific time period K=60×24=1440 . At the same time, set the number of charging stations No_bat=5, and the dispersion of the charge rate of each energy-carrying battery is 3, then the charge rate of the energy-carrying battery corresponding to the 5 charging stations includes 3 5 =243 combinations. To sum up, when the number of battery swap requests N=100, the problem complexity of obtaining the optimal battery swap request allocation scheme is 243×1440×100=34992000. In the case of the above-mentioned huge complexity, the efficiency and accuracy of obtaining the optimal battery swap request allocation scheme will be greatly reduced. Therefore, in this embodiment, a heuristic algorithm is used to obtain the optimal battery swap request allocation scheme. Specifically, A Monte Carlo tree search method, a particle swarm algorithm, a genetic algorithm, or a simulated annealing algorithm may be used.
下面以蒙特卡洛树搜索法为例,对本实施例中有序换电控制方法的实施过程进行说明。具体为:The following takes the Monte Carlo tree search method as an example to describe the implementation process of the method for controlling battery replacement in order in this embodiment. Specifically:
步骤S201:对蒙特卡洛树搜索法进行参数初始化,具体包括:特定时间段内0时刻没有电动汽车的换电请求,且换电站内所有充电工位对应的充电设施的输出功率为0。Step S201: Initialize the parameters of the Monte Carlo tree search method, specifically including: there is no battery replacement request from the electric vehicle at time 0 in a specific time period, and the output power of the charging facilities corresponding to all charging stations in the battery replacement station is 0.
步骤S202:获取到第一个换电请求后,启动蒙特卡洛树搜索法。同时,由于该换电请求为第一个换电请求,最优的换电请求分配方案中:所分配的换电请求分配换电时刻可以为该换电请求的获取时刻,即立刻对电动汽车进行电池更换;所分配载能电池的充电工位的充电倍率可以依据载能电池可接受的充电功率设定。Step S202: After obtaining the first battery replacement request, start the Monte Carlo tree search method. At the same time, since the battery swap request is the first battery swap request, in the optimal battery swap request allocation scheme: the assigned battery swap request allocation swap time can be the acquisition time of the battery swap request, that is, the electric vehicle Carry out battery replacement; the charging rate of the charging station of the assigned energy-carrying battery can be set according to the acceptable charging power of the energy-carrying battery.
步骤S203:在获取到第一个换电请求后的第一个时刻,判断是否接收到新的换电请求,若接收到则执行蒙特卡洛树搜索法,确定最优的换电请求分配方案,具体为:Step S203: At the first moment after the first battery swap request is obtained, determine whether a new battery swap request is received, and if so, perform Monte Carlo tree search to determine the optimal battery swap request allocation scheme ,Specifically:
1、选择步骤。1. Select steps.
从当前时刻换电站内载能电池状态开始,递归选择针对换电请求是否到来的前提下优化目标的优化策略,直至达到特定时间段的最后一个时刻。其中,最优策略为换电请求分配方案。Starting from the state of the energy-carrying battery in the power-swapping station at the current moment, recursively select the optimization strategy for the optimization target under the premise of whether the power-swapping request arrives, until the last moment of a specific time period is reached. Among them, the optimal strategy is the power swap request allocation scheme.
其中:in:
设定特定时间段内换电请求的到来是符合特定概率分布的。本实施例提供的一个优选实施方案中当特定时间段所包含的时间长度小于一定值的情况下,即在该特定时间段内最多只有一个换电请求发生,此时可以假设在特定时间段内的各时刻发生换电请求的概率都符合概率参数为p的(0,1)二项分布,即发生换电请求的概率为p,不发生换电请求的概率为1-p。It is set that the arrival of the battery replacement request within a specific time period conforms to a specific probability distribution. In a preferred implementation provided by this embodiment, when the length of time contained in a specific time period is less than a certain value, that is, at most one battery replacement request occurs within the specific time period, it can be assumed that within the specific time period The probability of a battery replacement request occurring at each moment of , conforms to the (0,1) binomial distribution with a probability parameter of p, that is, the probability of a battery replacement request occurring is p, and the probability of no battery replacement request occurring is 1-p.
