CN107207075A - Opening and closing device, scaffold and ship - Google Patents

Opening and closing device, scaffold and ship Download PDF

Info

Publication number
CN107207075A
CN107207075A CN201580074741.7A CN201580074741A CN107207075A CN 107207075 A CN107207075 A CN 107207075A CN 201580074741 A CN201580074741 A CN 201580074741A CN 107207075 A CN107207075 A CN 107207075A
Authority
CN
China
Prior art keywords
scaffold
opening
ship
main part
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201580074741.7A
Other languages
Chinese (zh)
Other versions
CN107207075B (en
Inventor
宫崎智
安藤聪
大塚浩友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MITSUBISHI Shipbuilding Corporation
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Publication of CN107207075A publication Critical patent/CN107207075A/en
Application granted granted Critical
Publication of CN107207075B publication Critical patent/CN107207075B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B3/56Bulkheads; Bulkhead reinforcements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/14Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed pressurised
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Ladders (AREA)

Abstract

Opening and closing device (24) is the opening and closing device of the opening portion (25) for the midway that obstruction is formed at scaffold portion (9), is possessed:Main part (26), can carry out displacement between the open positions of opening portion (25) blocking the closed position of opening portion (25) from top and being configured at the top of closed position and open;And limiting unit (30), in the case where main part (26) is in an open position, the direction for entering the side of opening portion 25 with user intersects and in the direction extension along scaffold portion (9), and limitation user enters opening portion (25) side.

Description

Opening and closing device, scaffold and ship
Technical field
The present invention relates to opening and closing device, scaffold and ship.
The application is based on the Japanese patent application 2015-038252 filed an application for 27th for 2 months for 2015, claims priority Power, and by its content quotation herein.
Background technology
There is a kind of objects such as liquid in order to transport extremely low temperature and accommodate rectangular-shape in the inner space of hull The ship of container.The inner space of the hull of this ship is separated into multiple by partition wall in ship cephalocaudal direction, is thus existed Ship cephalocaudal direction forms multiple cargo holds.These cargo holds separately accommodate container.That is, in the inside of hull, in bow Tail direction, which is arranged, multiple containers.
In the ship, in order to substantially ensure that the volume of container without making ship body large, by the gap of container and hull And the gap of container and partition wall forms as small as possible.
On the other hand, container is provided with heat-barrier material in its outer surface.The heat-barrier material needs to inspect periodically.Therefore, in institute State hull and partition wall around container and be provided with the scaffold for being used for checking heat-barrier material.The scaffold to extend in the horizontal direction Mode formed, also, be spaced one from compartment of terrain provided with multiple in above-below direction.Being provided between these multiple scaffolds is used for The ladder moved up and down for operator.For example, the ladder that extends upward of the scaffold from the top for being configured at partition wall with The gateways such as the manhole (manhole) located at upper deck are connected.
The partition wall is the so-called plate muscle construction for possessing board member and small rib strip component.Board member is formed as in beam Direction and the tabular of above-below direction extension.Small rib strip component is relative to board member in ship cephalocaudal direction towards by aftermost one Side protrudes close to the side (being in general stern-side) of bow and extended in above-below direction.Small rib strip component is for example set It is T-shaped etc. for section.Small rib strip component is arranged with multiple in beam direction and is assemblied in board member by welding etc..
Patent document 1 is different from the ship for carrying the container.But, the patent document 1 describes following technology:Dissipating Freight thing ship in, the inspection of the cabin rib in order to carry out the construction component as side sheets and scaffold, ladder are set.
Prior art literature
Patent document
Patent document 1:No. 4632762 publications of Japanese Patent No.
The content of the invention
Problems to be solved by the invention
Furthermore, the scaffold and ladder are under normal circumstances located at partition wall by aftermost side and close to bow This two side of side.
Located at the side not protruded by small rib strip component in aftermost side and the side of close bow of partition wall Scaffold and ladder are fixed on board member.Scaffold possesses the breach of up/down perforation at the position lifted by ladder.
The scaffold for the side not protruded located at the small rib strip component has when urgent etc. sometimes slings operator To the rescue route of upper deck.By being respectively arranged on the breach of the multiple scaffolds arranged in above-below direction, the rescue route exists Above-below direction is run through in cargo hold.These breach for forming rescue route are generally blocked by articulated standing workbench. Operator can move on the articulated standing workbench.
In partition wall by aftermost side and small rib strip component is protruded in the side of bow side, in plate structure Space between part and small rib strip component is provided with ladder.The laddered space also has with continuously square from scaffold sometimes The platform that formula extends to board member side, in order to avoid fallen when changing to ladder.In order to ensure rescue route, this platform is set sometimes For that can be opened and closed by hinge etc..
In the case of standing workbench and platform are set into be opened/closed, it is possible to forget obstruction after opening.Therefore, Operator must confirm underfooting in order to avoid being fallen from breach all the time, add the burden of the operator in Inspection.
A kind of opening and closing device of the burden of the operator for mitigating progress Inspection it is an object of the invention to provide energy etc., Scaffold and ship.
Technical scheme
According to the first scheme of the present invention, opening and closing device is the opening and closing dress of the opening portion for the midway that obstruction is formed at scaffold Put.Opening and closing device possesses:Main part, in the closed position from top blocking of said openings portion and can be configured at the closed position Top and open and carry out displacement between the open position of the opening portion.Opening and closing device is also equipped with:Limiting unit, in the main body In the case that portion is in an open position, the direction for entering the opening portion with user intersects and in the direction along the scaffold Extension, limitation user enters the opening portion.
By so constituting, in the case where main part is in closed position, user can safely move on main part. On the other hand, in the case where main part is in an open position, the side that limiting unit is intersected in the direction for entering opening portion with user To and along scaffold direction extension.Thus, for example, in the case of user unintentionally opening portion to be entered etc., limiting unit Contacted with user, therefore user can be made to notice that main part is in an open position.As a result, can mitigate because in Inspection The burden for the user for carrying out underfooting confirmation and producing.
According to the alternative plan of the present invention, opening and closing device can also be the limiting unit in first scheme with from the main part The back side protrude mode set.
, can be to enter opening with user when making main part be moved to open position from closed position by so constituting The direction in portion intersects and configures the limiting unit from the back side protrusion of main part in the mode extended along the direction of scaffold.Its result It is that can suppress the opening portion that user enters opening by simply constituting.
According to the third program of the present invention, opening and closing device can also be at least one of the limiting unit in first or alternative plan Part, it is formed by elastic component.
By so constituting, when main part is opened and closed, even if assuming that limiting unit is contacted with the structure of surrounding, limit Portion processed can also produce elastic deformation to avoid.Accordingly, it is capable to suppress the damage of the structure of surrounding, also, can be swimmingly to main body Operation is opened and closed in portion.
According to the fourth program of the present invention, opening and closing device can also be the first limitation into third program in either a program Portion is respectively arranged on the both sides in the direction that the scaffold is extended across the opening portion.
By so constituting, in the case of both sides extension of the scaffold to opening portion, no matter user is intended to from scaffold The which direction of bearing of trend enters opening portion, can be transferred through the entrance that limiting unit limits user.
According to the 5th scheme of the present invention, scaffold possesses opening portion, possesses the opening portion can be opened and closed the One into fourth program either a program opening and closing device.
By so constituting, due to that can block opening portion, therefore user can safely move.On the other hand, if opened Opening portion, then can suppress user and enter opening portion, also, can be readily formed and make rescue route of scaffold up/down perforation etc..
According to the 6th scheme of the present invention, ship possesses:Hull, is internally formed with cargo hold;Partition wall, in bow tail side To the division cargo hold;The scaffold of 5th scheme, is at least supported in the partition wall.
By so constituting, when being checked from the receiving structure such as the container of outside to being contained in the inside of cargo hold, Without confirming underfooting all the time while movement on scaffold.Accordingly, it is capable to mitigate because of the burden for the user that underfooting confirms and produces.
Beneficial effect
According to the opening and closing device, scaffold and ship, the burden for the user for carrying out Inspection can be mitigated.
Brief description of the drawings
Fig. 1 is the figure of the schematic configuration for the ship for representing embodiments of the present invention.
Fig. 2 is the profile of the partition wall along Fig. 1 II-II lines.
Fig. 3 is the figure of the partition wall of embodiments of the present invention from bow side.
Fig. 4 is the figure of the partition wall of embodiments of the present invention from stern-side.
Fig. 5 is the stereogram of the partition wall of embodiments of the present invention from bow side.
Fig. 6 is the stereogram of the partition wall of embodiments of the present invention from stern-side.
