CN107237443A - Main joist and secondary joist attachment structure - Google Patents

Main joist and secondary joist attachment structure Download PDF

Info

Publication number
CN107237443A
CN107237443A CN201610184663.2A CN201610184663A CN107237443A CN 107237443 A CN107237443 A CN 107237443A CN 201610184663 A CN201610184663 A CN 201610184663A CN 107237443 A CN107237443 A CN 107237443A
Authority
CN
China
Prior art keywords
joist
main joist
attachment structure
main
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610184663.2A
Other languages
Chinese (zh)
Inventor
赵云平
李昂
魏月钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing New Building Material Group Co Ltd
Original Assignee
Beijing New Building Material Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing New Building Material Group Co Ltd filed Critical Beijing New Building Material Group Co Ltd
Priority to CN201610184663.2A priority Critical patent/CN107237443A/en
Publication of CN107237443A publication Critical patent/CN107237443A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • E04B9/122Connections between non-parallel members of the supporting construction one member passing through the other member, both members laying at least partly in the same plane

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The application is related to a kind of main joist and secondary joist attachment structure, including main joist and secondary joist, the main joist and the intersecting setting of the secondary joist, connected in the main joist and the secondary joist intersection location by connector, the connector and the main joist socket connection, the connector are connected with the secondary joist clamping.The connector is T-shaped cavity, and the top of the T-shaped cavity is inverted U, and bottom forms to be extended downwardly after the inside constriction in inverted U edge.The connector passes through slot and the main joist socket connection.The slot is located at the extension of the connector to middle part.Present application addresses the problem of main joist and secondary joist intersection location connection reliability, be particularly suitable for use in require higher ceiling system to damping (shaking).

Description

Main joist and secondary joist attachment structure
Technical field
The application is related to a kind of building decoration engineering technical field, more particularly in a kind of building decoration engineering Ceiling system in keel connecting structure.
Background technology
In ceiling construction, main joist and secondary joist delivery position generally require to carry out main joist and secondary joist Connection, existing main joist and secondary joist connected mode is the connection by being pre-set in secondary joist end Part, when secondary joist and main joist join, the connection of delivery position is realized by end coupling grafting, The problem of this connected mode is present is, in main joist and secondary joist delivery position, only in main joist and time dragon Bone contact surface is attached, and because connector is arranged on keel body, itself can be to link position at Section weakened, so when furred ceiling is dynamic by shake (shaking), this position is easily due to shake (shaking) Dynamic generation mineral wool board comes off or malformation.
The content of the invention
In view of above-mentioned engineering is actual, the application proposes a kind of main joist and secondary joist attachment structure, and it passes through Connector is arranged on keel sheet external, realizes and consolidate main joist and secondary joist delivery position are comprehensive It is fixed, solve existing connector and be located at the poor technical problem of the reliability connected on body.
For achieving the above object, the application provides following technical scheme:
A kind of main joist and secondary joist attachment structure, including main joist and secondary joist, the main joist and institute State the intersecting setting of secondary joist, it is characterised in that:Pass through in the main joist and the secondary joist intersection location Connector is connected, the connector and the main joist socket connection, the connector and the secondary joist Clamping is connected.
Further, the connector is bolted with the secondary joist.
Specifically, the connector is T-shaped cavity, and the top of the T-shaped cavity is inverted U, bottom Formed to be extended downwardly after the inside constriction in inverted U edge.
Specifically, keyhole is offered in advance on the cavity wall of the T-shaped cavity bottom.
Preferably, the keyhole is slotted hole.
Specifically, the connector passes through slot and the main joist socket connection.
Further, the slot is located at the extension of the connector to middle part.
Further, the keyhole is located at the slot both sides.
Specifically, the connector is that first assembly and the second component are fastened and formed.
Specifically, the first assembly has inverted L shape body, and the inverted L shape body top margin edge has curved Hook, side is to identical with top margin to being bent to form first boss.
Specifically, second component has a plate-like body, the plate-like body with the first boss Correspondence position is bent to form second boss.
Specifically, the spaced neck in edge of the first assembly top margin, the second component top sides Edge has card corresponding with the neck.
Further, the card is on the plate-like body eccentric setting.
Compared with prior art, its advantage is as follows for above-mentioned technical proposal:
The application is engaged by two sheet splits, is realized at main joist and secondary joist cross delivery position Enclosed fixed form, the fixation that it has link position relative to existing face contact type fixed form It is more firm, its shock proof performance is stronger, and whole keel framework is more stable.
Further, since its connector of the combined connection component of the application is arranged on outside keel body, to keel The section of end is without weakening, it is ensured that the intensity of keel end is identical with keel body, it is to avoid connection position It is set to as strength weak region.
Furthermore, two components in the application are integral piece, and the globality of itself is good.
Two components in the application are fastened and connected, and its connected mode is simple, easy construction.
Brief description of the drawings
Fig. 1 is main joist and secondary joist attachment structure schematic diagram;
Fig. 2 is connector stereogram;
Fig. 3 is first assembly stereogram;
Fig. 4 is the second component stereogram;
Reference:1- first assemblies, 101- top margins, 102- necks, 103- crotches, 104- sides, 105- First boss, the keyholes of 106- first, the slots of 107- first, the components of 2- second, at the top of 201- plate-like bodies, 202- cards, 203- second boss, the keyholes of 204- second, the slots of 205- second, 3- main joists, 4- first Secondary joist, the secondary joists of 5- second, 6- bolts.
Embodiment
To make the goal of the invention, technical scheme and beneficial effect of the present invention of greater clarity, with reference to Accompanying drawing is illustrated to embodiments of the invention, it is necessary to explanation is, in the case where not conflicting, this Shen Please in embodiment and embodiment in feature can mutually be combined.
Fig. 1 is referred to, Fig. 1 is main joist and secondary joist attachment structure schematic diagram;A kind of main joist and time Keel connecting structure, including (secondary joist is two under normal circumstances, such as Fig. 1 for main joist 3 and secondary joist Shown in, including the first secondary joist 4 and the second secondary joist 5, the first secondary joist 4 and the second secondary joist 5 It is linearly arranged in same plane), the main joist 3 and the secondary joist are intersecting to be set, in the master Keel and the secondary joist intersection location are connected by connector, and the connector is inserted with the main joist 3 Connect in succession, the connector is connected with the secondary joist clamping, in order to from side by the connector with dragon Bone skeleton is fixed, and forms three-dimensional connected mode, and connector passes through bolt 6 with the secondary joist simultaneously Connection.
The concrete structure of the connector, refers to Fig. 2, and it includes the component 2 of first assembly 1 and second, The component 2 of first assembly 1 and second is fastened and connected, and T-shaped cavity, the T-shaped chamber are formed after fastening The top of body is inverted U, and bottom forms to be extended downwardly after the inside constriction in inverted U edge, T-shaped Cavity up/down perforation.In order to main joist grafting, offer on the component 2 of first assembly 1 and second slotting The slot that main joist is walked is formed after groove, fastening.
Because under normal circumstances, main joist is inverted T shaped keel, the top width of inverted T shaped keel is more than abdomen Plate thickness, therefore, the width for being more than bottom with the width on the main joist neck top of main joist clamping.
The concrete structure of above-mentioned first assembly 1 is as shown in figure 3, first assembly 1 has inverted L shape body Integral piece, the neck 102 that its top margin 101 is recessed to its plate face, this neck 102 is discontinuous card Groove, its edge of top margin 101 have be bent to form downwards crotch 103 (this crotch be used for engage the second component 2 edge), its side 104 bends inwards the first boss 105 to be formed and be contacted with secondary joist flank,
The flank Access Division of the above section of first boss 105 formation secondary joist side, partly serves as secondary below The web Access Division of keel side, offers two keyholes first on side of the first boss below 105 106, the first neck of main joist side 107 is offered on the side between two the first keyholes 106, by It is usually inverted T shaped keel in main joist, the rib width at the top of it is thick compared with web, so main joist side the The width on the top of one neck 107 is more than the width of bottom.
The concrete structure of above-mentioned second component 2 is as shown in figure 4, the second component 2 has the one of plate-like body The card 202 of the 201 oriented anisopleual extensions of plate-like body at the top of body part, plate-like body, so card Piece 202 be set for the eccentric relative to plate-like body (i.e. card 202 width on plate-like body not Symmetrically), bend inwards to form second boss 203 in the middle part of plate-like body, the top of second boss 203 The flank Access Division of secondary joist opposite side is formed, secondary joist opposite side is formed at the bottom of second boss 203 Web Access Division, two the second keyholes 204 are offered in web Access Division, in two the second keyholes 204 Between side on offer the second neck of main joist opposite side 205, because main joist is usually inverted T shaped Keel, the rib width at the top of it is thick compared with web, so the second neck of main joist opposite side 205 is also top Width be more than bottom width.
Need 2 points of explanation:
(1) in the second component 2, the part of card 202 with the equidirectional of second boss 203 is narrower, It is used for the clamping of neck 201 with first assembly 1, the card 202 with the opposite direction of second boss 203 Wider, gripping when it is used to fasten with the component 2 of first assembly 1 and second in part.
(2) in first assembly 1 keyhole position, lug boss position and main joist slot position with second group Position on part 2 is corresponded.
Although disclosed embodiment is as above, its content is only to facilitate understand the present invention Technical scheme and the embodiment that uses, be not intended to limit the present invention.Technology belonging to any present invention Technical staff in field, can be with the premise of disclosed core technology scheme is not departed from Any modification and change, but the protection domain that the present invention is limited are made in the form and details of implementation, still The scope that must be limited by appended claims is defined.