不同时刻换电站内载能电池状态可以采用前述载能电池的电量计算方法确定。The state of the energy-carrying battery in the power-swapping station at different times can be determined by using the above-mentioned power calculation method of the energy-carrying battery.
2、扩展步骤。2. Expansion steps.
若选择步骤中选择的优化策略,没有使得优化目标的目标函数达到全局最优,或者该优化策略会使某些换电请求无法满足时,创造一个或多个子节点,即一个或多个充电功率调整方法,并选择一个子节点C。If the optimization strategy selected in the selection step does not make the objective function of the optimization goal reach the global optimum, or the optimization strategy will make some battery replacement requests unsatisfactory, create one or more sub-nodes, that is, one or more charging power Adjust the method, and select a child node C.
3、模拟步骤。3. Simulation steps.
从子节点C开始运行一个模拟的输出结果,若该输出结果满足预设的约束条件则将该输出结果对应的优化目标的函数值作为该输出结果的评价值,若该输出结果不满足预设的约束条件则将该输出结果的评价值设置为0。Run a simulation output result from child node C. If the output result meets the preset constraint conditions, the function value of the optimization target corresponding to the output result is used as the evaluation value of the output result. If the output result does not meet the preset The constraint condition of the output result is set to 0.
4、反向传播步骤。4. Backpropagation step.
用模拟步骤得到的输出结果的评价值更新蒙特考罗搜索树中子节点C的父节点及其所有的祖先节点的局部优化函数值。The evaluation value of the output result obtained by the simulation step is used to update the local optimization function value of the parent node of the child node C and all its ancestor nodes in the Monte Carlo search tree.
重复执行步骤1-4,得到当前时刻优化目标最终的优化策略,以及维持一个节点带优化函数值的搜索树。Repeat steps 1-4 to obtain the final optimization strategy of the optimization target at the current moment, and maintain a search tree with nodes with optimization function values.
步骤S204:采用步骤S203所示的方法继续确定特定时间段内其余各时刻优化目标最终的优化策略,即可以得到最优的换电请求分配方案。Step S204: Use the method shown in step S203 to continue to determine the final optimization strategy of the optimization target at other moments within the specific time period, that is, the optimal battery swap request allocation scheme can be obtained.
上述实施例中虽然将各个步骤按照上述先后次序的方式进行了描述,但是本领域技术人员可以理解,为了实现本实施例的效果,不同的步骤之间不必按照这样的次序执行,其可以同时(并行)执行或以颠倒的次序执行,这些简单的变化都在本发明的保护范围之内。In the above embodiment, although the various steps are described according to the above sequence, those skilled in the art can understand that in order to achieve the effect of this embodiment, different steps do not have to be executed in this order, and they can be performed at the same time ( Parallel) execution or execution in reversed order, these simple changes are all within the protection scope of the present invention.
基于与方法实施例相同的技术构思,本发明实施例还提供了一种有序换电控制装置。下面结合附图对该有序换电控制装置进行具体说明。Based on the same technical concept as the method embodiment, the embodiment of the present invention also provides an orderly battery swap control device. The following is a specific description of the orderly battery replacement control device in conjunction with the accompanying drawings.
图2示例性示出了本实施例中有序换电控制装置的结构,如图所示,本实施例中有序换电控制装置可以包括换电请求获取模块11和换电请求分配方案生成模块12。其中,换电请求获取模块11可以配置为获取特定时间段内电动汽车的换电请求。换电请求分配方案生成模块12可以配置为依据所预设的各预设细分时段换电站中各载能电池的电量计算方法,基于预设的约束条件和预设的优化目标,采用启发式算法生成最优的换电请求分配方案。Figure 2 exemplarily shows the structure of the orderly battery swap control device in this embodiment. As shown in the figure, the orderly battery swap control device in this embodiment may include a battery swap request acquisition module 11 and a power swap request allocation scheme generation Module 12. Wherein, the battery swap request acquiring module 11 may be configured to acquire the battery swap requests of electric vehicles within a specific time period. The power swap request allocation plan generating module 12 can be configured to use heuristic calculation methods based on preset constraint conditions and preset optimization goals based on the power calculation method of each energy-carrying battery in the swap station in each preset subdivision period. The algorithm generates the optimal battery replacement request allocation scheme.