Fig. 7 is the top view of the movable workbench of embodiments of the present invention.
Fig. 8 is the side view of the movable workbench of embodiments of the present invention.
Fig. 9 is the stereogram for representing to form the state for rescuing route of embodiments of the present invention.
Figure 10 is the first of embodiments of the present invention the side view for improving the first platform of example.
Figure 11 is the second of embodiments of the present invention the stereogram for improving the first scaffold portion of example.
Embodiment
Then, the opening and closing device, scaffold and ship of one embodiment of the present invention are illustrated based on accompanying drawing.
Fig. 1 is the figure of the schematic configuration for the ship for representing embodiments of the present invention.
The ship 1 of present embodiment is the LPG fortune for transporting LPG (liquefied petroleum gas, liquefied petroleum gas) Defeated ship.In order to transport more LPG, the ship 1 can store LPG in the state of making LPG cooling liquids and reducing volume In container 3.In the container 3, heat-barrier material is equipped with its outer surface.
As shown in figure 1, the hull 2 of ship 1 possesses multiple cargo holds 4 inside it.These cargo holds 4 are the skies for accommodating container 3 Between.These cargo holds 4 in ship cephalocaudal direction in the way of forming a line provided with multiple.In the adjacent cargo hold 4 of ship cephalocaudal direction each other It is divided by partition wall 6 in ship cephalocaudal direction.The cargo hold 4 of present embodiment is formed at the lower section of the upper deck 5 of hull 2. In the Fig. 1, the ship cephalocaudal direction of hull 2 is represented by arrow, ship's head is represented with " F " respectively, stern side is represented with " A " To.
Fig. 2 is the profile of the partition wall along Fig. 1 II-II lines.
As shown in Fig. 2 partition wall 6 possesses:Wall portion 7, support 8, scaffold portion 9 and ladder portion 10.
Wall portion 7 possesses the first wall portion 7A and the second wall portion 7B.
First wall portion 7A is formed as the tabular in beam direction and above-below direction extension.
Second wall portion 7B is formed as the tabular parallel with the first wall portion 7A.The second wall portion 7B is formed in beam direction The position different from the first wall portion 7A.Second wall portion 7B of present embodiment is formed at two first arranged in beam direction Between wall portion 7A, positioned at the first wall portion 7A stern-side.The the first wall portion 7A and the second wall portion 7B of present embodiment are in bow tail Distance on direction is set as equal with the length of aftermentioned first support 8A and the second support 8B each ship cephalocaudal direction.
Support 8 is to ensure that rigid, the so-called small rib strip part of partition wall 6.The support 8 possesses the first support 8A With the second support 8B.
Fig. 3 is the figure of the partition wall of embodiments of the present invention from bow side.Fig. 4 is of the invention from stern-side Embodiment partition wall figure.
As shown in Figure 2 and Figure 3, the first support 8A is protruded from the first wall portion 7A wall 11 towards stern-side, also, In beam direction at spaced intervals provided with multiple.These the first support 8A by along wall 11 above-below direction extend in the way of Formed.First support 8A possesses the main part 13A extended in ship cephalocaudal direction and the top ends extended in beam direction 14A, section is formed as T-shaped.These first supports 8A main part 13A base portion is entered by welding etc. relative to wall 11 Row is fixed.
As shown in Figure 2, Figure 4 shows, the second support 8B is protruded from the second wall portion 7B wall 12 towards bow side, also, In beam direction spaced apart from each other provided with multiple.These the second support 8B in above-below direction to extend along wall 12 Mode is formed.Second support 8B possesses the main part 13B extended in ship cephalocaudal direction and the top extended in beam direction Portion 14B, section is formed as T-shaped.These second supports 8B main part 13B base portion is by welding etc. relative to wall 12 It is fixed.In Fig. 3, Fig. 4, in order to illustrate conveniently, the diagram in scaffold portion 9 is eliminated.
In the present embodiment, the second wall portion 7B is connected via support 8 with the first wall portion 7A.In present embodiment In, set two second support 8Bs of the quantity fully less than the first support 8A to be set at spaced intervals in beam direction. Moreover, the first support 8A and the second support 8B of present embodiment are formed at a part for the partition wall 6 on above-below direction, More specifically, it is formed at the part in addition to bottom of partition wall 6.
As shown in figure 3, by with the second wall portion 7B it is continuous and around above and below the first support 8A in the way of be formed with wall portion 7C.This two side above and below the first support 8A, the wall portion 7C wall 16a and the first support towards stern-side The 8A top ends 14A face 17 towards stern-side is in same plane.Wall portion 7C is in the first adjacent support of beam direction There are concave arc sections 18 between 8A.By these arc sections 18, in the first adjacent support 8A of beam direction Top ends 14A between formed above-below direction extend elongated hole.
As shown in figure 4, same with wall portion 7C, with continuous and around above and below the second support 8B side with the first wall portion 7A Formula is formed with wall portion 7D.This two side above and below the second support 8B, the wall portion 7D wall 15a towards bow side The face 19 towards bow side with the second support 8B top ends 14B is in same plane.Wall portion 7D is same with wall portion 7C, in ship There are concave arc sections 20 between the second adjacent support 8B of width.By these arc sections 20, in the beam The elongated hole of above-below direction extension is also formed between the top ends 14B of the second adjacent support 8B of degree direction.
Fig. 5 is the stereogram of the partition wall of embodiments of the present invention from bow side.Fig. 6 is the sheet from stern-side The stereogram of the partition wall of the embodiment of invention.
Scaffold portion 9 is configured to:When inspection of heat-barrier material of progress container 3 etc. is safeguarded, operator (user) can be supplied Mainly walking is moved in the horizontal direction.Scaffold portion 9 possesses the first scaffold portion 9A and the second scaffold portion 9B.
As shown in Fig. 2, Fig. 5, the first scaffold portion 9A is by the first wall portion 7A towards the wall 15 of bow side and second Bearing portion 8B is supported.First scaffold portion 9A is formed as the tabular in beam direction length, with from the first wall portion 7A towards bow The mode that side level is protruded is set.First scaffold portion 9A separates defined interval in the short transverse that above-below direction is cargo hold 4 Ground is provided with multiple.
As shown in Fig. 2, Fig. 6, the second scaffold portion 9B is with symmetrical in ship cephalocaudal direction and the first scaffold portion 9A Mode is set.Second scaffold portion 9B is by the second wall portion 7B towards the wall 16 (reference picture 2) of stern-side and the first support 8A is supported.Second scaffold portion 9B is same with the first scaffold portion 9A, is formed as in the longer tabular in beam direction, with from The mode that second wall portion 7B is protruded towards stern-side level is set.Second scaffold portion 9B is the height of cargo hold 4 in above-below direction Direction is at spaced intervals provided with multiple.
These first scaffolds portion 9A and the second scaffold portion 9B can be moved for operator's walking, also, with bow tail side To size small mode as far as possible set width dimensions W1 (for example, 400mm or so).These first scaffolds portion 9A and second Scaffold portion 9B ensures a little gap (for example, 200mm is left between container 3 in the horizontal direction in the cargo hold 4 being each set It is right).
The cargo hold 4 possesses sidepiece scaffold portion (not shown).Sidepiece scaffold portion is fixed in ship cephalocaudal direction phase The inner surface (not shown) of the two side for the hull 2 that adjacent partition wall 6 is connected to each other.In a cargo hold 4, sidepiece scaffold portion The the first scaffold portion 9A for being formed as and being configured at stern-side and the second continuous plates of scaffold portion 9B for being configured at bow side Shape.Sidepiece scaffold portion, at spaced intervals provided with multiple, connect be configured to mutually level first pin hand respectively in above-below direction Frame portion 9A and the second scaffold portion 9B.That is, operator by be respectively configured as mutually level first scaffold portion 9A, Moved on sidepiece scaffold portion and the second scaffold portion 9B, can be one week around container 3.
As shown in Fig. 2, Fig. 5, Fig. 6, ladder portion 10 possesses the first ladder portion 10A and the second ladder portion 10B.
As shown in figure 5, the first ladder portion 10A is in the first scaffold portion 9A and the second wall portion 7B wall towards bow side It is configured with multiple between 12, extends respectively in above-below direction.First ladder portion 10A of present embodiment is with across in above-below direction Mode between the first adjacent scaffold portion 9A is set, so that operator can be in the first adjacent scaffold of above-below direction Moved between portion 9A.Between the first scaffold portion 9A and the second wall portion 7B wall 12 towards bow side, these One ladder portion 10A is individually fixed in the second support 8B main part 13B and in beam direction and the second support 8B phases The main part 13A of the first adjacent support 8A.
The beam side that the first scaffold portion 9A is extended is configured at each other in the first adjacent ladder portion 10A of above-below direction Upward diverse location.Multiple first ladder portion 10A of present embodiment are set as follows:In above-below direction every a phase First ladder portion 10A of neighbour's configuration is located at the same position on the beam direction that the first scaffold portion 9A is extended each other.This In multiple first ladder portion 10A of embodiment, the first ladder portion 10A of the top is configured at being formed at opening for upper deck 5 Oral area is (not shown) to be connected, and operator can be moved to and match somebody with somebody by getting off from upper deck 5 via opening portion from the first ladder portion 10A It is placed on the first scaffold portion 9A of the top.
As shown in fig. 6, the second ladder portion 10B is in the second scaffold portion 9BA and the first wall portion 7A wall towards bow side It is configured with multiple between face 11, extends respectively in above-below direction.It is same with the second ladder portion 10A, the second ladder of present embodiment Sub-portion 10B is by across setting in the way of between the second adjacent scaffold portion 9B of above-below direction, so that operator can be Moved between the second adjacent scaffold portion 9B of above-below direction.In the second scaffold portion 9B and the first wall portion 7A towards ship Between the wall 11 of caudal, these second ladders portion 10B is fixed on the first support 8A main part 13A.
It is same with the first ladder portion 10A, the second scaffold is configured at each other in the second adjacent ladder portion 10B of above-below direction The diverse location on beam direction that portion 9B is extended.Multiple second ladder portion 10B of present embodiment are set as follows Put:The second ladder portion 10B being adjacent in above-below direction every one is located at the beam that the second scaffold portion 9B is extended each other The same position spent on direction.Moreover, in multiple second ladder portion 10B of present embodiment, being configured at the second ladder of the top Sub-portion 10B is connected with being formed at the opening portion (not shown) of upper deck 5, operator can by from upper deck 5 via opening portion from Second ladder portion 10B gets off and is moved on the second scaffold portion 9B for being configured at the top.
The opening portion for being formed at upper deck 5 can be by the first ladder portion 10A and the second independent landform of ladder portion 10B Into can also share.In addition, in said embodiment, exemplified situations below:Multiple first ladder portion 10A are relative Identical direction is all set in beam direction in the first support 8A, equally, multiple second ladder portion 10B are relative to Two support 8B are all set to identical direction in beam direction.But, the first ladder portion 10A and the second ladder portion 10B setting direction is not limited to the direction.
As shown in figure 5, be configured with the first ladder portion 10A the first scaffold portion 9A and the second wall portion 7B towards bow Between the wall 12 of side, the first platform 22 is respectively equipped with.These first platforms 22 with the first continuous modes of scaffold portion 9A Be formed as tabular.First platform 22 is from the first scaffold portion 9A towards the side close to the second wall portion 7B, in other words towards close The side extension of stern.Speech is changed in the space of multiple bottoms for being each configured with the first ladder portion 10A by these first platforms 22 It, by by being divided in beam direction adjacent two the second support 8B, the second wall portion 7B and the first scaffold portion 9A Block above and below at least a portion in the space (opening portion) gone out.It is flat that first can be stood on using the first ladder portion 10A operator On platform 22.Thus, operator easily can move between the first scaffold portion 9A and the first ladder portion 10A.
As shown in fig. 6, be configured with the second ladder portion 10B the second scaffold portion 9B and the first wall portion 7A towards stern Between the wall 11 of side, the second platform 23 is respectively equipped with.These second platforms 23 with the second continuous modes of scaffold portion 9B Be formed as tabular.Second platform 23 is from the second scaffold portion 9B towards the side close to the first wall portion 7A, in other words towards close The side extension of bow.Speech is changed in the space of multiple bottoms for being each configured with the second ladder portion 10B by these second platforms 23 It, by by being divided in beam direction adjacent two the first support 8A, the first wall portion 7A and the second scaffold portion 9B Block above and below at least a portion in the space gone out.It is same with the first platform 22, it can be stood using the second ladder portion 10B operator In on these second platforms 23.Thus, operator easily can move between the second scaffold portion 9B and the second ladder portion 10B It is dynamic.
Herein, although eliminate diagram, but in the first scaffold portion 9A top, be fixed with the second support 8B along ship The handrail of width extension.The handrail is not configured with the scope of the first platform 22 on beam direction.Equally, although save Diagram has been omited, but in the second scaffold portion 9B top, the handrail extended along beam direction is fixed with the first support 8A. The handrail is not configured with the scope of the second platform 23 on beam direction.
As shown in Fig. 2 the first scaffold portion 9A of present embodiment possesses movable workbench 24 (opening and closing device).Movably Formula workbench 24 is respectively arranged on the multiple first scaffold portion 9A set at spaced intervals in above-below direction.These are located at multiple the One scaffold portion 9A movable workbench 24 is respectively arranged at the same position on beam direction, is in other words respectively arranged at The position overlapped in above-below direction.
Fig. 7 is the top view of the movable workbench of embodiments of the present invention.Fig. 8 be embodiments of the present invention can The side view of dynamic formula workbench.
As shown in fig. 7, movable workbench 24 is located at the notch part (opening portion) 25 formed in the first scaffold portion 9A.Can Dynamic formula workbench 24 possesses workbench main part 26, base portion 27 and handle portions 28.
Workbench main part 26 is formed to block the flat board of the rectangle for the notch part 25 for being formed at the first scaffold portion 9A Shape.The edge 26a of the side close to the first wall portion 7A of workbench main part 26 is assemblied in base portion 27 via hinge part 29.Work Making platform main part 26 can be by the hinge part 29 in the open position in the portion of making a breach 25 and the closed position of obstruction notch part 25 Between operation is opened and closed.
The supporting table main part 26 from below of base portion 27.Ship of the base portion 27 from the first wall portion 7A along notch part 25 The edge 25a of width extends towards ship's head.The base portion 27 of present embodiment is in the work of closed position to cross over The mode for making the edge 26b in the beam direction of platform main part 26 and the edge 25a of the notch part 25 opposed with edge 26b is matched somebody with somebody Put.Base portion 27 supports the workbench main part 26 on edge 26b peripheries and the first scaffold portion on edge 25a peripheries from below 9A.The end 27a of the side of the close bow of the base portion 27 of present embodiment is configured at the first scaffold portion 9A close ship The ora terminalis 9a of first side stern-side.
Handle portions 28 are to make workbench main part 26 from closed position to open position and from open position to obstruction The part held when position is swung for operator.The handle portions 28 of present embodiment are fixed on workbench main part 26, from work The edge 26c of the side of the close bow of platform main part 26 is prominent to ship's head.More specifically, handle portions 28 are assembled respectively In workbench main part 26, the beam direction that the first scaffold portion 9A is extended both sides.The hand of present embodiment Portion 28 is formed as U-shaped.Workbench main part 26 is fixed in the end of the U-shaped of handle portions 28.
The movable workbench 24 is also equipped with limiting the limiting unit 30 that operator enters the side of notch part 25.Present embodiment Limiting unit 30 possess limitation rod portion 31.In the case where workbench main part 26 is in an open position, limitation rod portion 31 with The direction extension that the direction that operator enters notch part 25 intersects, also, extend along the first scaffold portion 9A to ship's head. In present embodiment, the direction that operator enters notch part 25 refers to that the first scaffold portion 9A that operator mainly moves is extended Direction (beam direction).In order to promote operator to note, the outer surface that limit rod portion 31 can also be set to yellow and The candy strip of black.
The limitation rod portion 31 of present embodiment is formed as cylindric, is assemblied in (the reference of the back side 32 of workbench main part 26 Fig. 8).More specifically, the base portion 31a in limitation rod portion 31 be fixed in the back side 32 of workbench main part 26 by edge 26b and The vicinity for two corner 26d that edge 26c is formed.That is, two limit rod portions 31 respectively from scaffold portion 9 to be extended The both sides in direction clip the mode of notch part 25 and set.These limitation rod portions 31 are at the back side relative to workbench main part 26 The direction extension of 32 substantial orthogonalities.By the way that movable workbench 24 is opened and closed, the end 31b warps in these limitation rod portions 31 Cross in Fig. 8 centered on hinge part 29 as the circular arc shown in double dot dash line.The length in these limitation rod portions 31 is set as:As The circular arc of the double dot dash line of the track of the end 31b will not touch the outer surface of container 3.
The material in limitation rod portion 31 can use metal, resin etc..Rubber can also be set in the end 31b sides in limitation rod portion 31 Glue etc. easily produces the elastic component of elastic deformation.In the case of so setting elastic member in limitation rod portion 31, following Aspect is favourable:Even if in the case that the length in limitation rod portion 31 is formed as touching the length of container 3, can also suppress container 3 Outer surface sustain damage.Can also be except the base portion 31a in limitation rod portion 31 major part or overall comprising base portion 31a by Elastic component is formed.By so constituting, losing for limitation rod portion 31 can be reduced.
Therefore, according to the embodiment, in the case where workbench main part 26 is in closed position, operator can be Safely moved on workbench main part 26.On the other hand, in the case where workbench main part 26 is in an open position, limitation Portion 30 extends in the direction intersected with the direction into the side of notch part 25 and along the first scaffold portion 9A direction.Thus, for example When the operator unintentionally side of notch part 25 to be entered, limiting unit 30 is contacted with operator, can notice operator Workbench main part 26 is in an open position.As a result, the behaviour produced because carrying out underfooting confirmation in Inspection can be mitigated The burden of author.
Moreover, limitation rod portion 31 is protruded from the back side 32 of workbench main part 26, thus only make workbench main part 26 from Closed position is moved to open position, can just be configured to the limitation rod portion 31 protruded from the back side 32 of workbench main part 26: The direction for entering notch part 25 with operator intersects and extended along the first scaffold portion 9A direction.As a result, can pass through Simple constitute enters notch part 25 to suppress the operator when notch part 25 is open.
Moreover, in the case where workbench main part 26 is in closed position, because limitation rod portion 31 is configured at scaffold The lower section in portion 9, therefore the movement of operator can not be limited the obstruction in portion 30.
Moreover, setting elastic member in the end 31b sides in limitation rod portion 31, thus, enter to workbench main part 26 During row opening and closing, even if limitation rod portion 31 touches the structure of surrounding, limitation rod portion 31 can also produce elastic deformation to avoid.Cause This, can suppress the damage of the structure of surrounding, also, operation swimmingly can be opened and closed to workbench main part 26.
Moreover, limitation rod portion 31 is individually fixed in two formed by the edge 26b and edge 26c of workbench main part 26 Individual corner 26d vicinity, thus, no matter operator, which is intended to enter from the which direction in the first scaffold portion 9A directions extended, lacks The side of oral area 25, can be transferred through limiting the entrance that rod portion 31 limits operator.
Fig. 9 is the stereogram for representing to form the state for rescuing route of embodiments of the present invention.
According to the scaffold portion 9 of the embodiment, notch part 25 is blocked by movable workbench 24, thus operated Person can safely move.On the other hand, if as shown in figure 9, portion 25 of making a breach, can suppress operator into notch part 25 Side, also, can be readily formed and make the rescue route of the up/down perforation of scaffold portion 9.
According to the ship of the embodiment, structure is being accommodated to the grade of container 3 for being contained in the inside of cargo hold 4 from outside When being checked, operator without confirming underfooting all the time while movement in scaffold portion 9.Accordingly, it is capable to mitigate because underfooting is true The burden for the operator for recognizing and producing.
(the first of embodiment improves example)
Then, based on accompanying drawing to the first of embodiments of the present invention the opening and closing device, scaffold and ship for improving example Illustrate.It is different from the configuration of the embodiment only limiting unit that the first of present embodiment improves example.Pair therefore, with it is described Embodiment identical part assigns identical symbol and illustrated, also, quotes Fig. 5, Fig. 6, omits repeat specification.
As shown in figure 5, in multiple first platforms 22, the first platform 22 for being configured at assigned position on beam direction is distinguished It is set to swing upward freely via hinge etc..That is, opened by making the first platform 22 all swing upward, can be The rescue route in above-below direction insertion is formed between second support 8B.Although eliminating diagram, the rescue route from point The inside in next door 6 passes through until the bottom of cargo hold 4.By the rescue route, for example, can be in the bottom from cargo hold 4 to upper deck 5 Between operator etc. that health in cargo hold 4 is deteriorated is pulled rapidly using rope etc..
As shown in fig. 6, in multiple second platforms 23, being configured at the second platform 23 and of assigned position on beam direction One platform 22 is same, is set to swing upward freely via hinge etc..That is, by making the first swingable platform 23 All swing to open upward, the rescue route in above-below direction insertion can be formed between the first support 8A.Here, the One platform 22 only configures different with the second platform 23, therefore the first platform 22 is illustrated in the following description, omits the The explanation of two platforms 23.
Figure 10 is the first of embodiments of the present invention the side view for improving the first platform of example.
As shown in Figure 10, the first platform 22 possesses:Main platform body portion 126, base portion (not shown) and handle portions 128.
Main platform body portion 126 be formed as in the horizontal direction blocking the first scaffold portion 9A and the second wall portion 7B towards ship The tabular of the rectangle in the space between the wall 12 of first side.The side close to the first ladder portion 10A in main platform body portion 126 Base portion 126a is assemblied in base portion via hinge part 129.Main platform body portion 126 can open the first pin by the hinge part 129 First scaffold of open position and obstruction in the space between hand cradle portion 9A and the second wall portion 7B wall 12 towards bow side Operation is opened and closed between the closed position in the space between portion 9A and the second wall portion 7B wall 12 towards bow side.With can The base portion 27 of dynamic formula workbench 24 is same, base portion (not shown) supporting platform main part 126 from below.
Handle portions 128 are to make main platform body portion 126 from closed position to open position and from open position to obstruction The part held when position is swung for operator.The handle portions 128 of present embodiment are fixed on main platform body portion 126.Handle portions 128 is prominent from the end 126b in main platform body portion 126 to the beam direction that the first scaffold portion 9A is extended.Handle portions 128 Assembled respectively at spaced intervals in the end 126b in a main platform body portion 126 ship cephalocaudal direction.It is same with the handle portions 28 Sample, the handle portions 128 of present embodiment are formed as U-shaped.Main platform body portion is fixed in the end of the U-shaped of handle portions 128 126。
It is same with the movable workbench 24, the first platform 22 possess limitation operator enter the first scaffold portion 9A with The limiting unit 130 in the space between the second wall portion 7B wall 12 towards bow side.Limiting unit 130 possesses limitation rod portion 131. In the case of in an open position in main platform body portion 126, limitation rod portion 131 is extended in the way of intersecting with ship cephalocaudal direction, Also, extend along the first scaffold portion 9A beam direction.In other words, ship cephalocaudal direction could also say that operator enters The direction in the space between the first scaffold portion 9A and the second wall portion 7B wall 12 towards bow side.With the limitation rod portion 31 is same, in order to promote operator to note, the outer surface for limiting rod portion 131 can also be set to the bar graph of yellow and black Case.
Limitation rod portion 131 is formed as cylindric, is assemblied in the back side 132 in main platform body portion 126.These limitation rod portions 131 Extend in the direction of the substantial orthogonality of the back side 132 relative to main platform body portion 126.By the way that the first platform 22 is opened and closed, The end 131b in these limitation rod portions 131 passes through in Figure 10 centered on hinge part 129 as the circular arc shown in double dot dash line.This The length in a little limitation rod portions 131 is set as:Will not be touched as the circular arc of the double dot dash line of the track of the end 131b Two support 8B main part 13B.
Same with the limitation rod portion 31, the material in limitation rod portion 131 can use metal, resin etc..Can also be in limitation The end 131b sides in rod portion 131 set the easy elastic component for producing elastic deformation such as rubber.So set in limitation rod portion 131 In the case of elastic member, be formed as touching the second support 8B length even in the length for limiting rod portion 131 In the case of, it can also suppress the second support 8B and sustain damage.In the limitation rod portion 131 or big except base portion 131a Part or the entirety comprising base portion 131a are formed by elastic component.In this case, losing for limitation rod portion 131 can be reduced.
Therefore, example is improved according to the first of the embodiment, is particularly in closed position in main platform body portion 126 In the case of, operator can stand in main platform body portion 126, safely be moved to the first ladder portion 10A.
On the other hand, in the case of in an open position in main platform body portion 126, limiting unit 130 is entered with operator Enter the direction of direction intersection and extend along the first scaffold portion 9A direction.Thus, for example, the position interrupted in handrail, in behaviour When author is intended to enter between the first scaffold portion 9A and the second wall portion 7B wall 12 towards bow side unintentionally, limit Portion 30 processed is contacted with operator, can suppress the entrance of operator.
(the second of embodiment improves example)
Then, based on accompanying drawing to the second of embodiments of the present invention the opening and closing device, scaffold and ship for improving example Illustrate.It is different from the supporting construction of the embodiment only limiting unit that the second of present embodiment improves example.Pair therefore, with The embodiment identical part assigns identical symbol and illustrated, also, omits repeat specification.
Figure 11 is the second of embodiments of the present invention the stereogram for improving the first scaffold portion of example.
As shown in figure 11, same with the embodiment, the first scaffold portion 9A of the second improvement example possesses movable Workbench 24 (opening and closing device).
Movable workbench 24 is located at the notch part (opening portion) 25 formed in the first scaffold portion 9A.With the embodiment party Formula is same, and movable workbench 24 possesses:Workbench main part 26, base portion 27, handle portions 28 and limiting unit 30.
The limiting unit 30 of the second improvement example possesses:Limit rod portion 31, support 33 and force section 34.
Same with the embodiment, the second limitation rod portion 31 for improving example is provided with two.It is same with the embodiment Sample, limitation rod portion 31 can configure in the case where workbench main part 26 is in an open position and enter breach in limitation operator The restriction site of the side of portion 25.What the limitation rod portion 31 in the restriction site was intersected with entering the direction of notch part 25 with operator Mode extends, also, extends along the first scaffold portion 9A to ship's head.
Support 33 with can from restriction site (in Figure 11, being represented with solid line) to retreating position (in Figure 11, with two point draw Represent) between the mode that swings up and down support limitation rod portion 31.Retreating position refers to the lower section for being rocked to the restriction site Position.These supports 33 have the swinging axle in the direction orthogonal with the approach axis of operator, i.e. beam direction extension 33a.These supports 33 are individually fixed in the back side 32 of workbench main part 26.That is, limitation rod portion 31 is supported in institute Support 33 is stated, thus, it is possible to vertically swing.On the other hand, the direction for entering notch part 25 in operator of support 33 The displacement in (in other words beam direction) is restricted.
Force section 34 is from the retreating position to being exerted a force between restriction site towards restriction site to limitation rod portion 31.This Assembled across between limitation rod portion 31 and the back side 32 of workbench main part 26 force section 34 of embodiment.Force section As long as 34 can be not limited to the helical spring shown in Figure 11 towards elastomer of the restriction site to the force of limitation rod portion 31.
By so constituting movable workbench 24, even if the length in limitation rod portion 31 is to open movable workbench 24 When can touch the length of container 3, open movable workbench 24 when, can also resist the applying power of force section 34 and make limitation Rod portion 31 is rocked to retreating position side to avoid.Accordingly, it is capable to suppress the appearance surface damage of container 3, also, limitation rod portion can be reduced 31 lose.Moreover, making limitation rod portion 31 avoid to retreating position side, limitation rod portion 31 can also return automatically to agretope Put, thus with manually make situation from limitation rod portion 31 to restriction site displacement compared with, the human error such as can suppress to forget to restore Generation.Moreover, the swing in the direction for entering the side of notch part 25 to operator in limitation rod portion 31 is restricted, therefore can more have Effect ground suppresses operator and enters the side of notch part 25.
The present invention is not limited to the embodiment, also comprising in the range of without departing from the gist of the present invention to described Embodiment implements embodiment obtained from various changes.That is, concrete shape, composition for being lifted in embodiment etc. are only one Example, can suitably be changed.
For example, in said embodiment, to limit rod portion 31,131 respectively from workbench main part 26, main platform body portion 126 back side 32,132 is illustrated in case of protruding.But, as long as the position that limitation rod portion 31,131 is protruded can press down The entrance of operator processed is just not limited to the back side 32,132.For example, it is also possible to be:Will limitation rod portion 31,131 and the first platform 22, Second platform 23 and the adjoining configuration of movable workbench 24, and make limitation rod portion 31,131 and the first platform 22, the second platform 23 and the opening and closing of movable workbench 24 swing in linkage.Moreover, with the first platform 22, the second platform 23 and movable The displacement in the limitation rod portion 31,131 of the opening and closing linkage of workbench 24 is not limited to swing.
Moreover, the shape in limitation rod portion 31,131 is not limited to the embodiment.The first platform 22, the second platform 23, And in the case that movable workbench 24 is in an open position, intersect with the approach axis of operator and along scaffold portion 9 direction extension.
Moreover, in said embodiment, the situation to the opening and closing device and scaffold of the present invention to be applied to ship 1 It is illustrated.But, however it is not limited to this, is for example, it is also possible to applied to beyond ship.
Moreover, the ship 1 of the embodiment is illustrated in case of LPG cargo ships.But, ship 1 Container 3 is stored and transport be not limited to LPG.Moreover, being also not necessarily limited to the liquid of this low temperature of LPG.The present invention can also be applied In the ship of the high temperature material such as conveying asphalt.
Industrial utilizability
It can apply to block the opening and closing device of the opening portion for the midway for being formed at scaffold, possess the pin hand of opening and closing device Frame and the ship for possessing the scaffold.According to opening and closing device, scaffold and ship, the use for carrying out Inspection can be mitigated The burden at family.
Symbol description
1 ship
2 hulls
3 containers
4 cargo holds
5 upper decks
6 partition walls
7 wall portions
The wall portions of 7A first
The wall portions of 7B second
8 supports
The supports of 8A first
The supports of 8B second
9 scaffold portions (scaffold)
The first scaffolds of 9A portion
9a ora terminalis
The second scaffolds of 9B portion
10 ladder portions
The first ladders of 10A portion
The second ladders of 10B portion
11 walls
12 walls
13A main parts
13B main parts
14A top ends
14B top ends
15 walls
15a walls
16 walls
16a walls
17 faces
18 arc sections
19 faces
20 arc sections
22 first platforms (opening and closing device)
23 second platforms (opening and closing device)
24 movable workbench (opening and closing device)
25 notch parts (opening portion)
25a edges
26 workbench main parts (main part)
26a edge
26b edge
27 base portions
27a ends
28 handle portions
29 hinge parts
30 limiting units
31 limitation rod portions
31a base portions
31b ends
32 back sides
33 supports
34 force sections
126 main platform body portions (main part)
126a base portions
126b ends
128 handle portions
129 hinge parts
130 limiting units
131 limitation rod portions
131a base portions
131b ends
132 back sides

