CN107219126A - Hydraulic test of pressure vessel device and method - Google Patents

Hydraulic test of pressure vessel device and method Download PDF

Info

Publication number
CN107219126A
CN107219126A CN201710408891.8A CN201710408891A CN107219126A CN 107219126 A CN107219126 A CN 107219126A CN 201710408891 A CN201710408891 A CN 201710408891A CN 107219126 A CN107219126 A CN 107219126A
Authority
CN
China
Prior art keywords
water
pressure vessel
pressure
hot
circulation pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710408891.8A
Other languages
Chinese (zh)
Other versions
CN107219126B (en
Inventor
张文成
毛晨君
蔡健华
茅陆荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SENSONG PRESSURE CONTAINER CO Ltd SHANGHAI
Original Assignee
SENSONG PRESSURE CONTAINER CO Ltd SHANGHAI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SENSONG PRESSURE CONTAINER CO Ltd SHANGHAI filed Critical SENSONG PRESSURE CONTAINER CO Ltd SHANGHAI
Priority to CN201710408891.8A priority Critical patent/CN107219126B/en
Publication of CN107219126A publication Critical patent/CN107219126A/en
Application granted granted Critical
Publication of CN107219126B publication Critical patent/CN107219126B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • G01N3/12Pressure testing
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D23/00Control of temperature
    • G05D23/19Control of temperature characterised by the use of electric means
    • G05D23/20Control of temperature characterised by the use of electric means with sensing elements having variation of electric or magnetic properties with change of temperature
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0014Type of force applied
    • G01N2203/0016Tensile or compressive
    • G01N2203/0019Compressive
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/003Generation of the force
    • G01N2203/0042Pneumatic or hydraulic means
    • G01N2203/0048Hydraulic means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/0202Control of the test

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present embodiments relate to hydraulic test of pressure vessel technical field, a kind of hydraulic test of pressure vessel device and method are disclosed.In the present invention, hydraulic test of pressure vessel device, including:Hot-water cylinder, the first circulation pipeline being connected between hot-water cylinder and pressure vessel and second circulation pipeline;Electric heater and moisturizing pipeline are provided with hot-water cylinder, hot-water cylinder passes through moisturizing pipeline water-filling, and the water charged pressure container in hot-water cylinder by electric heater to circulating water heating to preset temperature, is carried out by the water pressure test by first circulation pipeline and the circulation of second circulation pipeline;After the water pressure test terminates, draining is carried out to pressure vessel.By designing first circulation pipeline and second circulation pipeline between hot-water cylinder and pressure vessel, and recirculated water is carried out by the electric heater on hot-water cylinder to be heated to preset temperature, requirement of the hydraulic test of pressure vessel to test temperature can be met in any weather and geographical position, product competitiveness is improved.

Description

Hydraulic test of pressure vessel device and method
Technical field
The present embodiments relate to hydraulic test of pressure vessel technical field, more particularly to a kind of hydraulic test of pressure vessel Device and method.
Background technology
Pressure vessel has pressure test this process, in the prior art, most of pressure in manufacturing process, typically The pressure test of force container is carried out by medium of water.In order to avoid pressure vessel during pressure test because temperature is too low And build-up of pressure container material brittle failure, generally require test temperature (the pressure vessel wall metal temperature) ratio of control pressure container Pressure vessel wall metal is high at least 30 DEG C without moulding transition temperature.Due to metal material without moulding transition temperature and material, The many factors such as thickness, welding procedure, wlding matching are related, and the test temperature under different situations can not be provided in standard.
In standard GB150-2011, the requirement of test temperature is:Q345R, Q370R, 07MNMoVR container carry out liquid During pressure experiment, fluid temperature must not be less than 5 DEG C;When carbon steel and low alloy steel container carries out hydraulic test, fluid temperature must not Less than 15 DEG C;The fluid temperature of low-temperature (low temperature) vessel hydraulic test should be not less than the impact test temperature of case material and welding point (taking its high person) plus 20 DEG C, if because the factors such as thickness of slab cause material to be raised without moulding transition temperature, needing corresponding improve to try Test temperature.Design of pressure vessels engineer generally can also propose higher requirement to test temperature according to the engineering experience of enterprise, It is 20~40 DEG C such as to require test temperature.
The inventors found that:When pressure test is in cold winter or when being carried out in the northern area of China, due to Temperature is relatively low, it is generally difficult to meet the temperature requirement of pressure test, therefore can only be by proposing technology alteration list to client, it is desirable to Reduction original designs the test temperature of pressure test to solve this problem.
The content of the invention
The purpose of embodiment of the present invention is to provide a kind of hydraulic test of pressure vessel device and method, enabling Requirement of the hydraulic test of pressure vessel to test temperature can be met in any weather and geographical position, product competitiveness is improved.
In order to solve the above technical problems, embodiments of the present invention provide a kind of hydraulic test of pressure vessel device, bag Include:Hot-water cylinder, the first circulation pipeline being connected between the hot-water cylinder and the pressure vessel and second circulation pipeline;It is described Electric heater and moisturizing pipeline are provided with hot-water cylinder, the hot-water cylinder passes through described by the moisturizing pipeline water-filling Water in the hot-water cylinder is filled with the pressure vessel by one pipeloop and second circulation pipeline circulation, passes through the electricity Heater carries out the water pressure test to circulating water heating to preset temperature;After the water pressure test terminates, the pressure vessel is arranged Water.
Embodiments of the present invention additionally provide a kind of hydraulic test of pressure vessel method, comprise the following steps:
Hot-water cylinder is circulated the hot water by moisturizing pipeline water-filling, and by first circulation pipeline and second circulation pipeline Water in tank is filled with the pressure vessel;
The hot-water cylinder, to circulating water heating to preset temperature, carries out the water pressure test by electric heater;
After the water pressure test terminates, draining is carried out to the pressure vessel.
Embodiment of the present invention in terms of existing technologies, is followed by designing first between hot-water cylinder and pressure vessel Endless tube line and second circulation pipeline, and preset temperature is heated to recirculated water progress by the electric heater on hot-water cylinder, then The water pressure test is carried out to pressure vessel, the control of circulating water temperature in the water pressure test caused by the electric heater on hot-water cylinder Requirement of the hydraulic test of pressure vessel to test temperature can be met in any weather and geographical position, product competition is improved Power.
In addition, the first circulation pipeline include be arranged on the hot water pot bottom the first discharge outlet, first electronic section Only valve, water pump, check-valves, filter, electric control valve, flow sensor, the second electric check valve and it is arranged on the pressure Second discharge outlet of force container bottom, the pressure vessel is filled with by the first circulation pipeline by the water in the hot-water cylinder In and carry out the water pressure test when adjust water flow and pressure.
In addition, the first circulation pipeline also includes first be arranged between the filter and the electric control valve Hand stop valve, the second hand stop valve being arranged between the electric control valve and the flow sensor and with institute First manual stop valve, the electric control valve and second hand stop valve the 3rd hand stop valve in parallel are stated, it is described First and second hand stop valves are used to open in the electric control valve normal work, event occur in the electric control valve Closed during barrier, the 3rd hand stop valve is closed in the electric control valve normal work, is gone out in the electric control valve Existing fail-open, to ensure that the first circulation pipeline is remained able to when the electric control valve breaks down to the pressure The normal water-filling of force container.
In addition, the second circulation pipeline includes being arranged on first row gas port, the pressure sensing at the top of the pressure vessel Device, temperature sensor, the 3rd electric check valve, the 4th hand stop valve and water return outlet, the pressure is filled with through the hot-water cylinder Water in container can be circulated back to the hot-water cylinder by the second circulation pipeline;The moisturizing pipeline include water supplement port and 4th electric check valve, the moisturizing pipeline is connected with outer water tube, can be filled by the moisturizing pipeline to the hot-water cylinder Water.
In addition, the second circulation pipeline also includes U-tube, the peak of the U-tube is higher than the pressure vessel Peak.
In addition, the hot-water cylinder also includes being arranged on the high water level sensor of side, low water level sensor and is arranged on The second exhaust port at top.
In addition, the hydraulic test of pressure vessel device also include programmable logic controller (PLC) and with the FPGA The man-machine interface of controller connection, the programmable logic controller (PLC) and the water pump, the electric heater, the motorized adjustment Valve, first electric check valve, second electric check valve, the 3rd electric check valve, the 4th electronic cut-off Valve, the high water level sensor, the low water level sensor, the temperature sensor, the pressure sensor, the flow are passed Sensor is connected, for signal collecting and controlling;The man-machine interface is used for parameter input, presentation of information and printing.
In addition, the hot-water cylinder by electric heater to circulating water heating to preset temperature, the step of carrying out the water pressure test Including:Heating is automatically stopped when the electric heater is to circulating water heating to preset temperature, the second circulation pipeline is closed;It is logical Cross the first circulation pipeline to pressurize to the pressure vessel water-filling, until the pressure being arranged on the second circulation pipeline is passed The pressure value of sensor collection closes the first circulation pipeline when being equal to default hydraulic pressure pressure;Pressurize preset time;It is micro- to open institute The 3rd electric check valve on second circulation pipeline is stated, pressure value is closed the second circulation pipeline when being down to design pressure, And check the pressure vessel.
In addition, described include the step of pressurizeed by the first circulation pipeline to the pressure vessel water-filling:Adjustment is set Put the electric control valve on the first circulation pipeline, it is ensured that the rate of pressure rise of the pressure vessel is less than scheduled rate.
Brief description of the drawings
One or more embodiments are illustrative by the picture in corresponding accompanying drawing, these exemplary theorys The element with same reference numbers label is expressed as similar element in the bright restriction not constituted to embodiment, accompanying drawing, removes Composition is not limited the non-figure having in special statement, accompanying drawing.
Fig. 1 is the structural representation of the hydraulic test of pressure vessel device in first embodiment of the invention;
Fig. 2 is a kind of schematic flow sheet of the hydraulic test of pressure vessel method in second embodiment of the invention;
Fig. 3 is another schematic flow sheet of the hydraulic test of pressure vessel method in second embodiment of the invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with accompanying drawing to the present invention Each embodiment be explained in detail.However, it will be understood by those skilled in the art that in each embodiment party of the invention In formula, in order that reader more fully understands the application and proposes many ins and outs.But, even if without these ins and outs With many variations based on following embodiment and modification, the application technical scheme claimed can also be realized.
The first embodiment of the present invention is related to a kind of hydraulic test of pressure vessel device 100, as shown in figure 1, including:Heat Water pot 1, the first circulation pipeline 10 and second circulation pipeline 20 being connected between the hot-water cylinder 1 and the pressure vessel 2;Institute State and electric heater 11 and moisturizing pipeline 30 be provided with hot-water cylinder 1, the hot-water cylinder 1 by the water-filling of moisturizing pipeline 30, and Circulated by the first circulation pipeline 10 and the second circulation pipeline 20 and the water in the hot-water cylinder 1 is filled with the pressure Container 2, by the electric heater 11 to circulating water heating to preset temperature, carries out the water pressure test;It is right after the water pressure test terminates The pressure vessel 2 carries out draining.
Embodiment of the present invention in terms of existing technologies, by designing first between hot-water cylinder 1 and pressure vessel 2 Pipeloop 10 and second circulation pipeline 20, and recirculated water progress is heated to presetting by the electric heater 11 on hot-water cylinder 1 Temperature, then carries out the water pressure test, by the electric heater on hot-water cylinder to circulating water temperature in the water pressure test to pressure vessel 2 Control allow to that in any weather and geographical position requirement of the hydraulic test of pressure vessel to test temperature can be met, carry High product competitiveness.
In present embodiment, hot-water cylinder 1 by first circulation pipeline 10 by the water charged pressure container 2 in hot-water cylinder 1, and The water in pressure vessel 2 is back in hot-water cylinder 1 by second circulation pipeline 20, the water in hot-water cylinder 1 is filled in so circulation Enter pressure vessel 2.The first circulation pipeline 10 includes first the 101, first electricity of discharge outlet for being arranged on the bottom of hot-water cylinder 1 Dynamic stop valve 102, water pump 103, check-valves 104, filter 105, electric control valve 106, flow sensor 107, second are electronic Stop valve 108 and the second discharge outlet 109 for being arranged on the bottom of pressure vessel 2, will by the first circulation pipeline 10 Water in the hot-water cylinder 1 is filled with the pressure vessel 2 and the flow and pressure of water is adjusted when carrying out the water pressure test.Specifically Ground, the first electric check valve 102, the second electric check valve 108 are opened, and the water in the hot-water cylinder 1 can pass through the first draining Mouth 101 is