CN107193906A - The generation method and device of process pipe meter diagram BOM - Google Patents
The generation method and device of process pipe meter diagram BOM Download PDFInfo
- Publication number
- CN107193906A CN107193906A CN201710330568.3A CN201710330568A CN107193906A CN 107193906 A CN107193906 A CN 107193906A CN 201710330568 A CN201710330568 A CN 201710330568A CN 107193906 A CN107193906 A CN 107193906A
- Authority
- CN
- China
- Prior art keywords
- data
- block
- parameter
- graph
- process pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/445—Program loading or initiating
- G06F9/44521—Dynamic linking or loading; Link editing at or after load time, e.g. Java class loading
- G06F9/44526—Plug-ins; Add-ons
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computational Linguistics (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
Abstract
The invention discloses the generation method of process pipe meter diagram BOM and device, method includes:Receive the selected instruction of graph block in process pipe meter diagram;Read the material mark carried in graph block;Search identifies corresponding material category data with material in material data storehouse;Selection and the parameter of materials data corresponding to graph block in material category data;By the parameter of materials data transfer chosen into graph block data information memory block;The parameter of materials data in graph block data information memory block are will be transmitted to be stored in graph block data information memory block;The parameter of materials data preserved in extraction process pipeline meter figure in partial graphical block or the corresponding data information memory block of whole graph block, the parameter of materials data of extraction are collected and form is formed;Form is exported.It can collect the material formation inventory in process pipe meter diagram automatically to the present invention, and can export in a tabular form.
Description
Technical field
The present invention relates to AUTOCAD plug-in units field, more particularly to a kind of generation side of the process pipe meter diagram bill of materials
Method and device.
Background technology
AutoCAD is to use most computer aided design softwares in the world at present, at home each enterprise and designing institute
In be widely applied.AutoCAD is feature-rich, can easily realize various drawing and information storage function, but
It is a common software after all, and the specific function that each enterprise needs is not refined.For the ease of the customized work(of user
Can, the AutoCAD all-round openings API of internal control so that it fully can carry out plug-in unit according to enterprise or industry requirement
Exploitation, meets specific industry or the demand using function.Draw pipeline rout process pipe meter diagram after, designer in order to
After construction BOM is provided, it is necessary to count pipeline, the quantity of pipe fitting, totalling by hand thing is inputted in AutoCAD or EXCEL tables
The information such as title, specification, quantity, the material of material are to construct.In the enterprise for having ERP to manage, designer will also compare ERP things
Expect table, ERP numbering input inventories could be purchased into ERP system.Because pipeline, the species of particularly pipe fitting is various,
Not only waste time and energy but also often occur the situation of omission, input error.
The content of the invention
In order to overcome the deficiencies in the prior art, it is an object of the invention to provide the life of the process pipe meter diagram bill of materials
Into method and device, what it can solve that designer counts that the data message of pipe fitting brought by hand waste time and energy, omit and
The problem of mistake.
The purpose of the present invention is realized using following technical scheme:The generation method of process pipe meter diagram BOM, institute
State what AUTOCAD of the process pipe meter diagram based on exploitation plug-in unit completed, the AUTOCAD is connected with material data storehouse,
The process pipe meter diagram includes graph block, and the graph block has data information memory block, and methods described includes following step
Suddenly:
Receive the selected instruction of graph block in process pipe meter diagram;
Read the material mark carried in graph block;
Search identifies corresponding material category data with material in material data storehouse;
Selection and the parameter of materials data corresponding to graph block in material category data;
By the parameter of materials data transfer chosen into graph block data information memory block;
The parameter of materials data that will be transmitted in graph block data information memory block are stored in graph block data information memory
In block;
Preserved in extraction process pipeline meter figure in partial graphical block or the corresponding data information memory block of whole graph blocks
Parameter of materials data, the partial graphical block or whole graph block are selected partial graphical block or whole graph blocks;
The parameter of materials data of extraction are collected and form is formed;
Form is exported.
It is preferred that, the parameter of materials data include name of material, COM code, material specification, material model and material
Quantity.
It is preferred that, it is described the parameter of materials data of extraction are collected after also include:By the material ginseng collected
Number data are sorted out by COM code priority rule, described to carry out sorting out including identical to encoding by COM code preference rule
Material quantity carry out statistics merging.
It is preferred that, the selection in material category data and the parameter of materials data corresponding to graph block, the selection
Method includes input material major parameter, is searched out and immediate two groups of things of material major parameter according to the major parameter of material
Expect supplemental characteristic to preferably select.
It is preferred that, the material data storehouse is ERP system database.
It is preferred that, the graph block data information memory block includes graph block growth data dictionary.
Present invention also offers a kind of generating means of the process pipe meter diagram bill of materials, the process pipe meter diagram
Completed on AUTOCAD based on exploitation plug-in unit, the AUTOCAD is connected with material data storehouse, the process pipe instrument
Each graph block in table figure all has data information memory block, and described device includes
Instruction module is received, for receiving the selected instruction of graph block in process pipe meter diagram;
Read module, the material mark carried for reading in graph block;
Search module, the material category data corresponding with material mark for the search in material data storehouse;
Selecting module, for the selection in material category data and the parameter of materials data corresponding to graph block;
Transport module, for the parameter of materials data transfer that will choose into graph block data information memory block;
Preserving module, graph block is stored in for will be transmitted to the parameter of materials data in graph block data information memory block
In data information memory block;
Extraction module, for partial graphical block in extraction process pipeline meter figure or the corresponding data message of whole graph blocks
The parameter of materials data preserved in memory block, the partial graphical block or whole graph blocks are selected partial graphical block or complete
Portion's graph block;
Summarizing module, for being collected the parameter of materials data of extraction and forming form;
Output module, for form to be exported.
It is preferred that, the parameter of materials data include COM code, material specification, material model and material quantity.
It is preferred that, described device also include classifying module, for by the parameter of materials data collected by COM code
Priority rule is sorted out, and the COM code preference rule includes carrying out statistics merging to the quantity for encoding identical material.
It is preferred that, the selecting module selected in material category data with graph block corresponding to parameter of materials data,
The system of selection includes input material major parameter, is searched out according to the major parameter of material with material major parameter most
Two groups of close parameter of materials data are for preferably selecting.
Compared with prior art, the beneficial effects of the present invention are:By selecting material data in material data storehouse and inciting somebody to action
Material data is stored in the growth data dictionary of the graph block in process pipe meter diagram, by extracting in growth data dictionary
Material data formation form document, it is time saving and energy saving to reach, complete correct effect.
Brief description of the drawings
Fig. 1 is a kind of generation method schematic flow sheet of the process pipe meter diagram bill of materials in the embodiment of the present invention;
Fig. 2 is the specifically chosen steps flow chart schematic diagram of step 003 in Fig. 1;
Fig. 3 is a kind of structural representation of the generating means of the process pipe meter diagram bill of materials in the embodiment of the present invention.
Embodiment
Below, with reference to accompanying drawing and embodiment, the present invention is described further:
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
The present invention is to be connected based on the plug-in unit API module developed on AUTOCAD with the communication of ERP system material data storehouse, that
This realizes that data double-way is transmitted;Process pipe meter diagram in the present invention is is completed in AUTOCAD, process pipe
Graph block and line segment in meter diagram, which have, preserves data attribute;ERP system in the present invention stores all things needed to use
Expect information data.
Introduction basis based on more than, describes a kind of generation method of process pipe meter diagram BOM in detail below.
Such as Fig. 1, Fig. 1 is a kind of generation method flow signal of process pipe meter diagram BOM in the embodiment of the present invention
Figure, in Fig. 1, a kind of generation method of process pipe meter diagram BOM comprises the following steps:
Step 001:Receive the selected instruction of graph block in process pipe meter diagram;
Order is chosen to needing the graph block or line segment that store material data to perform in process pipe meter diagram, system is received
Instruction is chosen to this, graph block or line segment are read out.
Step 002:Read the material mark carried in graph block;
The mark such as title or parameter of the attached material represented containing graph block, is identified by reading these in graph block, can
To reduce the scope in retrieval material data storehouse.
