CN107218739A - A kind of refrigerating plant room based on the integrated races of BIM - Google Patents
A kind of refrigerating plant room based on the integrated races of BIM Download PDFInfo
- Publication number
- CN107218739A CN107218739A CN201710518885.8A CN201710518885A CN107218739A CN 107218739 A CN107218739 A CN 107218739A CN 201710518885 A CN201710518885 A CN 201710518885A CN 107218739 A CN107218739 A CN 107218739A
- Authority
- CN
- China
- Prior art keywords
- water
- race
- integrated
- pipe
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B1/00—Compression machines, plants or systems with non-reversible cycle
- F25B1/04—Compression machines, plants or systems with non-reversible cycle with compressor of rotary type
- F25B1/047—Compression machines, plants or systems with non-reversible cycle with compressor of rotary type of screw type
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Devices That Are Associated With Refrigeration Equipment (AREA)
Abstract
A kind of refrigerating plant room based on the integrated races of BIM of offer of the present invention, by using BIM technology, carry out integral modularized design, establishment becomes more meticulous, by parameter regulation, realize Rapid matching design, realize collision detection, instruct the refrigerating plant room that pipe fitting is prefabricated, instruct site operation.Refrigerating plant room includes integrated refrigeration unit race, integrated water pump race, integrated heat exchanger race and integrated point, water collector race, integrated pipeline race, equipment supporter, equipment hanger, support of pipelines, pipeline elevator and pipe insulating layer of the four class races comprising water pipe, the thereon pipeline without conduit fittings, conduit fittings, the actual physical size of accurate description equipment, reflect the installation and connection method of equipment, according to race's model realization collision detection and prefabricated customized and guide site operation.The refrigerating plant room that the present invention is designed can improve drafting efficiency using method for integrated designing, reduce the drafting time, and increase flexible arrangement, versatility.
Description
Technical field
It is more particularly to a kind of based on BIM integrated modules the present invention relates to refrigerating plant room design and installation technical field
Refrigerating plant room.
Background technology
BIM BIMs (Building Information Modeling) or architecture information management
(Building Information Management) be based on every relevant information data of construction-engineering project,
The BUILDINGS MODELS of three-dimensional is set up, the real information having by digital information analogue simulation building is complete with information
Property, information relevance, consistency on messaging, visualization, harmony, simulation, optimization property and the features such as figure can be gone out, improving life
Production efficiency, cost-effective and shortening duration aspect play a significant role.
The content of the invention
It is an object of the invention to provide a kind of integrated refrigerating plant room race block based on BIM, by using BIM technology, enter
The integral modularized design of row, create become more meticulous, by parameter regulation, realize Fast Drawing, realize collision detection, instruct pipe fitting
Refrigerating plant room BIM models that are prefabricated, instructing site operation.
Technical scheme:
A kind of refrigerating plant room based on the integrated race's blocks of BIM, including four class races, all kinds of races set multiple;Four class races are distinguished
For integrated refrigeration unit race 1, integrated water pump race 2, integrated heat exchanger race 3 and integrated point, water collector race 4, four class races
Include water pipe;Integrated point, water collector race 4 include integrated water knockout drum race and integrated water collector race, integrated water pump race 2
Including integrated chilled water pump race and integrated cooling water pump race;Water pipe includes chilled water water inlet pipe, chilled water outlet pipe, cooling
Pipe insulating layer is enclosed with water water inlet pipe and cooling water outlet pipe, water pipe;The water pipe termination of four class races is equipped with connector, even
The caliber of fitting is identical with the caliber of water pipe, and connector is used for connecting water pipe and main pipe;Connector by threeway or elbow with
Main pipe is connected, i.e. the main pipe of the chilled water water inlet pipe of four class races, chilled water outlet pipe and chilled water passes through threeway or elbow
It is connected, cooling water inlet pipe, the cooling water outlet pipe of four class races are connected with cooling water main pipe by threeway or elbow, four
The order of connection between class race is according to the flow direction order of chilled water or cooling water, i.e., chilled water main pipe is sequentially connected integrated collection
Hydrophone race, integrated chilled water pump race, integrated refrigeration unit race 1 and integrated water knockout drum race, cooling water main pipe connect successively
Meet integrated water collector race, integrated cooling water pump race, integrated refrigeration unit race 1 and integrated water knockout drum race;According to water
Flow direction, enters integrated refrigeration unit race 1 by chilled water water inlet pipe and cooling water inlet pipe, respectively by chilled water outlet pipe and cold
But water outlet pipe flows out integrated refrigeration unit race 1;
Butterfly valve 5, thermometer 6, pressure gauge 7 and y-type filter 8 are installed on chilled water water inlet pipe and cooling water inlet pipe;It is cold
Freeze and butterfly valve 5, thermometer 6 and pressure gauge 7 are installed on water outlet pipe and cooling water outlet pipe;
Described integrated refrigeration unit race 1 includes screw-type water chiller main body 12, butterfly valve 5, thermometer 6, pressure gauge
7th, y-type filter 8 and elastic connecting hose 9;Screw-type water chiller main body 12 passes sequentially through elastic connecting hose 9, transverse tube and bend pipe
Difference connecting pipe, pipeline is divided into two classes, and first kind pipeline has been sequentially distributed y-type filter 8, pressure gauge 7 and temperature from top to bottom
Butterfly valve 5 is provided with the top of degree meter 6, pipeline;The difference of Equations of The Second Kind pipeline and first kind pipeline is to be not provided with y-type filter 8;
Described integrated water pump race 2 include vertical or horizontal pump main body 13, butterfly valve 5, pressure gauge 7, y-type filter 8,
Elastic connecting hose 9 and check-valves 10, the water inlet end of vertical water pump main body 13 and water side pass through the elastic connecting tube of connecting hose 9
Road, pipeline is divided into inlet channel and outlet conduit;Inlet channel sets gradually y-type filter 8, pressure gauge 7 and butterfly from bottom to up
Valve 5;Check-valves 10, pressure gauge 7 and butterfly valve 5 are set gradually on outlet conduit from bottom to up;
Described integrated heat exchanger race 3 includes plate type heat exchanger main body 14, butterfly valve 5, thermometer 6, pressure gauge 7, Y type mistakes
Filter 8 and gate valve 11, plate type heat exchanger main body 14 is by length-adjustable transverse tube connecting pipe, and pipeline is divided into a water water inlet pipe
Road, secondary water inlet channel, a water outlet conduit and secondary water outlet conduit;Water inlet channel and secondary water water inlet pipe
On road, butterfly valve 5, thermometer 6, pressure gauge 7, y-type filter 8 and gate valve 11 are installed from connection end to the mouth of pipe;Water outlet pipe
On road and secondary water outlet conduit, butterfly valve 5, thermometer 6, pressure gauge 7 and gate valve 11 are installed from connection end to the mouth of pipe;
Described integrated point, water collector race 4 include point, water collector main body 15, butterfly valve 5, thermometer 6, pressure gauge 7 and lock
Valve 11, point, multiple pipelines, thermometer 6, pressure gauge 7 and bypass pipe are distributed in water collector main body 15, pipe diameter is different;Pipeline
It is divided into two classes, first kind pipeline is simple pipeline, and diameter is minimum;Equations of The Second Kind pipeline has been sequentially arranged gate valve from connection end to the mouth of pipe
11 and butterfly valve 5.
Beneficial effects of the present invention:
1. the present invention uses integrated thought, by the equipment in refrigerating plant room, pipe fitting, conduit fittings according to design need
Will, selective is integrated into Revit races module, is used as an overall race.Only need to be to remaining pipeline and a small amount of pipe fitting in application
Matched, that is, complete whole refrigeration system and set up, so that workload is greatly decreased, improved and draw efficiency.
2. by the parametrization to integrated refrigerating plant room race module, its part Main physical dimension adjustable is realized,
And can realize pipe fitting with caliber change automatically adjust, Auto-matching so that improve its application flexibility.In system group
During building, if need to be modified to equipment adapter, it need to only change to adapter caliber in family parameter, without changing pipeline
Annex, so that modification time is also greatly reduced.
3. race's root tuber is according to full size, the race's block characteristic of itself makes it easy to design, with versatility and flexible tune
Section property, can tackle different design requirements, while being easy to direct use of race's block between different engineering projects, migrating and repair
Change.
Brief description of the drawings
Fig. 1 is the schematic diagram of integrated refrigerating plant room.
Fig. 2 is the schematic diagram of integrated screw compressor refrigerating unit race.
Fig. 3 is the schematic diagram of integrated vertical water pump race.
Fig. 4 is the schematic diagram of integrated plate type heat exchanger race.
Fig. 5 is integrated point, the schematic diagram of water collector race.
In figure:1 integrated refrigeration unit race;2 integrated water pump races;3 integrated heat exchanger races;4 integrated points, water collector
Race;5 butterfly valves;6 thermometers;7 pressure gauges;8Y type filters;9 elastic connecting hoses;10 check-valves;11 gate valves;12 screw cold water
Generating set main body;13 vertical or horizontal pump main bodys;14 plate type heat exchanger main bodys;15 points, water collector main body.
Embodiment
Below in conjunction with accompanying drawing and technical scheme, the embodiment of the present invention is further illustrated.
1. a kind of refrigerating plant room based on the integrated race's blocks of BIM, it is characterised in that described refrigerating plant room includes four classes
Race, all kinds of races set multiple;Four class races are respectively integrated refrigeration unit race 1, integrated water pump race 2, integrated heat exchanger race 3
With integrated point, water collector race 4, four class races include water pipe;Integrated point, water collector race 4 include integrated water knockout drum race and
Integrated water collector race, integrated water pump race 2 includes integrated chilled water pump race and integrated cooling water pump race;Water pipe includes cold
Freeze on water water inlet pipe, chilled water outlet pipe, cooling water inlet pipe and cooling water outlet pipe, water pipe and be enclosed with pipe insulating layer;Four
The water pipe termination of class race is equipped with connector, and the caliber of connector is identical with the caliber of water pipe, connector be used for connecting water pipe and
Main pipe;Connector is connected by threeway or elbow with main pipe, i.e., the chilled water water inlet pipe of four class races, chilled water outlet pipe with
The main pipe of chilled water is connected by threeway or elbow, cooling water inlet pipe, cooling water outlet pipe and the cooling water of four class races
Main pipe is connected by threeway or elbow, the order of connection between four class races according to chilled water or cooling water flow direction order,
I.e. chilled water main pipe is sequentially connected integrated water collector race, integrated chilled water pump race, integrated refrigeration unit race 1 and integrated
Change water knockout drum race, cooling water main pipe is sequentially connected integrated water collector race, integrated cooling water pump race, integrated refrigeration unit
Race 1 and integrated water knockout drum race;According to the flow direction of water, integrated refrigeration machine is entered by chilled water water inlet pipe and cooling water inlet pipe
Group race 1, flows out integrated refrigeration unit race 1 by chilled water outlet pipe and cooling water outlet pipe respectively;
Butterfly valve 5, thermometer 6, pressure gauge 7 and y-type filter 8 are installed on chilled water water inlet pipe and cooling water inlet pipe;It is cold
Freeze and butterfly valve 5, thermometer 6 and pressure gauge 7 are installed on water outlet pipe and cooling water outlet pipe;
Described integrated refrigeration unit race 1 includes screw-type water chiller main body 12, butterfly valve 5, thermometer 6, pressure gauge
7th, y-type filter 8 and elastic connecting hose 9;Screw-type water chiller main body 12 passes sequentially through elastic connecting hose 9, transverse tube and bend pipe
Difference connecting pipe, pipeline is divided into two classes, and first kind pipeline has been sequentially distributed y-type filter 8, pressure gauge 7 and temperature from top to bottom
Butterfly valve 5 is provided with the top of degree meter 6, pipeline;The difference of Equations of The Second Kind pipeline and first kind pipeline is to be not provided with y-type filter 8;
Described integrated water pump race 2 include vertical or horizontal pump main body 13, butterfly valve 5, pressure gauge 7, y-type filter 8,
Elastic connecting hose 9 and check-valves 10, the water inlet end of vertical water pump main body 13 and water side pass through the elastic connecting tube of connecting hose 9
Road, pipeline is divided into inlet channel and outlet conduit;Inlet channel sets gradually y-type filter 8, pressure gauge 7 and butterfly from bottom to up
Valve 5;Check-valves 10, pressure gauge 7 and butterfly valve 5 are set gradually on outlet conduit from bottom to up;
Described integrated heat exchanger race 3 includes plate type heat exchanger main body 14, butterfly valve 5, thermometer 6, pressure gauge 7, Y type mistakes
Filter 8 and gate valve 11, plate type heat exchanger main body 14 is by length-adjustable transverse tube connecting pipe, and pipeline is divided into a water water inlet pipe
Road, secondary water inlet channel, a water outlet conduit and secondary water outlet conduit;Water inlet channel and secondary water water inlet pipe
On road, butterfly valve 5, thermometer 6, pressure gauge 7, y-type filter 8 and gate valve 11 are installed from connection end to the mouth of pipe;Water outlet pipe
On road and secondary water outlet conduit, butterfly valve 5, thermometer 6, pressure gauge 7 and gate valve 11 are installed from connection end to the mouth of pipe;
Described integrated point, water collector race 4 include point, water collector main body 15, butterfly valve 5, thermometer 6, pressure gauge 7 and lock
Valve 11, point, multiple pipelines, thermometer 6, pressure gauge 7 and bypass pipe are distributed in water collector main body 15, pipe diameter is different;Pipeline
It is divided into two classes, first kind pipeline is simple pipeline, and diameter is minimum;Equations of The Second Kind pipeline has been sequentially arranged gate valve from connection end to the mouth of pipe
11 and butterfly valve 5;
Integrated refrigerating plant room module based on BIM also includes integrated heat exchanger race, integrated water collecting and diversifying device race, equipment
Support or equipment hanger, support of pipelines or pipeline elevator.
Set up on described pipeline measuring instrumentss, sensor, valve, it is soft connect, filter etc..
Claims (3)
1. a kind of refrigerating plant room based on the integrated race's blocks of BIM, it is characterised in that described refrigerating plant room includes four class races, respectively
Class race sets multiple;Four class races are respectively integrated refrigeration unit race (1), integrated water pump race (2), integrated heat exchanger race
(3) and integrated point, water collector race (4), four class races include water pipe;Integrated point, water collector race (4) include integrated point of water
Device race and integrated water collector race, integrated water pump race (2) include integrated chilled water pump race and integrated cooling water pump race;Water
Pipe includes being enclosed with pipeline guarantor on chilled water water inlet pipe, chilled water outlet pipe, cooling water inlet pipe and cooling water outlet pipe, water pipe
Warm layer;The water pipe termination of four class races is equipped with connector, and the caliber of connector is identical with the caliber of water pipe, and connector is used to connect
Water pipe and main pipe;Connector is connected by threeway or elbow with main pipe, i.e. chilled water water inlet pipe, the chilled water of four class races go out
Water pipe is connected with the main pipe of chilled water by threeway or elbow, the cooling water inlet pipes of four class races, cooling water outlet pipe with
Cooling water main pipe is connected by threeway or elbow, the order of connection between four class races according to chilled water or cooling water flow direction
Sequentially, i.e., chilled water main pipe is sequentially connected integrated water collector race, integrated chilled water pump race, integrated refrigeration unit race
(1) and integrated water knockout drum race, cooling water main pipe be sequentially connected integrated water collector race, it is integrated cooling water pump race, integrated
Change refrigeration unit race (1) and integrated water knockout drum race;According to the flow direction of water, entered by chilled water water inlet pipe and cooling water inlet pipe
Integrated refrigeration unit race (1), flows out integrated refrigeration unit race (1) by chilled water outlet pipe and cooling water outlet pipe respectively;
Butterfly valve (5), thermometer (6), pressure gauge (7) and y-type filter are installed on chilled water water inlet pipe and cooling water inlet pipe
(8);Butterfly valve (5), thermometer (6) and pressure gauge (7) are installed on chilled water outlet pipe and cooling water outlet pipe;
Described integrated refrigeration unit race (1) includes screw-type water chiller main body (12), butterfly valve (5), thermometer (6), pressure
Power table (7), y-type filter (8) and elastic connecting hose (9);Screw-type water chiller main body (12) passes sequentially through elastic connecting hose
(9), transverse tube and bend pipe difference connecting pipe, pipeline are divided into two classes, and first kind pipeline has been sequentially distributed y-type filter from top to bottom
(8) butterfly valve (5) is provided with the top of, pressure gauge (7) and thermometer (6), pipeline;The difference of Equations of The Second Kind pipeline and first kind pipeline is
It is not provided with y-type filter (8);
Described integrated water pump race (2) includes vertical or horizontal pump main body (13), butterfly valve (5), pressure gauge (7), the filtering of Y types
Device (8), elastic connecting hose (9) and check-valves (10), the water inlet end of vertical water pump main body (13) and water side are soft by elasticity
Joint (9) connecting pipe, pipeline is divided into inlet channel and outlet conduit;Inlet channel sets gradually y-type filter from bottom to up
(8), pressure gauge (7) and butterfly valve (5);Check-valves (10), pressure gauge (7) and butterfly valve are set gradually on outlet conduit from bottom to up
(5);
Described integrated heat exchanger race (3) includes plate type heat exchanger main body (14), butterfly valve (5), thermometer (6), pressure gauge
(7), y-type filter (8) and gate valve (11), plate type heat exchanger main body (14) pass through length-adjustable transverse tube connecting pipe, pipeline
It is divided into water inlet channel, secondary water inlet channel, a water outlet conduit and secondary water outlet conduit;Water water inlet pipe
On road and secondary water inlet channel, butterfly valve (5), thermometer (6), pressure gauge (7), y-type filter are installed from connection end to the mouth of pipe
And gate valve (11) (8);On water outlet conduit and secondary water outlet conduit, butterfly valve (5), temperature are installed from connection end to the mouth of pipe
Degree meter (6), pressure gauge (7) and gate valve (11);
Described integrated point, water collector race (4) include point, water collector main body (15), butterfly valve (5), thermometer (6), pressure gauge
(7) multiple pipelines, thermometer (6), pressure gauge (7) and bypass pipe and gate valve (11), point, are distributed in water collector main body (15), is managed
Road diameter is different;Pipeline is divided into two classes, and first kind pipeline is simple pipeline, and diameter is minimum;Equations of The Second Kind pipeline is from connection end to pipe
Mouth has been sequentially arranged gate valve (11) and butterfly valve (5).
2. refrigerating plant room according to claim 1, it is characterised in that described refrigerating plant room also includes integrated heat exchanger
Race, integrated water collecting and diversifying device race, equipment supporter or equipment hanger, support of pipelines or pipeline elevator.
3. refrigerating plant room according to claim 1 or 2, it is characterised in that measuring instrumentss, sensing are set up on described pipeline
Device, valve, soft connect and/or filter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710518885.8A CN107218739B (en) | 2017-06-30 | 2017-06-30 | A kind of refrigerating plant room based on the integrated race of BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710518885.8A CN107218739B (en) | 2017-06-30 | 2017-06-30 | A kind of refrigerating plant room based on the integrated race of BIM |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107218739A true CN107218739A (en) | 2017-09-29 |
CN107218739B CN107218739B (en) | 2019-11-08 |
Family
ID=59951407
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710518885.8A Active CN107218739B (en) | 2017-06-30 | 2017-06-30 | A kind of refrigerating plant room based on the integrated race of BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107218739B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108932391A (en) * | 2018-07-11 | 2018-12-04 | 无锡市天宇民防建筑设计研究院有限公司 | The installation of BIM model refrigerator room modularization |
CN109408850A (en) * | 2018-08-28 | 2019-03-01 | 中建八局第建设有限公司 | A kind of equipment machine room forward design method based on BIM |
CN110107972A (en) * | 2019-04-24 | 2019-08-09 | 中建三局安装工程有限公司 | Cabin-type refrigerating plant room and its construction method |
CN111623564A (en) * | 2020-02-20 | 2020-09-04 | 上海朗绿建筑科技股份有限公司 | Multi-cavity hydraulic module |
CN112252784A (en) * | 2020-10-26 | 2021-01-22 | 北京市第三建筑工程有限公司 | Assembly construction method for refrigerating room |
CN114861284A (en) * | 2022-06-10 | 2022-08-05 | 中建安装集团有限公司 | BIM family manufacturing method for assembled water collecting and distributing device module |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103062963A (en) * | 2013-02-07 | 2013-04-24 | 江苏新城新能源有限公司 | Modularized water dividing and concentrating device |
US20150292779A1 (en) * | 2012-12-25 | 2015-10-15 | Jiangliang CHEN | Double-compressor air-source heat pump heating and heat supply system |
CN205137745U (en) * | 2015-11-11 | 2016-04-06 | 河南润恒节能技术开发有限公司 | Standardized equipment system of central air conditioning refrigeration computer lab |
CN206176829U (en) * | 2016-09-13 | 2017-05-17 | 欧悦冰雪投资管理(北京)有限公司 | Modularization unit reaches skating rink refrigerating system including this modularization unit |
CN207335216U (en) * | 2017-06-30 | 2018-05-08 | 大连理工大学 | A kind of refrigerating plant room based on the integrated races of BIM |
-
2017
- 2017-06-30 CN CN201710518885.8A patent/CN107218739B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150292779A1 (en) * | 2012-12-25 | 2015-10-15 | Jiangliang CHEN | Double-compressor air-source heat pump heating and heat supply system |
CN103062963A (en) * | 2013-02-07 | 2013-04-24 | 江苏新城新能源有限公司 | Modularized water dividing and concentrating device |
CN205137745U (en) * | 2015-11-11 | 2016-04-06 | 河南润恒节能技术开发有限公司 | Standardized equipment system of central air conditioning refrigeration computer lab |
CN206176829U (en) * | 2016-09-13 | 2017-05-17 | 欧悦冰雪投资管理(北京)有限公司 | Modularization unit reaches skating rink refrigerating system including this modularization unit |
CN207335216U (en) * | 2017-06-30 | 2018-05-08 | 大连理工大学 | A kind of refrigerating plant room based on the integrated races of BIM |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108932391A (en) * | 2018-07-11 | 2018-12-04 | 无锡市天宇民防建筑设计研究院有限公司 | The installation of BIM model refrigerator room modularization |
CN109408850A (en) * | 2018-08-28 | 2019-03-01 | 中建八局第建设有限公司 | A kind of equipment machine room forward design method based on BIM |
CN110107972A (en) * | 2019-04-24 | 2019-08-09 | 中建三局安装工程有限公司 | Cabin-type refrigerating plant room and its construction method |
CN111623564A (en) * | 2020-02-20 | 2020-09-04 | 上海朗绿建筑科技股份有限公司 | Multi-cavity hydraulic module |
CN111623564B (en) * | 2020-02-20 | 2021-08-24 | 上海朗绿建筑科技股份有限公司 | Multi-cavity hydraulic module |
CN112252784A (en) * | 2020-10-26 | 2021-01-22 | 北京市第三建筑工程有限公司 | Assembly construction method for refrigerating room |
CN114861284A (en) * | 2022-06-10 | 2022-08-05 | 中建安装集团有限公司 | BIM family manufacturing method for assembled water collecting and distributing device module |
Also Published As
Publication number | Publication date |
---|---|
CN107218739B (en) | 2019-11-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107218739A (en) | A kind of refrigerating plant room based on the integrated races of BIM | |
CN107895091B (en) | Module intelligent cold and hot station installation system and BIM model prefabrication construction method thereof | |
CN102338568A (en) | Online monitoring system and method for performance of condenser in power plant based on cleanness coefficient index | |
CN207335216U (en) | A kind of refrigerating plant room based on the integrated races of BIM | |
CN205748898U (en) | A kind of flow characteristics of regulating valve closed loop test system | |
CN111980027A (en) | Intelligent volute concrete temperature control system and method | |
CN110263960A (en) | A method of the public supply mains pressure monitoring point preferred arrangement based on PDD | |
CN202648973U (en) | Combustion gas wall heater performance comprehensive testing device | |
CN100570267C (en) | A kind of control method of heat exchanger heat transfer amount | |
CN208588642U (en) | A kind of ultra-high pump concrete nowed forming monitoring device | |
CN104280257A (en) | Heat exchange capability testing equipment of underground heat exchanger of ground source heat pump | |
CN103616405A (en) | Detection device of buried pipe system of ground source heat pump | |
CN201844205U (en) | Measuring device for drainage leakage of power plant feed water heater emergency drainage pipeline | |
CN207214205U (en) | A kind of efficient cascade utilization heating system that water is mixed with once net backwater | |
CN107247852A (en) | A kind of air-conditioning system equipment standard adapter race block based on BIM | |
CN206959224U (en) | A kind of Air Conditioning Facilities based on the integrated race's blocks of BIM | |
CN206819352U (en) | A kind of air-conditioning system equipment standard adapter race block based on BIM | |
CN105717965B (en) | Constant temperature and pressure recirculated water automatic control system for fluid structure interaction mode experiment | |
CN211060293U (en) | Novel vertical same-stroke water system | |
CN109446692B (en) | Method for optimizing water flow velocity in light pipe of surface air cooler for extracting cold energy of leakage water of extra-long tunnel | |
CN211041490U (en) | Refrigeration machine room based on BIM block modeling | |
CN107270449A (en) | A kind of Air Conditioning Facilities based on the integrated race's blocks of BIM | |
CN106643993A (en) | Device for low-temperature test for water supply vertical pipe and water meter | |
CN204789425U (en) | Two -way check ground thermal response test system | |
CN202229322U (en) | Central air conditioning system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |