CN107191170A - The intelligent bridging plug of one kind pumping makees completion method with perforation connection - Google Patents
The intelligent bridging plug of one kind pumping makees completion method with perforation connection Download PDFInfo
- Publication number
- CN107191170A CN107191170A CN201710542524.7A CN201710542524A CN107191170A CN 107191170 A CN107191170 A CN 107191170A CN 201710542524 A CN201710542524 A CN 201710542524A CN 107191170 A CN107191170 A CN 107191170A
- Authority
- CN
- China
- Prior art keywords
- bridging plug
- pressure break
- perforation
- completion
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000005086 pumping Methods 0.000 title claims abstract description 11
- 238000004064 recycling Methods 0.000 abstract description 2
- 239000007789 gas Substances 0.000 description 7
- 238000010586 diagram Methods 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 239000003209 petroleum derivative Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/261—Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
Make completion method the invention discloses the intelligent bridging plug of one kind pumping and perforation connection, preset short sleeve is to mark each fractured interval position in bunch tube, tripping in cable, magnetic orientator, perforation casing string, the preset sleeve pipe position of first interval is detected by magnetic orientator, start perforating gun perforation, act cable tube string, complete the pressure break of the first interval.Tripping in cable, magnetic orientator, perforating gun, intelligent bridging plug pipe string after the completion of first paragraph pressure break, second fractured layer position is determined by magnetic orientator, starts perforating gun perforation, setting bridging plug carries out pressure break, bridging plug is unsealed after the completion of pressure break, act cable fracturing string, perforation shotgun is filled up, tripping in cable, magnetic orientator, perforating gun, intelligent bridging plug pipe string, 3rd fractured layer position is determined by magnetic orientator, start perforating gun perforation, setting bridging plug carries out unsealing bridging plug after the completion of pressure break, pressure break.Above step is repeated, full wellbore fracture is completed.Holding pit shaft full-bore after the completion of the recycling of bridging plug in fracturing process, pressure break is realized, exempts and bores plug program.
Description
Technical field
The present invention relates to the untraditional reservoir Well Completion Engineering of Oil Reservoirs such as oil, natural gas field, especially a kind of underground fracture is used
The intelligent bridging plug of pumping makees completion method with perforation connection.
Background technology
Exploitation and the continuous exhaustion of the energy with oil gas field, unconventionaloil pool is by as the following petroleum gas energy
Important reliever relay.Statistics shows that the unconventional gas resource total amount such as China's compact sandstone gas, shale gas, coal bed gas is
The several times of conventional gas stock number, Unconventional gas exploration-development potential is unlimited.Unconventionaloil pool reservoir is respectively provided with reservoir
Fine and close, low hole, the feature of hyposmosis.At this stage, for the exploitation of this kind of untraditional reservoir, pumping bridging plug joins what is made with perforation
Completion technique has the advantages that the cycle is short because of it, performance it is good be the reservoir fracturing important method.But the method is existed simultaneously
Following deficiency:1. bridging plug can not be reused, it is both needed to consume a bridging plug using each layer of bridging plug pressure break, increase is constructed into
This;2. needing to bore after the completion of pressure break except bridging plug setting in pit shaft, extend the activity duration, increase operating risk.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of intelligent bridging plug of pumping and make completion method with perforation connection, solve
Certainly existing pumping bridging plug, which has bridging plug, can not reuse, need to bore except complex jobs such as bridging plugs, realize bridging plug in fracturing process
Recycling, pit shaft full-bore is kept after the completion of pressure break, exempts the purpose for boring plug program.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:The intelligent bridging plug of one kind pumping joins with perforation
Make completion method, comprise the following steps:
(1) in bunch tube preset short sleeve to mark each fractured interval position, tripping in cable, magnetic orientator,
Perforation casing string, the preset sleeve pipe position of the first interval is detected by magnetic orientator, starts perforating gun perforation, acts cable tube
String, completes the pressure break of the first interval;
(2) tripping in cable, magnetic orientator, perforating gun, intelligent bridging plug pipe string after the completion of first paragraph pressure break, true by magnetic orientator
Fixed second fractured layer position, starts perforating gun perforation, and setting bridging plug carries out unsealing bridging plug after the completion of pressure break, pressure break, rises
Cable fracturing string, perforation shotgun is filled up, tripping in cable, magnetic orientator, perforating gun, intelligent bridging plug pipe string, by magnetic orientation
Instrument determines the 3rd fractured layer position, starts perforating gun perforation, and setting bridging plug carries out unsealing bridging plug after the completion of pressure break, pressure break;
(3) above step is repeated, full wellbore fracture is completed.
The beneficial effects of the invention are as follows:
1st, intelligent bridging plug can be reused, and without reserving a bridging plug for each interval, greatly save instrument application
Cost;
2nd, pit shaft keeps full-bore after the completion of pressure break, remove from it is conventional bore plug program, reduce task difficulty, save operation into
This, improves operating efficiency, facility is provided for subsequent job.
Brief description of the drawings
Fig. 1 first paragraph perforation schematic diagrames of the present invention.
Fig. 2 second segment perforating and fracturing schematic diagrames of the present invention.
Wellbore schematic after the completion of Fig. 3 pressure breaks of the present invention.
In figure:1. short sleeve, 2. coiled tubings, 3. mechanical positioners, 4. coiled tubing perforating guns, 5. preforation tunnels,
6. cable, 7. magnetic orientators, 8. perforating guns, 9. intelligent bridging plugs, are stitched to 10. pressure breaks.
Embodiment
The present invention is described in further detail with reference to the accompanying drawings and detailed description:
The intelligent bridging plug of the pumping of the present invention makees completion method with perforation connection, comprises the following steps:
(1) in bunch tube preset short sleeve to mark each fractured interval position, tripping in cable, magnetic orientator,
Perforation casing string, the preset sleeve pipe position of the first interval is detected by magnetic orientator, starts perforating gun perforation, acts cable tube
String, completes the pressure break of the first interval;
(2) tripping in cable, magnetic orientator, perforating gun, intelligent bridging plug pipe string after the completion of first paragraph pressure break, true by magnetic orientator
Fixed second fractured layer position, starts perforating gun perforation, and setting bridging plug carries out unsealing bridging plug after the completion of pressure break, pressure break, rises
Cable fracturing string, perforation shotgun is filled up, tripping in cable, magnetic orientator, perforating gun, intelligent bridging plug pipe string, by magnetic orientation
Instrument determines the 3rd fractured layer position, starts perforating gun perforation, and setting bridging plug carries out unsealing bridging plug after the completion of pressure break, pressure break;
(3) above step is repeated, full wellbore fracture is completed.
Below in conjunction with the accompanying drawings, the present invention is described in further details.
As shown in figure 1, first, according to design fractured interval position, each design fractured interval is preset short in bunch tube
Sleeve pipe 1, coiled tubing 2, mechanical positioners 3, the coiled tubing pipe string tripping in pit shaft of perforating gun 4 are examined using mechanical positioners 3
The position of the first fractured interval short sleeve 1 is surveyed, determines that start coiled tubing behind the position of the first fractured interval is carried out with perforating gun 4
Coiled tubing perforation pipe string is played out after the completion of perforation, perforation, pressurization pressure break is carried out, first paragraph pressure break is completed, 5 be preforation tunnel.
As shown in Fig. 2 secondly, after the completion of first paragraph pressure break, pumping tripping in cable 6, magnetic orientator 7, perforating gun 8, intelligence
The pipe string of bridging plug 9, when magnetic orientator detects the second fractured interval short sleeve position, opens perforating gun perforation, after the completion of perforation
Setting learning bridge unseals intelligent bridging plug after the completion of filling in row the second fractured interval pressure break, second segment pressure break, acts cable pressure break pipe
String, loads the follow-up continuous tripping in cable fracturing string of perforation shotgun, when magnetic orientator detects the 3rd fractured interval short sleeve position
When putting, setting learning bridge fills in the fractured interval pressure break of row the 3rd after the completion of opening perforating gun perforation, perforation, and the 3rd section of pressure break is completed
Intelligent bridging plug is unsealed afterwards, acts cable fracturing string, and more than the 3rd section can be carried out not by repeating second and third interval fracturing process above
Fractured interval operation.
As shown in figure 3, it is last, after the completion of the equal pressure break of all intervals, act fracturing string, the pressure break for completing full pit shaft is applied
Work, 10 stitch for pressure break.
In summary, present disclosure is not limited in the above embodiments, and the knowledgeable people in same area can
Can propose other embodiments easily within the technological guidance's thought of the present invention, but this embodiment is included in this hair
Within the scope of bright.
Claims (1)
1. the intelligent bridging plug of one kind pumping makees completion method with perforation connection, it is characterised in that comprise the following steps:
(1) in bunch tube preset short sleeve to mark each fractured interval position, tripping in cable, magnetic orientator, perforation
Gun barrel string, the preset sleeve pipe position of the first interval is detected by magnetic orientator, starts perforating gun perforation, acts cable tube string, complete
Into the pressure break of the first interval;
(2) tripping in cable after the completion of first paragraph pressure break, magnetic orientator, perforating gun, intelligent bridging plug pipe string, the is determined by magnetic orientator
Two fractured layer positions, start perforating gun perforation, and setting bridging plug carries out unsealing bridging plug after the completion of pressure break, pressure break, acts cable
Fracturing string, perforation shotgun is filled up, tripping in cable, magnetic orientator, perforating gun, intelligent bridging plug pipe string, true by magnetic orientator
Fixed 3rd fractured layer position, starts perforating gun perforation, and setting bridging plug carries out unsealing bridging plug after the completion of pressure break, pressure break;
(3) above step is repeated, full wellbore fracture is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710542524.7A CN107191170A (en) | 2017-07-06 | 2017-07-06 | The intelligent bridging plug of one kind pumping makees completion method with perforation connection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710542524.7A CN107191170A (en) | 2017-07-06 | 2017-07-06 | The intelligent bridging plug of one kind pumping makees completion method with perforation connection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107191170A true CN107191170A (en) | 2017-09-22 |
Family
ID=59881424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710542524.7A Pending CN107191170A (en) | 2017-07-06 | 2017-07-06 | The intelligent bridging plug of one kind pumping makees completion method with perforation connection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107191170A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109899013A (en) * | 2019-02-11 | 2019-06-18 | 中国石油天然气股份有限公司 | A kind of horizontal well cable transmission waterpower pump-down tool Antisand sticking apparatus and method |
CN111561306A (en) * | 2020-06-02 | 2020-08-21 | 中国石油天然气股份有限公司 | Series operation pipe column of pumping ball seat and multiple clusters of perforation and application method |
CN112282730A (en) * | 2020-10-28 | 2021-01-29 | 中国石油天然气集团有限公司 | Real-time monitoring and evaluating method for deformation of underground casing induced by reservoir fracturing modification |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1995000739A1 (en) * | 1993-06-25 | 1995-01-05 | Sofitech N.V. | Selective zonal isolation of oil wells |
EP2521839A1 (en) * | 2010-01-04 | 2012-11-14 | Packers Plus Energy Services Inc. | Wellbore treatment apparatus and method |
CN203394493U (en) * | 2013-07-05 | 2014-01-15 | 中国石油天然气股份有限公司 | Fracturing process pipe column with soluble bridge plug |
CN203905896U (en) * | 2014-06-29 | 2014-10-29 | 荆州市赛瑞能源技术有限公司 | Mechanical withdrawable bridge plug |
CN204532320U (en) * | 2015-02-28 | 2015-08-05 | 中国石油天然气股份有限公司 | Ball seat packing many showers hole fracturing string |
CN105672941A (en) * | 2016-02-02 | 2016-06-15 | 四机赛瓦石油钻采设备有限公司 | Degradable drilling-free bridge plug fracturing process |
CN106593387A (en) * | 2016-12-21 | 2017-04-26 | 中国石油天然气股份有限公司 | Sectional multi-cluster fracturing method of horizontal well |
-
2017
- 2017-07-06 CN CN201710542524.7A patent/CN107191170A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1995000739A1 (en) * | 1993-06-25 | 1995-01-05 | Sofitech N.V. | Selective zonal isolation of oil wells |
EP2521839A1 (en) * | 2010-01-04 | 2012-11-14 | Packers Plus Energy Services Inc. | Wellbore treatment apparatus and method |
CN203394493U (en) * | 2013-07-05 | 2014-01-15 | 中国石油天然气股份有限公司 | Fracturing process pipe column with soluble bridge plug |
CN203905896U (en) * | 2014-06-29 | 2014-10-29 | 荆州市赛瑞能源技术有限公司 | Mechanical withdrawable bridge plug |
CN204532320U (en) * | 2015-02-28 | 2015-08-05 | 中国石油天然气股份有限公司 | Ball seat packing many showers hole fracturing string |
CN105672941A (en) * | 2016-02-02 | 2016-06-15 | 四机赛瓦石油钻采设备有限公司 | Degradable drilling-free bridge plug fracturing process |
CN106593387A (en) * | 2016-12-21 | 2017-04-26 | 中国石油天然气股份有限公司 | Sectional multi-cluster fracturing method of horizontal well |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109899013A (en) * | 2019-02-11 | 2019-06-18 | 中国石油天然气股份有限公司 | A kind of horizontal well cable transmission waterpower pump-down tool Antisand sticking apparatus and method |
CN111561306A (en) * | 2020-06-02 | 2020-08-21 | 中国石油天然气股份有限公司 | Series operation pipe column of pumping ball seat and multiple clusters of perforation and application method |
CN112282730A (en) * | 2020-10-28 | 2021-01-29 | 中国石油天然气集团有限公司 | Real-time monitoring and evaluating method for deformation of underground casing induced by reservoir fracturing modification |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104533287B (en) | A kind of fish spicule shape multilevel branch horizontal well shale gas reservoir that bores is drilled well and stimulation system | |
CN105840166B (en) | A kind of fractured horizontal well gas testing well-completing process using complete dissolvable bridge plug | |
CN104533288B (en) | A kind of fish spicule shape multilevel branch horizontal well shale gas reservoir that bores is drilled the method that well is with increasing production | |
CN106194131B (en) | It is spaced CO between multistage fracturing horizontal well seam2Oil flooding method | |
CN103061684B (en) | Open-hole horizontal well segmentation many bunches of homogeneous acidification tubing strings and acidization tool thereof | |
CN106437662A (en) | Hybrid temporary plugging volume fracturing method suitable for deep shale gas horizontal well | |
CN105201481A (en) | Liquid CO2 phase transition multipoint fracturing and permeability increasing method | |
CN104420835B (en) | Many cluster perforating and fracturing completion tubular columns and construction method | |
CN106351634B (en) | Casing horizontal well multistage refracturing method | |
CN110593837A (en) | Fracturing construction operation method for soluble full-bore sliding sleeve | |
CN105484698B (en) | A kind of composite bridge plug | |
CN107191170A (en) | The intelligent bridging plug of one kind pumping makees completion method with perforation connection | |
CN102979495A (en) | Multi-cluster current limiting fracturing string of open hole horizontal well and fracturing method thereof | |
CN104695923A (en) | Method for realizing sectional multi-cluster fracture of horizontal well by adopting soluble balls | |
CN105201461A (en) | Multistage sand jet perforation and fracture combined operation method adopting coiled tubing and bottom packer | |
CN204532234U (en) | Sliding sleeve of bushing and waterpower bridging plug combined type completion tubular column | |
CN109025940B (en) | CO for tight oil reservoir2Fracturing oil displacement integrated oil extraction method | |
CN104879110B (en) | Sub-clustering perforation staged fracturing combination operation process | |
CN107939336B (en) | Full-bore soluble sealing packing rubber plug and well completion method | |
CN203515342U (en) | Completion pipe string for multi-cluster perforation fracture | |
CN107130945A (en) | A kind of rupture disk perforated casing box cupling device | |
CN112431579B (en) | Preset small-diameter pipe internal fracturing device and method for side drilling well and small-hole well | |
CN207177850U (en) | A kind of rupture disk perforated casing box cupling device | |
CN106593387A (en) | Sectional multi-cluster fracturing method of horizontal well | |
CN105350948A (en) | Shale gas horizontal well staged fracturing method and shale gas horizontal well completion method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170922 |