CN107227963A - Shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device - Google Patents

Shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device Download PDF

Info

Publication number
CN107227963A
CN107227963A CN201710458304.6A CN201710458304A CN107227963A CN 107227963 A CN107227963 A CN 107227963A CN 201710458304 A CN201710458304 A CN 201710458304A CN 107227963 A CN107227963 A CN 107227963A
Authority
CN
China
Prior art keywords
pull bar
loading
worm
gear
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710458304.6A
Other languages
Chinese (zh)
Inventor
张稳军
焦亚磊
宋传辉
喻国伦
张高乐
宋晓龙
张云旆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201710458304.6A priority Critical patent/CN107227963A/en
Publication of CN107227963A publication Critical patent/CN107227963A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device, the rigidity for the shield tunnel adjacent tubes interannular strengthened for active, including pull bar 2 is reinforced, it is arranged on the fixing end 1 and loading end 3 for reinforcing the two ends of pull bar 2.The fixing end includes the standing screw 11 being connected with each other with circular shear connector and rotation end stand 12;Reinforcing pull bar 2 includes the part of leading screw 21, the part of smooth round bar 22 and reinforces pull bar rhombus first 23;Loading end includes standing screw 31, detachable rotary spanner 32, loading moment transformation case 33, torque transformation case fixing bolt 34 and the fixed part of end stand 35 5, and loading moment changes case 33 and tightened together by fixing bolt 34 with fixed end stand 35;Worm gear 335 is arranged inside loading moment transformation case 33, in loading moment transformation case 33, is provided with the cavity that diameter is more than the bore dia of leading screw 21.

Description

Shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device
Technical field
The invention belongs to Tunnel Engineering technical field, it is related to a kind of worm gear in the shield tunnel straightway pipe ring rigidity of structure Worm type stiffening device.
Background technology
Shield tunnel liner be usually it is assembled by prefabricated pipe section in shield tail, segment joint be divided into longitudinal seam and Ring seam, edge joint position is the weak link of liner structure stress.Shield tunnel adjacent tubes ring structure globality relies primarily on ring Between bolt maintain, because linear deformation occurs in a variety of causes in construction work, including trolley vibration load, ooze Leakage, different geology, different buried depth, different construction factors, constraint difference, Different Ground load and different surrounding enviroment changes etc. Various factors.The resisting longitudinal deformability in tunnel is very fragile, and the factor for causing tunnel deformation is typically to cause tunnel deformation to not The direction of profit is developed.After tunnel linear deformation or radius of curvature reach a certain amount value, pipe ring deformation can occupy shield tunnel Under structural construction boundary, serious conditions, it is possible to occur that section of jurisdiction circumferential weld joint open is excessive and leak or the destruction of section of jurisdiction longitudinal tensile, Influence the security and usability of shield tunnel.
Particularly in the construction time, because ground disturbance shield tunnel at initial stage differential settlement is more serious, tunnel adjacent tubes Interannular occur open deformation and dislocation deformation etc. engineering problem may be more obvious.Current shield tunnel adjacent tubes ring structure Steadiness relies primarily on interannular bolt to maintain, and lacks a kind of adjacent tubes ring structure rigidity active stiffening device, so urgently grinding A kind of adjacent tubes ring structure rigidity stiffening device is made, actively strengthens still being in the shield tunnel ring structure of construction time.
The content of the invention
It is an object of the invention to provide a kind of shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device, skill Art scheme is as follows:
A kind of shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device, the shield tunnel strengthened for active The rigidity of road adjacent tubes interannular, including pull bar 2 is reinforced, it is arranged on the fixing end 1 and loading end 3 for reinforcing the two ends of pull bar 2, its feature It is,
The fixing end includes the standing screw 11 being connected with each other with circular shear connector and rotation end stand 12, rotates end stand 12 It can be rotated freely around the axle of standing screw 11, rotation end stand 12 is provided with to the interspersed interstitial hole for reinforcing pull bar 2, in interstitial hole Place is provided with the tongue-and-groove 13 for preventing that reinforcing pull bar from rotating;
Reinforcing pull bar 2 includes the part of leading screw 21, the part of smooth round bar 22 and reinforces pull bar rhombus first 23, is drawn close to reinforcing The position of bar rhombus first 23 is provided with and prevented the anti-rotation tenon 24 that the tongue-and-groove 13 for reinforcing pull bar rotation matches;
Loading end, which includes standing screw 31, detachable rotary spanner 32, loading moment transformation case 33, torque transformation case, to be fixed Bolt 34 and the fixed part of end stand 35 5, fixed end stand 35 are connected in the form of shear connector with standing screw 31, it is possible to around The axis of standing screw 31 is rotated freely, and loading moment changes case 33 and tightened together by fixing bolt 34 with fixed end stand 35.
The detachable rotary spanner 32 is corner box spanner, and changing four angular poles on case with loading moment is engaged, Can freely it unload;
The loading moment transformation case 33 includes bending moment box bracket 331, active loading axis 332, pitch control shaft 333, driven snail Bar axle 334 and worm gear 335, wherein, active loading axis 332, pitch control shaft 333, driven worm screw 334 and turbine 335 pass through fixing axle Position part is fixed, the base of detachable rotary spanner 32 is connected with the top of active loading axis 332 by corner sleeve; Gear wheel and little gear are fixed with pitch control shaft 333, is mutually stung by gear wheel and the gear that is fixed in active loading axis 332 Close, be mutually twisted by little gear and the gear that is fixed on driven worm shaft 334;Snail is provided with driven worm shaft 334 Bar, and be mutually twisted by worm screw with turbine 335, worm gear 335 is provided with the internal thread matched with leading screw 21, and passes through leading screw 21 cause worm gear 335 to be stuck in by shearing in loading moment transformation case, and worm gear 335 is rotated, and leading screw 21 is tightened up, in the pulling force of pull bar In the presence of, adjacent tubes interannular is mutually adjacent to, so as to strengthen interannular rigidity;
Worm gear 335 is arranged inside loading moment transformation case 33, in loading moment transformation case 33, is provided with diameter and is more than The cavity of the bore dia of leading screw 21, worm gear is stuck in loading moment transformation case by shearing.
The present invention actively improves the rigidity between straightway pipe ring in the construction time, strengthens the globality of liner structure, and in lining Build surrounding slip casting intensity and reach that code requirement and soil layer disturbance are detachable after relatively stable;When engineering enters the operation phase, bad When the natural calamity such as geology location or earthquake occurs, the internal force between straightway pipe ring is actively improved, strengthens the entirety of liner structure Property, treat that liner structure is detachable after the completion of reinforcing.With advantages below:
Rigidity is reinforced between the present apparatus can actively increase shield tunnel straightway pipe ring, is effectively reduced due to severe geological conditions The changing of the relative positions between caused pipe ring, the globality for shield tunnel in severe type communities construction reinforced pipe ring structure provides method Measure;2. in the present apparatus, loading device is by mechanical devices such as worm gear in spacing boxes and worm screws, and number of parts is few, compact conformation, Sufficiently large loading tensile can be relatively easily reached, is shield tunnel construction process and later stage using adding safe guarantor Barrier;3. the angle of spiral of present apparatus spacing boxes worm screw, which is less than in the equivalent friction angle in ratcheting face, loading procedure, has self-locking performance, It can prevent from reinforcing draw-bar pull resilience;4. in terms of construction, install convenient is simple to operate, convenient disassembly.
Brief description of the drawings
Brief description of the drawings
Fig. 1 is the overall schematic of the present invention;
Fig. 2 (a) and (b) are fixing end front view and shear connector position enlarged drawing respectively;
Fig. 3 is to reinforce pull bar figure;
Fig. 4 is loading end front view;
Fig. 5 is loading end-view;
Fig. 6 is loading moment transformation case front view;
Fig. 7 is spacing boxes internal structural map.
Brief description of the drawings is as follows:
1- fixing ends
11- standing screws, 12- rotations end stand, 13- prevent from reinforcing the anti-rotation tongue-and-groove of pull bar rotation
2- reinforces pull bar
The smooth round bar of 21- leading screws, 22-, 23- reinforce pull bar rhombus head, 24- anti-rotation tenons
3- loading ends
The detachable rotary spanner of 31- standing screws, 32-, 33- loading moments transformation case, 34- torques transformation case fix spiral shell Bolt, 35- fix end stand, 331- bending moments box bracket, 332- actives loading axis, 333- pitch control shafts, the driven worm shafts of 334-, 335- snails Wheel
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
It is shown as shown in figs. 1-7, shield tunnel ring structure rigidity active stiffening device of the present invention, including reinforcing pull bar 2, Be arranged on the fixing end 1 and loading end 3 for reinforcing pull bar 2 two ends, the present invention can (1) actively improved in the construction time between straightway pipe ring Rigidity, strengthen liner structure globality, and around lining cutting slip casting intensity reach code requirement and soil layer disturbance it is more steady It is detachable after fixed;(2) when engineering enters the operation phase, when the natural calamity such as Unfavorable Conditions or earthquake occurs, actively improve Internal force between straightway pipe ring, strengthens the globality of liner structure, treats that liner structure is detachable after the completion of reinforcing.
The fixing end includes the standing screw 11 being connected with each other with circular shear connector and rotation end stand 12, in order to more preferable Pull bar 2 will be reinforced while inserting the fixing end at two ends, rotation end stand 12 can be rotated freely around the axle of standing screw 11.
The lower end of the rotation end stand 12 is deep into the top of standing screw 11, and rotation end stand 12 is provided with to wear The interstitial hole for reinforcing pull bar 2 is inserted, and provided with the tongue-and-groove 13 for preventing that reinforcing pull bar from rotating;
Reinforcing pull bar includes the part of leading screw 21, the part of smooth round bar 22 and reinforces pull bar rhombus first 23, is drawn close to reinforcing The position of bar rhombus first 23 is provided with and prevented the anti-rotation tenon 24 that the tongue-and-groove for reinforcing pull bar rotation matches;
Loading end includes standing screw 31, detachable rotary spanner 32, loading moment transformation case 33, fixing bolt 34 and consolidated The part of fixed end platform 35 5 is constituted, and standing screw 31 is fixed at tunnel segment hanging hole, and fixed end stand 35 is in the form of shear connector and solid Determine screw rod 31 to be connected, in order to preferably coordinate reinforcing pull bar 2, fixed end stand can be rotated freely around the axis of standing screw 31, Loading moment transformation case 33 tightens together by fixing bolt 34 with fixed end stand 35.
The detachable rotary spanner 32 is corner box spanner, and changing four angular poles on case with loading moment is engaged, Can freely it unload;
The loading moment transformation case 33 includes bending moment box bracket 331, active loading axis 332, pitch control shaft 333, driven snail Bar axle 334 and worm gear 335, wherein, active loading axis 332, pitch control shaft 333, driven worm screw 334 and turbine 335 pass through fixing axle Position part is fixed, the base of detachable rotary spanner 32 is connected with the top of active loading axis 332 by corner sleeve; Gear wheel and little gear are fixed with pitch control shaft 333, is mutually stung by gear wheel and the gear that is fixed in active loading axis 332 Close, be mutually twisted by little gear and the gear that is fixed on driven worm shaft 334;Snail is provided with driven worm shaft 334 Bar, and be mutually twisted by worm screw with turbine 335, worm gear 335 is provided with the internal thread matched with leading screw 21, and worm gear 335 revolves Turn, leading screw 21 is tightened up, so as to generate the pulling force of our needs;
Worm gear 335 is arranged inside loading moment transformation case 33, because worm gear diameter is more than in loading moment transformation case 33 The diameter in the interspersed hole of leading screw 21, so worm gear is stuck in loading moment transformation case by shearing.
It is specifically described below
(1) fixing end includes standing screw 11, rotation end stand 12.
The standing screw length 300mm;
The length that the rotation end stand is deep into standing screw part is 50mm, and the interspersed pull bar portion size of reinforcing in top is 80mm × 80mm × 80mm, a diameter of 60mm of interstitial hole, and provided with the tongue-and-groove for preventing that reinforcing pull bar from rotating.
(2) pull bar length is reinforced for 1660mm, a diameter of 55mm, including the part of leading screw 21, its length is 200mm;It is smooth The part of round bar 22, it is 60mm that length, which is 1400mm and reinforces first 23 length of pull bar rhombus, and circumscribed circle diameter is 80mm.
(3) loading end includes standing screw 31, detachable rotary spanner 32, loading moment transformation case 33, torque transformation case Fixing bolt 34, the fixed part of end stand 35 5 composition.
The length 310mm of standing screw 31;
The detachable rotary spanner 32 is corner box spanner;
The loading moment changes case 33 by bending moment box bracket 331, active loading axis 332, pitch control shaft 333, driven worm screw Axle 334, worm gear 335;
The size of bending moment box bracket 331 is 50mm × 100mm × 80mm, passes through the mechanical device such as gear and worm screw turbine Transmission, wherein, active loading axis 332, pitch control shaft 333, driven worm screw 334 and turbine 335 are by the position of fixing axle to portion Part is fixed, and the base of detachable rotary spanner 32 is connected with the top of active loading axis 332 by corner sleeve;In pitch control shaft 333 Gear wheel is mutually twisted with the middle gear of active loading axis 332, and little gear is mutually twisted with the driven middle gear of worm shaft 334;It is driven Worm screw is mutually twisted with turbine 335 in worm shaft 334.In loading procedure, first by two groups of teeth wheel active loading axis 332 and bending moment 333 pairs of rotating torques manually applied of axle are amplified, and multiplication factor can reach 4 times, after driven 334 pairs of amplifications of worm screw Torque carry out transmission and amplify again, by turbine 335 act on reinforcing pull bar on, multiplication factor reaches 64 times, whole bending moment Case is 256 times to torque amplification factors, and the torque of artificial very little is changed into very big mechanical force moment.
The 332 active loading axis, axial length 35mm, a diameter of 10mm, biretta position boss height is 10mm, and gear is pressed Length compares 2:3 position is fixed at cylinder axis, gear parameter:The number of teeth is that 12, pressure angle is that 20, helical angle is that 0, modulus is 1mm, the facewidth are that 10mm, addendum coefficient are that 1, tip clearance coefficient is that 0.25, root fillet is 0.38.
The pitch control shaft 333, is made up of axle, gear wheel and little gear.Axial length is 12mm, a diameter of 6mm;Gear wheel is joined Number:The number of teeth is that 24, pressure angle is that 20, helical angle is that 0, modulus is that 1mm, the facewidth are that 10mm, addendum coefficient are 1, tip clearance coefficient It is 0.38 for 0.25, root fillet;Little gear parameter:The number of teeth is that 12, pressure angle is that 20, helical angle is that 0, modulus is 1mm, the facewidth It is that 1, tip clearance coefficient is that 0.25, root fillet is 0.38 for 10mm, addendum coefficient.
The driven worm shaft 334, by axle, gear, worm screw composition.Gear parameter:The number of teeth is that 24, pressure angle is 20, spiral shell Swing angle is that 0, modulus is that 1mm, the facewidth are that 10mm, addendum coefficient are that 1, tip clearance coefficient is that 0.25, root fillet is 0.38;Worm screw Parameter:Number of threads is that 1, worm face width is that 46.75, modulus is that 2.5, reference diameter of worm is that 22.4, pressure angle is 20, led Journey angle is that 6.37, dextrorotation is that 2, gearratio is that 62, centre-to-centre spacing is 88.7.
The worm gear 335, worm gear parameter:Addendum coefficient is that 1, tip clearance coefficient is that 0.25, root fillet is the 0.38, facewidth It is that 117.8, section registration is 1.88 for 19.18, width angle.
The torque changes case fixing bolt 34, a diameter of 14mm of nut circumcircle, and thickness is 5mm, and screw diameter is 8mm。
The outer profile size of fixed end stand 35 is 80mm × 100mm × 80mm.
The fixing end that the present apparatus contains includes standing screw, rotation end stand, and standing screw main function is to consolidate the present apparatus It is scheduled on section of jurisdiction, rotation end stand not only can be such that the present apparatus more installs around described 360 degree of rotations of standing screw central shaft It is convenient, and the angle deviating error between section of jurisdiction can be tackled.
There is provided anti-rotation tongue-and-groove, reinforcing pull bar includes screw part and smooth round bar at the rotation end stand 12 that the present apparatus contains Part, screw part is provided with anti-rotation tenon, and pull bar rotation is reinforced so as to realize and prevent from adding in uninstall process.
The present apparatus contains loading moment transformation case 33, and internal force pipe ring accurately can be loaded by spanner.By this Device is loaded, and loading procedure is simple, and detachable rotary spanner 32 is rotated one week, active force 0.54MPa can be improved, so that real It is now accurate to strengthen the straightway pipe ring rigidity of structure.
Using the shield tunnel ring structure rigidity of the present embodiment worm gear type stiffening device when, first, treat shield tail After the completion of pipe sheet assembling, blocked at standing screw hexagonal (hexagon)nut 11, and screwed in the hole for hoist of shield duct piece with spanner.Together The operation of sample, standing screw 31 is screwed in adjacent tunnel segment hanging hole.Fixed end stand is respectively mounted at the top of two standing screws 35 and rotation end stand 12, then loading moment spacing boxes 33 are installed to after torque transformation case fixing bolt 34, will reinforce pull bar from Rotate and inserted at end stand 12, the fixed end stand 35 of screw part insertion installs detachable rotary spanner 32, you can use detachable rotation Turn spanner 32 to strengthen the rigidity of structure pipe ring by the present apparatus.After the completion of loading, detachable rotary spanner 32 can be entered Row is removed, the loading for other pipe ring location means.
After the disturbance of shield soil layer is stable, the present apparatus can be removed.First, using detachable 32 pairs of loadings of rotary spanner Torque spacing boxes 33 are unloaded, and first remove loading moment spacing boxes 33;Second step, which is removed, reinforces pull bar, can will reinforce pull bar Detached at rotation end stand 12;Finally, after fixed end stand 35 and rotation end stand 12 being removed, two standing screws are screwed out.

Claims (1)

1. a kind of shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device, the shield tunnel strengthened for active The rigidity of adjacent tubes interannular, including pull bar (2) is reinforced, the fixing end (1) and loading end (3) for reinforcing pull bar (2) two ends are arranged on, Characterized in that,
The fixing end includes the standing screw (11) being connected with each other with circular shear connector and rotation end stand (12), rotates end stand (12) it can be rotated freely around standing screw (11) axle, rotation end stand (12) is provided with to the interspersed centre for reinforcing pull bar (2) Hole, provided with the tongue-and-groove (13) for preventing that reinforcing pull bar from rotating at interstitial hole;
Reinforce pull bar (2) include leading screw (21) part, smooth round bar (22) partly with reinforce pull bar rhombus head (23), close to plus Gu the position of pull bar rhombus head (23) is provided with and prevented the anti-rotation tenon (24) that the tongue-and-groove (13) for reinforcing pull bar rotation matches;
Loading end includes standing screw (31), detachable rotary spanner (32), loading moment transformation case (33), torque transformation case and consolidated Determine bolt (34) and the fixed part of end stand (35) five, fixed end stand (35) is connected in the form of shear connector with standing screw (31) Connect, it is possible to which around standing screw (31), axis is rotated freely, loading moment transformation case (33) is by fixing bolt (34) with fixing End stand (35) tightens together;
The detachable rotary spanner (32) is corner box spanner, and changing four angular poles on case with loading moment is engaged, energy It is enough freely to unload;
Loading moment transformation case (33) include bending moment box bracket (331), active loading axis (332), pitch control shaft (333), from Dynamic worm shaft (334) and worm gear (335), wherein, active loading axis (332), pitch control shaft (333), driven worm screw (334) and turbine (335) part is fixed by the position of fixing axle, base and active loading axis (332) top of detachable rotary spanner (32) It is connected by corner sleeve;Gear wheel and little gear are fixed with pitch control shaft (333), is actively added with being fixed on by gear wheel The gear carried on axle (332) is mutually twisted, and is mutually twisted by little gear and the gear that is fixed on driven worm shaft (334); Worm screw is provided with driven worm shaft (334), and is mutually twisted by worm screw with turbine (335), worm gear (335) be provided with The internal thread that leading screw (21) matches, and worm gear (335) is stuck in loading moment by shearing and is changed in case by leading screw (21), Worm gear (335) is rotated, and leading screw (21) is tightened up, in the presence of the pulling force of pull bar, and adjacent tubes interannular is mutually adjacent to, so as to strengthen Interannular rigidity;
Worm gear (335) is arranged at loading moment transformation case (33) inside, in loading moment transformation case (33), is provided with diameter big In the cavity of leading screw (21) bore dia, worm gear is stuck in loading moment transformation case by shearing.
CN201710458304.6A 2017-06-16 2017-06-16 Shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device Pending CN107227963A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710458304.6A CN107227963A (en) 2017-06-16 2017-06-16 Shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710458304.6A CN107227963A (en) 2017-06-16 2017-06-16 Shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device

Publications (1)

Publication Number Publication Date
CN107227963A true CN107227963A (en) 2017-10-03

Family

ID=59935482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710458304.6A Pending CN107227963A (en) 2017-06-16 2017-06-16 Shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device

Country Status (1)

Country Link
CN (1) CN107227963A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112983473A (en) * 2021-03-19 2021-06-18 上海市城市建设设计研究总院(集团)有限公司 Shield segment bidirectional staggered joint splicing structure with mortise and tenon joints and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001207796A (en) * 2000-01-21 2001-08-03 Ps Corp Segment for tunnel lining and its assembly method
CN106286406A (en) * 2016-10-25 2017-01-04 珠海格力电器股份有限公司 Rotating machinery structure and vane diffuser thereof
CN205989323U (en) * 2016-08-27 2017-03-01 浙江水利水电学院 A kind of mobile device of the manually adjustable height for automobile inspection
CN206071597U (en) * 2016-10-09 2017-04-05 中铁十八局集团有限公司 A kind of TBM receives section of jurisdiction take-up device
CN206111190U (en) * 2016-10-30 2017-04-19 成都建工路桥建设有限公司 Rectangular shield digs tube coupling connected system in top
CN106761821A (en) * 2017-02-16 2017-05-31 同济大学 Pin-connected panel tunnel enhancing structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001207796A (en) * 2000-01-21 2001-08-03 Ps Corp Segment for tunnel lining and its assembly method
CN205989323U (en) * 2016-08-27 2017-03-01 浙江水利水电学院 A kind of mobile device of the manually adjustable height for automobile inspection
CN206071597U (en) * 2016-10-09 2017-04-05 中铁十八局集团有限公司 A kind of TBM receives section of jurisdiction take-up device
CN106286406A (en) * 2016-10-25 2017-01-04 珠海格力电器股份有限公司 Rotating machinery structure and vane diffuser thereof
CN206111190U (en) * 2016-10-30 2017-04-19 成都建工路桥建设有限公司 Rectangular shield digs tube coupling connected system in top
CN106761821A (en) * 2017-02-16 2017-05-31 同济大学 Pin-connected panel tunnel enhancing structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112983473A (en) * 2021-03-19 2021-06-18 上海市城市建设设计研究总院(集团)有限公司 Shield segment bidirectional staggered joint splicing structure with mortise and tenon joints and construction method thereof
CN112983473B (en) * 2021-03-19 2022-07-08 上海市城市建设设计研究总院(集团)有限公司 Shield segment bidirectional staggered joint splicing structure with mortise and tenon joints and construction method thereof

Similar Documents

Publication Publication Date Title
CN104024694B (en) The origin position method for initializing rotational of link actuation device and link actuation device
JPS605913A (en) Concrete foundation and stake driving machine therefor
US3355192A (en) Threaded connections
US7950876B2 (en) Socket wrench attachment for rotary drive member
KR102137563B1 (en) cut slop retaining wall construction structure and the method of constructing cut slop retaining wall
CN106460553A (en) Modular assembly for a turbine engine
CN107227963A (en) Shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device
US20130164081A1 (en) Connection mechanism
ES2918591T3 (en) Procedure and tool for removing a pitch bearing from a wind turbine hub
CN107143350A (en) Shield tunnel straightway liner structure rigidity gear driven type stiffening device
US9163671B2 (en) Connecting device
CN110374505A (en) A kind of drilling machine and bored pile construction method
CN207660616U (en) Shield tunnel straightway pipe ring rigidity of structure Worm-gear type stiffening device
CN108306603A (en) Solar tracking photovoltaic system and method
CN105971199A (en) Adjustable steel bar straight thread connecting sleeve and steel bar straight thread connecting method
CN205135403U (en) Auger machine with self -discharging soil function
CN107201907A (en) Shield tunnel straightway pipe ring rigidity of structure Worm-gear type strengthens method
CN107165654A (en) Shield tunnel straightway liner structure rigidity gear driven type strengthens method
US20110206468A1 (en) Reinforcement and/or anchor bolt
CN202882965U (en) Non-resin multi-anchor rock bolt capable of stopping rotation reversely
CN110617075B (en) Shield tunneling cutter head adjacent to sensitive building with ultra-small distance
CN107187893A (en) The delivery device of bulk tank
CN206841698U (en) Tail vane steering angle feedback mechanism peculiar to vessel
CN207554063U (en) Shield tunnel straightway liner structure rigidity gear driven type stiffening device
JP6580947B2 (en) Ground improvement method and ground improvement device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University

Applicant after: Tianjin University

Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92

Applicant before: Tianjin University

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20171003

RJ01 Rejection of invention patent application after publication