CN107191917A - Boiler superheater tube panel fixed structure - Google Patents

Boiler superheater tube panel fixed structure Download PDF

Info

Publication number
CN107191917A
CN107191917A CN201710502605.4A CN201710502605A CN107191917A CN 107191917 A CN107191917 A CN 107191917A CN 201710502605 A CN201710502605 A CN 201710502605A CN 107191917 A CN107191917 A CN 107191917A
Authority
CN
China
Prior art keywords
superheater tube
superheater
pipe clamp
bolt
fixed structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710502605.4A
Other languages
Chinese (zh)
Inventor
丁宇
姚圣余
刘家宝
曾小弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jingcheng Machine Manufacture Co Ltd
Original Assignee
Jiangsu Jingcheng Machine Manufacture Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jingcheng Machine Manufacture Co Ltd filed Critical Jiangsu Jingcheng Machine Manufacture Co Ltd
Priority to CN201710502605.4A priority Critical patent/CN107191917A/en
Publication of CN107191917A publication Critical patent/CN107191917A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/24Supporting, suspending, or setting arrangements, e.g. heat shielding

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Thermal Insulation (AREA)

Abstract

The invention discloses a kind of boiler superheater tube panel fixed structure, including some groups of pipe clamps, every superheater tube matches somebody with somebody unification group pipe clamp, every group of pipe clamp includes two intermediate plates, the inwall of intermediate plate is in cabochon, and fitted with the outer peripheral face of superheater tube wall, connect and be integrally formed from beginning to end between the adjacent clips of the same side, and it is respectively provided with screw in junction, bolt is set in screw, the intermediate plate for being located at superheater tube both sides respectively is connected so as to which superheater be clamped by bolt attaching nut, and pipe clamp, bolt and nut are made of exotic material.Above-mentioned setting allows formation face between superheater pipe clamp and superheater tube to contact, and superheater tube folder fixed form can at least be alleviated or avoid and concentrated wear be occurred between clamp road, and prevents stagger arrangement and cause superheater tube screen to deform and hang burnt.

Description

Boiler superheater tube panel fixed structure
Technical field
The present invention relates to boiler power station technical field, and in particular to a kind of boiler superheater tube panel fixed structure.
Background technology
Superheater is as the important component in boiler, and it mainly does function by increasing vapor (steam) temperature with increase steam Power, so as to improve power plant's thermodynamic efficiency.
Superheater of the prior art is unreasonable due to fixation, often occurs superheater tube stagger arrangement and causes superheater tube screen Deformation and extension are burnt.Pipe clamp come off cause superheater tube screen outside smoke-shock and steam inside impact in the presence of and and pipe clamp Occur to rock relatively, so as to cause tube panel to wear and tear.
It is combed plate pipe clamp to design in the prior art most, and the contact between the pipe clamp and superheater tube is linear contact lay, is led Cause pipeline still can occur partial contact rubbing between pipe clamp in the case of weak vibrations and finishing superheater pipeline is occurred part Abrasion, its concentrated wear depth can be normally reached 2mm, and superheater pipeline wall thickness is relatively thin in itself, so the mistake after being worn Hot device pipeline may result in the leakage of boiler finishing superheater.
The content of the invention
The technical problem to be solved in the present invention is to solve above-mentioned the deficiencies in the prior art to reduce superheater tube mill there is provided one kind The boiler superheater tube panel fixed structure of damage.
In order to solve above-mentioned the deficiencies in the prior art, the technical solution adopted by the present invention is:A kind of boiler superheater tube panel Fixed structure, including some groups of pipe clamps, every superheater tube match somebody with somebody unification group pipe clamp, and every group of pipe clamp includes two intermediate plates, intermediate plate Inwall is in cabochon, and is fitted with the outer peripheral face of superheater tube wall, the connection and one from beginning to end between the adjacent clips of the same side It is body formed, and be respectively provided with junction in screw, screw bolt is set, bolt attaching nut will be located at superheater tube two respectively The intermediate plate of side is connected to clamp in superheater, and pipe clamp, bolt and nut are made of exotic material.
Further, the outer wall of the intermediate plate also be in cabochon, and with inwall and superheater tube it is concentric set.
Further, what the bolt and intermediate plate were linked to be direct-connected is vertically arranged.
Further, the pipe clamp is made using Integral melting molding.
Further, it is provided with respectively between the intermediate plate end of same superheater tube both sides between 1.5~2.5mm Gap.
From above-mentioned technical proposal it can be seen that the present invention has advantages below:Above-mentioned setting allow superheater pipe clamp with Face contact is formed between superheater tube, superheater tube folder fixed form can at least be alleviated or avoid and be sent out between clamp road Raw concentrated wear, and prevent stagger arrangement and cause superheater tube screen to deform and hang burnt;Preset clearance is set, bolt can be facilitated Regulation, and bending can be facilitated in the intermediate plate of cabochon, so that superheater tube of preferably fitting, by superheater pipe clamp Tightly.
Brief description of the drawings
Fig. 1 is the present invention and superheater tube scheme of installation front view;
Fig. 2 is the present invention and superheater tube scheme of installation top view;
Fig. 3 is structural representation of the invention.
Embodiment
The embodiment of the present invention is elaborated below in conjunction with accompanying drawing.
As shown in Fig. 1,2 or 3, boiler superheater tube panel fixed structure of the invention, including some groups of pipe clamps, every mistake Hot device pipe matches somebody with somebody unification group pipe clamp, and every group of pipe clamp includes two intermediate plates 1, and the inwall of intermediate plate is in cabochon, and with the wall of superheater tube 2 Outer peripheral face is fitted, and is connected and is integrally formed from beginning to end between the adjacent clips of the same side, hot investment casting, material are touched using Integral melting Matter uses high temperature resistant 2520, and is respectively provided with setting bolt 4 in screw 3, screw 3 in junction, and the attaching nut of bolt 4 will respectively Intermediate plate positioned at the pipe both sides of superheater 2 is connected to clamp in superheater, and bolt 4 and nut 5 use heat-resistance stainless steel Material.
Above-mentioned setting allows formation face between superheater pipe clamp and superheater tube to contact, the clamping fixed side of the superheater tube Formula can at least be alleviated or avoid and concentrated wear be occurred between clamp road, and prevents stagger arrangement and cause superheater tube screen Deformation and extension are burnt.
The outer wall of the intermediate plate also be in cabochon, and with inwall and superheater tube it is concentric set.Bolt and intermediate plate What is be linked to be direct-connected is vertically arranged.The pipe clamp moulds the intermediate plate end made and be located at same superheater tube both sides respectively using Integral melting 1.5~2.5mm gap is provided between portion.Preset clearance is set, the regulation of bolt can be facilitated, and can in the intermediate plate of cabochon To facilitate bending, so that superheater tube of preferably fitting, superheater tube is clamped.
The typical method of embodiments of the present invention is described in detail above in association with accompanying drawing, still, the present invention is not limited to Detail in above-mentioned embodiment, in the range of the technology design of the present invention, can be carried out to technical scheme A variety of simple variants, these simple variants belong to protection scope of the present invention.

Claims (5)

1. a kind of boiler superheater tube panel fixed structure, including some groups of pipe clamps, every superheater tube match somebody with somebody unification group pipe clamp, every group Pipe clamp includes two intermediate plates, it is characterised in that:The inwall of intermediate plate is in cabochon, and is fitted with the outer peripheral face of superheater tube wall, position Connect and be integrally formed from beginning to end between the adjacent clips of the same side, and be respectively provided with junction in screw, screw spiral shell is set The intermediate plate for being located at superheater tube both sides respectively is connected so as to which superheater be clamped by bolt, bolt attaching nut, pipe clamp, bolt And nut is made of exotic material.
2. boiler superheater tube panel fixed structure according to claim 1, it is characterised in that:The outer wall of the intermediate plate is also in Cabochon, and with inwall and superheater tube it is concentric set.
3. the boiler superheater tube panel fixed structure according to claims 1 or 2, it is characterised in that:The bolt and folder What piece was linked to be direct-connected is vertically arranged.
4. boiler superheater tube panel fixed structure according to claim 1, it is characterised in that:The pipe clamp uses Integral melting Molding is made.
5. the boiler superheater tube panel fixed structure according to claims 1 or 2, it is characterised in that:It is located at respectively same 1.5~2.5mm gap is provided between the intermediate plate end of root superheater tube both sides.
CN201710502605.4A 2017-06-27 2017-06-27 Boiler superheater tube panel fixed structure Pending CN107191917A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710502605.4A CN107191917A (en) 2017-06-27 2017-06-27 Boiler superheater tube panel fixed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710502605.4A CN107191917A (en) 2017-06-27 2017-06-27 Boiler superheater tube panel fixed structure

Publications (1)

Publication Number Publication Date
CN107191917A true CN107191917A (en) 2017-09-22

Family

ID=59880265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710502605.4A Pending CN107191917A (en) 2017-06-27 2017-06-27 Boiler superheater tube panel fixed structure

Country Status (1)

Country Link
CN (1) CN107191917A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107906506A (en) * 2017-11-30 2018-04-13 江苏中科重工股份有限公司 Pendant superheater
CN111023085A (en) * 2019-12-19 2020-04-17 大唐郓城发电有限公司 Heating surface structure of boiler with reheating circulating fluidized bed
CN114135862A (en) * 2021-11-30 2022-03-04 刘杰 Tube body positioning mechanism of boiler superheater

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3527261A (en) * 1968-11-12 1970-09-08 Babcock & Wilcox Co Tube guide apparatus
CN101718428A (en) * 2009-12-28 2010-06-02 上海锅炉厂有限公司 Positioning device used for suspension pipe
CN202303328U (en) * 2011-11-02 2012-07-04 哈尔滨锅炉厂有限责任公司 Fixing device for supercritical boiler superheater tube screen
CN202501444U (en) * 2012-02-29 2012-10-24 东方电气集团东方锅炉股份有限公司 Fixed curved pipe clamp served as sliding block in boiler

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3527261A (en) * 1968-11-12 1970-09-08 Babcock & Wilcox Co Tube guide apparatus
CN101718428A (en) * 2009-12-28 2010-06-02 上海锅炉厂有限公司 Positioning device used for suspension pipe
CN202303328U (en) * 2011-11-02 2012-07-04 哈尔滨锅炉厂有限责任公司 Fixing device for supercritical boiler superheater tube screen
CN202501444U (en) * 2012-02-29 2012-10-24 东方电气集团东方锅炉股份有限公司 Fixed curved pipe clamp served as sliding block in boiler

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107906506A (en) * 2017-11-30 2018-04-13 江苏中科重工股份有限公司 Pendant superheater
CN107906506B (en) * 2017-11-30 2019-07-16 江苏中科重工股份有限公司 Pendant superheater
CN111023085A (en) * 2019-12-19 2020-04-17 大唐郓城发电有限公司 Heating surface structure of boiler with reheating circulating fluidized bed
CN114135862A (en) * 2021-11-30 2022-03-04 刘杰 Tube body positioning mechanism of boiler superheater

Similar Documents

Publication Publication Date Title
CN107191917A (en) Boiler superheater tube panel fixed structure
IN2012DN05092A (en)
CN201818332U (en) Turbine-end heat insulation structure of turbocharger
CN202643714U (en) Molten steel slag hot-stuffy pool inner wall tightening device
CN101701269B (en) Method for connecting water inlet pipe and water outlet pipe of blast furnace cooling wall
CN205020515U (en) Roll aqueous vapor cooling nozzle assembly
CN201662056U (en) Water spraying device of desuperheater
CN212640284U (en) Energy-saving toughening furnace for building glass
CN209196814U (en) A kind of Industrial Boiler heating mechanism
CN208187138U (en) A kind of thermal energy recycling heating installation pouring waste heat using molten iron
CN207581640U (en) A kind of anti-displacement steel structure clamp device
CN204042880U (en) A kind of slag discharge pipe of fluidized bed boiler
CN206094004U (en) Re -heater for boiler
CN204554787U (en) The external bed for circulating fluidized bed boiler secondary medium temperature overheater improved
CN106765025B (en) A kind of biomass steam generator core cylinder
CN209633884U (en) A kind of press chamber heating mechanism of oil press
CN217841753U (en) Heat preservation system of steam extraction pipeline in steam turbine low pressure jar
CN205551169U (en) Extra -high voltage iron tower is with big specification angle steel high -frequency heating crib crimper
CN205408204U (en) High -efficient refrigerated stainless steel silicon steel post
CN208398058U (en) Boiler superheater tube panel fixes device
CN212006727U (en) High-temperature aluminum alloy ingot casting heating furnace burner sleeve
CN2545210Y (en) Copper plate cooling wall with toothed slag groove structure
KR100213428B1 (en) Water cooled panel connecting cap for electric arc furnace
CN208595554U (en) A kind of hot-blast stove diesel oil ignitor
CN210596191U (en) U-shaped heat exchange pipe elbow heat treatment chamber furnace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922

RJ01 Rejection of invention patent application after publication