CN107223531A - 一种大树移植工艺 - Google Patents
一种大树移植工艺 Download PDFInfo
- Publication number
- CN107223531A CN107223531A CN201710398477.3A CN201710398477A CN107223531A CN 107223531 A CN107223531 A CN 107223531A CN 201710398477 A CN201710398477 A CN 201710398477A CN 107223531 A CN107223531 A CN 107223531A
- Authority
- CN
- China
- Prior art keywords
- tree
- soil
- soil ball
- root
- big
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G23/00—Forestry
- A01G23/02—Transplanting, uprooting, felling or delimbing trees
- A01G23/04—Transplanting trees; Devices for grasping the root ball, e.g. stump forceps; Wrappings or packages for transporting trees
Abstract
本发明公开了一种大树移植工艺,包括以下步骤:1)苗木考察,2)树种选择,3)确定移植时间,4)土沟测算、开挖,5)根部处理,6)捆扎土球,7)起吊大树,8)装车运输,9)现场验苗,10)场地清理,11)种植定位放线,12)树穴开挖,13)施基肥、安装透气管,14)疏枝、除叶,15)移栽定植,16)养护管理。从而提高大树移植的成活率。
Description
技术领域
本发明涉及景观工艺,具体涉及一种大树移植工艺。
背景技术
大树移栽是一项难度较大的绿化工程技术,移栽时大树移植的技术措施不当,栽后养护管理不合理,都会影响大树移植的成活率。
发明内容
本发明的目的在于提供一种大树移植工艺, 为了解决景观石材饰面泛碱的问题。
为了达到上述目的,本发明的技术方案是:一种大树移植工艺,其特征在于,包括以下步骤:
1)苗木考察,了解苗木的生长习性、适植时间、产地、存圃数量及价格成本;
2)树种选择,采用形态优良、无病虫害, 生长健壮的乡土品种和适宜移栽地气候的品种;
3)确定移植时间,在春季萌动前和秋季落叶后的树木休眠期进行移植;
4)土沟测算、开挖,大树起挖时以树干为中心,计算出的土球直径;顺着所画圆向外开沟挖土,沟宽60-80cm,土球高度一般为土球直径的60-80%,对于细根可用利铲或铲刀直接铲断粗,大根必须用手锯锯断,切忌用其他工具硬性弄断撕裂;土球基本成形后将土球修整光滑,土球修整到1/2 时逐渐向里收底,收到1/3 时,在底部修一平底,整个土球呈倒圆台形;
5)根部处理,用植物根系生根液喷施根部,诱导大树快速生根,用植物根系消毒、杀菌液喷施土球,消毒防根腐,喷整个土球,重喷根切面及须根细根系;
6)捆扎土球,树基部扎草绳钉护板以保护树干,扎8-10 圈草绳;
7)起吊大树,在断根前先用吊车扶定;根据树冠和土球重量确定起吊部位,使大树的重心在起吊部位下方,在起吊部位扎60-70cm 宽的草绳,在草绳上钉同样高度均匀分布的木板,起吊时将钢绳的挂钩或软带紧紧地套牢在木板上,树木装进汽车时,使树冠向着汽车尾部,根部土块靠近司机室,树干包上柔软材料放在木架上,用软绳扎紧,树冠用软绳适当缠拢,土块下垫木板,然后用木板将土块夹住或用绳子将土块缚紧在车厢两侧,吊运时对大树进行遮荫、补水保湿;
8)装车运输,装车时使用软绳,土球装车时在土球的下方垫原生土或草绳,树干与后车板接触处由软木支撑,车箱中土球两侧用软木或沙袋支垫,运输途中树冠高于地面;
9)现场验苗,苗木进场时检查乔木、灌木规格、树型和蓬型;
10)场地清理,清除场内外临时设施及垃圾,对于超高地形的进行开挖,地形偏低的则进行土方回填,在车库顶板上施工的,则先进行顶板的滤水层施工后回土;
11)种植定位放线,行道树的定点放线、自然式树木的定点放线,孤植树钉木桩,片植树用白灰线划清范围;
12)树穴开挖,确定位置后,根据树木根系或土球大小、土质情况确定数穴大小,比根系或土球直径大20—30 厘米,树穴口径上下一致,挖穴时以定点标记为圆心,以定好的树穴直径在地上划圆,沿圆的四周向下垂直挖掘,然后将穴底挖松、弄平,挖出的表土与底土分开堆放,坏土也分开堆放,斜坡上挖树穴的时候先整成一个小平台,然后开始挖穴;
13)施基肥、安装透气管,透气管根据现场移植的大树土球直径来定制,将透气管垂直紧贴土球,一端放入泥球底部,一端露出地表5 至8 厘米;
14)疏枝、除叶,苗木到场解除收扎树冠的草绳,进行修剪和梳枝,修剪为整体的l/3~3/5;树干、主枝用草绳或草片进行包扎后在树上拉好浪风绳;
15)移栽定植,定植时分别将大树轻轻斜吊于定植穴内,撤除缠扎树冠的绳子,将树冠立起扶正,在土球四周下部垫入少量的土,使树直立稳定;当填土至坑的1/2 时,将苗木轻轻提若干下,分层埋土踏实,然后撤除土球外包扎的绳包,填入表土一半时,用木棍将土球砸实,作好水堰,然后把捆拢树冠的草绳等解开取下;
16)养护管理,对定植后的大树进行包裹树干、浇水、喷水、遮阴、大树输液、灌根、支撑、施肥、病虫害防治。
断根处理是在土沟开挖过程中,如遇较粗的根,应用锋利的修枝剪或手锯切断,使之与沟的内壁齐平,并涂抹生根保护剂的处理手段。
大树输液技术是一种新型园林处理技术,道理如同人体输液,为了给树体补充营养,以维持正常的新陈代谢,药效直接,对环境污染较小。营养液含有树木生长所需的营养,可激活大树的细胞活性,提供大树生长活性物质,并且有利于给大树补充水分。
本发明的有益效果是:提高大树移植成活率。
附图说明
图1是本发明的流程图。
具体实施方式
实施例1
一种大树移植工艺,其特征在于,包括以下步骤:
1)苗木考察,了解苗木的生长习性、适植时间、产地、存圃数量及价格成本;
2)树种选择,采用形态优良、无病虫害, 生长健壮的乡土品种和适宜移栽地气候的品种;
3)确定移植时间,在春季萌动前和秋季落叶后的树木休眠期进行移植;南北方气候差异较大,若冬季气温较高的地区,四季均可移栽,但早春2~3 月和11 月中下旬~12 月上旬进行移栽最佳,切忌在夏季树木蒸腾量大时移栽,移栽前注意天气情况应避开高温、低温天气和北风天等。北方最佳移栽时期是早春,但要注意避开封冻期并做好土面保护和防风防寒;
4)土沟测算、开挖,大树起挖时以树干为中心,计算出的土球直径;顺着所画圆向外开沟挖土,沟宽60-80cm,土球高度一般为土球直径的60-80%,对于细根可用利铲或铲刀直接铲断粗,大根必须用手锯锯断,切忌用其他工具硬性弄断撕裂;土球基本成形后将土球修整光滑,土球修整到1/2 时逐渐向里收底,收到1/3 时,在底部修一平底,整个土球呈倒圆台形;
5)根部处理,用植物根系生根液喷施根部,诱导大树快速生根,用植物根系消毒、杀菌液喷施土球,消毒防根腐,喷整个土球,重喷根切面及须根细根系;
6)捆扎土球,树基部扎草绳钉护板以保护树干,扎8-10 圈草绳;
7)起吊大树,在断根前先用吊车扶定;根据树冠和土球重量确定起吊部位,使大树的重心在起吊部位下方,在起吊部位扎60-70cm 宽的草绳,在草绳上钉同样高度均匀分布的木板,起吊时将钢绳的挂钩或软带紧紧地套牢在木板上,树木装进汽车时,使树冠向着汽车尾部,根部土块靠近司机室,树干包上柔软材料放在木架上,用软绳扎紧,树冠用软绳适当缠拢,土块下垫木板,然后用木板将土块夹住或用绳子将土块缚紧在车厢两侧,吊运时对大树进行遮荫、补水保湿;
8)装车运输,装车时使用软绳,土球装车时在土球的下方垫原生土或草绳,树干与后车板接触处由软木支撑,车箱中土球两侧用软木或沙袋支垫,运输途中树冠高于地面;
9)现场验苗,苗木进场时检查乔木、灌木规格、树型和蓬型;
10)场地清理,清除场内外临时设施及垃圾,对于超高地形的进行开挖,地形偏低的则进行土方回填,在车库顶板上施工的,则先进行顶板的滤水层施工后回土;
11)种植定位放线,行道树的定点放线、自然式树木的定点放线,孤植树钉木桩,片植树用白灰线划清范围;
12)树穴开挖,确定位置后,根据树木根系或土球大小、土质情况确定数穴大小,比根系或土球直径大20—30 厘米,树穴口径上下一致,挖穴时以定点标记为圆心,以定好的树穴直径在地上划圆,沿圆的四周向下垂直挖掘,然后将穴底挖松、弄平,挖出的表土与底土分开堆放,坏土也分开堆放,斜坡上挖树穴的时候先整成一个小平台,然后开始挖穴;
13)施基肥、安装透气管,透气管根据现场移植的大树土球直径来定制,将透气管垂直紧贴土球,一端放入泥球底部,一端露出地表5 至8 厘米;
14)疏枝、除叶,苗木到场解除收扎树冠的草绳,进行修剪和梳枝,修剪为整体的l/3~3/5;树干、主枝用草绳或草片进行包扎后在树上拉好浪风绳;
15)移栽定植,定植时分别将大树轻轻斜吊于定植穴内,撤除缠扎树冠的绳子,将树冠立起扶正,在土球四周下部垫入少量的土,使树直立稳定;当填土至坑的1/2 时,将苗木轻轻提若干下,分层埋土踏实,然后撤除土球外包扎的绳包,填入表土一半时,用木棍将土球砸实,作好水堰,然后把捆拢树冠的草绳等解开取下;
16)养护管理,对定植后的大树进行包裹树干、浇水、喷水、遮阴、大树输液、灌根、支撑、施肥、病虫害防治。
断根处理是在土沟开挖过程中,如遇较粗的根,应用锋利的修枝剪或手锯切断,使之与沟的内壁齐平,并涂抹生根保护剂的处理手段。
大树输液技术是一种新型园林处理技术,道理如同人体输液,为了给树体补充营养,以维持正常的新陈代谢,药效直接,对环境污染较小。营养液含有树木生长所需的营养,可激活大树的细胞活性,提供大树生长活性物质,并且有利于给大树补充水分。
Claims (1)
1.一种大树移植工艺,其特征在于,包括以下步骤:
1)苗木考察,了解苗木的生长习性、适植时间、产地、存圃数量及价格成本;
2)树种选择,采用形态优良、无病虫害, 生长健壮的乡土品种和适宜移栽地气候的品
3)确定移植时间,在春季萌动前和秋季落叶后的树木休眠期进行移植;
4)土沟测算、开挖,大树起挖时以树干为中心,计算出的土球直径;顺着所画圆向外开沟挖土,沟宽60-80cm,土球高度一般为土球直径的60-80%,对于细根可用利铲或铲刀直接铲断粗,大根用手锯锯断,土球基本成形后将土球修整光滑,土球修整到1/2 时逐渐向里收底,收到1/3 时,在底部修一平底,整个土球呈倒圆台形;
5)根部处理,用植物根系生根液喷施根部,诱导大树快速生根,用植物根系消毒、杀菌液喷施土球,消毒防根腐,喷整个土球,重喷根切面及须根细根系;
6)捆扎土球,树基部扎草绳钉护板以保护树干,扎8-10 圈草绳;
7)起吊大树,在断根前先用吊车扶定;根据树冠和土球重量确定起吊部位,使大树的重心在起吊部位下方,在起吊部位扎60-70cm 宽的草绳,在草绳上钉同样高度均匀分布的木板,起吊时将钢绳的挂钩或软带紧紧地套牢在木板上,树木装进汽车时,使树冠向着汽车尾部,根部土块靠近司机室,树干包上柔软材料放在木架上,用软绳扎紧,树冠用软绳适当缠拢,土块下垫木板,然后用木板将土块夹住或用绳子将土块缚紧在车厢两侧,吊运时对大树进行遮荫、补水保湿;
8)装车运输,装车时使用软绳,土球装车时在土球的下方垫原生土或草绳,树干与后车板接触处由软木支撑,车箱中土球两侧用软木或沙袋支垫,运输途中树冠高于地面;
9)现场验苗,苗木进场时检查乔木、灌木规格、树型和蓬型;
10)场地清理,清除场内外临时设施及垃圾,对于超高地形的进行开挖,地形偏低的则进行土方回填,在车库顶板上施工的,则先进行顶板的滤水层施工后回土;
11)种植定位放线,行道树的定点放线、自然式树木的定点放线,孤植树钉木桩,片植树用白灰线划清范围;
12)树穴开挖,确定位置后,根据树木根系或土球大小、土质情况确定数穴大小,比根系或土球直径大20—30 厘米,树穴口径上下一致,挖穴时以定点标记为圆心,以定好的树穴直径在地上划圆,沿圆的四周向下垂直挖掘,然后将穴底挖松、弄平,挖出的表土与底土分开堆放,坏土也分开堆放,斜坡上挖树穴的时候先整成一个小平台,然后开始挖穴;
13)施基肥、安装透气管,透气管根据现场移植的大树土球直径来定制,将透气管垂直紧贴土球,一端放入泥球底部,一端露出地表5 至8 厘米;
14)疏枝、除叶,苗木到场解除收扎树冠的草绳,进行修剪和梳枝,修剪为整体的l/3~3/5;树干、主枝用草绳或草片进行包扎后在树上拉好浪风绳;
15)移栽定植,定植时分别将大树轻轻斜吊于定植穴内,撤除缠扎树冠的绳子,将树冠立起扶正,在土球四周下部垫入少量的土,使树直立稳定;当填土至坑的1/2 时,将苗木轻轻提若干下,分层埋土踏实,然后撤除土球外包扎的绳包,填入表土一半时,用木棍将土球砸实,作好水堰,然后把捆拢树冠的草绳等解开取下;
16)养护管理,对定植后的大树进行包裹树干、浇水、喷水、遮阴、大树输液、灌根、支撑、施肥、病虫害防治。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710398477.3A CN107223531A (zh) | 2017-05-31 | 2017-05-31 | 一种大树移植工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710398477.3A CN107223531A (zh) | 2017-05-31 | 2017-05-31 | 一种大树移植工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107223531A true CN107223531A (zh) | 2017-10-03 |
Family
ID=59933533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710398477.3A Pending CN107223531A (zh) | 2017-05-31 | 2017-05-31 | 一种大树移植工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107223531A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108464215A (zh) * | 2018-04-18 | 2018-08-31 | 广州普邦园林股份有限公司 | 一种滨海盐碱地大规格木本植物移植方法 |
CN109042031A (zh) * | 2018-08-27 | 2018-12-21 | 黑龙江省森林植物园(黑龙江省森林植物研究所) | 提高盐碱地大树栽植成活率的方法 |
CN109566230A (zh) * | 2018-12-27 | 2019-04-05 | 华艺生态园林股份有限公司 | 一种提高景观马褂木移植成活率的方法 |
CN110521530A (zh) * | 2019-08-26 | 2019-12-03 | 浙江荣林环境股份有限公司 | 一种大型树木的移植方法 |
CN111567355A (zh) * | 2020-05-14 | 2020-08-25 | 上海园林(集团)有限公司 | 一种大型树木反季节移植方法 |
CN112931000A (zh) * | 2021-01-27 | 2021-06-11 | 福建昱勋建设有限公司 | 结构间隙土与通气管提升苗木成活率施工工艺 |
CN113016559A (zh) * | 2021-04-19 | 2021-06-25 | 厦门雅众建设集团有限公司 | 一种园林绿化树木的移栽方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100212557A1 (en) * | 2009-02-26 | 2010-08-26 | Chung-Peng Tien | Fruit tree bonsai planting method |
CN102657061A (zh) * | 2012-05-23 | 2012-09-12 | 滁州市剑春园林园艺工程有限公司 | 园林苗术的移植方法 |
CN103238499A (zh) * | 2013-05-22 | 2013-08-14 | 宜宾云辰乔木园林有限责任公司 | 大树移植方法 |
KR101358953B1 (ko) * | 2013-07-19 | 2014-02-06 | 성우조경주식회사 | 수목 착근 촉진 발근 패드를 이용한 수목 이식 방법 |
CN104686284A (zh) * | 2015-03-25 | 2015-06-10 | 大连金三元生态园林工程股份有限公司 | 北方冬季大树移栽方法 |
CN104756822A (zh) * | 2015-04-27 | 2015-07-08 | 扬州大学 | 一种景观用银杏大树移植的方法 |
CN106106027A (zh) * | 2016-06-25 | 2016-11-16 | 合肥隆扬农业科技有限公司 | 一种园林苗木的移植方法 |
-
2017
- 2017-05-31 CN CN201710398477.3A patent/CN107223531A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100212557A1 (en) * | 2009-02-26 | 2010-08-26 | Chung-Peng Tien | Fruit tree bonsai planting method |
CN102657061A (zh) * | 2012-05-23 | 2012-09-12 | 滁州市剑春园林园艺工程有限公司 | 园林苗术的移植方法 |
CN103238499A (zh) * | 2013-05-22 | 2013-08-14 | 宜宾云辰乔木园林有限责任公司 | 大树移植方法 |
KR101358953B1 (ko) * | 2013-07-19 | 2014-02-06 | 성우조경주식회사 | 수목 착근 촉진 발근 패드를 이용한 수목 이식 방법 |
CN104686284A (zh) * | 2015-03-25 | 2015-06-10 | 大连金三元生态园林工程股份有限公司 | 北方冬季大树移栽方法 |
CN104756822A (zh) * | 2015-04-27 | 2015-07-08 | 扬州大学 | 一种景观用银杏大树移植的方法 |
CN106106027A (zh) * | 2016-06-25 | 2016-11-16 | 合肥隆扬农业科技有限公司 | 一种园林苗木的移植方法 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108464215A (zh) * | 2018-04-18 | 2018-08-31 | 广州普邦园林股份有限公司 | 一种滨海盐碱地大规格木本植物移植方法 |
CN109042031A (zh) * | 2018-08-27 | 2018-12-21 | 黑龙江省森林植物园(黑龙江省森林植物研究所) | 提高盐碱地大树栽植成活率的方法 |
CN109042031B (zh) * | 2018-08-27 | 2021-07-23 | 黑龙江省森林植物园(黑龙江省森林植物研究所) | 提高盐碱地大树栽植成活率的方法 |
CN109566230A (zh) * | 2018-12-27 | 2019-04-05 | 华艺生态园林股份有限公司 | 一种提高景观马褂木移植成活率的方法 |
CN110521530A (zh) * | 2019-08-26 | 2019-12-03 | 浙江荣林环境股份有限公司 | 一种大型树木的移植方法 |
CN111567355A (zh) * | 2020-05-14 | 2020-08-25 | 上海园林(集团)有限公司 | 一种大型树木反季节移植方法 |
CN112931000A (zh) * | 2021-01-27 | 2021-06-11 | 福建昱勋建设有限公司 | 结构间隙土与通气管提升苗木成活率施工工艺 |
CN113016559A (zh) * | 2021-04-19 | 2021-06-25 | 厦门雅众建设集团有限公司 | 一种园林绿化树木的移栽方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102657061B (zh) | 园林苗木的移植方法 | |
CN107223531A (zh) | 一种大树移植工艺 | |
CN103461068B (zh) | 在盐碱地移植大型景观树方法及移植树穴的结构布局 | |
CN104982300B (zh) | 一种干旱荒漠区防护林体系建设的方法 | |
CN104067902A (zh) | 提高树木移栽成活率的方法 | |
CN104642054B (zh) | 一种北方大规格国槐移植施工方法 | |
CN105284546A (zh) | 一种野生水果冷饭团的人工栽培方法 | |
CN109122191A (zh) | 大规格水杉全冠栽植施工方法 | |
CN107646606A (zh) | 盐碱地乔木移栽方法 | |
CN103975773B (zh) | 多枝彩叶观赏造型盆景树的人工培育方法 | |
CN104396693A (zh) | 大树木的移植方法 | |
CN105850650A (zh) | 一种提高香樟移植成活率的方法 | |
CN101669439A (zh) | 大树全冠移植方法 | |
CN103975775B (zh) | 多层彩叶观赏造型盆景树的人工培育方法 | |
CN104186275B (zh) | 一种大树全冠移植方法 | |
CN103975774B (zh) | 多头彩叶观赏造型盆景树的人工培育方法 | |
CN107439335A (zh) | 一种大型树木移植方法 | |
CN107439338A (zh) | 一种夏季高温全冠移植马褂木大树的方法 | |
CN112840936A (zh) | 大规格红玉兰反季节移植方法 | |
CN107232003B (zh) | 耐水湿乔木水中建植的施工方法 | |
CN108718848A (zh) | 园林苗木的移植方法 | |
CN206821505U (zh) | 一种乔木冬季移栽保护坑 | |
CN103053380A (zh) | 一种提高大中径级树木的移植成活率及生长效果的方法 | |
CN108541505A (zh) | 一种乔木栽植方法 | |
CN106888924A (zh) | 一种绿化大苗全冠栽植方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171003 |
|
RJ01 | Rejection of invention patent application after publication |