本实施例中换电请求可以包括设定的最晚换电时间和期望更换载能电池的电量下限。各预设细分时段为按照设定时段时长对特定时间段进行划分的各时间段。换电站中各载能电池的电量计算方法为依据前一细分时段换电站中所有载能电池状态以及各充电工位的充电倍率计算当前细分时段换电站所有载能电池状态的方法。换电请求分配方案包括所分配的换电请求分配换电时刻、所分配载能电池的充电工位和各预设细分时段中各充电工位的充电倍率。In this embodiment, the battery replacement request may include a set latest battery replacement time and a lower limit of the battery power expected to be replaced. Each preset subdivided time period is each time period that divides a specific time period according to the duration of the set time period. The method of calculating the power of each energy-carrying battery in the swap station is to calculate the state of all the energy-carrying batteries in the swap station in the current subdivision period based on the state of all the energy-carrying batteries in the swap station in the previous subdivision period and the charging rate of each charging station. The battery swap request allocation scheme includes the allocated battery swap time, the allocated charging station of the energy-carrying battery, and the charging rate of each charging station in each preset subdivision period.
本领域技术人员可以理解,上述有序换电控制装置还包括一些其他公知结构,例如处理器、控制器、存储器等,其中,存储器包括但不限于随机存储器、闪存、只读存储器、可编程只读存储器、易失性存储器、非易失性存储器、串行存储器、并行存储器或寄存器等,处理器包括但不限于CPLD/FPGA、DSP、ARM处理器、MIPS处理器等,为了不必要地模糊本公开的实施例,这些公知的结构未在图2中示出。Those skilled in the art can understand that the above-mentioned sequential battery replacement control device also includes some other known structures, such as a processor, a controller, a memory, etc., wherein the memory includes but not limited to random access memory, flash memory, read-only memory, programmable only Read memory, volatile memory, non-volatile memory, serial memory, parallel memory or registers, etc. Processors include but not limited to CPLD/FPGA, DSP, ARM processors, MIPS processors, etc. In order to unnecessarily obscure Embodiments of the present disclosure, these known structures are not shown in FIG. 2 .
应该理解,图2中的各个模块的数量仅仅是示意性的。根据实际需要,各模块可以具有任意的数量。It should be understood that the number of modules in Fig. 2 is only illustrative. According to actual needs, each module can have any number.
基于与方法实施例相同的技术构思,本发明实施例还提供了一种有序换电控制装置,该装置可以包括处理器和存储设备。其中,处理器可以用于执行各指令。存储设备可以用于存储多条指令,该指令可以适用于由处理器加载并执行上述方法实施例中有序换电控制方法的各步骤。Based on the same technical concept as the method embodiment, the embodiment of the present invention also provides an orderly battery swap control device, which may include a processor and a storage device. Wherein, the processor can be used to execute various instructions. The storage device can be used to store a plurality of instructions, and the instructions can be adapted to be loaded by the processor and execute each step of the sequential battery swap control method in the above method embodiments.
上述存储设备和有序换电控制装置实施例可以用于执行上述有序换电控制方法实施例,其技术原理、所解决的技术问题及产生的技术效果相似,所属技术领域的技术人员可以清楚地了解到,为描述的方便和简洁,上述描述的有序换电控制过程的具体工作过程及有关说明,可以参考前述有序换电控制方法实施例中的对应过程,在此不再赘述。The above embodiment of the storage device and the orderly battery swap control device can be used to execute the above example of the orderly battery swap control method. The technical principles, technical problems solved, and technical effects are similar, and those skilled in the art can clearly understand It is understood that, for the convenience and conciseness of description, the specific working process and relevant descriptions of the above-described orderly battery swap control process can refer to the corresponding process in the aforementioned sequential battery swap control method embodiment, and will not be repeated here.
本领域技术人员可以理解,可以对实施例中的设备中的模块进行自适应性地改变并且把它们设置在与该实施例不同的一个或多个设备中。可以把实施例中的模块或单元或组件组合成一个模块或单元或组件,以及此外可以把它们分成多个子模块或子单元或子组件。除了这样的特征和/或过程或者单元中的至少一些是相互排斥之外,可以采用任何组合对本说明书(包括伴随的权利要求、摘要和附图)中公开的所有特征以及如此公开的任何方法或者设备的所有过程或单元进行组合。除非另外明确陈述,本说明书(包括伴随的权利要求、摘要和附图)中公开的每个特征可以由提供相同、等同或相似目的的替代特征来代替。Those skilled in the art can understand that the modules in the device in the embodiment can be adaptively changed and arranged in one or more devices different from the embodiment. Modules or units or components in the embodiments may be combined into one module or unit or component, and furthermore may be divided into a plurality of sub-modules or sub-units or sub-assemblies. All features disclosed in this specification (including accompanying claims, abstract and drawings) and any method or method so disclosed may be used in any combination, except that at least some of such features and/or processes or units are mutually exclusive. All processes or units of equipment are combined. Each feature disclosed in this specification (including accompanying claims, abstract and drawings) may be replaced by alternative features serving the same, equivalent or similar purpose, unless expressly stated otherwise.
基于上述有序换电控制装置,本发明实施例还提供了一种换电站。具体地,本实施例中换电站包括动力电池更换系统,该动力电池更换系统可以包括上述装置实施例所述的有序换电控制装置。本实施例中通过该有序换电控制装置可以实现换电站对电动汽车进行有序换电,降低电网损耗和负荷冲击。Based on the above-mentioned sequential battery swap control device, an embodiment of the present invention also provides a swap station. Specifically, the switching station in this embodiment includes a power battery replacement system, and the power battery replacement system may include the orderly battery replacement control device described in the above device embodiments. In this embodiment, the orderly battery exchange control device can realize orderly battery exchange for electric vehicles at the battery exchange station, reducing power grid loss and load impact.
此外,本领域的技术人员能够理解,尽管在此所述的一些实施例包括其它实施例中所包括的某些特征而不是其它特征,但是不同实施例的特征的组合意味着处于本发明的范围之内并且形成不同的实施例。例如,在本发明的权利要求书中,所要求保护的实施例的任意之一都可以以任意的组合方式来使用。Furthermore, those skilled in the art will understand that although some embodiments described herein include some features included in other embodiments but not others, combinations of features from different embodiments are meant to be within the scope of the invention. and form different embodiments. For example, in the claims of the present invention, any one of the claimed embodiments can be used in any combination.
本发明的各个部件实施例可以以硬件实现,或者以在一个或者多个处理器上运行的软件模块实现,或者以它们的组合实现。本领域的技术人员应当理解,可以在实践中使用微处理器或者数字信号处理器(DSP)来实现根据本发明实施例的服务器、客户端中的一些或者全部部件的一些或者全部功能。本发明还可以实现为用于执行这里所描述的方法的一部分或者全部的设备或者装置程序(例如,PC程序和PC程序产品)。这样的实现本发明的程序可以存储在PC可读介质上,或者可以具有一个或者多个信号的形式。这样的信号可以从因特网网站上下载得到,或者在载体信号上提供,或者以任何其他形式提供。The various component embodiments of the present invention may be implemented in hardware, or in software modules running on one or more processors, or in a combination thereof. Those skilled in the art should understand that a microprocessor or a digital signal processor (DSP) may be used in practice to implement some or all functions of some or all components of the server and the client according to the embodiments of the present invention. The present invention can also be implemented as an apparatus or apparatus program (eg, PC program and PC program product) for performing a part or all of the methods described herein. Such a program for realizing the present invention may be stored on a PC-readable medium, or may be in the form of one or more signals. Such a signal may be downloaded from an Internet site, or provided on a carrier signal, or provided in any other form.
应该注意的是上述实施例对本发明进行说明而不是对本发明进行限制,并且本领域技术人员在不脱离所附权利要求的范围的情况下可设计出替换实施例。在权利要求中,不应将位于括号之间的任何参考符号构造成对权利要求的限制。单词“包含”不排除存在未列在权利要求中的元件或步骤。位于元件之前的单词“一”或“一个”不排除存在多个这样的元件。本发明可以借助于包括有若干不同元件的硬件以及借助于适当编程的PC来实现。在列举了若干装置的单元权利要求中,这些装置中的若干个可以是通过同一个硬件项来具体体现。单词第一、第二、以及第三等的使用不表示任何顺序。可将这些单词解释为名称。It should be noted that the above-mentioned embodiments illustrate rather than limit the invention, and that those skilled in the art will be able to design alternative embodiments without departing from the scope of the appended claims. In the claims, any reference signs placed between parentheses shall not be construed as limiting the claim. The word "comprising" does not exclude the presence of elements or steps not listed in a claim. The word "a" or "an" preceding an element does not exclude the presence of a plurality of such elements. The invention can be implemented by means of hardware comprising several distinct elements, and by means of a suitably programmed PC. In a unit claim enumerating several means, several of these means can be embodied by one and the same item of hardware. The use of the words first, second, and third, etc. does not indicate any order. These words can be interpreted as names.
至此,已经结合附图所示的优选实施方式描述了本发明的技术方案,但是,本领域技术人员容易理解的是,本发明的保护范围显然不局限于这些具体实施方式。在不偏离本发明的原理的前提下,本领域技术人员可以对相关技术特征作出等同的更改或替换,这些更改或替换之后的技术方案都将落入本发明的保护范围之内。So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings, but those skilled in the art will easily understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principles of the present invention, those skilled in the art can make equivalent changes or substitutions to relevant technical features, and the technical solutions after these changes or substitutions will all fall within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710368050.9A CN107244312B (en) | 2017-05-23 | 2017-05-23 | Electrical changing station and orderly change controller for electric consumption, method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710368050.9A CN107244312B (en) | 2017-05-23 | 2017-05-23 | Electrical changing station and orderly change controller for electric consumption, method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107244312A true CN107244312A (en) | 2017-10-13 |
CN107244312B CN107244312B (en) | 2019-11-26 |
Family
ID=60017026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710368050.9A Active CN107244312B (en) | 2017-05-23 | 2017-05-23 | Electrical changing station and orderly change controller for electric consumption, method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107244312B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109130943A (en) * | 2018-07-24 | 2019-01-04 | 燕山大学 | Shared battery station control strategy |
CN109191026A (en) * | 2018-11-09 | 2019-01-11 | 浙江大学 | A kind of energy conversion device service life Explore of Unified Management Ideas based on simulated annealing |
WO2019184286A1 (en) * | 2018-03-29 | 2019-10-03 | 山东大学 | Online dynamic decision-making method and system for unit restoration |
CN112366739A (en) * | 2020-11-03 | 2021-02-12 | 国网河北省电力有限公司衡水供电分公司 | Configuration method, device and equipment of power distribution network and storage medium |
CN114971113A (en) * | 2021-02-26 | 2022-08-30 | 奥动新能源汽车科技有限公司 | Configuration method, system, equipment and medium for battery number of battery replacement station |
WO2023028873A1 (en) * | 2021-08-31 | 2023-03-09 | 宁德时代新能源科技股份有限公司 | Battery swapping method, apparatus and system, and device and medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102074978A (en) * | 2010-10-27 | 2011-05-25 | 国家电网公司 | Charging and replacing power station, charging and replacing control method and system and operation monitoring system |
US20130026971A1 (en) * | 2011-07-26 | 2013-01-31 | Gogoro, Inc. | Apparatus, method and article for collection, charging and distributing power storage devices, such as batteries |
CN102931696A (en) * | 2012-10-15 | 2013-02-13 | 广东电网公司电力科学研究院 | Charging scheduling method for electric automobile battery swapping station |
CN104377719A (en) * | 2014-12-04 | 2015-02-25 | 河海大学常州校区 | Electric automobile ordered charging delaminating and districting scheduling method based on double scales of time and space |
CN104953652A (en) * | 2015-06-11 | 2015-09-30 | 国网山东省电力公司电力科学研究院 | Control method for ordered charging of electromobile |
CN105140977A (en) * | 2014-05-29 | 2015-12-09 | 国家电网公司 | Electric automobile battery replacement method based on power network dispatching and battery replacement service Internet of things |
-
2017
- 2017-05-23 CN CN201710368050.9A patent/CN107244312B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102074978A (en) * | 2010-10-27 | 2011-05-25 | 国家电网公司 | Charging and replacing power station, charging and replacing control method and system and operation monitoring system |
US20130026971A1 (en) * | 2011-07-26 | 2013-01-31 | Gogoro, Inc. | Apparatus, method and article for collection, charging and distributing power storage devices, such as batteries |
CN102931696A (en) * | 2012-10-15 | 2013-02-13 | 广东电网公司电力科学研究院 | Charging scheduling method for electric automobile battery swapping station |
CN105140977A (en) * | 2014-05-29 | 2015-12-09 | 国家电网公司 | Electric automobile battery replacement method based on power network dispatching and battery replacement service Internet of things |
CN104377719A (en) * | 2014-12-04 | 2015-02-25 | 河海大学常州校区 | Electric automobile ordered charging delaminating and districting scheduling method based on double scales of time and space |
CN104953652A (en) * | 2015-06-11 | 2015-09-30 | 国网山东省电力公司电力科学研究院 | Control method for ordered charging of electromobile |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11159018B2 (en) | 2018-03-29 | 2021-10-26 | Shandong University | Method and system for online decision making of generator start-up |
WO2019184286A1 (en) * | 2018-03-29 | 2019-10-03 | 山东大学 | Online dynamic decision-making method and system for unit restoration |
CN109130943A (en) * | 2018-07-24 | 2019-01-04 | 燕山大学 | Shared battery station control strategy |
CN109130943B (en) * | 2018-07-24 | 2020-06-02 | 燕山大学 | Shared battery station control strategy |
CN109191026B (en) * | 2018-11-09 | 2022-03-25 | 浙江大学 | A unified life management method for energy conversion devices based on simulated annealing algorithm |
CN109191026A (en) * | 2018-11-09 | 2019-01-11 | 浙江大学 | A kind of energy conversion device service life Explore of Unified Management Ideas based on simulated annealing |
CN112366739A (en) * | 2020-11-03 | 2021-02-12 | 国网河北省电力有限公司衡水供电分公司 | Configuration method, device and equipment of power distribution network and storage medium |
CN112366739B (en) * | 2020-11-03 | 2022-08-19 | 国网河北省电力有限公司衡水供电分公司 | Configuration method, device and equipment of power distribution network and storage medium |
CN114971113A (en) * | 2021-02-26 | 2022-08-30 | 奥动新能源汽车科技有限公司 | Configuration method, system, equipment and medium for battery number of battery replacement station |
CN114971113B (en) * | 2021-02-26 | 2025-06-24 | 奥动新能源股份有限公司 | Method, system, device and medium for configuring the number of batteries in a battery swap station |
WO2023028873A1 (en) * | 2021-08-31 | 2023-03-09 | 宁德时代新能源科技股份有限公司 | Battery swapping method, apparatus and system, and device and medium |
KR20230035195A (en) * | 2021-08-31 | 2023-03-13 | 컨템포러리 엠퍼렉스 테크놀로지 씨오., 리미티드 | Battery replacement methods, devices, systems, devices and media |
KR102644595B1 (en) * | 2021-08-31 | 2024-03-08 | 컨템포러리 엠퍼렉스 테크놀로지 씨오., 리미티드 | Battery replacement methods, devices, systems, devices and media |
US12090885B2 (en) | 2021-08-31 | 2024-09-17 | Contemporary Amperex Technology Co., Limited | Battery swapping method, apparatus, system, device and medium |
Also Published As
Publication number | Publication date |
---|---|
CN107244312B (en) | 2019-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107244312B (en) | Electrical changing station and orderly change controller for electric consumption, method | |
Wu et al. | A charging-scheme decision model for electric vehicle battery swapping station using varied population evolutionary algorithms | |
Hu et al. | Periodic charging for wireless sensor networks with multiple portable chargers | |
CN106233571A (en) | Load dispatch in many battery apparatus | |
CN110929964B (en) | Energy-storage-containing power distribution network optimal scheduling method based on approximate dynamic programming algorithm | |
US20230148201A1 (en) | Method and system for supplying power to device, and related device | |
CN112966883B (en) | Comprehensive energy system operation optimization method and terminal equipment | |
CN109886509A (en) | A mobile multi-sink node path planning method, system and electronic device | |
CN105976108A (en) | Distributed energy storage planning method of power distribution network | |
CN105896580B (en) | A kind of micro-capacitance sensor multiobjective optimization control method and device | |
JP2020114178A (en) | Power control device, power control method, and power control program | |
CN116468159A (en) | Reactive power optimization method based on dual-delay depth deterministic strategy gradient | |
CN108551175A (en) | Power distribution network energy accumulation capacity configuration | |
Tomar et al. | An efficient scheme for on-demand energy replenishment in wireless rechargeable sensor networks | |
Subramaniam et al. | Optimal planning and allocation of Plug-in Hybrid Electric Vehicles charging stations using a novel hybrid optimization technique | |
KR20140038622A (en) | Charge and discharge amount distribution apparatus of energy storage system and the method thereof | |
CN110119889A (en) | A kind of evaluation of power distribution network joint mobility and partition method | |
CN117879070A (en) | Power distribution network reactive power optimization method considering transfer reinforcement learning electric automobile station | |
US20150220098A1 (en) | Information processing apparatus, power-consuming body, information processing method, and program | |
CN116316725A (en) | Energy storage array macroscopic consistency coordination control method, system and electronic equipment | |
CN115271454A (en) | Flexible resource aggregation feasible domain accurate modeling and approximation method, device and equipment | |
CN118554507A (en) | Electric vehicle charging and discharging control method, device, computer equipment and storage medium | |
CN116093995B (en) | A method and system for multi-objective network reconfiguration of power distribution system | |
Grünewald et al. | A decentralized charge management for electric vehicles using a genetic algorithm: Case study and proof-of-concept in Java and FPGA | |
CN112906964B (en) | A distributed energy storage combination method considering aggregation effects |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 201804 room 115, 569 Anchi Road, Anting Town, Jiading District, Shanghai Patentee after: NIO Co.,Ltd. Country or region after: China Address before: 201805 building 20, Lane 56, Antuo Road, Anting Town, Jiading District, Shanghai Patentee before: NIO Co.,Ltd. Country or region before: China |
|
CP03 | Change of name, title or address | ||
TR01 | Transfer of patent right |
Effective date of registration: 20241224 Address after: No. 218, 2nd Floor, Building 6, Phase I, Optoelectronic Supporting Industrial Park, No. 117 Zuoling Road, Zuoling Town, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430078 (Wuhan Free Trade Zone Area) Patentee after: Wuhan Weilai Energy Co.,Ltd. Country or region after: China Address before: 201804 room 115, 569 Anchi Road, Anting Town, Jiading District, Shanghai Patentee before: NIO Co.,Ltd. Country or region before: China |
|
TR01 | Transfer of patent right |