CN107213750A - A kind of H2Purification system and gas handling system - Google Patents
A kind of H2Purification system and gas handling system Download PDFInfo
- Publication number
- CN107213750A CN107213750A CN201710558308.1A CN201710558308A CN107213750A CN 107213750 A CN107213750 A CN 107213750A CN 201710558308 A CN201710558308 A CN 201710558308A CN 107213750 A CN107213750 A CN 107213750A
- Authority
- CN
- China
- Prior art keywords
- subflow road
- road
- annular channel
- subflow
- adsorption tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/02—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
- B01D53/04—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
- B01D53/047—Pressure swing adsorption
- B01D53/0473—Rapid pressure swing adsorption
-
- C—CHEMISTRY; METALLURGY
- C01—INORGANIC CHEMISTRY
- C01B—NON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
- C01B3/00—Hydrogen; Gaseous mixtures containing hydrogen; Separation of hydrogen from mixtures containing it; Purification of hydrogen
- C01B3/50—Separation of hydrogen or hydrogen containing gases from gaseous mixtures, e.g. purification
- C01B3/56—Separation of hydrogen or hydrogen containing gases from gaseous mixtures, e.g. purification by contacting with solids; Regeneration of used solids
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2259/00—Type of treatment
- B01D2259/40—Further details for adsorption processes and devices
- B01D2259/40003—Methods relating to valve switching
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2259/00—Type of treatment
- B01D2259/40—Further details for adsorption processes and devices
- B01D2259/40007—Controlling pressure or temperature swing adsorption
-
- C—CHEMISTRY; METALLURGY
- C01—INORGANIC CHEMISTRY
- C01B—NON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
- C01B2210/00—Purification or separation of specific gases
- C01B2210/0001—Separation or purification processing
- C01B2210/0009—Physical processing
- C01B2210/0014—Physical processing by adsorption in solids
- C01B2210/0015—Physical processing by adsorption in solids characterised by the adsorbent
-
- C—CHEMISTRY; METALLURGY
- C01—INORGANIC CHEMISTRY
- C01P—INDEXING SCHEME RELATING TO STRUCTURAL AND PHYSICAL ASPECTS OF SOLID INORGANIC COMPOUNDS
- C01P2006/00—Physical properties of inorganic compounds
- C01P2006/80—Compositional purity
Abstract
A kind of H2Purification system and gas handling system, are related to H2Purification technique field.H2Purification system includes raw material air pipe, product air pipe, inverse put air pipe, rotary valve and adsorption tower.Rotary valve includes nonrotational part and tumbler, and nonrotational part has first flow, and tumbler has second flow channel.Tumbler is rotated so that second flow channel selectively connects raw material air pipe, product air pipe, inverse put air pipe and adsorption tower.Gas handling system includes above-mentioned H2Purification system.The two is controlled with a rotary valve to multi-pipeline, reduces cost, easy to control.
Description
Technical field
The present invention relates to H2Purification technique field, in particular to a kind of H2Purification system and gas handling system.
Background technology
Pressure Swing Adsorption H2System is added whole more due to comprising many operating procedures, causing sequencing valve quantity very
The investment cost and equipment installation cost of individual device, and vavle shelf area floor space is big, is unfavorable for device into sled.
Pressure Swing Adsorption H2System is short due to circulation time, causes sequencing valve switching frequency high, each unit failure of valve
Probability significantly increases.Meanwhile, in pressure-variable adsorption pressure equalization process, valve element is washed away by high velocity air, and valve sealing face is easy
Damage, cause valves leakage, influence plant running, increase the regular maintenance expense and maintenance difficulty of device, and extend production
When consume, add production cost.
From current Pressure Swing Adsorption H2From the point of view of the running situation of device, leakage is that influence is whole in sequencing valve failure or sealing surface
The maximum bottleneck of individual device stable operation.Although journey can be extended by improving the form of valve design and optimization sealing surface structure
The problem of controlling valve use time, but can not fundamentally avoid leaking in sequencing valve failure and sealing surface.
Generally, H2Adsorption process in adsorption operations time it is short (less than one second), so short time requirement
Sequencing valve allows for quick response, and this requirement to sequencing valve is very high, greatly increases the cost of sequencing valve.
The content of the invention
First purpose of the present invention is to provide a kind of H2Purification system, it replaces traditional multi-pipeline work by rotary valve
Complicated sequencing valve during skill, realizes a rotary valve while multiple pipelines are switched over the purpose of control, phase
Than in traditional sequencing valve, significantly reducing the consumptive material of production equipment, equipment investment cost is reduced, while making the control to valve
More facilitate, reduce the fault rate of valve, reduce maintenance cost.
Second object of the present invention is to provide a kind of gas handling system, and it replaces traditional multi-pipeline using rotary valve
Complicated sequencing valve in technical process, realizes a rotary valve while multiple pipelines are switched over the purpose of control,
Compared to traditional sequencing valve, the consumptive material of production equipment is significantly reduced, equipment investment cost is reduced, while making the control to valve
System more facilitates, and reduces the fault rate of valve, reduces maintenance cost.
What embodiments of the invention were realized in:
A kind of H2Purification system, it includes raw material air pipe, product air pipe, inverse put air pipe, rotary valve and at least one
Individual adsorption tower.Adsorption tower has the first interface connected with its adsorbent chamber and second interface.Rotary valve includes nonrotational part and can
The tumbler rotated relative to nonrotational part, nonrotational part has the first flow through its side wall, and first flow includes the first son
Runner, the second subflow road, the 3rd subflow road, the 4th subflow road and the 5th subflow road, tumbler have second flow channel.First interface
With the first sub- flow passage, second interface and the second sub- flow passage, raw material air pipe and the 3rd sub- flow passage, product tracheae
The sub- flow passages of Lu Yu tetra-, inverse put air pipe and the 5th sub- flow passage.
The tumbler of rotary valve is used to rotate relative to nonrotational part, so that in a rotation period of tumbler:Second
Runner selectively communicates with the first subflow road and the 3rd subflow road, and simultaneously by the second subflow road and the 4th subflow road selectivity
Ground is connected, and for single adsorption tower, connection duration, the second subflow road and the 4th in the first subflow road and the 3rd subflow road
The connection duration in subflow road accounts for a quarter of rotation period;Second flow channel is selective by the first subflow road and the 5th subflow road
Ground is connected, and for single adsorption tower, the connection duration in the first subflow road and the 5th subflow road accounts for the 12 of rotation period
/ mono-.
Further, H2Purification system also includes rinsing gas inlet tube and the first flushing gas outlet, and first flow is also wrapped
The 6th subflow road and the 7th subflow road are included, gas inlet tube and the 6th sub- flow passage is rinsed, first rinses gas outlet and the 7th
Sub- flow passage.The tumbler of rotary valve is used to rotate relative to nonrotational part, so that in rotation period:Second flow channel is by second
Subflow road is selectively communicated with the 6th subflow road, and simultaneously selectively communicates with the first subflow road and the 7th subflow road, and
For single adsorption tower, the connection duration in the second subflow road and the 6th subflow road, the first subflow road and the 7th subflow road
Connection duration accounts for 1st/12nd of rotation period.
Further, H2Purification system also includes whole loading line, and first flow also includes the 8th subflow road, whole gas tube
The sub- flow passages of Lu Yu eight.The tumbler of rotary valve is used to rotate relative to nonrotational part, so that in rotation period:Second
Road selectively communicates with the second subflow road and the 8th subflow road, and for single adsorption tower, the second subflow road and the 8th
The connection duration in subflow road accounts for 20 a quarters of rotation period.
Further, H2Purification system also includes second and rinses gas outlet, and first flow also includes the 9th subflow road, the
Two rinse gas outlet and the 9th sub- flow passage.The tumbler of rotary valve is used to rotate relative to nonrotational part, so as to rotate
In cycle:Second flow channel selectively communicates with the first subflow road and the 9th subflow road, and for single adsorption tower, first
The connection duration in subflow road and the 9th subflow road accounts for 1/6th of rotation period.
Further, H2Purification system is also included along blowdown piping, and first flow also includes the tenth subflow road, along bleeder pipe
The sub- flow passages of Lu Yu ten.The tumbler of rotary valve is used to rotate relative to nonrotational part, so that in rotation period:Second
Road selectively communicates with the second subflow road and the tenth subflow road, and for single adsorption tower, the second subflow road and the tenth
The connection duration in subflow road accounts for 20 a quarters of rotation period.
Further, first interface, second interface, raw material air pipe, product air pipe and inverse put air pipe with non-turn
Moving part is connected.
Further, second flow channel includes multiple annular channels and multiple interlayer runners;Annular channel is by the outer of tumbler
Wall is recessed towards the side away from nonrotational part, and circumferentially disposed and annular channel of the annular channel along tumbler is in fan ring-type substantially
Or it is circular, the center of circle of the circumference corresponding to annular channel is located at the rotational axis line of tumbler, and each interlayer runner is communicated to
Few two annular channels.The tumbler of rotary valve is used to rotate relative to nonrotational part, so that in rotation period:Annular channel with
Interlayer runner selectively communicates with the first subflow road and the 3rd subflow road, and simultaneously selects the second subflow road and the 4th subflow road
Connect to selecting property;Annular channel selectively communicates with the first subflow road and the 5th subflow road with interlayer runner.
Further, tumbler includes the multiple parallel and elementary layer that is coaxially disposed, the axial lines of multiple elementary layers with
The rotational axis line of tumbler, which is overlapped, to be set, and each elementary layer is provided with least one annular channel.
Further, for any one subflow road and an annular channel with sub- flow passage, along tumbler
Circumferential, the ratio that the corresponding central angle number of degrees sum of both the length of annular channel and the aperture in subflow road accounts for all angle numbers is
First ratio, the flow time of adsorption process of subflow road when being connected to annular channel residing for corresponding adsorption tower accounts for a flow week
The ratio of phase is the second ratio, and the first ratio and the second ratio are of substantially equal.
Further, adsorption tower is multiple, the first subflow road and the second subflow road also to be multiple, each first subflow road and
At least one first interface is connected, and each second subflow road is connected with least one second interface;The tumbler of rotary valve is used for
Rotated relative to nonrotational part, so that second flow channel selectively connects in each the second subflow road.
Further, adsorption tower, the first subflow road and the second subflow road are 12, first interface and the first subflow road one
One correspondence connection, second interface is corresponded with the second subflow road and connected.The tumbler of rotary valve turns for relatively nonrotational part
It is dynamic, so that in rotation period:The second interface of annular channel and near few two adsorption towers of interlayer runner is selectively communicated with,
And the connection duration of the second interface of an adsorption tower and the second interface of other adsorption towers accounts for 1/3rd of rotation period.
A kind of gas handling system, it includes above-mentioned H2Purification system.
The beneficial effect of the embodiment of the present invention is:
H provided in an embodiment of the present invention2Purification system replaces crisscross multiple in traditional multi-pipeline technical process by rotary valve
Miscellaneous sequencing valve, realizes the purpose that a rotary valve switches over control to multiple pipelines.By the rotation for rotating rotary valve
Part, can make second flow channel selectively connect in each subflow road of first flow, and then adsorption tower is selected with each pipeline
Property connection so as to complete each flow in pressure-variable adsorption.Compared to traditional sequencing valve, the consumption of production equipment is significantly reduced
Material, reduces equipment investment cost and installation cost, simplifies equipment installation, and the time for shortening equipment installation and dismounting disappears
Consumption.Meanwhile, it by rotating the tumbler of rotary valve can be achieved that the connected mode of the pipeline of whole system is controlled and adjusted
It is whole, operating burden of the valve in switching is enormously simplify, the control to valve is more facilitated, reduces the fault rate of valve,
Reduce maintenance cost.
H provided in an embodiment of the present invention2Purification system can change the annexation of whole pipeline by rotating rotary valve,
Set by the rotating speed or adjustment timer that adjust the motor for being used to drive rotary valve, can effectively reduce pressure-variable adsorption and follow
The ring time, make it possible that adsorption operations step run time is less than 2 seconds, and conventional pressure variated adsorption program control valve is opened due to sequencing valve
The limitation of pass time, it is impossible to accomplish that operating procedure run time is less than 2 seconds.By reducing the pressure swing adsorption cycles time, it can make
Adsorbent quickly carries out absorption work, and then reduces the filling size of adsorbent, and reduces with this equipment cost investment.This
Outside, because the pressure swing adsorption cycles time shortens, the size of adsorption tower is reduced, is easy to whole device into sled, reduces the system of device
Make and installation cost.Meanwhile, rotary valve can meet H completely2Requirement of the purification system to being switched fast.
Gas handling system provided in an embodiment of the present invention, it is replaced in traditional multi-pipeline technical process using rotary valve is enough
Complicated sequencing valve, while switching over control to multiple pipelines, compared to traditional sequencing valve, significantly reduces production and sets
Standby consumptive material, reduces equipment investment cost, while control more facilitates, reduces fault rate, reduces maintenance cost.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be attached to what is used required in embodiment
Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore is not construed as pair
The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this
A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is H provided in an embodiment of the present invention2The schematic diagram of purification system;
Fig. 2 is the H in Fig. 12The schematic cross-section of the rotary valve of purification system;
Fig. 3 is the H in Fig. 12Axle of the side wall and first flow of the nonrotational part of the rotary valve of purification system along rotary valve
To the floor map cut and after being deployed;
Fig. 4 is the H in Fig. 12The second flow channel of the tumbler of the rotary valve of purification system is cut along the axial direction of rotary valve
Floor map after cutting and deploying;
Fig. 5 is the H in Fig. 12The schematic diagram of the annular channel of purification system and the circular arc corresponding to subflow road;
Fig. 6 is the H in Fig. 12The schematic diagram of the seal of purification system.
Icon:1000-H2Purification system;100- rotary valves;110- tumblers;The nonrotational parts of 120-;130- first flows;
The first subflows of 131- road;131a- subflows road;131b- subflows road;131c- subflows road;131d- subflows road;131e- subflows road;
131f- subflows road;131g- subflows road;131h- subflows road;131i- subflows road;131j- subflows road;131k- subflows road;131l-
Subflow road;The second subflows of 132- road;132a- subflows road;132b- subflows road;132c- subflows road;132d- subflows road;132e-
Runner;132f- subflows road;132g- subflows road;132h- subflows road;132i- subflows road;132j- subflows road;132k- subflows road;
132l- subflows road;The subflow roads of 133- the 3rd;The subflow roads of 134- the 4th;The subflow roads of 135- the 5th;The subflow roads of 136- the 6th;137-
7th subflow road;The subflow roads of 138- the 8th;The subflow roads of 139- the 9th;The subflow roads of 1310- the tenth;140- second flow channels;01- annulars
Runner;02- annular channels;03- annular channels;04- annular channels;041- annular channels;042- annular channels;043- annular flows
Road;044- annular channels;05- annular channels;06- annular channels;07- annular channels;08- annular channels;081- annular channels;
082- annular channels;083- annular channels;084- annular channels;085- annular channels;086- annular channels;087- annular flows
Road;088- annular channels;089- annular channels;0810- annular channels;0811- annular channels;0812- annular channels;0813-
Annular channel;09- annular channels;010- annular channels;001- interlayer runners;002- interlayer runners;003- interlayer runners;004-
Interlayer runner;005- interlayer runners;006- interlayer runners;007- interlayer runners;008- interlayer runners;009- interlayer runners;
0010- interlayer runners;0011- interlayer runners;0012- interlayer runners;0013- interlayer runners;210- adsorption towers;210a- first
Interface;210b- second interfaces;211- adsorption towers;211a- first interfaces;211b- second interfaces;212- adsorption towers;212a-
One interface;212b- second interfaces;213- adsorption towers;213a- first interfaces;213b- second interfaces;214- adsorption towers;214a-
First interface;214b- second interfaces;215- adsorption towers;215a- first interfaces;215b- second interfaces;216- adsorption towers;
216a- first interfaces;216b- second interfaces;217- adsorption towers;217a- first interfaces;217b- second interfaces;218- is adsorbed
Tower;218a- first interfaces;218b- second interfaces;219- adsorption towers;219a- first interfaces;219b- second interfaces;2110- inhales
Attached tower;2110a- first interfaces;2110b- second interfaces;2111- adsorption towers;2111a- first interfaces;2111b- second interfaces;
220- raw material air pipes;230- product air pipes;240- inverse put air pipes;250- end loading lines;260- rinses gas inlet tube;
270a- first rinses gas outlet;270b- second rinses gas outlet;280- is along blowdown piping;290- connecting tubes;300- is close
Sealing.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
A part of embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings
The component of example can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiments of the invention below to providing in the accompanying drawings is not intended to limit claimed
The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiment in the present invention, this area is common
The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected
Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
Term " first ", " second ", " the 3rd " etc. are only used for distinguishing description, and it is not intended that indicating or implying relatively heavy
The property wanted.
" substantially ", the term such as " basic " is intended to illustrate that related content is not absolute accurate of requirement, but can have one
Fixed deviation.
In the description of the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ",
" connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or integratedly be connected
Connect;Can be joined directly together, can also be indirectly connected to by intermediary, can be the connection of two element internals.For this
For the those of ordinary skill in field, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment
Fig. 1 is refer to, the present embodiment provides a kind of H2Purification system 1000, H2Purification system 1000 include rotary valve 100,
Adsorption tower unit (not marked in figure), raw material air pipe 220, product air pipe 230, inverse put air pipe 240, whole loading line
250th, rinse gas inlet tube 260, first and rinse gas outlet 270a, the second flushing gas outlet 270b and along blowdown piping 280.
Raw material air pipe 220, product air pipe 230, inverse put air pipe 240, whole loading line 250, flushing gas inlet tube
260th, first rinse gas outlet 270a, second rinse gas outlet 270b, along blowdown piping 280 and adsorption tower unit with
Rotary valve 100 is connected.It should be noted that Fig. 1 illustrate only above-mentioned each pipeline and adsorption tower unit each connect
Annexation between mouth and rotary valve 100, Fig. 1 is the schematic diagram of annexation, and the position of connection is not defined.
Rotary valve 100 in rotation process can by raw material air pipe 220, product air pipe 230, inverse put air pipe 240,
Whole loading line 250, rinse gas inlet tube 260, first and rinse gas outlet 270a, the second flushing gas outlet 270b and along putting
Air pipe 280 is connected with adsorption tower Unit selection, it is possible to will mutually be selected between each adsorption tower in adsorption tower unit
Property connection so that adsorption tower unit can smoothly complete whole adsorption process.
H2Purification system 1000 replaces complicated sequencing valve in traditional multi-pipeline technical process by rotary valve 100,
Rotary valve 100 is realized while multiple pipelines are switched over the purpose of control.Compared to traditional sequencing valve, life is significantly reduced
The consumptive material of equipment is produced, equipment investment cost is reduced, while making the control to valve and pipeline switching more facilitate, reduces valve
The fault rate of door, reduces maintenance cost.
Fig. 2, Fig. 3 and Fig. 4 are referred to, rotary valve 100 includes tumbler 110 and nonrotational part 120, and tumbler 110 can turn
Nonrotational part 120 is placed in dynamicly.In the present embodiment, tumbler 110 is cylindric in substantially, and nonrotational part 120 is in substantially
Cylindrical shape, nonrotational part 120 is sheathed on tumbler 110, and nonrotational part 120 is coaxially disposed with tumbler 110, nonrotational part
The lateral wall of 120 madial wall and tumbler 110 offsets.It should be noted that in other embodiments of the invention, tumbler
110 can also be in cylindrical shape substantially.
Further, nonrotational part 120 has first flow 130, and first flow 130 includes the first subflow road 131, second
Subflow road 132, the 3rd subflow road 133, the 4th subflow road 134, the 5th subflow road 135, the 6th subflow road 136, the 7th subflow road
137th, the 8th subflow road 138, the 9th subflow road 139 and the tenth subflow road 1310.First flow 130 runs through nonrotational part 120
Side wall.Tumbler 110 has second flow channel 140.First flow 130 is used for adsorption tower unit and each pipeline connection,
By the control to first flow 130 and the connected relation of second flow channel 140, the adsorbed state to adsorption tower unit is realized indirectly
Control.
Further, adsorption tower unit includes adsorption tower 210, adsorption tower 211, adsorption tower 212, adsorption tower 213, adsorption tower
214th, adsorption tower 215, adsorption tower 216, adsorption tower 217, adsorption tower 218, adsorption tower 219, adsorption tower 2110 and adsorption tower 2111.
Wherein, adsorption tower 210 has the first interface 210a and second interface 210b connected with its adsorbent chamber;Adsorption tower 211 have with
The first interface 211a and second interface 211b of its adsorbent chamber connection;Adsorption tower 212 has connected with its adsorbent chamber first to connect
Mouth 212a and second interface 212b;Adsorption tower 213 has the first interface 213a and second interface 213b connected with its adsorbent chamber;
Adsorption tower 214 has the first interface 214a and second interface 214b connected with its adsorbent chamber;Adsorption tower 215 has to be adsorbed with it
The first interface 215a and second interface 215b of chamber connection;Adsorption tower 216 has the first interface 216a connected with its adsorbent chamber
With second interface 216b;Adsorption tower 217 has the first interface 217a and second interface 217b connected with its adsorbent chamber;Adsorption tower
218 have the first interface 218a and second interface 218b connected with its adsorbent chamber;Adsorption tower 219 has to be connected with its adsorbent chamber
First interface 219a and second interface 219b;Adsorption tower 2110 has the first interface 2110a that is connected with its adsorbent chamber and the
Two interface 2110b;Adsorption tower 2111 has the first interface 2111a and second interface 2111b connected with its adsorbent chamber.Unstripped gas
Pipeline 220, product air pipe 230, inverse put air pipe 240, whole loading line 250, flushing gas inlet tube 260, first rinse gas
Outlet 270a, the second flushing gas outlet 270b, suitable blowdown piping 280 and whole first interfaces and whole second interfaces are equal
It is connected to the lateral wall of nonrotational part 120.
It should be noted that the adsorbent for adsorbing the foreign gas in unstripped gas is filled with each adsorption tower,
It is purified hydrogen the selective absorption of foreign gas using adsorbent.
In the present embodiment, specifically, the first subflow road 131 and the second subflow road 132 are 12,12 the first subflows
Road 131 and 12 the second subflow roads 132 are set along the circumferential uniform intervals of nonrotational part 120.
12 the first subflow roads 131 connect one to one and connected with 12 first interfaces of adsorption tower unit;12
Two subflow roads 132 connect one to one and connected with 12 second interfaces of adsorption tower unit;Of raw material air pipe 220 and the 3rd
Runner 133 is connected and connected;Product air pipe 230 is connected and connected with the 4th subflow road 134;Inverse put air pipe 240 and the 5th
Subflow road 135 is connected and connected;Whole loading line 250 is connected and connected with the 8th subflow road 138;Rinse gas inlet tube 260 with
6th subflow road 136 is connected and connected;First flushing gas outlet 270a is connected and connected with the 7th subflow road 137;Second punching
Gas washing outlet 270b is connected and connected with the 9th subflow road 139;It is connected and connects with the tenth subflow road 1310 along blowdown piping 280
It is logical.
By rotating tumbler 110, the relatively nonrotational part 120 of tumbler 110 can be made to rotate, so that second
Road 140 rotates with respect to first flow 130, so that change the connected relation between second flow channel 140 and first flow 130,
And then change whole H2The pipeline connection relation of purification system 1000, reaches the mesh switched between different absorption phases
's.
Refer to Fig. 3 and Fig. 4.Fig. 3 is that the axial direction of the side wall and first flow 130 of nonrotational part 120 along rotary valve 100 is entered
Row is cut and the floor map after deploying, and is simultaneously the madial wall of nonrotational part 120 towards we this.Fig. 4 is tumbler
Axial direction of 110 second flow channel 140 along rotary valve 100 is cut and the floor map after being deployed, towards our this
Face is the inner side of tumbler 110.
It should be noted that in figs. 3 and 4, being carried out to the plane outspread drawing of nonrotational part 120 and tumbler 110
Subregion.Along the circumference of rotary valve 100, the plane outspread drawing of nonrotational part 120 and tumbler 110 24 have been divided into
Continuous zonule, numbering is 1~24 respectively, wherein, before expansion, what 1 and 24 two region was connected to, table for convenience
Show, be to deploy nonrotational part 120 and tumbler 110 along 1 and 24 border in figure.Along the axial direction of rotary valve 100, tumbler
110 have the multiple parallel and elementary layer that is coaxially disposed, the rotational axis line of the axial lines of multiple elementary layers with tumbler 110
Overlap and set, these elementary layers represent 10 layer-shaped areas respectively, numbering is A~J respectively.Region corresponding to these elementary layers
A~J is mutually arranged at intervals.
In an embodiment of the present invention, first flow 130 and the width of second flow channel 140 refer to the axle along rotary valve 100
To width, the length of first flow 130 and second flow channel 140 refers to the circumferential length along rotary valve 100.Above-mentioned numbering
1 lattice, 10 zonules that numbering is A~J are represented as 1~24 circumferential length of each zonule along rotary valve 100
It is equal along the axial width of rotary valve 100.
Specifically, second flow channel 140 includes annular channel unit (not marked in figure) and interlayer flow passage unit (is not marked in figure
Go out).Annular channel unit includes multiple annular channels, and multiple annular channels are by the lateral wall of tumbler 110 towards away from non-turn
The side depression of moving part 120, multiple annular channels are along the circumferentially disposed of tumbler 110, and multiple annular channels are in substantially
Ring-type or annular shape are fanned, the center of circle of the circumference corresponding to multiple annular channels is located at the rotational axis line of tumbler 110, rotates and turns
Moving part 110 is so that multiple annular channels are connected with the selectivity of first flow 130.Annular channel is located at the region corresponding to elementary layer
A~J.Interlayer flow passage unit includes multiple interlayer runners, and interlayer runner is used to connect two annular channels.
Annular channel be used for first flow 130 carry out it is selective connect, can make annular flow by rotating tumbler 110
Road is rotated, so as to change the connected relation of annular channel and first flow 130.And interlayer runner is to be used to connect two annular flows
Road, acted on using the indirect communication of interlayer runner, two sub- runner indirect communications of first flow 130 can be made, so that
It is interconnected between each adsorption tower and each pipeline, and each adsorption tower can be changed by rotating tumbler 110
And the connected relation between each pipeline, so as to reach control H2The purpose of the adsorbed state of purification system 1000.
It should be noted that because the lateral wall of the madial wall and tumbler 110 of nonrotational part 120 offsets, so non-turn
Moving part 120 has sealing function to annular channel, makes the gas for entering annular channel will not be from nonrotational part 120 and tumbler
Escaped between 110, it is ensured that gas in annular channel can smoothly, be exactly into default path.And the present invention's
In other embodiment, interlayer runner can also be for the annular channel of three or more to be connected, and two annulars
Also not necessarily simply connected between runner by an interlayer runner, can also be by two or more between two annular channels
Individual interlayer runner is connected.
Further, in the present embodiment, annular channel unit includes annular channel 01, annular channel 02, annular channel
03rd, annular channel 04, annular channel 05, annular channel 06, annular channel 07, annular channel 08, annular channel 09 and annular flow
Road 010.
More specifically, the corresponding J1~J24 of annular channel 01 whole annular section, annular channel 01 is annular shape.Annular
Corresponding I1~the I24 of runner 02 whole annular section, annular channel 02 is also annular shape.Corresponding H1~the H24's of annular channel 03
Whole annular section, annular channel 03 is also annular shape.
Annular channel 04 includes annular channel 041, annular channel 042, annular channel 043 and annular channel 044.Annular flow
Road 041 is the continuous fan ring-type in correspondence G20~G1 regions, wherein, length of the annular channel 041 in G20 regions is whole G20 areas
The half of length of field, the i.e. length of annular channel 041 are 5.5 lattice.Similar, if not providing certain illustrated, mean that and occupy
Whole corresponding region.Annular channel 042 is the continuous fan ring-type in correspondence G7~G10 regions, wherein, annular channel 042 is in G7 areas
The length in domain is that the half of whole G7 zone lengths, the i.e. length of annular channel 042 are 3.5 lattice.Annular channel 043 is correspondence
The continuous fan ring-type in G11~G12 regions, wherein, length of the annular channel 043 in G11 regions is the one of whole G11 zone lengths
Half, the i.e. length of annular channel 043 are 1.5 lattice.Annular channel 044 is the continuous fan ring-type in correspondence G13~G14 regions, wherein,
Length of the annular channel 044 in G13 regions is that the half of whole G13 zone lengths, the i.e. length of annular channel 044 are 1.5 lattice.
Corresponding F1~the F24 of annular channel 05 whole annular section, annular channel 05 is also annular shape.06 pair of annular channel
E1~E24 whole annular section is answered, annular channel 06 is also annular shape.Corresponding D1~the D24 of annular channel 07 whole ring-type
Region, annular channel 07 is also annular shape.
Annular channel 08 includes annular channel 081, annular channel 082, annular channel 083, annular channel 084, annular flow
Road 085, annular channel 086, annular channel 087, annular channel 088, annular channel 089, annular channel 0810, annular channel
0811st, annular channel 0812 and annular channel 0813.
Annular channel 081 is the continuous fan ring-type in correspondence C20~C1 regions, wherein, annular channel 081 is in C20 regions
Length is that the half of whole C20 zone lengths, the i.e. length of annular channel 081 are 5.5 lattice.
Annular channel 082 is the continuous fan ring-type in correspondence C2 regions, wherein, length of the annular channel 082 in C2 regions is
The half of whole C2 zone lengths, the i.e. length of annular channel 082 are 0.5 lattice, and annular channel 082 and annular channel 081 it
Between distance be 0.5 lattice.
Annular channel 083 is the continuous fan ring-type in correspondence C3 regions, wherein, length of the annular channel 083 in C3 regions is
The half of whole C3 zone lengths, the i.e. length of annular channel 083 are 0.5 lattice, and annular channel 082 and annular channel 083 it
Between distance be 0.5 lattice.
Annular channel 084 is the continuous fan ring-type in correspondence C4 regions, wherein, length of the annular channel 084 in C4 regions is
The half of whole C4 zone lengths, the i.e. length of annular channel 084 are 0.5 lattice, and annular channel 084 and annular channel 083 it
Between distance be 0.5 lattice.
Annular channel 085 is the continuous fan ring-type in correspondence C5 regions, wherein, length of the annular channel 085 in C5 regions is
The half of whole C5 zone lengths, the i.e. length of annular channel 085 are 0.5 lattice, and annular channel 085 and annular channel 084 it
Between distance be 0.5 lattice.
Annular channel 086 is the continuous fan ring-type in correspondence C6 regions, wherein, length of the annular channel 086 in C6 regions is
The half of whole C6 zone lengths, the i.e. length of annular channel 086 are 0.5 lattice, and annular channel 086 and annular channel 085 it
Between distance be 0.5 lattice.
Annular channel 087 is the continuous fan ring-type in correspondence C7~C10 regions, wherein, length of the annular channel 087 in C7 regions
It is 3.5 lattice to spend for the half of whole C7 zone lengths, the i.e. length of annular channel 087, and annular channel 087 and annular channel
The distance between 086 is 0.5 lattice.
Annular channel 088 is the continuous fan ring-type in correspondence C11~C12 regions, wherein, annular channel 088 is in C11 regions
Length is that the half of whole C11 zone lengths, the i.e. length of annular channel 088 are 1.5 lattice, and annular channel 088 and annular flow
The distance between road 087 is 0.5 lattice.
Annular channel 089 is the continuous fan ring-type in correspondence C15 regions, wherein, length of the annular channel 089 in C15 regions
It is 0.5 lattice for the half of whole C15 zone lengths, the i.e. length of annular channel 089, and annular channel 089 and annular channel 088
The distance between be 2.5 lattice.
Annular channel 0810 is the continuous fan ring-type in correspondence C16 regions, wherein, length of the annular channel 0810 in C16 regions
It is 0.5 lattice to spend for the half of whole C16 zone lengths, the i.e. length of annular channel 0810, and annular channel 089 and annular channel
The distance between 0810 is 0.5 lattice.
Annular channel 0811 is the continuous fan ring-type in correspondence C17 regions, wherein, length of the annular channel 0811 in C17 regions
It is 0.5 lattice to spend for the half of whole C17 zone lengths, the i.e. length of annular channel 0811, and annular channel 0811 and annular flow
The distance between road 0810 is 0.5 lattice.
Annular channel 0812 is the continuous fan ring-type in correspondence C18 regions, wherein, length of the annular channel 0812 in C18 regions
It is 0.5 lattice to spend for the half of whole C18 zone lengths, the i.e. length of annular channel 0812, and annular channel 0812 and annular flow
The distance between road 0811 is 0.5 lattice.
Annular channel 0813 is the continuous fan ring-type in correspondence C19 regions, wherein, length of the annular channel 0813 in C19 regions
It is 0.5 lattice to spend for the half of whole C19 zone lengths, the i.e. length of annular channel 0813, and annular channel 0812 and annular flow
The distance between road 0813 is 0.5 lattice.
Corresponding B1~the B24 of annular channel 09 whole annular section, annular channel 09 is annular shape.010 pair of annular channel
A1~A24 whole annular section is answered, annular channel 010 is annular shape.
Interlayer flow passage unit includes interlayer runner 001, interlayer runner 002, interlayer runner 003, interlayer runner 004, interlayer
Runner 005, interlayer runner 006, interlayer runner 007, interlayer runner 008, interlayer runner 009, interlayer runner 0010, interlayer runner
0011st, interlayer runner 0012 and interlayer runner 0013.
Wherein, interlayer runner 001 connects annular channel 01 with annular channel 041;Interlayer runner 002 is by annular channel 02
Connected with annular channel 044;Interlayer runner 003 connects annular channel 03 with annular channel 043;Interlayer runner 004 is by annular
Runner 05 is connected with annular channel 042;Interlayer runner 005 connects annular channel 06 with annular channel 088;Interlayer runner 006
Annular channel 06 is connected with annular channel 087;Interlayer runner 007 connects annular channel 07 with annular channel 089;Interflow
Road 008 connects annular channel 084 with annular channel 0812;Interlayer runner 009 connects annular channel 085 and annular channel 0811
It is logical;Interlayer runner 0010 connects annular channel 086 with annular channel 0810;Interlayer runner 0011 is by annular channel 03 and annular
Runner 0813 is connected;Interlayer runner 0012 connects annular channel 082 with annular channel 09;Interlayer runner 0013 is by annular channel
081 connects with annular channel 010.
It should be noted that in the present embodiment, each interlayer runner is the connecting pipe located at tumbler 110, often
Individual interlayer runner is used to connect specific two annular channels, and other annular channels or other interlayer runners will not be caused to do
Disturb.Preferably, each interlayer runner can so reduce the resistance suffered by air-flow in arc substantially, improve gas stream
Stability during dynamic.In other embodiments of the invention, the shape of each interlayer runner be not particularly limited and
Regulation, can connect specific two annular channels.In other embodiments of the present invention, each interlayer runner is also
Can be recessed the connectivity slot that is formed, but not limited to this towards the side away from nonrotational part 120 by the side wall of tumbler 110.
Further, in the present embodiment, first flow 130 is to extend radially through nonrotational part 120 along nonrotational part 120
Through hole.In the present embodiment, between each first subflow road 131 at intervals of 1.5 lattice, between each second subflow road 132
Interval be also 1.5 lattice, and the length in each first subflow road 131 and each second subflow road 132 is 0.5 lattice.12
First subflow road 131 is respectively subflow road 131a, subflow road 131b, subflow road 131c, subflow road 131d, subflow road 131e, son
Runner 131f, subflow road 131g, subflow road 131h, subflow road 131i, subflow road 131j, subflow road 131k and subflow road 131l.
12 the second subflow roads 132 are respectively subflow road 132a, subflow road 132b, subflow road 132c, subflow road 132d, subflow road
132e, subflow road 132f, subflow road 132g, subflow road 132h, subflow road 132i, subflow road 132j, subflow road 132k and subflow
Road 132l.And the 3rd subflow road 133, the 4th subflow road 134, the 5th subflow road 135, the 6th subflow road 136, the 7th subflow road
137th, the number in the 8th subflow road 138, the 9th subflow road 139 and the tenth subflow road 1310 is one and length is 0.5 lattice.
Along the axial direction of rotary valve 100, subflow road 131a, subflow road 132a, the 3rd subflow road 133, the 4th subflow road 134, the 5th subflow
Road 135, the 6th subflow road 136, the 7th subflow road 137, the 8th subflow road 138, the 9th subflow road 139 and the tenth subflow road 1310
Arranged in substantial linear.
It should be noted that in other embodiments of the invention, first flow 130 can also be other shapes, to
The shape of one runner 130 is not restricted, as long as first flow 130 can connect specific annular channel i.e. with exterior line
Can.
Specifically, in the present embodiment, subflow road 131a is located at the one of G2 regions and the close G1 regions positioned at G2 regions
End, the first subflow road 131 is used to connect with annular channel 04.Subflow road 132a is located at C2 regions and positioned at the close C1 in C2 regions
The one end in region, the second subflow road 132 is used to connect with annular channel 08.3rd subflow road 133 is located at J2 regions and positioned at J2
The one end in the close J1 regions in region, the 3rd subflow road 133 is used to connect with annular channel 01.4th subflow road 134 is located at A2
Region and the one end in close A1 regions positioned at A2 regions, the 4th subflow road 134 with annular channel 010 for connecting.5th son
Runner 135 is located at the one end in I2 regions and the close I1 regions positioned at I2 regions, and the 5th subflow road 135 is used for and annular channel 02
Connection.6th subflow road 136 is located at the one end in E2 regions and the close E1 regions positioned at E2 regions, and the 6th subflow road 136 is used for
Connected with annular channel 06.7th subflow road 137 is located at the one end in H2 regions and the close H1 regions positioned at H2 regions, the 7th son
Runner 137 is used to connect with annular channel 03.8th subflow road 138 is located at B2 regions and is located at the close B1 regions in B2 regions
One end, the 8th subflow road 138 is used to connect with annular channel 09.9th subflow road 139 is located at F2 regions and positioned at F2 regions
One end close to F1 regions, the 9th subflow road 139 is used to connect with annular channel 05.Tenth subflow road 1310 be located at D2 regions and
One end positioned at the close D1 regions in D2 regions, the tenth subflow road 1310 is used to connect with annular channel 07.
It should be noted that being to be indirectly connected between 12 first interfaces and 12 second interfaces and nonrotational part 120.Even
12 first interfaces and 12 second interfaces are connected to nonrotational part 120 by adapter 290.I.e.:Connecting tube 290 is by first interface
210a, first interface 211a, first interface 212a, first interface 213a, first interface 214a, first interface 215a, first connect
Mouth 216a, first interface 217a, first interface 218a, first interface 219a, first interface 2110a and first interface 2111a are same
Subflow road 131a, subflow road 131b, subflow road 131c, subflow road 131d, subflow road 131e, subflow road 131f, subflow road 131g,
Subflow road 131h, subflow road 131i, subflow road 131j, subflow road 131k and subflow road 131l connect one to one, i.e., first connects
Mouth 210a is connected with subflow road 131a by connecting tube 290, and first interface 211a is connected with subflow road 131b by connecting tube 290, with
This analogizes, and here is omitted.Connecting tube 290 connects second interface 210b, second interface 211b, second interface 212b, second
Mouth 213b, second interface 214b, second interface 215b, second interface 216b, second interface 217b, second interface 218b, second
Interface 219b, second interface 2110b and second interface 2111b are with subflow road 132a, subflow road 132b, subflow road 132c, subflow
Road 132d, subflow road 132e, subflow road 132f, subflow road 132g, subflow road 132h, subflow road 132i, subflow road 132j, subflow
Road 132k and subflow road 132l connect one to one.I.e. second interface 210b is connected with subflow road 132a by connecting tube 290, and second
Interface 211b is connected with subflow road 132b by connecting tube 290, by that analogy, and here is omitted.
With reference to H2The specific adsorption process of purification system 1000 is to rotary valve 100 and H2Purification system 1000 is carried out
Describe in detail.
H2The operating time-scale of purification system 1000 is as shown in table 1, wherein:A represents absorption;E1D represents one down;E2D
Represent two down;E3D represents that three drop;E4D represents that four drop;PP represents suitable and put;D represents inverse put;P1 represents to rinse for the first time;
P2 represents second of flushing;E4R represents that four rise;E3R represents that three rise;E2R represents that two rise;E1R represents that one rises;FR tables
Show final boosting.Each sequential represents the period of same length.
Table 1H2Purification system 1000 operates time-scale
Fig. 3 and Fig. 4 are referred to, by taking adsorption tower 210 as an example, as shown in table 1, works as H2Purification system 1000 will enter sequential
When 1, now, the zonule 1 of tumbler 110 is overlapped with the zonule 1 of the nonrotational part 120 in Fig. 3 in Fig. 4, tumbler 110
Zonule 24 and the zonule 24 of nonrotational part 120 also overlap.Now annular channel 041 will connect with subflow road 131a
Lead to, and annular channel 081 will be connected with subflow road 132a, adsorption tower 210 will enter absorption phase.It should be noted that.
In H2In the whole sequential of purification system 1000, the rotation direction of tumbler 110 is the circumferential direction K along rotary valve 100, and
Nonrotational part 120 is remained stationary as, i.e., tumbler 110 is rotated relative to nonrotational part 120.
Work as H2Purification system 1000 enters sequential 1, and annular channel 041 is connected with subflow road 131a, and annular channel 081
Connected with subflow road 132a, adsorption tower 210 enters absorption phase.
Unstripped gas enters annular channel 01 by raw material air pipe 220 through the 3rd subflow road 133, then is entered by interlayer runner 001
Enter annular channel 041 and enter adsorption tower 210, after being adsorbed, product gas H through subflow road 131a and first interface 210a2By
Second interface 210b is successively through subflow road 132a, annular channel 081, interlayer runner 0013, annular channel 010, the 4th subflow road
Discharged after 134 into product gas pipeline 230.Foreign gas in absorption phase, unstripped gas, which is substantially all, to be adsorbed by adsorbent,
There was only minimal amount of foreign gas in product gas, not there is foreign gas even.
Due to annular channel 081 and subflow road 132a length and be 6 lattice, and annular channel 041 and subflow road 131a
Length and be also 6 lattice, therefore the whole absorption phase of adsorption tower 210 can continue the time corresponding to 6 lattice length, i.e. adsorption tower 210
Absorption phase to account for the ratio of whole cycle be the lattice of 6 lattice/24, equal to a quarter, this absorption with adsorption tower in time-scale 210
The ratio 6/24 that stage accounts for whole timing cycles is consistent.The whole absorption phase of adsorption tower 210 continues whole sequential 1 to sequential 6.
It should be noted that annular channel 041 and subflow road 131a length and the ratio for accounting for whole 24 lattice are the first ratio
Example, annular channel 081 and subflow road 132a length and the ratio for accounting for whole 24 lattice are also the first ratio, and absorption phase is accounted for entirely
The ratio of timing cycles is the second ratio.In theory, the first ratio should be equal with the second ratio.It should be noted that such as Fig. 5
Shown, the length of annular channel 041 refers to the arc length L3 corresponding to circumference of the annular channel 041 along rotary valve 100, subflow road
131a length refers to the arc length L2 corresponding to circumferences of the subflow road 131a aperture L1 along rotary valve 100, special instruction, subflow
Road 131a length does not imply that subflow road 131a aperture L1, and refers to subflow road 131a aperture L1 along rotary valve 100
Arc length L2 corresponding to circumference.L2 and L3 length and account for the ratio of girth of tumbler 110 and accounted for entirely equal to respective stage
The ratio of timing cycles.Above-mentioned ratio can also account for the ratio of angle of circumference with the number of degrees sum of the central angle corresponding to L2 and L3
To represent, i.e. the ratio that the number of degrees sum of L2 and the central angle corresponding to L3 accounts for angle of circumference accounts for whole sequential week equal to respective stage
The ratio of phase.In the present embodiment, for simplicity, represented using length ratio.But in actual production process, above-mentioned two
Ratio is extremely difficult to completely the same, typically can all have certain error, as long as not influenceing H2The normal work(of purification system 1000
Can, certain error is acceptable.Therefore, the first ratio and the second ratio are of substantially equal also possible.Whole rings
Shape runner and subflow road meet the requirement.
Please continue to refer to Fig. 3 and Fig. 4, when the absorption phase of adsorption tower 210 has just terminated and will enter one down, i.e.,
When adsorption tower 210 will enter sequential 7, the zonule 1 of tumbler 110 is overlapped with the zonule 7 of nonrotational part 120.Now, it is sub
Runner 132a just disconnects with annular channel 081, and will be connected with annular channel 0813;Subflow road 131a just with annular flow
Road 041 disconnects.When adsorption tower 210 enters sequential 7, annular channel 0813 is connected with subflow road 132a, and now annular channel
083 connects with subflow road 132e, and interlayer runner 0011 connects annular channel 083 with annular channel 0813, adsorption tower 210 with
Adsorption tower 214 is connected, and adsorption tower 210 is in the one down stage, and adsorption tower 214 rises the stage in one.And at subflow road 131a
In off-state.
In this stage, due to subflow road 132a and annular channel 0813 length and be 1 lattice, and subflow road 132e and ring
The length of shape runner 083 and be also 1 lattice, therefore the one of the one down stage of adsorption tower 210 and adsorption tower 214 rises continuing for stage
Time is 20 a quarters of whole timing cycles.The one down stage of adsorption tower 210 and the one of adsorption tower 214 rise rank
The whole sequential 7 of Duan Chixu.
When the one down stage of adsorption tower 210 has just terminated and will enter two down, i.e., adsorption tower 210 will enter
During sequential 8, the zonule 1 of tumbler 110 is overlapped with the zonule 8 of nonrotational part 120.Now, subflow road 132a just with ring
Shape runner 0813 disconnects, and will be connected with annular channel 0812.When adsorption tower 210 enter sequential 8, annular channel 0812 i.e. with
Subflow road 132a is connected, and now annular channel 084 is connected with subflow road 132f, and interlayer runner 008 is by annular channel 0812
Connected with annular channel 084, adsorption tower 210 is connected with adsorption tower 215, adsorption tower 210 is in two down stage, adsorption tower 215
The stage is risen in two.And subflow road 131a is off.
In this stage, due to subflow road 132a and annular channel 0812 length and be 1 lattice, and subflow road 132f and ring
The length of shape runner 084 and be also 1 lattice, therefore the two of the two down stage of adsorption tower 210 and adsorption tower 215 rise continuing for stage
Time is 20 a quarters of whole timing cycles.The two down stage of adsorption tower 210 and the two of adsorption tower 215 rise rank
The whole sequential 8 of Duan Chixu.
When the two down stage of adsorption tower 210 has just terminated and will be dropped into three, i.e., adsorption tower 210 will enter
During sequential 9, the zonule 1 of tumbler 110 is overlapped with the zonule 9 of nonrotational part 120.Now, subflow road 132a just with ring
Shape runner 0812 disconnects, and will be connected with annular channel 0811.When adsorption tower 210 enter sequential 9, annular channel 0811 i.e. with
Subflow road 132a is connected, and now annular channel 085 is connected with subflow road 132g, and interlayer runner 009 is by annular channel 0811
Connected with annular channel 085, adsorption tower 210 is connected with adsorption tower 216, adsorption tower 210 is in three equal depression of order sections, adsorption tower 216
The stage is risen in three.And subflow road 131a is off.
In this stage, due to subflow road 132a and annular channel 0811 length and be 1 lattice, and subflow road 132g and ring
The length of shape runner 085 and be also 1 lattice, therefore the three of the three of adsorption tower 210 equal depression of orders sections and adsorption tower 216 rise continuing for stage
Time is 20 a quarters of whole timing cycles.Three equal depression of order sections of adsorption tower 210 and the three of adsorption tower 216 rise rank
The whole sequential 9 of Duan Chixu.
When three equal depression of order sections of adsorption tower 210 have just terminated and will be dropped into four, i.e., adsorption tower 210 will enter
During sequential 10, the zonule 1 of tumbler 110 is overlapped with the zonule 10 of nonrotational part 120.Now, subflow road 132a just with
Annular channel 0811 disconnects, and will be connected with annular channel 0810.When adsorption tower 210 enters sequential 10, annular channel 0810
Connected with subflow road 132a, and now annular channel 086 is connected with subflow road 132h, and interlayer runner 0010 is by annular channel
0810 is connected with annular channel 086, and adsorption tower 210 is connected with adsorption tower 217, and adsorption tower 210 is in four equal depression of order sections, adsorption tower
217 rise the stage in four.And subflow road 131a is off.
In this stage, due to subflow road 132a and annular channel 0810 length and be 1 lattice, and subflow road 132h and ring
The length of shape runner 086 and be also 1 lattice, therefore the four of the four of adsorption tower 210 equal depression of orders sections and adsorption tower 217 rise continuing for stage
Time is 20 a quarters of whole timing cycles.Four equal depression of order sections of adsorption tower 210 and the four of adsorption tower 217 rise rank
The whole sequential 10 of Duan Chixu.
When four equal depression of order sections of adsorption tower 210 have just terminated and will enter along putting, i.e., adsorption tower 210 will enter fashionable
During sequence 11, the zonule 1 of tumbler 110 is overlapped with the zonule 11 of nonrotational part 120.Now, subflow road 132a just with ring
Shape runner 0810 disconnects, and will be connected with annular channel 089.When adsorption tower 210 enter sequential 11, annular channel 089 i.e. with
Subflow road 132a is connected, and adsorption tower 210 puts the stage in suitable.And subflow road 131a is off.Connect along deflating by second
Mouthful 210b successively behind subflow road 132a, annular channel 089, interlayer runner 007, annular channel 07, the tenth subflow road 1310 by
Discharged along blowdown piping 280.
In this stage, due to subflow road 132a and annular channel 089 length and be 1 lattice, therefore adsorption tower 210 along putting
The duration in stage is 20 a quarters of whole timing cycles.The suitable stage of putting of adsorption tower 210 continues whole sequential
11。
When adsorption tower 210 has just terminated along the stage that puts and will enter the inverse put stage, i.e., adsorption tower 210 will enter
During sequential 12, the zonule 1 of tumbler 110 is overlapped with the zonule 12 of nonrotational part 120.Now, subflow road 132a just with
Annular channel 089 disconnects;And subflow road 131a will be connected with annular channel 044.When adsorption tower 210 enters sequential 12, subflow
Road 131a is connected with annular channel 044, and subflow road 132a is off, and adsorption tower 210 is in the inverse put stage.Reverse gas by
First interface 210a is successively through subflow road 131a, annular channel 044, interlayer runner 002, annular channel 02, the 5th subflow road 135
Discharged afterwards by inverse put air pipe 240.
In this stage, due to subflow road 131a and annular channel 044 length and be 2 lattice, therefore the inverse put of adsorption tower 210
The duration in stage is 2nd/24th of whole timing cycles.The inverse put stage of adsorption tower 210 continues whole sequential 12
With sequential 13.
When the inverse put stage of adsorption tower 210 has just terminated and will enter first time rinse stage, i.e., adsorption tower 210 is
When will enter sequential 14, the zonule 1 of tumbler 110 is overlapped with the zonule 14 of nonrotational part 120.Now, subflow road 131a
Just disconnect, and will be connected with annular channel 043 with annular channel 044;Subflow road 132a will also connect with annular channel 088
It is logical.When adsorption tower 210 enters sequential 14, subflow road 131a is connected with annular channel 043, and subflow road 132a is and annular channel
088 connection, adsorption tower 210 is in first time rinse stage.Gas is rinsed by flushing gas inlet tube 260 successively through the 6th subflow road
136th, adsorption tower is entered after annular channel 06, interlayer runner 005, annular channel 088, subflow road 132a and second interface 210b
The adsorbent of 210 pairs of adsorption towers 210 is rinsed, the flushing gas after flushing by first interface 210a successively through subflow road 131a,
Gas outlet 270a is rinsed behind annular channel 043, interlayer runner 003, annular channel 03, the 7th subflow road 137 by first to discharge.
In this stage, due to subflow road 131a and annular channel 043 length and be 2 lattice, subflow road 132a and annular
The length of runner 088 and be also 2 lattice, therefore the duration of the first time rinse stage of adsorption tower 210 is whole timing cycles
2/24ths.The first time rinse stage of adsorption tower 210 continues whole sequential 14 to sequential 15.
When the first time rinse stage of adsorption tower 210 has just terminated and will enter second of rinse stage, that is, adsorb
When tower 210 will enter sequential 16, the zonule 1 of tumbler 110 is overlapped with the zonule 16 of nonrotational part 120.Now, subflow
Road 131a just disconnects with annular channel 043, and will be connected with annular channel 042;Subflow road 132a also just with annular flow
Road 088 disconnects, and will be connected with annular channel 087.When adsorption tower 210 enters sequential 16, subflow road 131a and annular channel
042 connection, subflow road 132a is connected with annular channel 087, and adsorption tower 210 is in second of rinse stage.Gas is rinsed by rushing
Gas washing inlet tube 260 is successively through the 6th subflow road 136, annular channel 06, interlayer runner 006, annular channel 087, subflow road
The adsorbent of adsorption tower 210 is rinsed into adsorption tower 210 after 132a and second interface 210b, the flushing gas after flushing by
First interface 210a is successively through subflow road 131a, annular channel 042, interlayer runner 004, annular channel 05, the 9th subflow road 139
Gas outlet 270b is rinsed by second afterwards to discharge.
In this stage, due to subflow road 131a and annular channel 042 length and be 4 lattice, subflow road 132a and annular
The length of runner 087 and be also 4 lattice, therefore the duration of second of rinse stage of adsorption tower 210 is whole timing cycles
4/24ths.Second of rinse stage of adsorption tower 210 continues whole sequential 16 to sequential 19.
When second of rinse stage of adsorption tower 210 has just terminated and will enter four and rises the stage, i.e. adsorption tower 210
When will enter sequential 20, the zonule 1 of tumbler 110 is overlapped with the zonule 20 of nonrotational part 120.Now, subflow road
131a just disconnects with annular channel 042;Subflow road 132a just disconnects with annular channel 087, and will be with annular channel 086
Connection.When adsorption tower 210 enter sequential 20, annular channel 086 i.e. connect with subflow road 132a, and now annular channel 0810 and
Subflow road 132f is connected, and interlayer runner 0010 connects annular channel 086 with annular channel 0810, adsorption tower 210 and absorption
Tower 215 is connected, and adsorption tower 210 rises the stage in four, and adsorption tower 215 is in four equal depression of order sections.And subflow road 131a is in and broken
Open state.
In this stage, due to subflow road 132a and annular channel 086 length and be 1 lattice, and subflow road 132f and ring
The length of shape runner 0810 and be also 1 lattice, therefore the four of adsorption tower 210 rise holding for four equal depression of orders section of stage and adsorption tower 215
The continuous time is 20 a quarters of whole timing cycles.The four of adsorption tower 210 rise the stage and the four of adsorption tower 215 and dropped
Stage continues whole sequential 20.
When adsorption tower 210 four rise the stage just terminated and will enter three liter the stage when, i.e., adsorption tower 210 will
During into sequential 21, the zonule 1 of tumbler 110 is overlapped with the zonule 21 of nonrotational part 120.Now, subflow road 132a is firm
Just disconnect, and will be connected with annular channel 085 with annular channel 086.When adsorption tower 210 enters sequential 21, annular channel 085
Connected with subflow road 132a, and now annular channel 0811 is connected with subflow road 132g, and interlayer runner 009 is by annular channel
085 is connected with annular channel 0811, and adsorption tower 210 is connected with adsorption tower 216, and adsorption tower 210 rises the stage in three, adsorption tower
216 in three equal depression of order sections.And subflow road 131a is off.
In this stage, due to subflow road 132a and annular channel 085 length and be 1 lattice, and subflow road 132g and ring
The length of shape runner 0811 and be also 1 lattice, therefore the three of adsorption tower 210 rise holding for three equal depression of orders section of stage and adsorption tower 216
The continuous time is 20 a quarters of whole timing cycles.The three of adsorption tower 210 rise the stage and the three of adsorption tower 216 and dropped
Stage continues whole sequential 21.
When adsorption tower 210 three rise the stage just terminated and will enter two liter the stage when, i.e., adsorption tower 210 will
During into sequential 22, the zonule 1 of tumbler 110 is overlapped with the zonule 22 of nonrotational part 120.Now, subflow road 132a is firm
Just disconnect, and will be connected with annular channel 084 with annular channel 085.When adsorption tower 210 enters sequential 22, annular channel 084
Connected with subflow road 132a, and now annular channel 0812 is connected with subflow road 132h, and interlayer runner 008 is by annular channel
084 is connected with annular channel 0812, and adsorption tower 210 is connected with adsorption tower 217, and adsorption tower 210 rises the stage in two, adsorption tower
217 are in the two down stage.And subflow road 131a is off.
In this stage, due to subflow road 132a and annular channel 084 length and be 1 lattice, and subflow road 132h and ring
The length of shape runner 0812 and be also 1 lattice, therefore the two of adsorption tower 210 rise holding for stage and the two down stage of adsorption tower 217
The continuous time is 20 a quarters of whole timing cycles.The two of adsorption tower 210 rise the two down of stage and adsorption tower 217
Stage continues whole sequential 22.
When adsorption tower 210 two rise the stage just terminated and will enter one liter the stage when, i.e., adsorption tower 210 will
During into sequential 23, the zonule 1 of tumbler 110 is overlapped with the zonule 23 of nonrotational part 120.Now, subflow road 132a is firm
Just disconnect, and will be connected with annular channel 083 with annular channel 084.When adsorption tower 210 enters sequential 23, annular channel 083
Connected with subflow road 132a, and now annular channel 0813 is connected with subflow road 132i, and interlayer runner 0011 is by annular flow
Road 083 is connected with annular channel 0813, and adsorption tower 210 is connected with adsorption tower 218, and adsorption tower 210 rises the stage in one, absorption
Tower 218 is in the one down stage.And subflow road 131a is off.
In this stage, due to subflow road 132a and annular channel 083 length and be 1 lattice, and subflow road 132i and ring
The length of shape runner 0813 and be also 1 lattice, therefore the one of adsorption tower 210 rises holding for stage and the one down stage of adsorption tower 218
The continuous time is 20 a quarters of whole timing cycles.The one of adsorption tower 210 rises the one down of stage and adsorption tower 218
Stage continues whole sequential 23.
When adsorption tower 210 one rise the stage just terminated and will into final boost phase when, i.e., adsorption tower 210 is
When will enter sequential 24, the zonule 1 of tumbler 110 is overlapped with the zonule 24 of nonrotational part 120.Now, subflow road 132a
Just disconnect, and will be connected with annular channel 082 with annular channel 083.When adsorption tower 210 enters sequential 24, annular channel
082 connects with subflow road 132a, and adsorption tower 210 is in final boost phase.Subflow road 131a is still within off-state.Eventually
Inflation is by whole loading line 250 successively through the 8th subflow road 138, annular channel 09, interlayer runner 0012, annular channel 082, son
Final boosting processing is carried out to adsorption tower 210 into adsorption tower 210 through second interface 210b after runner 132a.
In this stage, due to subflow road 132a and annular channel 082 length and be 1 lattice, therefore adsorption tower 210 is final
The duration of boost phase is 20 a quarters of whole timing cycles.The final boost phase of adsorption tower 210 continues whole
Individual sequential 24.
Thus, adsorption tower 210 completes a timing cycles, if continuing, and adsorption tower 210 is then according to above-mentioned flow
Circulated.The sequential of other adsorption towers is similar to adsorption tower 210, and other adsorption towers are in different sequential ranks as can be drawn from Table 1
Section state in which, and first flow 130, second flow channel 140 and whole pipeline connection status and annexation.Specifically please
With reference to table 1 and refering to Fig. 3 and Fig. 4, here is omitted.
Therefore deduce that:H2Purification system 1000 instead of wrong in traditional multi-pipeline technical process by rotary valve 100
Comprehensive complicated sequencing valve, makes the various sequencing valve of quantity successfully be substituted by a rotary valve 100, realizes a rotary valve 100
To whole H2Purification system 1000 switches over the purpose of control.By rotating the tumbler 110 of rotary valve 100, can be made
Two runners 140 selectively connect in each subflow road of first flow 130, and then make each adsorption tower and each pipeline selectivity
Connection, so as to complete each flow in pressure-variable adsorption.
Compared to traditional sequencing valve, the consumptive material of production equipment is significantly reduced, equipment investment cost and peace is greatly reduced
Dress up this.And equipment installation is simplified, shorten the time loss that equipment is installed and dismantled.Meanwhile, rotated only by rotating
The tumbler 110 of valve 100 can be achieved to whole H2Connection between each adsorption tower and each pipeline of purification system 1000
The control and adjustment of relation, enormously simplify H2Workload and operating burden of the purification system 1000 when adsorbed state switches,
Make to H2The control of purification system 1000 more facilitates, and substantially increases production efficiency.Because valve reduced number is to 1, greatly
Failsafe valve rate is reduced greatly, H is improved2Purification system 1000 overall stability and security, reduce maintenance cost with
Time loss.
H2Purification system 1000 can change the annexation of whole system by rotating rotary valve 100, be used by adjusting
Set in the rotating speed or adjustment timer of the motor of driving rotary valve 100, when can effectively reduce the circulation of timing cycles
Between, make it possible that adsorption operations step run time is less than 2 seconds.For conventional pressure variated adsorption program control valve, due to program control
The limitation of threshold switch time, it is impossible to accomplish that operating procedure run time is less than 2 seconds.And utilize H2Purification system 1000, by subtracting
The circulation time of few timing cycles, adsorbent can be made quickly to be adsorbed and De contamination, and then reduce the filling chi of adsorbent
It is very little.The volume of adsorption tower can be so greatly reduced, and equipment cost is reduced with this and is invested.Further, since timing cycles
Circulation time shortens, and reduces the volume of adsorption tower, is easy to whole H2Purification system 1000 reduces manufacture and is mounted into sled
This.
It should be noted that in other embodiments of the present invention, H2The structure of purification system can be different, eventually inflation
Pipeline 250, suitable blowdown piping 280, for the first time flushing gas inlet tube 260, flushing gas outlet 270a or second of flushing gas go out
Any one in mouth pipe 270b and the sequential stage corresponding to it can be selectively added H as option2Purification system
In system.And now adsorption tower quantity, first flow and second flow channel will also be made to change and delete accordingly, time-scale can also differ
Sample.These deformations can show that here is omitted with reference to the above.
Further, in other embodiments of the present invention, the flows such as pre- absorption can also be added to H2Purification system
In system, pressure liter and the number of times of equal pressure drop can also be adjusted according to needs of production.Accordingly, these flows are added
The structure of first flow and second flow channel, time-scale can accordingly change afterwards, and these changes can be according to above-mentioned adsorption tower 210
Adsorption process principles and methods and combine table 1, Fig. 3 and Fig. 4 and show that here is omitted.
Further, in the present embodiment, in order to improve the sealing effectiveness between tumbler 110 and nonrotational part 120, turn
One end of the close nonrotational part 120 of each annular channel of moving part 110 is provided with the seal 300 for being used for improving sealing effectiveness,
As shown in Figure 6.Seal 300 is located on each annular channel, seal 300 simultaneously with tumbler 110 and nonrotational part 120
Offset and be interference fitted, seal 300 is connected to tumbler 110, and seal 300 is with relatively nonrotational 120 turns of the part of tumbler 110
It is dynamic.Seal 300 can further improve sealing effectiveness, prevent gas from being escaped between referring to from tumbler 110 and nonrotational part 120,
And can further prevent the gas of different runners from mixing, it is ensured that the purity of gas.Specifically, in the present embodiment, it is close
Sealing 300 is elastic seal ring.It should be noted that in other embodiments of the invention, seal 300 can also be that ring is set
In one end of the close tumbler 110 of first flow 130.
In other embodiments of the invention, the quantity of adsorption tower can be different, multiple first interfaces of multiple adsorption towers
Can also with the same first sub- flow passage, and multiple adsorption towers multiple second interfaces also with same second subflow road
Connection.Now, multiple adsorption towers are in same stage in same sequential.It is same to inhale in other embodiments of the present invention
The first interface of attached tower can also simultaneously with the multiple first sub- flow passages, and same adsorption tower second interface also simultaneously
With the multiple second sub- flow passages.Now, multiple first flows and multiple second flow channel synchronizations are used to same absorption
The gas of tower is conveyed.
In the other embodiment of the present invention, rotary valve can be different, and the tumbler 110 of rotary valve is fixed, can not
Rotate, rather than tumbler 120 can rotate relative rotation part 110 and rotate.Second flow channel 140 is then arranged at nonrotational part 120
Madial wall, and first flow is then arranged at tumbler 110, and first flow now is different from first flow 130, now
First flow be by the end of tumbler 110 enter tumbler 110 and by tumbler 110 side wall run through tumbler 110.Should
In the case of, rotate nonrotational part 120 and can be achieved to H2The control of purification system.
In the still other embodiments of the present invention, tumbler is column, rather than tumbler is then arranged at the end of tumbler,
Tumbler can be rotated relative to nonrotational part.Now, second flow channel is located at the end of the close nonrotational part of tumbler, first flow
Through nonrotational part.In this case, rotating tumbler can also realize to H2The control of purification system.Similar deformation is herein no longer
Enumerate.
In also some embodiments of the present invention, the shape of annular channel, which also differs, is set to fan ring-type or annular shape, may be used also
To be other shapes, as long as its corresponding effect can be realized.
It should be noted that in an embodiment of the present invention, time-scale is not unique, time-scale can be according to actual production
Need to be drafted and adjusted.Change after time-scale, accordingly, first flow and second flow channel can also do corresponding adjustment.Only
Make the structure and corresponding time-scale of first flow and second flow channel corresponding, and first flow, both second flow channels are same
The matching way of time-scale can show that here is omitted with reference to the above.In addition, in the other embodiment of the present invention
In, the flushing in table 1 can be replaced by evacuating, meanwhile, second flow channel and first flow are also required to do in corresponding structure
Change, and the embodiment of the flow passage structure evacuated is referred to the above and draws, also repeats no more herein.
On the other hand, in an embodiment of the present invention, the position and setting of each interlayer runner and each annular channel
Order be not changeless, the position of each interlayer runner and each annular channel can be adjusted flexibly according to actual needs
Put and order.In addition, the position in each subflow road of first flow 130 is nor changeless, can be according to actual feelings
Condition is changed and adjusted, as long as ensureing that specific subflow road can be connected with specific annular channel in particular moment.
And these change and adjustment can be adjusted according to actual time-scale.
It should be noted that can also be by least two H2Purification system 1000 is arranged in series to form H2Multistage purification system,
It so can further improve product gas H2Purity.And can also be by H2The solution that multistage purification system posterior segment system is produced
Air-breathing is backfilled to leading portion system and carries out adsorption treatment again, to improve the rate of recovery of effective gas and the purity of product gas.
In general, in the present embodiment, H2Purification system 1000 replaces traditional multi-pipeline technique mistake by rotary valve 100
Complicated sequencing valve in journey, realizes a rotary valve 100 while multiple pipelines are switched over the purpose of control.Reduction
Cost, reduces fault rate, makes operation and controls more to facilitate.
The present embodiment also provides a kind of gas handling system, and the gas handling system includes H2Purification system 1000.Gas
Processing system replaces complicated sequencing valve in traditional multi-pipeline technical process using rotary valve is enough, while entering to multiple pipelines
Row switching control, compared to traditional sequencing valve, significantly reduces the consumptive material of production equipment, reduces equipment investment cost, simultaneously
Control more facilitates, and reduces fault rate, reduces maintenance cost.
The present embodiment also provides a kind of H2Method of purification.The H2Method of purification includes rotating H2The tumbler of purification system with
Make in a rotation period of tumbler:At least one period, within the period, second flow channel by least one
One subflow road and the 3rd sub- flow passage, and simultaneously by least one second subflow road and the 4th sub- flow passage.It is at least another
One period, within the period, second flow channel is by least one first subflow road and the 5th sub- flow passage.
Further, H2Method of purification also includes rotating tumbler so that in rotation period:At least one period,
Within the period, second flow channel by least one second subflow road and the 6th sub- flow passage, and simultaneously by least one
One subflow road and the 7th sub- flow passage.
Further, H2Method of purification also includes rotating tumbler so that in rotation period:At least one period,
Within the period, second flow channel is by least one second subflow road and the 8th sub- flow passage.
Further, H2Method of purification also includes rotating tumbler so that in rotation period:At least one period,
Within the period, second flow channel is by least one first subflow road and the 9th sub- flow passage.
Further, H2Method of purification also includes rotating tumbler so that in rotation period:At least one period,
Within the period, second flow channel is by least one second subflow road and the tenth sub- flow passage.
The H that the present embodiment is provided2Method of purification is easy to implement, simple to operate, by the tumbler for rotating rotary valve
Realize and the connected mode of the pipeline of whole system is controlled and adjusted, enormously simplify operation of the valve in switching and bear
Load, make control to valve more facilitate, it is to avoid controls the operating burden that a large amount of sequencing valves are brought simultaneously.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies
Change, equivalent substitution, improvement etc., should be included in the scope of the protection.
Claims (12)
1. a kind of H2Purification system, it is characterised in that including raw material air pipe, product air pipe, inverse put air pipe, rotary valve and
At least one adsorption tower;The adsorption tower has the first interface connected with its adsorbent chamber and second interface;The rotary valve bag
Nonrotational part and the tumbler that can be rotated relative to the nonrotational part are included, the nonrotational part has through the first-class of its side wall
Road, the first flow includes the first subflow road, the second subflow road, the 3rd subflow road, the 4th subflow road and the 5th subflow road, institute
Stating tumbler has second flow channel, the first interface and the described first sub- flow passage, the second interface and described second
Sub- flow passage, the raw material air pipe and the 3rd sub- flow passage, the product air pipe and the 4th subflow road
Connection, the inverse put air pipe and the 5th sub- flow passage;
The tumbler of the rotary valve is used to rotate relative to the nonrotational part, so that in a rotation of the tumbler
In cycle:The second flow channel selectively communicates with the first subflow road with the 3rd subflow road, and simultaneously will be described
Second subflow road is selectively communicated with the 4th subflow road, and for the single adsorption tower, first subflow
The connection duration in road and the connection duration, the second subflow road and the 4th subflow road in the 3rd subflow road accounts for described
The a quarter of rotation period;The second flow channel selectively communicates with the first subflow road with the 5th subflow road,
And for the single adsorption tower, the connection duration in the first subflow road and the 5th subflow road accounts for the rotation week
/ 12nd of phase.
2. H according to claim 12Purification system, it is characterised in that the H2Purification system also includes rinsing gas entrance
Pipe and first rinses gas outlet, and the first flow also includes the 6th subflow road and the 7th subflow road, the flushing gas entrance
Pipe and the 6th sub- flow passage, described first rinses gas outlet and the 7th sub- flow passage;
The tumbler of the rotary valve is used to rotate relative to the nonrotational part, so that in the rotation period:It is described
Second flow channel selectively communicates with the second subflow road with the 6th subflow road, and simultaneously by the first subflow road with
The 7th subflow road is selectively communicated with, and for the single adsorption tower, the second subflow road and the described 6th
Connection duration, the connection duration in the first subflow road and the 7th subflow road in subflow road account for the ten of the rotation period
1/2nd.
3. H according to claim 1 or 22Purification system, it is characterised in that the H2Purification system also includes whole gas tube
Road, the first flow also includes the 8th subflow road, the whole loading line and the 8th sub- flow passage;
The tumbler of the rotary valve is used to rotate relative to the nonrotational part, so that in the rotation period:It is described
Second flow channel selectively communicates with the second subflow road and the 8th subflow road, and for the single adsorption tower, institute
The connection duration for stating the second subflow road and the 8th subflow road accounts for 20 a quarters of the rotation period.
4. H according to claim 22Purification system, it is characterised in that the H2Purification system also includes second and rinses gas
Outlet, the first flow also includes the 9th subflow road, and described second rinses gas outlet and the 9th sub- flow passage;
The tumbler of the rotary valve is used to rotate relative to the nonrotational part, so that in the rotation period:It is described
Second flow channel selectively communicates with the first subflow road and the 9th subflow road, and for the single adsorption tower, institute
The connection duration for stating the first subflow road and the 9th subflow road accounts for 1/6th of the rotation period.
5. H according to claim 1 or 22Purification system, it is characterised in that the H2Purification system is also included along bleeder pipe
Road, the first flow also includes the tenth subflow road, the suitable blowdown piping and the tenth sub- flow passage;
The tumbler of the rotary valve is used to rotate relative to the nonrotational part, so that in the rotation period:It is described
Second flow channel selectively communicates with the second subflow road with the tenth subflow road, and for the single adsorption tower
The connection duration in speech, the second subflow road and the tenth subflow road accounts for 20 a quarters of the rotation period.
6. H according to claim 12Purification system, it is characterised in that the first interface, the second interface, described
Raw material air pipe, the product air pipe and the inverse put air pipe are connected with the nonrotational part.
7. H according to claim 12Purification system, it is characterised in that the second flow channel include multiple annular channels and
Multiple interlayer runners;The annular channel is recessed by the outer wall of the tumbler towards the side away from the nonrotational part, described
Circumferentially disposed and described annular channel of the annular channel along the tumbler is in fan ring-type or annular shape substantially, the annular flow
The center of circle of circumference corresponding to road is located at the rotational axis line of the tumbler, and each interlayer runner is communicated to few two institutes
State annular channel;
The tumbler of the rotary valve is used to rotate relative to the nonrotational part, so that in the rotation period:It is described
Annular channel selectively communicates with the first subflow road with the 3rd subflow road with the interlayer runner, and simultaneously by institute
The second subflow road is stated to selectively communicate with the 4th subflow road;The annular channel and the interlayer runner are by described first
Subflow road is selectively communicated with the 5th subflow road.
8. H according to claim 72Purification system, it is characterised in that the tumbler includes multiple parallel and coaxially set
The elementary layer put, the axial line of multiple elementary layers overlaps setting with the rotational axis line of the tumbler, each described
Elementary layer is provided with least one described annular channel.
9. the H according to claim 7 or 82Purification system, it is characterised in that for any one subflow road and with the subflow
For one annular channel of road connection, along the circumference of the tumbler, the length of the annular channel and the subflow
The ratio that the corresponding central angle number of degrees sum in both apertures in road accounts for all angle numbers is the first ratio, the subflow road with it is described
It is the second ratio that the flow time of adsorption process when annular channel is connected residing for corresponding adsorption tower, which accounts for the ratio of a process cycle,
Example, first ratio and second ratio are of substantially equal.
10. H according to claim 12Purification system, it is characterised in that the adsorption tower is multiple, first subflow
Road is also multiple with the second subflow road, and each first subflow road is connected with first interface at least one described, each
The second subflow road is connected with second interface at least one described;The tumbler of the rotary valve is used for relatively described non-
Tumbler is rotated, so that the second flow channel selectively connects in each described second subflow road.
11. H according to claim 102Purification system, it is characterised in that the adsorption tower, the first subflow road and institute
It is 12 to state the second subflow road, and the first interface and the first subflow road are corresponded and connect, the second interface and
The second subflow road corresponds connection;
The tumbler of the rotary valve is used to rotate relative to the nonrotational part, so that in the rotation period:It is described
The second interface of annular channel and near few two adsorption towers of the interlayer runner is selectively communicated with, and a suction
The connection duration of the second interface of attached tower and the second interface of other adsorption towers accounts for 1/3rd of the rotation period.
12. a kind of gas handling system, it is characterised in that including the H as described in claim 1~11 any one2Purification system
System.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710558308.1A CN107213750B (en) | 2017-07-10 | 2017-07-10 | H (H) 2 Purification system and gas treatment system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710558308.1A CN107213750B (en) | 2017-07-10 | 2017-07-10 | H (H) 2 Purification system and gas treatment system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107213750A true CN107213750A (en) | 2017-09-29 |
CN107213750B CN107213750B (en) | 2023-07-18 |
Family
ID=59952062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710558308.1A Active CN107213750B (en) | 2017-07-10 | 2017-07-10 | H (H) 2 Purification system and gas treatment system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107213750B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114748971A (en) * | 2022-03-16 | 2022-07-15 | 四川天采科技有限责任公司 | Method for purifying H2 and CO from synthesis gas by using rotary distributor |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0231568A1 (en) * | 1986-02-06 | 1987-08-12 | Uop | Multiport axial valve with balanced rotor |
US4705627A (en) * | 1982-02-04 | 1987-11-10 | Toray Industries, Inc. | Absorption apparatus including rotary valve |
CA2274301A1 (en) * | 1999-06-10 | 2000-12-10 | Questor Industries Inc. | Chemical reactor with pressure swing adsorption |
US6311719B1 (en) * | 1999-08-10 | 2001-11-06 | Sequal Technologies, Inc. | Rotary valve assembly for pressure swing adsorption system |
CN1459136A (en) * | 2001-03-14 | 2003-11-26 | 探索空气技术公司 | Electric current generation system comprising fuel cell and rotary pressure swing absorption unit |
US20040094216A1 (en) * | 2002-11-15 | 2004-05-20 | Wagner Glenn Paul | Rotary sequencing valve with flexible port plate |
JP2005083516A (en) * | 2003-09-10 | 2005-03-31 | Teijin Ltd | Rotary valve and pressure swing suction type gas separating device |
TW200517155A (en) * | 2003-09-09 | 2005-06-01 | Teijin Pharma Ltd | Oxygen concentrating apparatus and rotary valve |
CN101008455A (en) * | 2007-01-19 | 2007-08-01 | 西安交通大学 | 36-way rotary valve of simulated moving bed with high performance liquid preparative chromatography |
KR100806044B1 (en) * | 2006-12-29 | 2008-02-26 | 신동만 | Forward/reversible circulating valve device |
CN101474520A (en) * | 2008-01-03 | 2009-07-08 | 上海标氢气体技术有限公司 | Device for adsorptive separation and purification of industrial gas |
CN101927150A (en) * | 2009-06-26 | 2010-12-29 | 阮立昂 | Radial flow continuous reaction/regeneration apparatus |
CN103291961A (en) * | 2013-05-29 | 2013-09-11 | 武汉安和节能新技术有限公司 | Automatic reversing valve |
US20130333571A1 (en) * | 2011-03-01 | 2013-12-19 | Narasimhan Sundaram | Apparatus and Systems Having a Rotary Valve Assembly and Swing Adsorption Processes Related Thereto |
CN103534003A (en) * | 2011-05-09 | 2014-01-22 | 乔治洛德方法研究和开发液化空气有限公司 | Adsorption purification unit with rotary distributor and means for regulating the flow rates |
CN205244488U (en) * | 2015-12-09 | 2016-05-18 | 王欣 | Bulldoze six passageway valves of formula of opening and close |
CN106763910A (en) * | 2017-01-22 | 2017-05-31 | 成都赛普瑞兴科技有限公司 | A kind of whirligig and gas fractionation unit |
CN207856614U (en) * | 2017-07-10 | 2018-09-14 | 成都赛普瑞兴科技有限公司 | A kind of H2Purification system and gas handling system |
-
2017
- 2017-07-10 CN CN201710558308.1A patent/CN107213750B/en active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4705627A (en) * | 1982-02-04 | 1987-11-10 | Toray Industries, Inc. | Absorption apparatus including rotary valve |
EP0231568A1 (en) * | 1986-02-06 | 1987-08-12 | Uop | Multiport axial valve with balanced rotor |
CA2274301A1 (en) * | 1999-06-10 | 2000-12-10 | Questor Industries Inc. | Chemical reactor with pressure swing adsorption |
US6311719B1 (en) * | 1999-08-10 | 2001-11-06 | Sequal Technologies, Inc. | Rotary valve assembly for pressure swing adsorption system |
CN1459136A (en) * | 2001-03-14 | 2003-11-26 | 探索空气技术公司 | Electric current generation system comprising fuel cell and rotary pressure swing absorption unit |
US20040094216A1 (en) * | 2002-11-15 | 2004-05-20 | Wagner Glenn Paul | Rotary sequencing valve with flexible port plate |
TW200517155A (en) * | 2003-09-09 | 2005-06-01 | Teijin Pharma Ltd | Oxygen concentrating apparatus and rotary valve |
JP2005083516A (en) * | 2003-09-10 | 2005-03-31 | Teijin Ltd | Rotary valve and pressure swing suction type gas separating device |
KR100806044B1 (en) * | 2006-12-29 | 2008-02-26 | 신동만 | Forward/reversible circulating valve device |
CN101008455A (en) * | 2007-01-19 | 2007-08-01 | 西安交通大学 | 36-way rotary valve of simulated moving bed with high performance liquid preparative chromatography |
CN101474520A (en) * | 2008-01-03 | 2009-07-08 | 上海标氢气体技术有限公司 | Device for adsorptive separation and purification of industrial gas |
CN101927150A (en) * | 2009-06-26 | 2010-12-29 | 阮立昂 | Radial flow continuous reaction/regeneration apparatus |
US20130333571A1 (en) * | 2011-03-01 | 2013-12-19 | Narasimhan Sundaram | Apparatus and Systems Having a Rotary Valve Assembly and Swing Adsorption Processes Related Thereto |
CN103534003A (en) * | 2011-05-09 | 2014-01-22 | 乔治洛德方法研究和开发液化空气有限公司 | Adsorption purification unit with rotary distributor and means for regulating the flow rates |
CN103291961A (en) * | 2013-05-29 | 2013-09-11 | 武汉安和节能新技术有限公司 | Automatic reversing valve |
CN205244488U (en) * | 2015-12-09 | 2016-05-18 | 王欣 | Bulldoze six passageway valves of formula of opening and close |
CN106763910A (en) * | 2017-01-22 | 2017-05-31 | 成都赛普瑞兴科技有限公司 | A kind of whirligig and gas fractionation unit |
CN207856614U (en) * | 2017-07-10 | 2018-09-14 | 成都赛普瑞兴科技有限公司 | A kind of H2Purification system and gas handling system |
Non-Patent Citations (1)
Title |
---|
全国安全生产教育培训教材编审委员会: "《合成氨工艺作业》", 31 July 2013, 中国矿业大学出版社, pages: 68 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114748971A (en) * | 2022-03-16 | 2022-07-15 | 四川天采科技有限责任公司 | Method for purifying H2 and CO from synthesis gas by using rotary distributor |
CN114748971B (en) * | 2022-03-16 | 2023-03-03 | 四川天采科技有限责任公司 | Method for purifying H2 and CO from synthesis gas by using rotary distributor |
Also Published As
Publication number | Publication date |
---|---|
CN107213750B (en) | 2023-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207856614U (en) | A kind of H2Purification system and gas handling system | |
CN107213750A (en) | A kind of H2Purification system and gas handling system | |
CN105351556B (en) | Double gas share plug valve | |
CN102678966A (en) | Multifunctional control valve | |
CN207137637U (en) | A kind of N2Purification system and gas handling system | |
CN207928954U (en) | A kind of CO purification systems and rotary valve | |
CN107224840A (en) | A kind of N2Purification system and gas handling system | |
CN106402431B (en) | A kind of double-channel butterfly valve valve | |
CN207042185U (en) | A kind of O2Purification system and gas handling system | |
CN107213749A (en) | A kind of CO2Purification system and gas handling system | |
CN207614593U (en) | A kind of gas decarbonization system and gas handling system | |
CN105749599B (en) | A kind of Hydrodynamic recoil filter wash web filter | |
CN106102860B (en) | Air flows enhanced self-cleaning disc filter device | |
CN107158883A (en) | A kind of air dryer systems and gas handling system | |
CN107213748A (en) | A kind of CO purification systems and rotary valve | |
CN208082140U (en) | A kind of air dryer systems and gas handling system | |
CN107138022A (en) | A kind of gas decarbonization system and gas handling system | |
CN103845948B (en) | The built-in pipeline connecting method of water purifier with many filter galls recoil switch | |
CN206874887U (en) | A kind of rotary valve and its component | |
CN107355564A (en) | A kind of rotary valve and its component | |
CN107185355A (en) | A kind of O2Purification system and gas handling system | |
CN206874886U (en) | A kind of rotary valve and its component | |
CN202666634U (en) | Hot gas pipe filter | |
CN207253810U (en) | A kind of aromatics absorption Simulation moving bed | |
CN206556321U (en) | Liquid nitrogen washing molecular sieve shifts to an earlier date cooling device in a kind of synthetic ammonia installation startup procedure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |