- CN107190941A CN107190941A CN201710608010.7A CN201710608010A CN107190941A CN 107190941 A CN107190941 A CN 107190941A CN 201710608010 A CN201710608010 A CN 201710608010A CN 107190941 A CN107190941 A CN 107190941A
- Authority
- CN
- China
- Prior art keywords
- fixed
- ear
- neck
- nail
- ceramic tile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0832—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
- E04F13/0833—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable
- E04F13/0835—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable the fastening elements extending into the back side of the covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/14—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
- E04F13/142—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass with an outer layer of ceramics or clays
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2201/00—Joining sheets or plates or panels
- E04F2201/05—Separate connectors or inserts, e.g. pegs, pins, keys or strips
- E04F2201/0505—Pegs or pins
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Dispersion Chemistry (AREA)
- Finishing Walls (AREA)
Abstract
The present invention is mainly used in architectural engineering furnishing fields tiling for the fixation nail that furring tile is constructed and used, it may ensure that ceramic tile will not fall off;It is made up of fixed part, nail portion, slotting ear, and its operation principle is:When the slotting ear of the fixed nail of neck press-in of ceramic tile, because the left end for inserting ear is local and height of the height less than neck passage of lining bar, this part can enter neck, when the tilted upward portion for inserting ear is hindered by passage, after the neck for continuing pressure ceramic tile, insert the rake of ear, vertical portion, horizontal part, symmetrical shrinkage deformation will occur for variant part, until inserting the variant part up and down of ear into after in-line, the tilted upward portion of ear is inserted completely into neck, then the resilience of variant part up and down of slotting ear resets, withstand the right-hand member of neck inner chamber in the vertical portion up and down for inserting ear, by ceramic tile and the fixed completion of fixed nail, certainly the nail portion of fixed nail need to be hammered within the walls.
Description
Technical field
Used present invention is mainly used for architectural engineering furnishing fields tiling.
Background technology
Patent of invention " the heat preservation ceramic tile construction method of the buckle-type anti-dropout " application number applied:2017106027177
And patent of invention " a kind of buckle-type prevents the construction method that the vitreous wall brick comes off " application number applied:2017105930782,
It is required for a kind of fixed nail to be fixed with ceramic tile, it is ensured that ceramic tile will not fall off.
The content of the invention
The present invention is exactly this fixed nail, it is ensured that ceramic tile will not fall off;It is by fixed part(1), nail portion(2), insert ear
(3)Composition, fixed part(1)Right-hand member and nail portion(2)It is fixed, fixed part(1)Left end each up and down fix a slotting ear(3), porcelain
Brick(4)Upper and lower side have multiple necks(11), neck(11)There is passage(12);Insert ear(3)By lining bar(5)And use elastic steel sheet pressure
The rake being made(6), vertical portion(7), variant part(8), horizontal part(9), end(10)Composition, rake(6), vertical portion
(7), variant part(8), horizontal part(9), end(10)The closing post of a upper and lower opening is constituted, bar is served as a contrast(5)It is fixed on this envelope
Close in post, serve as a contrast bar(5)The section left side and end(10)It is fixed, serve as a contrast bar(5)Section top and bottom respectively with tilted upward portion(6)
It is fixed, upper slotting ear(3)Lining bar(5)Lower end and fixed part(1)Upper end fix, underthrust ear(3)Lining bar(5)Upper end with
Fixed part(1)Lower end fix, serve as a contrast bar(5)Height be less than ceramic tile(4)Neck(11)Passage(12)Height, by end
(10), rake(6), vertical portion(7)The shape and ceramic tile of composition(4)Neck(11)Cavity shape coincide;Its work is former
Reason is:Work as ceramic tile(4)Neck(11)The slotting ear of the fixed nail of press-in(3)When, due to inserting ear(3)Left end is local and lining bar(5)
Height be less than neck(11)Passage(12)Height, this part can enter neck(11), when slotting ear(3)Tilted upward
Portion(6)By passage(12)During obstruction, continue to press ceramic tile(4)Neck(11)Afterwards, rake(6), vertical portion(7), horizontal part
(9), variant part(8)To occur symmetrical shrinkage deformation, the variant part above and below(8)Into after in-line, tilted upward portion(6)It is complete
Enter neck entirely(11)It is interior, subsequent variant part up and down(8)Resilience resets, up and down vertical portion(7)Withstand neck(11)The right side of inner chamber
End, by ceramic tile(4)With the fixed completion of fixed nail, the nail portion of certainly fixed nail(2)It need to hammer within the walls.
Brief description of the drawings
Description of reference numerals:1- fixed parts, 2- nails portion, 3- inserts ear, 4- ceramic tiles, 5- lining bars, 6- rakes, 7- vertical portions,
8- variant parts, 9- horizontal parts, 10- ends, 11- necks, 12- passages.
Fig. 1 is the horizontal profile decomposing schematic representation of ceramic tile and fixed nail.
Fig. 2 is horizontal sectional drawing of the ceramic tile with fixed nail after fixed.
Fig. 3 is to insert ear horizontal sectional drawing.
Fig. 4 is to insert the ear right side to regard side view.
Embodiment
The embodiment of the present invention has been described in detail in the content of the invention, is not repeated herein, needs explanation:The present invention's
A pair insert ears arrange that the gravity that ceramic tile comes off downwards is undertaken by fixed part 1 about 3, ceramic tile topple come off topple power by
Ear 3 is inserted to undertake.
Claims (1)
1. the fixed nail constructed for furring tile, it is characterized in that:It is main by fixed part(1), nail portion(2), insert ear(3)Group
Into fixed part(1)Right-hand member and nail portion(2)It is fixed, fixed part(1)Left end each up and down fix a slotting ear(3), ceramic tile(4)
Upper and lower side have multiple necks(11), neck(11)There is passage(12);Insert ear(3)By lining bar(5)And be pressed into elastic steel sheet
Rake(6), vertical portion(7), variant part(8), horizontal part(9), end(10)Composition, rake(6), vertical portion(7), become
Shape portion(8), horizontal part(9), end(10)The closing post of a upper and lower opening is constituted, bar is served as a contrast(5)It is fixed in this closing post,
Serve as a contrast bar(5)The section left side and end(10)It is fixed, serve as a contrast bar(5)Section top and bottom respectively with tilted upward portion(6)It is fixed, on
Insert ear(3)Lining bar(5)Lower end and fixed part(1)Upper end fix, underthrust ear(3)Lining bar(5)Upper end and fixed part
(1)Lower end fix, serve as a contrast bar(5)Height be less than ceramic tile(4)Neck(11)Passage(12)Height, by end(10)、
Rake(6), vertical portion(7)The shape and ceramic tile of composition(4)Neck(11)Cavity shape coincide;Its operation principle is:
Work as ceramic tile(4)Neck(11)The slotting ear of the fixed nail of press-in(3)When, due to inserting ear(3)Left end is local and lining bar(5)Height
Less than neck(11)Passage(12)Height, this part can enter neck(11), when slotting ear(3)Tilted upward portion(6)
By passage(12)During obstruction, continue to press ceramic tile(4)Neck(11)Afterwards, rake(6), vertical portion(7), horizontal part(9), become
Shape portion(8)To occur symmetrical shrinkage deformation, the variant part above and below(8)Into after in-line, tilted upward portion(6)Completely into
Neck(11)It is interior, subsequent variant part up and down(8)Resilience resets, up and down vertical portion(7)Withstand neck(11)The right-hand member of inner chamber, by porcelain
Brick(4)With the fixed completion of fixed nail, the nail portion of certainly fixed nail(2)It need to hammer within the walls.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710608010.7A CN107190941A (en) | 2017-07-24 | 2017-07-24 | The fixed nail constructed for furring tile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710608010.7A CN107190941A (en) | 2017-07-24 | 2017-07-24 | The fixed nail constructed for furring tile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107190941A true CN107190941A (en) | 2017-09-22 |
Family
ID=59884590
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710608010.7A Pending CN107190941A (en) | 2017-07-24 | 2017-07-24 | The fixed nail constructed for furring tile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107190941A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395701A (en) * | 2019-09-12 | 2020-07-10 | 绿城装饰工程集团有限公司 | Assembled wallboard connecting piece |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080017772A (en) * | 2006-08-22 | 2008-02-27 | 주식회사 씨알에스 시스템 | Wall panel having fix bracket |
CN202831510U (en) * | 2012-10-19 | 2013-03-27 | 福建省闽南建筑工程有限公司 | Novel outer hang type wall face stone |
CN203271045U (en) * | 2013-05-14 | 2013-11-06 | 深圳市鹏润达市政工程有限公司 | Detachable plastic wall tile for indoor wall |
CN205224484U (en) * | 2015-11-10 | 2016-05-11 | 山东科技大学 | Building energy conservation wall tile |
CN205476371U (en) * | 2016-03-16 | 2016-08-17 | 深圳市卓艺装饰设计工程有限公司 | Ceramic tile suspended structure |
WO2016144584A1 (en) * | 2015-03-09 | 2016-09-15 | Baker, Geoff | A spring-loaded split-tongue connector system |
CN205875589U (en) * | 2016-08-09 | 2017-01-11 | 博洛尼家居用品(北京)股份有限公司 | Wallboard installation component |
CN106545143A (en) * | 2016-12-10 | 2017-03-29 | 青岛蓝天创先科技服务有限公司 | A kind of heat-insulating exterior wall ceramic tile and installation method of not accumulation of salt in the surface soil |
-
2017
- 2017-07-24 CN CN201710608010.7A patent/CN107190941A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080017772A (en) * | 2006-08-22 | 2008-02-27 | 주식회사 씨알에스 시스템 | Wall panel having fix bracket |
CN202831510U (en) * | 2012-10-19 | 2013-03-27 | 福建省闽南建筑工程有限公司 | Novel outer hang type wall face stone |
CN203271045U (en) * | 2013-05-14 | 2013-11-06 | 深圳市鹏润达市政工程有限公司 | Detachable plastic wall tile for indoor wall |
WO2016144584A1 (en) * | 2015-03-09 | 2016-09-15 | Baker, Geoff | A spring-loaded split-tongue connector system |
CN205224484U (en) * | 2015-11-10 | 2016-05-11 | 山东科技大学 | Building energy conservation wall tile |
CN205476371U (en) * | 2016-03-16 | 2016-08-17 | 深圳市卓艺装饰设计工程有限公司 | Ceramic tile suspended structure |
CN205875589U (en) * | 2016-08-09 | 2017-01-11 | 博洛尼家居用品(北京)股份有限公司 | Wallboard installation component |
CN106545143A (en) * | 2016-12-10 | 2017-03-29 | 青岛蓝天创先科技服务有限公司 | A kind of heat-insulating exterior wall ceramic tile and installation method of not accumulation of salt in the surface soil |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395701A (en) * | 2019-09-12 | 2020-07-10 | 绿城装饰工程集团有限公司 | Assembled wallboard connecting piece |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3132447A (en) | Multiple support refractory arch and wall construction | |
CN106545143A (en) | A kind of heat-insulating exterior wall ceramic tile and installation method of not accumulation of salt in the surface soil | |
CN206844815U (en) | A kind of transformer station's Assembled enclosing wall | |
CN107190941A (en) | The fixed nail constructed for furring tile | |
CN102846388A (en) | Plug-type retention structure of implant abutment | |
IT9021669A1 (en) | GROUP OF CLOSING BRICKS | |
CN204024053U (en) | A kind of cast-in-place concrete floor pipe preformed hole mould | |
WO2004082504B1 (en) | Dental implant fixture | |
CN107313571A (en) | A kind of Novel wall tile fixes nail | |
CN203403056U (en) | Central calibration device for furnace head in building of coke furnace | |
CN209293184U (en) | A kind of arch lamina tecti brick mold structure of enclosed construction | |
CN211342421U (en) | Prefabricated and cast-in-place windowsill coping structure that combines together | |
CN201327298Y (en) | Magnesium-zirconium spool tile | |
CN204665918U (en) | Kiln furred ceiling refractory brick | |
TW200700561A (en) | Method for transporting furnace bottom mantel for blast furnace | |
CN107246119A (en) | Furring tile fixes nail and manufacture method | |
CN209918877U (en) | Steel ladle safety masonry structure | |
CN206859612U (en) | Socket type support system frame body for high formwork | |
CN106989594A (en) | Buckled tunnel cave kiln body | |
CN205063031U (en) | Structure that ftractures is prevented to right angle wall | |
CN105155737A (en) | Width-adjustable section bar for wall bodies or door bodies of workshop buildings | |
CN107254945A (en) | A kind of circular neck ceramic tile | |
CN205444641U (en) | Four female mortise -tenon joint building blocks of cross brickwork and brickwork thereof | |
CN205475980U (en) | Square three female mortise -tenon joint building blocks and brickwork thereof | |
CN204781958U (en) | Hole mould is reserved in installation of concrete horizontal member combination formula |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170922 |
|
RJ01 | Rejection of invention patent application after publication |