Claims (13)

1. a kind of main joist and secondary joist attachment structure, including main joist and secondary joist, the main joist With the intersecting setting of the secondary joist, it is characterised in that:In the main joist and the secondary joist intersection location Connected by connector, the connector and the main joist socket connection, the connector with described time Keel clamping is connected.
2. main joist as claimed in claim 1 and secondary joist attachment structure, it is characterised in that:It is described Connector is bolted with the secondary joist.
3. main joist as claimed in claim 1 and secondary joist attachment structure, it is characterised in that:It is described Connector is T-shaped cavity, and the top of the T-shaped cavity is inverted U, and bottom is the inverted U side Extend downwardly and form after the inside constriction of edge.
4. main joist as claimed in claim 3 and secondary joist attachment structure, it is characterised in that:It is described Keyhole is offered on the cavity wall of T-shaped cavity bottom in advance.
5. main joist as claimed in claim 4 and secondary joist attachment structure, it is characterised in that:It is described Keyhole is slotted hole.
6. main joist as claimed in claim 4 and secondary joist attachment structure, it is characterised in that:It is described Connector passes through slot and the main joist socket connection.
7. main joist as claimed in claim 6 and secondary joist attachment structure, it is characterised in that:It is described Slot is located at the extension of the connector to middle part.
8. main joist as claimed in claim 6 and secondary joist attachment structure, it is characterised in that:It is described Keyhole is located at the slot both sides and the secondary joist web correspondence position.
9. main joist as claimed in claim 3 and secondary joist attachment structure, it is characterised in that:It is described Connector is that first assembly and the second component are fastened and formed.
10. main joist as claimed in claim 9 and secondary joist attachment structure, it is characterised in that:It is described First assembly has an inverted L shape body, and there is a crotch at the inverted L shape body top margin edge, side to top margin It is identical to being bent to form first boss.
11. main joist as claimed in claim 10 and secondary joist attachment structure, it is characterised in that:Institute Stating the second component has plate-like body, and the plate-like body is the first boss correspondence position bent Into second boss.
12. main joist as claimed in claim 11 and secondary joist attachment structure, it is characterised in that:Institute The spaced neck in edge of first assembly top margin is stated, the second component top edge has and the neck Corresponding card.
13. main joist as claimed in claim 12 and secondary joist attachment structure, it is characterised in that:Institute Card is stated on the plate-like body eccentric setting.
CN201610184663.2A 2016-03-28 2016-03-28 Main joist and secondary joist attachment structure Withdrawn CN107237443A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610184663.2A CN107237443A (en) 2016-03-28 2016-03-28 Main joist and secondary joist attachment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610184663.2A CN107237443A (en) 2016-03-28 2016-03-28 Main joist and secondary joist attachment structure

Publications (1)

Publication Number Publication Date
CN107237443A true CN107237443A (en) 2017-10-10

Family

ID=59982673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610184663.2A Withdrawn CN107237443A (en) 2016-03-28 2016-03-28 Main joist and secondary joist attachment structure

Country Status (1)

Country Link
CN (1) CN107237443A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316538A (en) * 2018-01-12 2018-07-24 中国地震局工程力学研究所 Ceiling system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316538A (en) * 2018-01-12 2018-07-24 中国地震局工程力学研究所 Ceiling system

Similar Documents

Publication Publication Date Title
CN102644343A (en) Fabricated building wall body node and connection method thereof
CN107237443A (en) Main joist and secondary joist attachment structure
CN205577202U (en) Building decorative curtain wall
CN101494324B (en) Earthing terminal
CA3049104C (en) Corrugated steel sheet having inclined portions with adjusted coupling hole positions
CN205637296U (en) Furred ceiling board shock -absorbing structure
WO2018033054A1 (en) Highly stable building formwork of convenient location
CN205577217U (en) Main joist and secondary joist connection structure
CN102444229A (en) Spatial three-way adjustable flexible curtain wall connecting member and construction method thereof
CN207003671U (en) Architectural engineering support beam and stand column pile attachment structure
CN103292093A (en) Pipeline connecting piece
CN202055369U (en) Connecting component for connecting between wall plates of composite plate
CN205637298U (en) Fossil fragments built -up connection spare
CN215977897U (en) Fire prevention sound insulation's assembled wallboard
CN210507832U (en) Horizontal opposed connector for light steel keel
CN211143583U (en) Novel external wall decoration insulation construction
CN204112531U (en) A kind of connector of insulating light wall slab
CN205637293U (en) Fossil fragments extension connecting piece
CN107237442A (en) A kind of keelson and skeleton keel connecting structure
CN205242707U (en) Integral mobile home's wall connection structure
CN207003787U (en) A kind of reinforced building concrete building block
CN208981682U (en) Integral bathroom wall plate component
CN205503643U (en) Plate object connection structure
CN207892177U (en) The mounting structure of aluminum honeycomb panel composite board
CN108547837A (en) A kind of intelligent locking connection member of hollow furniture plate body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20171010