Step 003:Search identifies corresponding material category data with material in material data storehouse;
Material data storehouse in the present embodiment is company ERP system material data storehouse.According to the mark letter for reading graph block
Breath, goes in material data storehouse to be identified in search, the present embodiment specific search step as shown in Figure 2:
Step 031:Retrieved in material data storehouse and whether there is the material consistent with identifying in name of material;
Such as graph block is designated equipment, then retrieves inventory or the option row with the presence or absence of equipment in material data storehouse
Table;
Step 032:If any then by the material category data output consistent with identifying, if not, carrying out material class to mark
Do not judge;
Exported if any the lists for then ranging equipment by all, as do not find it is consistent, then need to be judged, that is, sentence
This is not designated which type, such as equipment, instrument, valve;
Step 033:Export the material category data judged;
Differentiation finishes mark and belongs to that material category, then is exported corresponding material category list.
Step 004:Selection and the parameter of materials data corresponding to graph block in material category data;
Material category data include various materials supplemental characteristic, such as equipment includes title, model, specification, material etc.,
The more specific parameter of materials data of selection are carried out in material category data.
Step 005:By the parameter of materials data transfer chosen into graph block data information memory block;
The parameter of materials data chosen are exported from ERP system database, and derived parameter of materials data are passed
In the defeated data information memory block to graph block.
Step 006:The parameter of materials data that will be transmitted in graph block data information memory block are stored in graph block data
In block information memory;
Graph block has the data information memory block for preserving data, and data information memory block includes growth data dictionary, thing
Material supplemental characteristic is just stored in the growth data dictionary of graph block.
Step 007:Partial graphical block or the corresponding data information memory of whole graph blocks in extraction process pipeline meter figure
The parameter of materials data preserved in block;
The graph block of partial graphical block or whole graph block outputting material supplemental characteristics for needed for, the partial graphical block of extraction
Or whole graph blocks are selected graph block, it is from the corresponding data information memory block of graph block to extract material supplemental characteristic
Read and export.
Step 008:The parameter of materials data of extraction are collected and form is formed;
The parameter of materials data of extraction are successively summarised in a file according to output, and form the neat table of a form
Lattice.
Step 009:The parameter of materials data collected are sorted out by COM code priority rule;
Parameter of materials data include COM code, material specification, material quantity, material material etc., the parameter of materials collected
Data are ranked up classification according to COM code, and COM code preference rule includes uniting to the quantity for encoding identical material
Meter merges.
Step 010:Form is exported;
Form can be exported with the file of EXCEL forms.
Based on the generation method of process above pipeline meter figure BOM, the present invention also accordingly provides a kind of technique
Pipeline meter figure BOM generating means, as shown in figure 3, described device includes:
Instruction module 10 is received, for receiving the selected instruction of graph block in process pipe meter diagram;
Read module 20, the material mark carried for reading in graph block;
Search module 30, the material category data corresponding with material mark for the search in material data storehouse;
Selecting module 40, for the selection in material category data and the parameter of materials data corresponding to graph block;
Transport module 50, for the parameter of materials data transfer that will choose into graph block data information memory block;
Preserving module 60, figure is stored in for will be transmitted to the parameter of materials data in graph block data information memory block
In block data message memory block;
Extraction module 70, for partial graphical block in extraction process pipeline meter figure or the corresponding data letter of whole graph blocks
The parameter of materials data that preserve in breath memory block, the partial graphical block or whole graph blocks for selected partial graphical block or
Whole graph blocks;
Summarizing module 80, for being collected the parameter of materials data of extraction and forming form;
Classifying module 90, for the parameter of materials data collected to be sorted out by COM code priority rule, institute
Stating COM code preference rule includes carrying out statistics merging to the quantity for encoding identical material;
Output module 10, for form to be exported;
Form can be exported with the file of EXCEL forms.
Each step that the functional module of device in the present embodiment corresponds in above-mentioned generation method, is each step
Executive agent, does not just repeat to describe function and the principle of modules in detail in the present apparatus.
Beneficial effect of the present invention is:By selecting material data in material data storehouse and material data being stored in into work
In the growth data dictionary of graph block in skill pipeline meter figure, by extracting the material data formation table in growth data dictionary
Lattice file, it is time saving and energy saving to reach, complete correct effect.
It will be apparent to those skilled in the art that technical scheme that can be as described above and design, make other various
It is corresponding to change and deformation, and all these change and deformation should all belong to the protection domain of the claims in the present invention
Within.
Claims (10)
1. the generation method of process pipe meter diagram BOM, it is characterised in that the process pipe meter diagram is based on exploitation
What the AUTOCAD of plug-in unit completed, the AUTOCAD is connected with material data storehouse, and the process pipe meter diagram includes figure
Shape block, the graph block has data information memory block, the described method comprises the following steps:
Receive the selected instruction of graph block in process pipe meter diagram;
Read the material mark carried in graph block;
Search identifies corresponding material category data with material in material data storehouse;
Selection and the parameter of materials data corresponding to graph block in material category data;
By the parameter of materials data transfer chosen into graph block data information memory block;
The parameter of materials data in graph block data information memory block are will be transmitted to be stored in graph block data information memory block;
The thing preserved in extraction process pipeline meter figure in partial graphical block or the corresponding data information memory block of whole graph block
Expect supplemental characteristic, the partial graphical block or whole graph blocks are selected partial graphical block or whole graph blocks;
The parameter of materials data of extraction are collected and form is formed;
Form is exported.
2. the generation method of process pipe meter diagram BOM as claimed in claim 1, it is characterised in that the material ginseng
Number data include name of material, COM code, material specification, material model and material quantity.
3. the generation method of process pipe meter diagram BOM as claimed in claim 2, it is characterised in that described by extraction
Parameter of materials data also include after being collected:The parameter of materials data collected are carried out by COM code priority rule
Sort out, it is described to carry out sorting out including carrying out statistics merging to the quantity for encoding identical material by COM code preference rule.
4. the generation method of process pipe meter diagram BOM as claimed in claim 1, it is characterised in that described in material
Selection and the parameter of materials data corresponding to graph block in categorical data, the system of selection include input material major parameter,
Searched out according to the major parameter of material with immediate two groups of parameter of materials data of material major parameter for preferably selecting.
5. the generation method of process pipe meter diagram BOM as claimed in claim 1, it is characterised in that the material number
It is ERP system database according to storehouse.
6. the generation method of process pipe meter diagram BOM as claimed in claim 1, it is characterised in that the graph block
Data information memory block includes graph block growth data dictionary.
7. the generating means of process pipe meter diagram BOM, it is characterised in that the process pipe meter diagram is based on exploitation
Completed on the AUTOCAD of plug-in unit, the AUTOCAD is connected with material data storehouse, in the process pipe meter diagram
Each graph block all has data information memory block, and described device includes
Instruction module is received, for receiving the selected instruction of graph block in process pipe meter diagram;
Read module, the material mark carried for reading in graph block;
Search module, the material category data corresponding with material mark for the search in material data storehouse;
Selecting module, for the selection in material category data and the parameter of materials data corresponding to graph block;
Transport module, for the parameter of materials data transfer that will choose into graph block data information memory block;
Preserving module, graph block data are stored in for will be transmitted to the parameter of materials data in graph block data information memory block
In block information memory;
Extraction module, for partial graphical block in extraction process pipeline meter figure or the corresponding data information memory of whole graph blocks
The parameter of materials data preserved in block, the partial graphical block or whole graph blocks figure for selected partial graphical block or all
Shape block;
Summarizing module, for being collected the parameter of materials data of extraction and forming form;
Output module, for form to be exported.
8. the generating means of process pipe meter diagram BOM as claimed in claim 7, it is characterised in that the material ginseng
Number data include COM code, material specification, material model and material quantity.
9. the generating means of process pipe meter diagram BOM as claimed in claim 8, it is characterised in that described device is also
Including classifying module, for the parameter of materials data collected to be sorted out by COM code priority rule, the material
Encoding preference rule includes carrying out statistics merging to the quantity for encoding identical material.
10. the generating means of process pipe meter diagram BOM as claimed in claim 7, it is characterised in that the selection
Module selects to include input material with the parameter of materials data corresponding to graph block, the system of selection in material category data
Major parameter, is searched out with immediate two groups of parameter of materials data of material major parameter for excellent according to the major parameter of material
Choosing selection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710330568.3A CN107193906B (en) | 2017-05-11 | 2017-05-11 | Method and device for generating process pipeline instrument diagram bill of materials |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710330568.3A CN107193906B (en) | 2017-05-11 | 2017-05-11 | Method and device for generating process pipeline instrument diagram bill of materials |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107193906A true CN107193906A (en) | 2017-09-22 |
CN107193906B CN107193906B (en) | 2020-09-04 |
Family
ID=59872487
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710330568.3A Active CN107193906B (en) | 2017-05-11 | 2017-05-11 | Method and device for generating process pipeline instrument diagram bill of materials |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107193906B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110362883A (en) * | 2019-06-25 | 2019-10-22 | 中车青岛四方机车车辆股份有限公司 | A kind of maintenance packaging technology design method and bogie overhaul assemble method |
CN110377620A (en) * | 2019-07-16 | 2019-10-25 | 四川康佳智能终端科技有限公司 | A kind of material searching method, computer and storage medium based on BOM tool |
CN111459397A (en) * | 2020-02-28 | 2020-07-28 | 湖南华中天地环保科技有限公司 | Data identification instrument |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080077902A1 (en) * | 2006-09-26 | 2008-03-27 | Ichiro Harashima | Method of Determining Range Of Change in Design, Design Change Range Determining Apparatus, and Design Change Range Determining System |
US20100057729A1 (en) * | 2008-08-29 | 2010-03-04 | Siemens Product Lifecycle Management Software Inc. | System, Method, and Computer Program Product for a Geometric Search of a Configurable Product Structure |
CN101702219A (en) * | 2009-12-08 | 2010-05-05 | 金蝶软件(中国)有限公司 | Method for generating material information and device thereof |
CN102004943A (en) * | 2010-04-28 | 2011-04-06 | 重庆迈特科技有限责任公司 | Product multiple-BOM (bill of material) tree configurator based on unified material store |
CN102004954A (en) * | 2010-11-12 | 2011-04-06 | 上海信哲通软件有限公司 | Product information system and information integration method of product design system |
WO2011127112A2 (en) * | 2010-04-07 | 2011-10-13 | Siemens Product Lifecycle Management Software Inc. | System and method for visualization and comparison of physical assets using engineering design data |
CN102999671A (en) * | 2012-11-30 | 2013-03-27 | 江苏省电力公司盱眙县供电公司 | Computer design method of standard distribution network line |
CN105574735A (en) * | 2015-12-15 | 2016-05-11 | 北京中网易企秀科技有限公司 | Internet-based display material system and display material manufacturing method |
CN105975562A (en) * | 2016-05-03 | 2016-09-28 | 水木智博(北京)网络信息科技有限公司 | Method and apparatus for automatically generating budget table of engineering drawing |
CN106484995A (en) * | 2016-09-30 | 2017-03-08 | 华中科技大学无锡研究院 | A kind of generation method of the GB standard BOM based on CATIA |
-
2017
- 2017-05-11 CN CN201710330568.3A patent/CN107193906B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080077902A1 (en) * | 2006-09-26 | 2008-03-27 | Ichiro Harashima | Method of Determining Range Of Change in Design, Design Change Range Determining Apparatus, and Design Change Range Determining System |
US20100057729A1 (en) * | 2008-08-29 | 2010-03-04 | Siemens Product Lifecycle Management Software Inc. | System, Method, and Computer Program Product for a Geometric Search of a Configurable Product Structure |
CN101702219A (en) * | 2009-12-08 | 2010-05-05 | 金蝶软件(中国)有限公司 | Method for generating material information and device thereof |
WO2011127112A2 (en) * | 2010-04-07 | 2011-10-13 | Siemens Product Lifecycle Management Software Inc. | System and method for visualization and comparison of physical assets using engineering design data |
CN102004943A (en) * | 2010-04-28 | 2011-04-06 | 重庆迈特科技有限责任公司 | Product multiple-BOM (bill of material) tree configurator based on unified material store |
CN102004954A (en) * | 2010-11-12 | 2011-04-06 | 上海信哲通软件有限公司 | Product information system and information integration method of product design system |
CN102999671A (en) * | 2012-11-30 | 2013-03-27 | 江苏省电力公司盱眙县供电公司 | Computer design method of standard distribution network line |
CN105574735A (en) * | 2015-12-15 | 2016-05-11 | 北京中网易企秀科技有限公司 | Internet-based display material system and display material manufacturing method |
CN105975562A (en) * | 2016-05-03 | 2016-09-28 | 水木智博(北京)网络信息科技有限公司 | Method and apparatus for automatically generating budget table of engineering drawing |
CN106484995A (en) * | 2016-09-30 | 2017-03-08 | 华中科技大学无锡研究院 | A kind of generation method of the GB standard BOM based on CATIA |
Non-Patent Citations (1)
Title |
---|
战德臣等: "基于物料清单 /工艺清单的网络图绘制方法", 《中国机械工程》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110362883A (en) * | 2019-06-25 | 2019-10-22 | 中车青岛四方机车车辆股份有限公司 | A kind of maintenance packaging technology design method and bogie overhaul assemble method |
CN110377620A (en) * | 2019-07-16 | 2019-10-25 | 四川康佳智能终端科技有限公司 | A kind of material searching method, computer and storage medium based on BOM tool |
CN111459397A (en) * | 2020-02-28 | 2020-07-28 | 湖南华中天地环保科技有限公司 | Data identification instrument |
CN111459397B (en) * | 2020-02-28 | 2023-09-26 | 湖南华中天地环保科技有限公司 | Data identifier |
Also Published As
Publication number | Publication date |
---|---|
CN107193906B (en) | 2020-09-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103678620B (en) | Knowledge document recommendation method based on user historical behavior features | |
US8015198B2 (en) | Method for automatically indexing documents | |
CN109669933B (en) | Transaction data intelligent processing method and device and computer readable storage medium | |
CN103049568B (en) | The method of the document classification to magnanimity document library | |
CN104364781B (en) | System and method for calculating classification ratio | |
CN104216876B (en) | Information text filter method and system | |
CN105787025A (en) | Network platform public account classifying method and device | |
CN103279542A (en) | Data importing processing method and data processing device | |
CN107193906A (en) | The generation method and device of process pipe meter diagram BOM | |
CN104636424A (en) | Method for building literature review framework based on atlas analysis | |
CN103837770A (en) | Electrical equipment defect detection and maintenance method | |
CN108280225B (en) | Semantic retrieval method and semantic retrieval system | |
CN101236550B (en) | Method and system for processing tree -type structure data | |
CN106156372A (en) | The sorting technique of a kind of internet site and device | |
CN105975466A (en) | Method and device for machine manuscript writing aiming at short newsflashes | |
CN103106245A (en) | Method which is used for classifying translation manuscript in automatic fragmentation mode and based on large-scale term corpus | |
CN104298736A (en) | Method and device for aggregating and connecting data as well as database system | |
AU2002331728A1 (en) | A method for automatically indexing documents | |
CN107958004A (en) | The construction method and device of a kind of knowledge base | |
US20130124255A1 (en) | Presort Scheme Optimizer and Simulator | |
CN102169491A (en) | Dynamic detection method for multi-data concentrated and repeated records | |
CN105373531A (en) | Short topic text identification method and device based on social network | |
Cecelja | Manufacturing Information and Data Systems: Analysis, Design and Practice | |
CN111898351B (en) | Automatic Excel data importing method and device based on Aviator, terminal equipment and storage medium | |
CN107273417A (en) | The generation method and device of a kind of pipeline rout figure BOM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Generation method and device of P & ID BOM Effective date of registration: 20210128 Granted publication date: 20200904 Pledgee: Bank of China Limited by Share Ltd. Guangzhou Panyu branch Pledgor: AWS ENVIRONMENT TECHNOLOGIES Ltd. Registration number: Y2021980000838 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |