CN107210962A - 路径选择方法、装置及系统 - Google Patents
路径选择方法、装置及系统 Download PDFInfo
- Publication number
- CN107210962A CN107210962A CN201580073048.8A CN201580073048A CN107210962A CN 107210962 A CN107210962 A CN 107210962A CN 201580073048 A CN201580073048 A CN 201580073048A CN 107210962 A CN107210962 A CN 107210962A
- Authority
- CN
- China
- Prior art keywords
- state
- path
- node
- link
- bandwidth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000000903 blocking effect Effects 0.000 claims abstract description 94
- 238000000034 method Methods 0.000 claims abstract description 34
- 238000005192 partition Methods 0.000 claims description 17
- 238000004891 communication Methods 0.000 abstract description 17
- 238000010586 diagram Methods 0.000 description 17
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000005055 memory storage Effects 0.000 description 1
- 230000035772 mutation Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L45/00—Routing or path finding of packets in data switching networks
- H04L45/12—Shortest path evaluation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L45/00—Routing or path finding of packets in data switching networks
- H04L45/24—Multipath
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
Description
Claims (22)
- 一种路径选择方法,其特征在于,包括:确定当前业务的可用路径集合,所述可用路径集合包括至少一条可用路径;获得所述至少一条可用路径中每条可用路径的阻路代价;在所述可用路径集合中,根据阻路代价的大小选择一条可用路径为最优路径;其中,所述获得所述至少一条可用路径中每条可用路径的阻路代价,具体包括:确定一条可用路径上所包括的任意一个节点为第一节点,其中任意每两个所述第一节点构成一个第一节点对(a,b);计算所述第一节点对(a,b)的至少一个阻塞比例,所述至少一个阻塞比例用来衡量所述第一节点对(a,b)之间的链路被占用后对后续业务形成的阻塞大小;对所述第一节点对(a,b)的至少一个阻塞比例求和,得到所述第一节点对(a,b)的节点阻塞代价;根据所述第一节点对(a,b)的节点阻塞代价计算该条所述可用路径的阻路代价。
- 根据权利要求1所述的方法,其特征在于,所述根据所述第一节点对(a,b)的节点阻塞代价计算该条所述可用路径的阻路代价,具体包括:将所述可用路径上每个所述第一节点对(a,b)的节点阻塞代价乘以第一加权系数后再求和,得到该条所述可用路径的阻路代价。
- 根据权利要求1或2所述的方法,其特征在于,所述根据阻路代价的大小选择一条可用路径为最优路径,具体包括:在所述可用路径集合中选择所述阻路代价最小的可用路径为最优路径。
- 根据权利要求1或2所述的方法,其特征在于,所述根据阻路代价的大小选择一条可用路径为最优路径,具体包括:根据所述可用路径的属性计算路径代价,其中,所述可用路径的属性包括:路径长度、使用费用和信号强度;对所述阻路代价乘以第二加权系数后的数值,和所述路径代价乘以第三 加权系数后的数值求和,得到综合代价,在所述可用路径集合中选择所述综合代价最小的可用路径为最优路径。
- 根据权利要求1-4任一项所述的方法,其特征在于,所述计算所述第一节点对(a,b)的至少一个阻塞比例,具体包括:确定与所述第一节点对(a,b)中第一节点a连接的任意一个节点为第二节点,与所述第一节点对(a,b)中第一节点b连接的任意一个节点为第三节点,任意一个所述第二节点与所述第一节点a之间的链路为第一链路,两个所述第一节点之间的链路为第二链路,任意一个所述第三节点与所述第一节点b之间的链路为第三链路,一条所述第一链路、一条所述第二链路和一条所述第三链路组成一条第一路径;计算确定的至少一条所述第一路径的阻塞比例,得到所述第一节点对(a,b)的至少一个阻塞比例,其中,至少一条所述第一路径中,不同的第一路径之间的第一链路不同,和/或不同的第一路径之间的第三链路不同。
- 根据权利要求5所述的方法,其特征在于,所述计算确定的至少一条所述第一路径的阻塞比例,具体包括:若所述第一链路、所述第二链路和所述第三链路内部均未被划分为多条子链路;则所述第一链路的状态为畅通状态或者阻塞状态,所述第二链路的状态为拟占用状态,所述第三链路的状态为畅通状态或者阻塞状态;其中,若所述第一链路或者所述第三链路中至少一个状态为所述阻塞状态,则所述第一路径的阻塞比例为第一数值;若所述第一链路和所述第三链路的状态均为所述畅通状态,则所述第一路径的阻塞比例为第二数值。
- 根据权利要求5所述的方法,其特征在于,所述计算确定的至少一条所述第一路径的阻塞比例,具体包括:若所述第一链路、所述第二链路和所述第三链路分别被划分为m条第一子链路、m条第二子链路和m条第三子链路,一条所述第一子链路、一条所述第二子链路和一条所述第三子链路组成一条第一子路径,所述第一路径包括m条所述第一子路径,其中,m≥2,m∈N+;则所述第一子链路的状态、所述第二子链路的状态和所述第三子链路的 状态为畅通状态或者阻塞状态,并且每条所述第二链路中至少存在一条所述第二子链路的状态为拟占用状态;若所述第一子链路的状态、所述第二子链路的状态和所述第三子链路的状态中至少一个为阻塞状态,则对应的所述第一子路径的状态为阻塞状态;若所述第一子链路的状态、所述第二子链路的状态和所述第三子链路的状态中每一条子链路都为畅通状态,则对应的所述第一子路径的状态为畅通状态;若所述第一子链路的状态和所述第三子链路的状态都为畅通状态,并且所述第二子链路的状态为拟占用状态,则对应的所述第一子路径的状态为拟占用状态;根据每条所述第一子路径的状态计算所述第一路径的阻塞比例。
- 根据权利要求7所述的方法,其特征在于,所述根据每条所述第一子路径的状态计算所述第一路径的阻塞比例,具体包括:确定所述第一路径包括状态为所述拟占用状态的所述第一子路径的数量,得到第三数值;确定所述第一路径包括状态为所述拟占用状态的所述第一子路径的数量和状态为畅通状态的所述第一子路径的数量之和,得到第四数值;计算所述第三数值与所述第四数值的比值,得到所述第一路径的阻塞比例。
- 根据权利要求5所述的方法,其特征在于,所述计算确定的至少一条所述第一路径的阻塞比例,具体包括:将所述第一链路按照带宽划分为第一带宽和第二带宽,将所述第二链路按照带宽划分为第三带宽、第四带宽和第五带宽,将所述第三链路按照带宽划分为第六带宽和第七带宽,其中所述第一带宽、所述第三带宽和所述第六带宽的状态为阻塞状态,所述第二带宽、所述第四带宽和所述第七带宽的状态为畅通状态,所述第五带宽的状态为拟占用状态;确定所述第二带宽、所述第四带宽和所述第七带宽的最小值,得到第五数值;确定所述第二带宽、所述第四带宽和所述第五带宽之和,和所述第七带宽的最小值,得到第六数值;计算所述第五数值与所述第六数值的差值,并计算所述差值与所述第六数值的比值,得到所述第一路径的阻塞比例。
- 一种路径选择装置,其特征在于,包括:确定模块,用于确定当前业务的可用路径集合,所述可用路径集合包括至少一条可用路径;获取模块,用于获得所述至少一条可用路径中每条可用路径的阻路代价;选择模块,用于在所述可用路径集合中,根据阻路代价的大小选择一条可用路径为最优路径;其中,所述获取模块具体包括:确定单元,用于确定一条可用路径上所包括的任意一个节点为第一节点,其中任意每两个所述第一节点构成一个第一节点对(a,b);计算单元,用于计算所述第一节点对(a,b)的至少一个阻塞比例,所述至少一个阻塞比例用来衡量所述第一节点对(a,b)之间的链路被占用后对后续业务形成的阻塞大小,对所述第一节点对(a,b)的至少一个阻塞比例求和,得到所述第一节点对(a,b)的节点阻塞代价,根据所述第一节点对(a,b)的节点阻塞代价计算该条所述可用路径的阻路代价。
- 根据权利要求10所述的装置,其特征在于,所述获取模块,具体用于:将所述可用路径上每个所述第一节点对(a,b)的节点阻塞代价乘以第一加权系数后再求和,得到该条所述可用路径的阻路代价。
- 根据权利要求10或11所述的装置,其特征在于,所述选择模块,具体用于:在所述可用路径集合中选择所述阻路代价最小的可用路径为最优路径。
- 根据权利要求10或11所述的装置,其特征在于,所述选择模块,具体用于:根据所述可用路径的属性计算路径代价,其中,所述可用路径的属性包括:路径长度、使用费用和信号强度;对所述阻路代价乘以第二加权系数后的数值,和所述路径代价乘以第三加权系数后的数值求和,得到综合代价,在所述可用路径集合中选择所述综合代价最小的可用路径为最优路径。
- 根据权利要求10-13任一项所述的装置,其特征在于,所述计算单元,具体用于:确定与所述第一节点对(a,b)中第一节点a连接的任意一个节点为第二节点,与所述第一节点对(a,b)中第一节点b连接的任意一个节点为第三节点,任意一个所述第二节点与所述第一节点a之间的链路为第一链路,两个所述第一节点之间的链路为第二链路,任意一个所述第三节点与所述第一节点b之间的链路为第三链路,一条所述第一链路、一条所述第二链路和一条所述第三链路组成一条第一路径;计算确定的至少一条所述第一路径的阻塞比例,得到所述第一节点对(a,b)的至少一个阻塞比例,其中,至少一条所述第一路径中,不同的第一路径之间的第一链路不同,和/或不同的第一路径之间的第三链路不同。
- 根据权利要求14所述的装置,其特征在于,所述计算单元,具体用于:若所述第一链路、所述第二链路和所述第三链路内部均未被划分为多条子链路;则所述第一链路的状态为畅通状态或者阻塞状态,所述第二链路的状态为拟占用状态,所述第三链路的状态为畅通状态或者阻塞状态;其中,若所述第一链路或者所述第三链路中至少一个状态为所述阻塞状态,则计算所述第一路径的阻塞比例为第一数值;若所述第一链路和所述第三链路的状态均为所述畅通状态,则计算所述第一路径的阻塞比例为第二数值。
- 根据权利要求14所述的装置,其特征在于,所述计算单元,具体用于:若所述第一链路、所述第二链路和所述第三链路分别被划分为m条第一子链路、m条第二子链路和m条第三子链路,一条所述第一子链路、一条所述第二子链路和一条所述第三子链路组成一条第一子路径,所述第一路径包括m条所述第一子路径,其中,m≥2,m∈N+;则所述第一子链路的状态、所述第二子链路的状态和所述第三子链路的状态为畅通状态或者阻塞状态,并且每条所述第二链路中至少存在一条所述第二子链路的状态为拟占用状态;根据所述第一子链路的状态、所述第二子链路的状态和所述第三子链路的状态确定所述第一子路径的状态,其中,所述第一子路径的状态为阻塞状态、畅通状态和拟占用状态;若所述第一子链路的状态、所述第二子链路的状态和所述第三子链路的状态中至少一个为阻塞状态,则对应的所述第一子路径的状态为阻塞状态;若所述第一子链路的状态、所述第二子链路的状态和所述第三子链路的状态中每一条子链路都为畅通状态,则对应的所述第一子路径的状态为畅通状态;若所述第一子链路的状态和所述第三子链路的状态都为畅通状态,并且所述第二子链路的状态为拟占用状态,则对应的所述第一子路径的状态为拟占用状态;根据每条所述第一子路径的状态计算所述第一路径的阻塞比例。
- 根据权利要求16所述的装置,其特征在于,所述计算单元,具体用于:确定所述第一路径包括状态为所述拟占用状态的所述第一子路径的数量,得到第三数值;确定所述第一路径包括状态为所述拟占用状态的所述第一子路径的数量和状态为畅通状态的所述第一子路径的数量之和,得到第四数值;计算所述第三数值与所述第四数值的比值,得到所述第一路径的阻塞比例。
- 根据权利要求14所述的装置,其特征在于,所述计算单元,具体用于:将所述第一链路按照带宽划分为第一带宽和第二带宽,将所述第二链路按照带宽划分为第三带宽、第四带宽和第五带宽,将所述第三链路按照带宽划分为第六带宽和第七带宽,其中所述第一带宽、所述第三带宽和所述第六带宽的状态为阻塞状态,所述第二带宽、所述第四带宽和所述第七带宽的状态为畅通状态,所述第五带宽的状态为拟占用状态;确定所述第二带宽、所述第四带宽和所述第七带宽的最小值,得到第五数值;确定所述第二带宽、所述第四带宽和所述第五带宽之和,和所述第七带 宽的最小值,得到第六数值;计算所述第五数值与所述第六数值的差值,并计算所述差值与所述第六数值的比值,得到所述第一路径的阻塞比例。
- 一种路径选择系统,其特征在于,包括:多个节点和路径选择装置;所述多个节点,用于运行当前业务,其中所述多个节点构成至少一条可用路径;所述路径选择装置,包括:确定模块,用于确定当前业务的可用路径集合,所述可用路径集合包括至少一条可用路径;获取模块,用于获得所述至少一条可用路径中每条可用路径的阻路代价;选择模块,用于在所述可用路径集合中,根据阻路代价的大小选择一条可用路径为最优路径;其中,所述获取模块,具体包括:确定单元,用于确定一条可用路径上所包括的任意一个节点为第一节点,其中任意每两个所述第一节点构成一个第一节点对(a,b);计算单元,用于计算所述第一节点对(a,b)的至少一个阻塞比例,所述至少一个阻塞比例用来衡量所述第一节点对(a,b)之间的链路被占用后对后续业务形成的阻塞大小,对所述第一节点对(a,b)的至少一个阻塞比例求和,得到所述第一节点对(a,b)的节点阻塞代价,根据所述第一节点对(a,b)的节点阻塞代价计算该条所述可用路径的阻路代价。
- 根据权利要求19所述的系统,其特征在于,所述获取模块,具体用于:将所述可用路径上每个所述第一节点对(a,b)的节点阻塞代价乘以第一加权系数后再求和,得到该条所述可用路径的阻路代价。
- 根据权利要求19或20所述的系统,其特征在于,所述选择模块,具体用于:在所述可用路径集合中选择所述阻路代价最小的可用路径为最优路径。
- 根据权利要求19或20所述的系统,其特征在于,所述选择模块,具体用于:根据所述可用路径的属性计算路径代价,其中,所述可用路径的属性包 括:路径长度、使用费用和信号强度;对所述阻路代价乘以第二加权系数后的数值,和所述路径代价乘以第三加权系数后的数值求和,得到综合代价,在所述可用路径集合中选择所述综合代价最小的可用路径为最优路径。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2015/072921 WO2016127368A1 (zh) | 2015-02-12 | 2015-02-12 | 路径选择方法、装置及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107210962A true CN107210962A (zh) | 2017-09-26 |
CN107210962B CN107210962B (zh) | 2020-04-14 |
Family
ID=56613971
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201580073048.8A Active CN107210962B (zh) | 2015-02-12 | 2015-02-12 | 路径选择方法、装置及系统 |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3247077B1 (zh) |
CN (1) | CN107210962B (zh) |
ES (1) | ES2747263T3 (zh) |
WO (1) | WO2016127368A1 (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115865761A (zh) * | 2022-12-07 | 2023-03-28 | 安世亚太科技股份有限公司 | 一种考虑阻塞反馈的网络实体任务活动代价评估方法 |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108023817B (zh) * | 2016-11-04 | 2021-03-02 | 华为技术有限公司 | 一种确定数据传输路径的方法、装置 |
US10521380B1 (en) | 2018-06-12 | 2019-12-31 | International Business Machines Corporation | Using storage controllers to respond to multipath input/output requests |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120057603A1 (en) * | 2010-09-08 | 2012-03-08 | Telefonaktiebolaget L M Ericsson (Publ) | Automated Traffic Engineering for 802.1AQ Based Upon the Use of Link Utilization as Feedback into the Tie Breaking Mechanism |
EP2639750A1 (en) * | 2012-03-12 | 2013-09-18 | Fujitsu Limited | Path searching method and path search device |
US20140098675A1 (en) * | 2012-10-05 | 2014-04-10 | Cisco Technology, Inc. | Mpls segment-routing |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6831895B1 (en) * | 1999-05-19 | 2004-12-14 | Lucent Technologies Inc. | Methods and devices for relieving congestion in hop-by-hop routed packet networks |
WO2004055615A2 (en) * | 2002-12-17 | 2004-07-01 | Saraph Girish P | Routing scheme based on virtual space representation |
CN101155137A (zh) * | 2006-09-25 | 2008-04-02 | 华为技术有限公司 | 一种确定路由路径的方法和路由路径确定单元 |
US8248925B2 (en) * | 2009-09-08 | 2012-08-21 | Rockstar Bidco, LP | Method and apparatus for selecting between multiple equal cost paths |
CN101674630B (zh) * | 2009-09-25 | 2012-10-24 | 南京邮电大学 | 一种可感知拥塞的跨层路由实现方法 |
CN101951658A (zh) * | 2010-09-16 | 2011-01-19 | 北京邮电大学 | 一种基于路径质量感知的移动自组网Internet网关路由选择方法 |
US8862775B2 (en) * | 2010-11-26 | 2014-10-14 | Industrial Technology Research Institute | Network server and load balancing routing method for networks thereof |
-
2015
- 2015-02-12 EP EP15881530.8A patent/EP3247077B1/en active Active
- 2015-02-12 ES ES15881530T patent/ES2747263T3/es active Active
- 2015-02-12 WO PCT/CN2015/072921 patent/WO2016127368A1/zh active Application Filing
- 2015-02-12 CN CN201580073048.8A patent/CN107210962B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120057603A1 (en) * | 2010-09-08 | 2012-03-08 | Telefonaktiebolaget L M Ericsson (Publ) | Automated Traffic Engineering for 802.1AQ Based Upon the Use of Link Utilization as Feedback into the Tie Breaking Mechanism |
EP2639750A1 (en) * | 2012-03-12 | 2013-09-18 | Fujitsu Limited | Path searching method and path search device |
US20140098675A1 (en) * | 2012-10-05 | 2014-04-10 | Cisco Technology, Inc. | Mpls segment-routing |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115865761A (zh) * | 2022-12-07 | 2023-03-28 | 安世亚太科技股份有限公司 | 一种考虑阻塞反馈的网络实体任务活动代价评估方法 |
Also Published As
Publication number | Publication date |
---|---|
ES2747263T3 (es) | 2020-03-10 |
EP3247077A1 (en) | 2017-11-22 |
CN107210962B (zh) | 2020-04-14 |
EP3247077B1 (en) | 2019-07-31 |
EP3247077A4 (en) | 2018-04-18 |
WO2016127368A1 (zh) | 2016-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP4016940B1 (en) | Shortest path computation method and server | |
US6904462B1 (en) | Method and system for allocating protection path resources | |
US8495201B2 (en) | Assigning telecommunications nodes to community of interest clusters | |
US20170346691A1 (en) | Network topology optimization | |
CN109218858B (zh) | 用于空分复用光网络的频谱分配方法、装置以及存储介质 | |
CN107659426B (zh) | 分配物理资源的方法和网络侧设备 | |
EP3868062B1 (en) | Methods and apparatus for transmitting data over multiple paths in a network | |
CN102780628B (zh) | 面向多核微处理器的片上互连网络路由方法 | |
US20160065449A1 (en) | Bandwidth-Weighted Equal Cost Multi-Path Routing | |
CN104917659A (zh) | 一种基于虚拟网络连接特性的虚拟网络映射方法 | |
US20170078189A1 (en) | Apparatus and method transmitting packets | |
CN107210962A (zh) | 路径选择方法、装置及系统 | |
CN109361547B (zh) | 一种网络切片链路部署方法与装置 | |
CN115208815A (zh) | 路由方法和路由装置 | |
CN105453489B (zh) | 一种改进型环状拓扑结构及其应用方法 | |
CN108347377B (zh) | 数据转发方法及装置 | |
CN103873367A (zh) | 胖树网络中的无死锁路由 | |
CN108574594A (zh) | 一种网络业务传输的方法及系统 | |
CN105049315B (zh) | 一种基于虚拟网络分割的虚拟网络改进映射方法 | |
CN107453997B (zh) | 一种基于双代价的优化路由方法 | |
CN108174446B (zh) | 一种资源占用度最小化的网络节点链路资源联合分配方法 | |
CN113660677B (zh) | 带权时变网络在耗费限制下的最大错误独立路径计算方法 | |
CN114363738B (zh) | 面向数据中心资源感知的虚拟网络映射方法 | |
US8706882B2 (en) | Apparatus and method for allocating devices to a communication route | |
CN112134743B (zh) | 一种参数配置方法及装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211028 Address after: 510670 Room 518, 91 Kefeng Road, Huangpu District, Guangzhou City, Guangdong Province Patentee after: Guangzhou Fangwei Information Technology Co.,Ltd. Address before: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen Patentee before: HUAWEI TECHNOLOGIES Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211029 Address after: 314500 02, No. 4, South Zaoqiang street, No. 1, Nanmen Gongnong Road, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province Patentee after: Jiaxing Zhixu Information Technology Co.,Ltd. Address before: 510670 Room 518, 91 Kefeng Road, Huangpu District, Guangzhou City, Guangdong Province Patentee before: Guangzhou Fangwei Information Technology Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220831 Address after: Room A02, Room 1906, No. 7 Shuangshan Avenue, Nansha District, Guangzhou City, Guangdong Province, 510000 Patentee after: Guangdong Lampang New Energy Co.,Ltd. Address before: 314500 02, No. 4, South Zaoqiang street, No. 1, Nanmen Gongnong Road, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province Patentee before: Jiaxing Zhixu Information Technology Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230911 Address after: 201100 1st floor, building 1, 1755 Hongmei South Road, Minhang District, Shanghai Patentee after: Shanghai Nanbang Hua New Energy Co.,Ltd. Address before: Room A02, Room 1906, No. 7 Shuangshan Avenue, Nansha District, Guangzhou City, Guangdong Province, 510000 Patentee before: Guangdong Lampang New Energy Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240125 Address after: 201800 Two Five Floors of 333 Huangqing Road, Jiading District, Shanghai Patentee after: SHANGHAI PENGBANG INDUSTRIAL Co.,Ltd. Country or region after: China Address before: 201100 1st floor, building 1, 1755 Hongmei South Road, Minhang District, Shanghai Patentee before: Shanghai Nanbang Hua New Energy Co.,Ltd. Country or region before: China |