flowed out, and water pump 103 is injected by first electric check valve 102, and water pump 103 can be pressurizeed and be conveyed to water, Then water flows through check-valves 104, and check-valves 104 ensure that water flows to the side of pressure vessel 2 from the side of hot-water cylinder 1, prevent water Flow backwards, water then flow through filter 105, the filter 105 is Y-filter, can prevent impurity with the impurity in filter water Deposition after being flowed to dampening in pressure vessel 2, water then flow through electric control valve 106, and the electric control valve 106 can be with The flow and pressure of water are adjusted, flow sensor 107 is water then flow through, the flow sensor 107 can detect The flow of water in one pipeloop 10, then water sequentially pass through the second electric check valve 108, the second discharge outlet 109 enter pressure In force container 2.Wherein, the water in the hot-water cylinder 1 can be controlled by the opening and closing of first electric control valve 102 Whether discharge.
In present embodiment, first row is additionally provided between the first row gas port 201 at the top of pressure vessel 2 and the external world Air valve 207, for controlling first row gas port 201 to be vented, ensure that to during 2 water-filling of pressure vessel by the sky in pressure vessel 2 Gas is drained.
In present embodiment, the first circulation pipeline 10 also includes being arranged on the filter 105 and the electric adjustable Save the first manual stop valve 110 between valve 106, be arranged between the electric control valve 106 and the flow sensor 107 The second hand stop valve 111 and with the first manual stop valve 110, the electric control valve 106 and described second The 3rd hand stop valve 112 in parallel of hand stop valve 111.When the electric control valve 106 is working properly, the first manual The hand stop valve 111 of stop valve 110 and second is maintained a normally open, and the 3rd hand stop valve 112 keeps normally closed.And in the electric adjustable Section valve 106 breaks down when can not work, and closes the hand stop valve 111 of first manual stop valve 110 and second, opens simultaneously The 3rd hand stop valve 112 is opened, can so ensure that the first circulation pipeline 10 occurs in the electric control valve 106 Remained able to during failure to the normal water-filling of the pressure vessel 2, now can also be to the electric control valve 106 of failure Place under repair or change.
In present embodiment, the second circulation pipeline 20 includes being arranged on the first exhaust at the top of pressure vessel 2 Mouth 201, pressure sensor 202, temperature sensor 203, the 3rd electric check valve 204, the 4th hand stop valve 205 and water return outlet 208.Second circulation pipeline 20 coordinates first circulation pipeline 10 to use, and realizes that exhaust, water-filling and the circulation of pressure vessel 2 add Heat.Wherein, pressure sensor 202 and temperature sensor 203 are arranged between the electric check valve 204 of pressure vessel 2 and the 3rd, are made When must close three electric check valves 204 pressure sensor 202 and temperature sensor 203 can still distinguish collecting temperature signal and Pressure signal.The water being filled with through the hot-water cylinder 1 in the pressure vessel 2 can be recycled back to by the second circulation pipeline 20 To the hot-water cylinder 1.Specifically, in the water-filling into the pressure vessel 2, the second circulation pipeline 20 and first circulation pipe One closed loop of line 10 and the formation of pressure vessel 2 and hot-water cylinder 1, electric heater 11 is arranged on hot-water cylinder 1, to heat Water in water pot 1 is heated, and the second circulation pipeline 20 and the formation of first circulation pipeline 10 closed loop so that Electric heater 11 can carry out circulating-heating to whole recirculated water, while the exhaust of pressure vessel 2, water-filling are realized, so as to Meet the control requirement for carrying out hydraulic test of pressure vessel to test temperature.
Specifically, in the water-filling into pressure vessel 2, the water in pressure vessel 2 sequentially passes through first row gas port 201, institute State pressure sensor 202, temperature sensor 203, the 3rd electric check valve 204 and the 4th hand stop valve 205 and water return outlet 208 injection hot-water cylinders 1.Wherein, in water filling process, the collection hydraulic signal of pressure sensor 202 is simultaneously shown, described Temperature sensor 203 gathers water temperature signal.When temperature sensor 203 gather temperature signal higher than hydraulic pressure temperature upper limit or under During+5 DEG C of limit value, electric heater 11 is automatically stopped heating, and the 3rd electric check valve 204 closed on pipeloop 2.Described Four hand stop valves 205 can manual-lock second circulation pipeline 20 when necessary.
In present embodiment, the second circulation pipeline 20 also includes U-tube 206, and the peak of the U-tube 206 is high Water before water is full of in the peak of the pressure vessel 2, it is ensured that in water filling process, in pressure vessel 2 will not be back to hot water In tank 1.
The moisturizing pipeline 30 includes the electric check valve 302 of water supplement port 301 and the 4th, the moisturizing pipeline 30 and external water Pipe is connected, can be to the hot-water cylinder water-filling by the moisturizing pipeline.Specifically, hydraulic pressure is being proceeded by, is opening the 4th electricity The dynamic water-filling into hot-water cylinder 1 of stop valve 302, and the water in hot-water cylinder 1 is automatic when being charged to enough closes the 4th electronic cut-off Valve 302, stops the water-filling into hot-water cylinder 1.Second row is additionally provided between the second exhaust port 14 at the top of hot-water cylinder 1 and the external world Air valve 15.Second row air valve 15 is used to control the second exhaust port 14 to be vented.
The hot-water cylinder 1 also includes being arranged on the high water level sensor 12 of side, low water level sensor 13 and is arranged on The second exhaust port 14 at top.Opened up respectively at the high water level sensor 12 and the position of the low water level sensor 13 There are high water level mouthful 16 and low water level mouthful 17, for marking the water level in hot-water cylinder 1.It is described in the water-filling into the hot-water cylinder 1 Gas in hot-water cylinder 1 is discharged by second exhaust port 14.High water level sensor 12, low water level sensor 13 sense the hot water Water level in tank 1, when low water level sensor 13 senses water level higher than low water level mouthfuls 17, automatically turns on the on moisturizing pipeline Four electric check valves 302, and close the first electric check valve 102 and water pump 103 of the bottom of hot-water cylinder 1.Work as high water level sensor 12 when sensing water level higher than high water level mouthfuls 16, and automatic the 4th electric check valve 302 closed on moisturizing pipeline stops to hot water Water-filling in tank 1.
In present embodiment, circulated by the first circulation pipeline 10 and the second circulation pipeline 20 by the heat Water in water pot 1 is filled with during the pressure vessel 2, when the temperature signal that temperature sensor 203 is gathered is higher than preset temperature When, electric heater 11 is automatically stopped heating, and the 3rd electric check valve 204 closed on pipeloop 2, that is, closes second circulation Pipeline 20.The pressure sensor 202 on flow sensor 107 and second circulation pipeline 20 on first circulation pipeline 10 is adopted respectively The flow and pressure signal of collection, while adjusting the electric control valve 106 on first circulation pipeline 10, it is ensured that the liter of pressure vessel 2 Speed is pressed to be less than setting value;When the pressure value that the pressure sensor 202 on second circulation pipeline 20 is gathered is equal to hydraulic pressure pressure, Stop the second electric check valve 108 of water pump 103 and the bottom of closing presure container 2, that is, close first circulation pipeline 10, stop to The water-filling of pressure vessel 2, now the hydraulic pressure in pressure vessel 2 reach the hydraulic pressure needed for the water pressure test.Wherein, preset temperature can root According to need set, it is preferable that preset temperature is set to+5 DEG C of hydraulic pressure temperature upper limit or lower limit.
In present embodiment, after the pressurize preset time of pressure vessel 2, the part water in pressure vessel 2 is followed by second Endless tube line 20 is back to hot-water cylinder 1, realizes that the pressure value of pressure vessel 2 is reduced to design pressure, specifically, micro- to open second circulation The 3rd electric check valve 204 on pipeline 20, the water in pressure vessel 2 is back to hot-water cylinder 1 to reduce in pressure vessel 2 Pressure value is to design pressure.After the hydraulic pressure pressure value in pressure vessel 2 is down to design pressure, the 3rd electric check valve is closed 204, reviewer starts to check pressure vessel 2, so far completes the water pressure test of pressure vessel 2.
In present embodiment, the 5th electric check valve is additionally provided between first electric check valve 102 and the external world 113, for controlling the draining of the first discharge outlet 101.The 6th electricity is additionally provided between the second electric check valve 108 and the external world Dynamic stop valve 114, for controlling the draining of the second discharge outlet 109.After the water pressure test terminates, the of the bottom of Opening pressure container 2 Two electric check valves 108 and the 6th electric check valve 114, the water in pressure vessel 2 is drained.By the water row in pressure vessel 2 After to the greatest extent, the connection of hot-water cylinder 1 and pressure vessel 2 is disconnected.
In present embodiment, the hydraulic test of pressure vessel device 100 also include programmable logic controller (PLC) 3 and with institute State the man-machine interface 4 of the connection of programmable logic controller (PLC) 3.The programmable logic controller (PLC) 3 and the water pump 103, the electricity Heater 11, the electric control valve 106, first electric check valve 102, second electric check valve 108, described Three electric check valves 204, the 4th electric check valve 302, the high water level sensor 12, the low water level sensor 13, The temperature sensor 203, the pressure sensor 202, the flow sensor 107 are connected, for signal collecting and controlling. Specifically, programmable logic controller (PLC) 3 receives the water level information that high water level sensor 12 and low water level sensor 13 are sensed, and root The switch of the 4th electric check valve 302 is controlled according to water level information;The temperature signal that reception temperature sensor 203 is gathered, and according to The temperature signal controls the switch of the 3rd electric check valve 204;What reception pressure sensor 202 and flow sensor 107 were gathered Pressure signal and flow, control electric control valve 106, the switch of the electric check valve 204 of water pump 103 and the 3rd;In hydraulic pressure examination Test after end, also control the first electric check valve 102, the 5th electric check valve 113, the 3rd electric check valve 204, second electronic The switch of the electric check valve 114 of stop valve 108 and the 6th.
In present embodiment, the man-machine interface is used for parameter input, presentation of information and printing, specifically, to pressure Before the water-filling of container 2, the temperature of the setting water pressure test, rate of pressure rise, design pressure, hydraulic test pressure in man-machine interface 4 With the dwell time etc.;When carrying out the water pressure test, display whether to reach high water level face and low water level face and displays temperature signal And flow signal, after the water pressure test terminates, the man-machine interface 4 can show printable water pressure test overall process temperature and Pressure curve.The man-machine interface 4 is connected with the programmable logic controller (PLC) 3, is controlled by the programmable logic controller (PLC) 3 The man-machine interface 4 is made to work.Due to the design of programmable logic controller (PLC) 3 and man-machine interface 4, it is possible to achieve the water pressure test is complete Process automation is controlled and recorded, and can reduce production and the quantity of reviewer, reduces the probability of artificial maloperation, reduces process note Record the finishing time of file and test report.
The hydraulic test of pressure vessel device 100 of embodiment of the present invention is by carrying out ultimate attainmentization module Integrated design and system Make, it is only necessary to which scene provides water and electricity and can just used, the appearance and size that device can be achieved is minimum, and the whole world, which is moved to diverse location, to be made With.
Second embodiment of the present invention is related to a kind of hydraulic test of pressure vessel method, as shown in Fig. 2 including following step Suddenly:
Step S10, hot-water cylinder 1 passes through first circulation pipeline 10 and second circulation pipeline by the water-filling of moisturizing pipeline 30 Water in the hot-water cylinder 1 is filled with the pressure vessel 2 by circulation 20.
Before step S10, the first circulation pipeline 10 and second between connection hot-water cylinder 1 and pressure vessel 2 is followed Endless tube line 20.
In step slo, specifically opening the 4th electric check valve 302 on moisturizing pipeline 30, filled to hot-water cylinder 1 Water, when high water level sensor 12 senses water in hot-water cylinder 1 and reaches high water level mouthful 16, opens first circulation pipeline 10 and the Two pipeloops 20, to the water-filling of pressure vessel 2.When the water level that low water level sensor 13 is sensed in hot-water cylinder 1 is less than low water level During mouth 17, the 4th electric check valve 302 on moisturizing pipeline 30 is automatically turned on, when high water level sensor 12 senses hot-water cylinder 1 In water level higher than high water level mouthfuls 16 when, automatic the 4th electric check valve 302 closed on moisturizing pipeline 30, now hot-water cylinder 1 Enough water needed for carrying out the water pressure test has all been filled with pressure vessel 2.
Step S11, the hot-water cylinder 1, to circulating water heating to preset temperature, carries out the water pressure test by electric heater 11.
In step s 11, as shown in figure 3, specifically including following steps:
Step S30, is automatically stopped heating when the electric heater 11 is to circulating water heating to preset temperature, close described the Two pipeloops 20.
In step s 30, specifically, the water in hot-water cylinder 1 is heated by electric heater 11, works as temperature sensor 203 temperature collected are automatically stopped heating, and close second circulation pipeline 20 when within the scope of preset temperature ± 5 DEG C On the 3rd electric check valve 204.
Step S31, is pressurizeed by the first circulation pipeline 10 to the water-filling of pressure vessel 2, until being arranged on described The pressure value that pressure sensor 202 on second circulation pipeline 20 is gathered is closed described first when being equal to default hydraulic pressure pressure and followed Endless tube line 10.
In step S31, specifically the flow collected according to the flow sensor 107 on first circulation pipeline 10 The pressure signal that pressure sensor 202 on signal and second circulation pipeline 20 is collected, adjustment is arranged on the first circulation Electric control valve 106 on pipeline 10, it is ensured that the rate of pressure rise of the pressure vessel 2 is less than scheduled rate.When second circulation pipe The pressure signal that pressure sensor 202 on line 20 is gathered closes the first circulation pipeline 10 when being equal to default hydraulic pressure pressure On water pump 103 and the bottom of pressure vessel 2 the second electric check valve 108, stop to the water-filling of pressure vessel 2, now pressure holds Hydraulic pressure in device 2 reaches the hydraulic pressure needed for the water pressure test.
Step S32, pressurize preset time.
In step s 32, the preset time is set before the water pressure test is carried out in the man-machine interface 4.
Step S33, micro- the 3rd electric check valve 204 for opening the second circulation pipeline 20 makes pressure value be down to design pressure The second circulation pipeline 20 is closed during power, and checks the pressure vessel 2.
In step S33, specifically micro- the 3rd electric check valve 204 opened on second circulation pipeline 20, when pressure is passed When the pressure value that sensor 202 is measured is reduced to design pressure, the 3rd electric control valve 204 is closed, and whether check pressure vessel 2 There is damage.
Step S12, after the water pressure test terminates, draining is carried out to the pressure vessel 2.
In step s 12, after the water pressure test terminates, pressure release is clicked in man-machine interface 4, the pressure vessel is opened 2 the second discharge outlet 109, and the second electric check valve 108 and the progress draining of the 6th electric check valve 114 are opened simultaneously, until, Water in pressure vessel 2 is drained.
After water in pressure vessel 2 is drained, by the first circulation pipeline 10 between hot-water cylinder 1 and pressure vessel 2 and Two pipeloops 20 disconnect.
The step of various methods are divided above, be intended merely to description it is clear, can be merged into when realizing a step or Some steps are split, multiple steps are decomposed into, as long as including identical logical relation, all protection domain in this patent It is interior;To adding inessential modification in algorithm or in flow or introducing inessential design, but its algorithm is not changed Core design with flow is all in the protection domain of the patent.
It is seen that, present embodiment is the embodiment of the method corresponding with first embodiment, and present embodiment can be with First embodiment is worked in coordination implementation.The relevant technical details mentioned in first embodiment still have in the present embodiment Effect, in order to reduce repetition, is repeated no more here.Correspondingly, the relevant technical details mentioned in present embodiment are also applicable in In first embodiment.
It will be understood by those skilled in the art that the respective embodiments described above are to realize the specific embodiment of the present invention, And in actual applications, can to it, various changes can be made in the form and details, without departing from the spirit and scope of the present invention.

Claims (10)

1. a kind of hydraulic test of pressure vessel device, it is characterised in that including:Hot-water cylinder, it is connected to the hot-water cylinder and described First circulation pipeline and second circulation pipeline between pressure vessel;Electric heater and filling pipe are provided with the hot-water cylinder Line, the hot-water cylinder is followed by the moisturizing pipeline water-filling, and by the first circulation pipeline and the second circulation pipeline Water in the hot-water cylinder is filled with the pressure vessel by ring, by the electric heater to circulating water heating to preset temperature, Carry out the water pressure test;After the water pressure test terminates, draining is carried out to the pressure vessel.
2. hydraulic test of pressure vessel device according to claim 1, it is characterised in that the first circulation pipeline includes It is arranged on the first discharge outlet, the first electric check valve, water pump, check-valves, filter, the motorized adjustment of the hot water pot bottom Valve, flow sensor, the second electric check valve and the second discharge outlet for being arranged on the pressure vessel bottom.
3. hydraulic test of pressure vessel device according to claim 2, it is characterised in that the first circulation pipeline is also wrapped Include the first manual stop valve being arranged between the filter and the electric control valve, be arranged on the electric control valve and The second hand stop valve between the flow sensor and with the first manual stop valve, the electric control valve and Second hand stop valve the 3rd hand stop valve in parallel.
4. hydraulic test of pressure vessel device according to claim 3, it is characterised in that the second circulation pipeline includes It is arranged on first row gas port at the top of the pressure vessel, pressure sensor, temperature sensor, the 3rd electric check valve, the 4th Hand stop valve and water return outlet;The moisturizing pipeline includes water supplement port and the 4th electric check valve, the moisturizing pipeline and outside Water pipe is connected.
5. hydraulic test of pressure vessel device according to claim 4, it is characterised in that the second circulation pipeline is also wrapped U-tube is included, the peak of the U-tube is higher than the peak of the pressure vessel.
6. hydraulic test of pressure vessel device according to claim 4, it is characterised in that the hot-water cylinder also includes setting The high water level sensor of side, low water level sensor and be arranged on top second exhaust port.
7. hydraulic test of pressure vessel device according to claim 6, it is characterised in that the hydraulic test of pressure vessel Device also includes programmable logic controller (PLC) and the man-machine interface being connected with the programmable logic controller (PLC), and described may be programmed is patrolled Collect controller and the water pump, the electric heater, the electric control valve, first electric check valve, second electricity Dynamic stop valve, the 3rd electric check valve, the 4th electric check valve, the high water level sensor, the low water level are passed Sensor, the temperature sensor, the pressure sensor, flow sensor connection, for signal collecting and controlling;It is described Man-machine interface is used for parameter input, presentation of information and printing.
8. a kind of hydraulic test of pressure vessel method, it is characterised in that comprise the following steps:
Hot-water cylinder is circulated in the hot-water cylinder by moisturizing pipeline water-filling, and by first circulation pipeline and second circulation pipeline Water be filled with the pressure vessel;
The hot-water cylinder, to circulating water heating to preset temperature, carries out the water pressure test by electric heater;
After the water pressure test terminates, draining is carried out to the pressure vessel.
9. hydraulic test of pressure vessel method according to claim 8, it is characterised in that the hot-water cylinder passes through electrical heating Device is to circulating water heating to preset temperature, and the step of carrying out the water pressure test includes:
Heating is automatically stopped when the electric heater is to circulating water heating to preset temperature, the second circulation pipeline is closed;
Pressurizeed by the first circulation pipeline to the pressure vessel water-filling, until being arranged on the second circulation pipeline The pressure value of pressure sensor collection closes the first circulation pipeline when being equal to default hydraulic pressure pressure;
Pressurize preset time;
Micro- the 3rd electric check valve opened on the second circulation pipeline, makes pressure value close described second when being down to design pressure Pipeloop, and check the pressure vessel.
10. hydraulic test of pressure vessel method according to claim 9, it is characterised in that described to be followed by described first The step of endless tube line pressurizes to the pressure vessel water-filling includes:
Adjustment is arranged on the electric control valve on the first circulation pipeline, it is ensured that the rate of pressure rise of the pressure vessel is less than pre- If speed.
CN201710408891.8A 2017-06-02 2017-06-02 Pressure vessel hydrostatic test device and method Active CN107219126B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710408891.8A CN107219126B (en) 2017-06-02 2017-06-02 Pressure vessel hydrostatic test device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710408891.8A CN107219126B (en) 2017-06-02 2017-06-02 Pressure vessel hydrostatic test device and method

Publications (2)

Publication Number Publication Date
CN107219126A true CN107219126A (en) 2017-09-29
CN107219126B CN107219126B (en) 2024-03-22

Family

ID=59947084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710408891.8A Active CN107219126B (en) 2017-06-02 2017-06-02 Pressure vessel hydrostatic test device and method

Country Status (1)

Country Link
CN (1) CN107219126B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109696284A (en) * 2017-10-20 2019-04-30 联合汽车电子有限公司 Test device and test method
CN110441128A (en) * 2019-07-30 2019-11-12 江苏普格机械有限公司 A kind of hydrostatic testing tool for pressure container and its pressure-measuring method
CN111351021A (en) * 2018-12-21 2020-06-30 核动力运行研究所 Method for preheating tube plate of steam generator secondary side hydrostatic test
CN111503522A (en) * 2020-04-29 2020-08-07 杰瑞石油天然气工程有限公司 Pressure testing device and pressure testing method for long-distance pipeline
CN113670734A (en) * 2021-08-06 2021-11-19 中国成达工程有限公司 Jacketed pipe hydrostatic test structure and test method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003083859A (en) * 2001-09-17 2003-03-19 Toshiba Corp General purpose automatic pressure test device
CN201575957U (en) * 2009-12-29 2010-09-08 罗务勤 Semiautomatic control device for hydraulic test and air tightness test of pressure vessel
CN102192819A (en) * 2010-03-11 2011-09-21 中国核动力研究设计院 Quick heating process for pre-service hydrostatic test of secondary side of steam generator
CN203702521U (en) * 2014-02-25 2014-07-09 上海出入境检验检疫局机电产品检测技术中心 High-temperature water pump testing device
CN106198601A (en) * 2016-06-30 2016-12-07 洛阳双瑞特种装备有限公司 A kind of steam carries out the system and method for hot test to composite plate container
CN206906157U (en) * 2017-06-02 2018-01-19 上海森松压力容器有限公司 Hydraulic test of pressure vessel device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003083859A (en) * 2001-09-17 2003-03-19 Toshiba Corp General purpose automatic pressure test device
CN201575957U (en) * 2009-12-29 2010-09-08 罗务勤 Semiautomatic control device for hydraulic test and air tightness test of pressure vessel
CN102192819A (en) * 2010-03-11 2011-09-21 中国核动力研究设计院 Quick heating process for pre-service hydrostatic test of secondary side of steam generator
CN203702521U (en) * 2014-02-25 2014-07-09 上海出入境检验检疫局机电产品检测技术中心 High-temperature water pump testing device
CN106198601A (en) * 2016-06-30 2016-12-07 洛阳双瑞特种装备有限公司 A kind of steam carries out the system and method for hot test to composite plate container
CN206906157U (en) * 2017-06-02 2018-01-19 上海森松压力容器有限公司 Hydraulic test of pressure vessel device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姜来举;王春玲;刘俊才;: "圆图记录仪在压力容器水压试验上的应用", 天津科技, no. 03 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109696284A (en) * 2017-10-20 2019-04-30 联合汽车电子有限公司 Test device and test method
CN111351021A (en) * 2018-12-21 2020-06-30 核动力运行研究所 Method for preheating tube plate of steam generator secondary side hydrostatic test
CN110441128A (en) * 2019-07-30 2019-11-12 江苏普格机械有限公司 A kind of hydrostatic testing tool for pressure container and its pressure-measuring method
CN111503522A (en) * 2020-04-29 2020-08-07 杰瑞石油天然气工程有限公司 Pressure testing device and pressure testing method for long-distance pipeline
CN111503522B (en) * 2020-04-29 2022-02-11 杰瑞石油天然气工程有限公司 Pressure testing device and pressure testing method for long-distance pipeline
CN113670734A (en) * 2021-08-06 2021-11-19 中国成达工程有限公司 Jacketed pipe hydrostatic test structure and test method

Also Published As

Publication number Publication date
CN107219126B (en) 2024-03-22

Similar Documents

Publication Publication Date Title
CN107219126A (en) Hydraulic test of pressure vessel device and method
CN201503346U (en) Control system for detecting oil temperature of speed changer
CN104928866B (en) Dye automatic control system
CN104729178B (en) Power plant's seawater direct-current cooling system
CN206906157U (en) Hydraulic test of pressure vessel device
CN205605183U (en) Natural gas recovering device
CN201981217U (en) Circulating cooling water system for blast furnace tuyere small sleeve
CN207501460U (en) A kind of novel online Low Voltage Pure water heating system
CN206489457U (en) Dynamic high-temperature high-pressure steam oxidation test device for controlling oxygen content
CN207146491U (en) Mixed water heat exchange station with dehydration detection and defencive function and a variety of pressurization methodses
CN208844395U (en) A kind of liquid level electronic induction and temperature control system
CN203653985U (en) Temperature control system of dyeing machine
CN203771510U (en) Heating water supplementation system of power plant
CN207764053U (en) A kind of resistance to compression detection device of pressure vessel
CN207210339U (en) A kind of oil depot oil-filtering apparatus
CN207438900U (en) A kind of Oil Guide heating unit of plasthetics processing
CN206843312U (en) A kind of cooling water heating constant-temperature equipment for producing double matte glass pressing machines
CN203532422U (en) Oil filtering device for hydraulic station
CN205064279U (en) Air compressor secondary heat -exchanging device with function of waste heat recovery
CN104019371A (en) Coating system
CN203732410U (en) Hose testing machine
CN205102221U (en) Deep well low temperature nuclear heating reactor safety heat transfer system
CN207768782U (en) A kind of fermentation tank disinfection system
CN111121518B (en) Automatic waste heat recovery device and recovery method
CN108220158A (en) One kind automatically controls solar energy heating marsh-gas generating equipment and control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Workshop 1, building 1, No. 458, Zhongmin Road, Maogang Town, Songjiang District, Shanghai, 201607

Applicant after: Shanghai Senyong Engineering Equipment Co.,Ltd.

Address before: 200137 building 3, No. 562, Gaoxiang Ring Road, Pudong New Area, Shanghai

Applicant before: SHANGHAI MORIMATSU PRESSURE VESSEL Co.,Ltd.

CB02 Change of applicant information
CB02 Change of applicant information

Address after: Building 1-6, No. 458 Zhongmin Road, Maogang Town, Songjiang District, Shanghai, July 2016

Applicant after: Shanghai Senyong Engineering Equipment Co.,Ltd.

Address before: Workshop 1, building 1, No. 458, Zhongmin Road, Maogang Town, Songjiang District, Shanghai, 201607

Applicant before: Shanghai Senyong Engineering Equipment Co.,Ltd.

GR01 Patent grant
GR01 Patent grant