Claims (6)

1. a kind of opening and closing device, obstruction is formed at the opening portion of the midway of scaffold, possess:
Main part, can be in the closed position from top blocking of said openings portion with being configured at the top of the closed position and beating Open and carry out displacement between the open position of the opening portion;
Limiting unit, in the case where the main part is in an open position, the direction for entering the opening portion with user intersects simultaneously And extend along the direction of the scaffold, limitation user enters the opening portion.
2. opening and closing device according to claim 1, wherein,
The limiting unit is set in the way of being protruded from the back side of the main part.
3. opening and closing device according to claim 1 or 2, wherein,
At least a portion of the limiting unit is formed by elastic component.
4. opening and closing device according to any one of claim 1 to 3, wherein,
The limiting unit is respectively arranged on the both sides in the direction that the scaffold is extended across the opening portion.
5. a kind of scaffold, possesses opening portion,
Possesses the opening and closing device any one of the Claims 1-4 that the opening portion can be opened and closed.
6. a kind of ship, possesses:Hull, is internally formed with cargo hold;
Partition wall, the cargo hold is divided in ship cephalocaudal direction;
Scaffold described in claim 5, is at least supported in the partition wall.
CN201580074741.7A 2015-02-27 2015-06-19 Opening and closing device, scaffold, and ship Active CN107207075B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2015038252A JP6355053B2 (en) 2015-02-27 2015-02-27 Switchgear, scaffold, and ship
JP2015-038252 2015-02-27
PCT/JP2015/067739 WO2016135995A1 (en) 2015-02-27 2015-06-19 Opening/closing device, foothold, and marine vessel

Publications (2)

Publication Number Publication Date
CN107207075A true CN107207075A (en) 2017-09-26
CN107207075B CN107207075B (en) 2019-12-27

Family

ID=56788037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201580074741.7A Active CN107207075B (en) 2015-02-27 2015-06-19 Opening and closing device, scaffold, and ship

Country Status (5)

Country Link
JP (1) JP6355053B2 (en)
KR (1) KR101899273B1 (en)
CN (1) CN107207075B (en)
SG (1) SG11201705659XA (en)
WO (1) WO2016135995A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114379705A (en) * 2022-01-11 2022-04-22 沪东中华造船(集团)有限公司 Transverse bulkhead structure for large LNG ship

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4068738A (en) * 1974-11-18 1978-01-17 Ronald Reed Scaffolding
GB2353313B (en) * 1999-08-19 2003-10-15 Clarksteel Ltd Access cover assembly
CN2587939Y (en) * 2002-12-26 2003-11-26 孙学年 Multi-function manhole cover
EP1936041A2 (en) * 2006-12-22 2008-06-25 Prefabricados Uniblok, S.A. Operator access door for underground buildings
CN203716184U (en) * 2013-12-27 2014-07-16 国家电网公司 Manhole cover available for opening protection and alarm
KR20140127374A (en) * 2010-07-30 2014-11-04 삼성중공업 주식회사 Piracy protection device

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6112493A (en) * 1984-06-27 1986-01-20 Mitsubishi Heavy Ind Ltd Passage device for communicating between upper and lower sides in ship
JPH07116848B2 (en) * 1988-01-30 1995-12-18 東急建設株式会社 Curing lid device with handrail for slab opening
JPH0520994U (en) * 1991-08-30 1993-03-19 三井造船株式会社 Passage for cargo tanks of tankers
JP3182827B2 (en) * 1991-12-27 2001-07-03 石川島播磨重工業株式会社 Outfitting method for compartments in ships
JP4632762B2 (en) 2004-11-26 2011-02-16 ユニバーサル造船株式会社 Inspecting equipment for hull side wall structural members
JP4252966B2 (en) * 2005-03-28 2009-04-08 住友重機械マリンエンジニアリング株式会社 Fixed scaffold for inspection of bulk carriers
KR101368630B1 (en) * 2012-07-06 2014-03-04 삼성중공업 주식회사 Cover device for grating hole
KR20140047389A (en) * 2012-10-12 2014-04-22 현대중공업 주식회사 Opening and closing apparatus for rudder trunk platform access

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4068738A (en) * 1974-11-18 1978-01-17 Ronald Reed Scaffolding
GB2353313B (en) * 1999-08-19 2003-10-15 Clarksteel Ltd Access cover assembly
CN2587939Y (en) * 2002-12-26 2003-11-26 孙学年 Multi-function manhole cover
EP1936041A2 (en) * 2006-12-22 2008-06-25 Prefabricados Uniblok, S.A. Operator access door for underground buildings
KR20140127374A (en) * 2010-07-30 2014-11-04 삼성중공업 주식회사 Piracy protection device
CN203716184U (en) * 2013-12-27 2014-07-16 国家电网公司 Manhole cover available for opening protection and alarm

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114379705A (en) * 2022-01-11 2022-04-22 沪东中华造船(集团)有限公司 Transverse bulkhead structure for large LNG ship

Also Published As

Publication number Publication date
WO2016135995A1 (en) 2016-09-01
CN107207075B (en) 2019-12-27
JP2016159691A (en) 2016-09-05
JP6355053B2 (en) 2018-07-11
KR101899273B1 (en) 2018-09-14
KR20170094426A (en) 2017-08-17
SG11201705659XA (en) 2017-08-30

Similar Documents

Publication Publication Date Title
EP3248905A1 (en) Foldable container
CN208306931U (en) Elevator landing structure peculiar to vessel
CN107207075A (en) Opening and closing device, scaffold and ship
KR101772807B1 (en) Vessel Cargo with Void Space
DE102011002432B4 (en) Barge for the transport of containers and / or swap bodies
CN107097900A (en) A kind of novel mixed bulkhead structure of Large Container Ship
CA2939828C (en) Exoskeleton ship hull structure
CN103661793A (en) Ship based oblique double-bottom arc-shaped bilge
KR101580977B1 (en) Lashing bridges
JP6300279B2 (en) Ship
CN212709837U (en) Connection structure at intersection of groove type bulkhead
KR101873442B1 (en) Remodeling method of container ship
JP7076793B2 (en) Folding container
KR20140001988U (en) Retractable Platform
JP2020037447A (en) container
KR200479216Y1 (en) Wire-mesh container
JP2018187967A (en) Hull structure and ship
CN218751245U (en) Horizontal bulkhead of oil tanker without horizontal truss and application structure
ES2822167T3 (en) Procedure for the production of a rear section of the rudder blade
KR101471279B1 (en) A liquefied gas storage tank and a ship having the tank
CN205819493U (en) One can receive formula vertical ladder
JP2007217001A (en) Tank container
JP5613288B1 (en) Cargo hold structure of chip carrier
CN106629149A (en) Flip platform applied to hoisting limited place
CN105113971A (en) Portable ladder suitable for large ore carrier

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180723

Address after: Kanagawa

Applicant after: MITSUBISHI Shipbuilding Corporation

Address before: Tokyo, Japan, Japan

Applicant before: Mit-subishi Heavy Industries Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant