CN107190597A - A kind of Ballast track quick multifunctional construction equipment - Google Patents

A kind of Ballast track quick multifunctional construction equipment Download PDF

Info

Publication number
CN107190597A
CN107190597A CN201710593919.XA CN201710593919A CN107190597A CN 107190597 A CN107190597 A CN 107190597A CN 201710593919 A CN201710593919 A CN 201710593919A CN 107190597 A CN107190597 A CN 107190597A
Authority
CN
China
Prior art keywords
track
ramming
firm
equipment
ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710593919.XA
Other languages
Chinese (zh)
Inventor
段景朝
曹国义
王亚斌
张立新
王金龙
尹志强
张爱玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201710593919.XA priority Critical patent/CN107190597A/en
Publication of CN107190597A publication Critical patent/CN107190597A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/20Compacting the material of the track-carrying ballastway, e.g. by vibrating the track, by surface vibrators
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/12Tamping devices
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/16Guiding or measuring means, e.g. for alignment, canting, stepwise propagation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The present invention discloses a kind of Ballast track quick multifunctional construction equipment, including main framing and support frame, and support frame bottom is provided with the hydraulic pressure rail clamping device for clamping rail;The lifting combination supporting leg being arranged on main framing includes movable support rod and supporting leg hydraulic jack, and movable support rod includes the vertical leg for being used to equipment and rail being integrally lifted up, and the diagonal brace supporting leg that equipment and rail are integrally offset to the left or to the right;Also include the combination unit that vibrates being suspended to by link on main framing crossbeam, the combination unit that vibrates includes multiple reduction hydraulic jacks made firm by ramming and be provided with rod, link for controlling and adjusting the depth for making rod insertion railway ballast firm by ramming.The present invention by Ballast track railway roadbed construct accurate measurement, play track lining and making firm by ramming and combine together, realize Quick mechanical and be turned into industry, greatly reduce the input of personnel, goods and materials and equipment, improve production efficiency, construction cost is reduced, the requirement of Ballast track railway roadbed construction quality has been reached.

Description

A kind of Ballast track quick multifunctional construction equipment
Technical field
The present invention relates to Ballast track technical field of construction equipment, specially a kind of Ballast track quick multifunctional construction is set It is standby.
Background technology
The accurate measurement of Ballast track railway roadbed engineering, track lifting, track lining and make construction technology and plant equipment sample at home and abroad firm by ramming Formula is more, is analyzed according to current existing construction technology:Carried out more than Ballast track railway roadbed engineering using traditional construction technology Construction, is raised track using MDZ Operation Vans group, track lining, makes firm by ramming and stablize construction operation, and the car group structural style is larger, again, Rail and sleeper are easily damaged during construction, because build is long, is unfavorable for track switch, safety line and to short distance Ballast tracks such as hair lines Railway roadbed is constructed, and track switch, safety line and to railway roadbed construction is individually carried out using hand fit's mini-plant more than hair line, so as to increase Railway roadbed engineering construction workload, causes the construction period not to be protected, and greatly increases construction cost and later period maintenance expense, And work progress quality safety is difficult to control to.
Analyzed according to the input situation of live human resources:Large area railway roadbed engineering is carried out using traditional construction technique During construction, because construction work amount is big, to ensure railway roadbed engineering construction safety quality and construction speed, substantial amounts of people need to be put into Power, material resources and big mini-plant carry out coordinating big machine to support progress railway roadbed construction.
The content of the invention
Therefore, in order to reduce construction cost, accelerating construction progress, production efficiency is improved, for Ballast track railway roadbed engineering Construction carries out the development work of quick multifunctional construction equipment, divides by live practice of construction situation and to traditional construction technique Analysis, summary are studied, and the present invention provides a kind of Ballast track quick multifunctional construction equipment.Technical scheme is as follows:
A kind of Ballast track quick multifunctional construction equipment, including horizontally disposed rectangle main framing, main framing front-end and back-end Crossbeam both sides on be respectively equipped with support frame, support frame bottom is provided with the hydraulic pressure rail clamping device for clamping rail;Also Supporting leg is combined in multigroup lifting being supported on railway ballast face including being arranged on main framing, and lifting combination supporting leg includes movable supporting Bar and the supporting leg hydraulic jack being arranged on movable support rod;Movable support rod includes being used for integrally carrying equipment and rail upwards The vertical leg raised track is risen, and equipment and rail entirety are offset to the diagonal brace supporting leg for carrying out track lining to the left or to the right;Also wrap Include the combination unit that vibrates being suspended to by link on main framing crossbeam, the combination unit that vibrates include it is multiple make rod firm by ramming, connect The reduction hydraulic jack for controlling and adjusting the depth for making rod insertion railway ballast firm by ramming is provided with frame, rod upper end is made firm by ramming and is provided with use The motor of frequency is made firm by ramming in control.
Further, it is equipped with reduction electronics between the support frame of rear end two between the support frame of main framing front end two Track forces.
Further, in addition to running gear, running gear includes control device, running gear and power set;Control Device processed is used to control running gear and power set;Running gear includes the road wheel for being arranged on main framing priority;Power is filled Put diesel-driven generator and total hydraulic jack including providing kinetic energy for running gear.
Further, in addition to precision measurement system, precision measurement system includes mechanical prism and total powerstation;Mechanical rib Mirror includes the prism head that is fixed on automatic hydraulic support frame, and mechanical prism has two groups, be respectively arranged in before equipment left end and Right-hand member afterwards;Total powerstation and automatic hydraulic support frame pass through remote control control.
Further, the hydraulic pressure rail clamping device includes the railway clamp being folded on rail, and railway clamp passes through adjustable Hydraulic jack regulation is clamped or unclamped.
Further, the main framing crossbeam is respectively used to smash provided with longitudinally running track and horizontal running track Gu rod does longitudinal shift and transverse shift.
Further, the depth of the vibration frequency for making rod firm by ramming for collecting and insertion railway ballast is additionally provided with the link Inductor.
The beneficial effects of the invention are as follows:The present invention by Ballast track railway roadbed construct accurate measurement, rise track lining and making firm by ramming melt for The novel and multifunctional construction equipment that one is constructed, by coming into operation for the equipment, is realized in Ballast track railway roadbed work Journey large-area construction Quick mechanical is turned into industry, because the equipment is small, and construction is flexible, goes out, Ye Ke road outer in main track construction Trouble, safety line, to the construction of hair line and big machine parking line etc. position there is identical effect, equally valid reach disposably apply The effect of work shaping, computer is preserved to the various data collected in work progress, filed, is easy in later stage railway roadbed engineering Quality examination, examination;The equipment not only greatly reduces the input of operating personnel, goods and materials and equipment in work progress, carries again High production efficiency, reduces construction cost, full powers instead of the construction technology that traditional big machine supports construction, be effectively accomplished simultaneously The requirement of Ballast track railway roadbed construction quality.
Brief description of the drawings
Fig. 1 is the plan of Ballast track quick multifunctional construction equipment of the present invention.
The profile that Fig. 2 is A-A and H-H in Fig. 1.
Fig. 3 is the structural representation of mechanical prism.
The profile that Fig. 4 is B-B and G-G in Fig. 1.
The profile that Fig. 5 is C-C and F-F in Fig. 1.
The profile that Fig. 6 is D-D and E-E in Fig. 1.
The profile that Fig. 7 is I-I and M-M in Fig. 1.
The profile that Fig. 8 is J-J and L-L in Fig. 1.
The profile that Fig. 9 is K-K in Fig. 1.
In figure:1- main framings;2- rail;3- machinery prisms;31- prism heads;32- automatic hydraulic support frames;4- lifting groups Close supporting leg;41- supporting leg hydraulic jacks;42- movable support rods;5- hydraulic pressure rail clamping devices;51- adjustable hydraulic compressing cylinders;52- tracks Folder;6- vibrates combination unit;61- makes rod firm by ramming;62- motors;63- reduction hydraulic jacks;The longitudinally running tracks of 7-;8- is laterally run Track;9- sleepers;10- body frame telescopic ends;11- reduction Electronic track forces;The 12- bottoms tiny fragments of stone, coal, etc.;13- mends the tiny fragments of stone, coal, etc..
Embodiment
The present invention is described in further details with specific embodiment below in conjunction with the accompanying drawings.As shown in figure 1, one kind has tiny fragments of stone, coal, etc. rail On road quick multifunctional construction equipment, including horizontally disposed rectangle main framing 1, the crossbeam both sides of the front-end and back-end of main framing 1 Support frame is respectively equipped with, support frame bottom is provided with the hydraulic pressure rail clamping device 5 for clamping rail 2;Also include being arranged on The lifting combination supporting leg 4 that multigroup on main framing 1 is supported on railway ballast face, lifting combination supporting leg 4 include movable support rod 42 and It is arranged on the supporting leg hydraulic jack 41 on movable support rod 42;Movable support rod 42 is included for equipment and rail is integrally upward The vertical leg raised track is lifted, and equipment and rail entirety are offset to the diagonal brace supporting leg for carrying out track lining to the left or to the right;Also Including the combination unit 6 that vibrates being suspended to by link on the crossbeam of main framing 1, the combination unit 6 that vibrates makes rod firm by ramming including multiple 61, the reduction hydraulic jack 63 for controlling and adjusting the depth for making the insertion railway ballast of rod 61 firm by ramming is provided with link, rod is made firm by ramming 61 upper ends are provided with the motor 62 for making frequency firm by ramming for control.
Accurate measurement that the equipment constructs Ballast track railway roadbed, track lifting, track lining and make firm by ramming to combine together and constructed, root Different controls are carried out according to different working procedures.Equipment is divided into:Structural framework system, operating room, dynamical system, running gear, Precision measurement system, rise track lining system, make system, monitoring device system, hydraulic system and automation control system firm by ramming.Its each The working method of system and effect are as follows:
Structural framework system:Set using a formula skeleton is hung in the middle of front and rear support, structural framework is by main framing 1 and support frame group Into, the front and back end of equipment connects support frame upper end, lower end by the sill of main framing 1 and played a supporting role on rail, in Between suspend other constructing devices in midair, main framing 1 and support frame are all assemblied to form by steel construction, its front and back end main framing and The joint of support frame sets reduction hydraulic jack, reduction Electronic track forces 11 is set also in the middle of support frame, such as Fig. 2 institutes Show, reduction Electronic track forces 11 can detect gauge at any time, be easy to control gauge, be more convenient equipment from main track to track switch, to hair line and Safety line carries out construction operation.
Operating room:It is made up of control device, computer control system and display monitoring system;Control device major control Manage the running gear, dynamical system and hydraulic system of the quick multifunctional construction equipment;Computer control system and display are supervised Control system will manage control precision measurement system, play track lining system, make system, monitoring device system and hydraulic system firm by ramming;Display Monitoring system shows the running situation of each process construction parameter, the data of detection and equipment by CRT pictures, is easy to Operating personnel can carry out recalling CRT pictures at any time controlling the operation of each device.
Dynamical system:It is made up of, is generated electricity using diesel-driven generator by kinetic energy diesel-driven generator, total motor and each separated motor It is converted into electric energy, then kinetic energy is converted into for equipment by total hydraulic jack by electric energy and power is provided, equipment is walked, while to set Standby total motor and separated motor provide electric energy, and each separated motor is controlled by total motor, each device of equipment is normally run.
Running gear:It is made up of control device, running gear and power set, in control device setting and operating room, Running gear and power set are can control using operation button;Running gear is attached with main framing, in order to suitable for there is the tiny fragments of stone, coal, etc. Ballast bed of track is constructed, and ensures equipment walking safety, in steel construction main framing 2 road wheels of forward and backward each setting.In construction When, to ensure equipment walking required precision, walked using hydraulic-pressure control apparatus;After the completion of construction, produced using generator band Electric energy drive equipment walking, power set mainly for running gear provide kinetic energy by diesel-driven generator and total hydraulic jack, Transmitted by a series of power, finally pass to the process of the whole mechanical arrangement of road wheel.
Precision measurement system:It is made up of prism first 31, automatic hydraulic support frame 32 and total powerstation.As shown in figure 3, prism First 31 are arranged on automatic hydraulic support frame 32, and prism leveling, prism arrangement are reached by the hydraulic pressure supporting leg that automatically adjusts Device is arranged in a crossed manner on main framing entablature top, and one is arranged on left end before equipment, and another is arranged on rear right-hand member.In measurement people When member is using total station survey, it is easy to check, checks whether equipment main framing structure meets the requirements;And in survey crew by whole station Instrument is set up, leveling, after the completion of check and backsight, filled total powerstation and computer and Remote using LAN The supporting connection of progress is put, carrying out control total powerstation at any time by computer or remote control device measures, and utilizes calculating Machine can control automatic hydraulic support and carry out leveling prism, convenient that measurement accuracy requirement is effectively reached in work progress.
Play track lining system:It is made up of each 3 liftings combination supporting leg in front and rear left, center, right, hydraulic pressure retaining clip rail.Such as Shown in Fig. 4, lifting combination supporting leg includes supporting leg hydraulic jack 41 and movable support rod, and movable support rod 42 includes being used for equipment The vertical leg raised track integrally is lifted up with rail, and the overall skew to the left or to the right of equipment and rail is subjected to track lining Diagonal brace supporting leg.In work progress, its upper side load is unloaded, combined the unit first with hydraulic pressure retaining clip rail by rail Clamp, each 3 liftings combination supporting leg in left, center, right, which is supported on railway ballast face, before and after recycling integrally lifts equipment and rail, reaches The effect of track lifting.If track lining need to be carried out, reduction is carried out using the hydraulic jack in diagonal brace supporting leg, make equipment it is overall to the left or to Line displacement is entered on the right side, reaches the effect of track lining.As shown in figure 5, hydraulic pressure rail clamping device 5 includes the railway clamp 52 being folded on rail 2, Railway clamp 52 is adjusted by adjustable hydraulic compressing cylinder 51 to be clamped or unclamps.Hydraulic pressure retaining clip rail combination unit in railway clamp rise dial Folder rail can be carried out during road, and in normal walking or other plant runnings, guard rail can be carried out, it is to avoid rail is damaged in work progress Road.
Make system firm by ramming:As shown in Figure 6 and Figure 7, in addition to by link it is suspended to the combination of vibrating on the crossbeam of main framing 1 Device 6, the combination unit 6 that vibrates include it is multiple make firm by ramming to be provided with rod 61, link make rod 61 firm by ramming for controlling and adjusting and insert The reduction hydraulic jack 63 of the depth of railway ballast, makes the upper end of rod 61 firm by ramming and is provided with the motor 62 for making frequency firm by ramming for control.This implementation Example carries out railway roadbed railway ballast using plug-in type tamper and made firm by ramming, and the equipment, which is set, to be installed eight groups of two row totally 16 plug-in types are made rod firm by ramming and hanged Hang on main framing crossbeam.Each 3 sections of 2 rows are set before and after main framing entablature, is easy to make rod firm by ramming and vertically moves, in lateral connection Each 4 sections of 2 rows horizontal running track is set on frame, is easy to make rod transverse shifting firm by ramming, when making railway ballast firm by ramming, full side can be vertically and horizontally moved Make railway ballast firm by ramming in position.Construct for convenience, it is each 4 groups before and after a small group totally 2 rows to set 2 plug-in types to make rod firm by ramming, in horizontal operation Rail inferior portion connects 1 adjustable hydraulic compressing cylinder to adjust the height that 2 plug-in types make rod firm by ramming, controls and adjust to make rod insertion firm by ramming The depth of railway ballast;Set 1 motor control 1 to make caput firm by ramming, in construction, received using the inductor on link Collection makes the vibration frequency of rod and the depth of insertion railway ballast firm by ramming, often row make firm by ramming rod to make frequency firm by ramming consistent with insertion depth, can be in CRT Picture individually shows analog picture, and is configured layering to make frequency firm by ramming first big after small), when the vibration frequency for making every layer of rod firm by ramming reaches To computer installation predetermined value when, computer would automatically turn on adjustable hydraulic compressing cylinder and ascend into next layer and smash Gu, during making firm by ramming, computer can be automatically adjusted according to the data being collected into vibration frequency and insertion railway ballast depth, It is effectively accomplished design specification requirement.
Monitoring device system:It is made up of various sensing devices, data communication apparatus, sensing reception processing device and data are defeated Send machine to be arranged on operating room, and connect computer;And in structural framework system, operating room, dynamical system, running gear, precision Measuring system, the keypoint part for playing track lining system, making each system such as system firm by ramming are separately provided various sensors, and each system passes through Data communication apparatus independently collects required all kinds of induction installation Monitoring Datas, and is delivered in computer, is received by computer The data of collection are analyzed, Document Solution, and send corresponding instruction, control device operation.
Hydraulic system:Including dynamical element, executive component, control element, auxiliary element and hydraulic oil, hydraulic system is divided into Total hydraulic oil pump, variable pump, distributing valve and each adjustable point of hydraulic oil pump composition, total hydraulic oil is controlled by computer program Pump, variable pump, distributing valve and each adjustable point of hydraulic oil pump are operated, structural framework system, dynamical system, Running System System, precision measurement system, the hydraulic means for playing track lining system, making firm by ramming in each system such as system are independently arranged, individually controlled, During construction, run according to the hydraulic means that working procedure computer would automatically turn on each system.
Automation control system:Constructed according to a kind of Ballast track quick multifunctional construction equipment in Ballast track railway roadbed Technique and process production management characteristic analysis, automation control system must are fulfilled for detection to field equipment state, each dress Control and the display of Technical innova- tion, the collection of data, processing and the data communication put, in order to achieve this, automation control System processed should be made up of four parts, i.e. computer control system, display monitoring system, data monitoring system and execution system, i.e., The control principle of each system is:
1)Computer control system:According to reaching each index in design drawing and code requirement, equipment operation and production process Etc., establishment computer control system journey is carried out by the purpose of this automation control system by computer programming professional Sequence, in work progress, by the In-put design drawing in computer program and authority data parameter, sets using computer pair The overall process of operation and the construction production of standby and each device is controlled in real time, and can be constructed according to design drawing requirement Field apparatus automatic control is managed, and each data detected in work progress are recorded, and is preserved, and is easy to the later stage Inspection, examination to concrete quality.
2)Display monitoring system:Shown using CRT pictures, key frame and each subsystem picture dynamic show each equipment Running situation operation, stopping, failure of work progress etc. and process data, have text importing operation, and can reflect operation And the function, important data, such as measurement data, circuit offset distance, gauge, track lifting such as the position broken down of display and time as a result Highly, make rod firm by ramming and make frequency and insertion depth, the speed of equipment operation and the position of failure generation and time etc., Ying You firm by ramming Special data display, the situation of main device operation uses lamplight pointing, sets alarm, and installs on main framing small-sized take the photograph As the running situation of head, at any time facilities for observation, arbitrarily it can regulate and control to observe each CRT picture.
3)Data monitoring system:Data monitoring system is to utilize structural framework system, operating room, dynamical system, Running System System, precision measurement system, the keypoint part for playing track lining system, making each system such as system firm by ramming are separately provided various induction installations and entered Each construction technology Data Detection of row is collected, and the data of collection is sent into computer, computer is using input in computer program Data are differentiated, and send instruction.
Equipment operation is carried out according to Ballast track construction technology of ballast bed, and when entering each procedure, operator can pass through Input through keyboard start stop command, the monitoring device and performs device of the process carry out isolated operation, and individually control, CRT pictures are shown The position of process construction and the data of monitoring.
4)Execution system:Kinetic energy and electric energy are provided for equipment using oil recovery generator, in normal walking, is driven using electric energy Dynamic equipment operation.In construction, changed, walked using hydraulic means driving equipment by the electric energy for providing generator, The distance for facilitating control device to run, when equipment is run to construction section, operating personnel first carry out checking whether each device pacifies Be attached to position and carry out initial adjustment, and start each device and dallied, check each device whether normal operation, while initial adjustment, Survey crew has set up total powerstation, and check, backsight, while operating personnel carry out setting up LAN, pass through computer connection and survey Measuring appratus and remote control device, and check whether control device meets requirement.
After the completion of initial adjustment, operating personnel's starting device prism automatic leveling button, make equipment top prism pass through it is automatic Hydraulic support frame carries out automatic leveling, after leveling, and the front and rear prism that computer controlled automatic total powerstation measures equipment top comes Equipment is checked, during check, the data that operating personnel can show according to CRT pictures are adjusted equipment, so as to reach secondary The effect of accurate adjustment.
After the completion of equipment and the secondary accurate adjustment of measuring instrument, operating personnel measure 50m before and after equipment using total powerstation Rail top face absolute altitude and track offset distance, by import the parameter in computer program inner orbit line carry out computer program analysis, Calculate, computer CRT pictures show and remote manipulator on show related data, measured by total Station Precise, computer The related data that program analysis is calculated, computer assigns equipment operating instruction automatically, raises track first, track lining system is run, First order lifting combination supporting leg drops to railway ballast face stress, then passes through the adjustable hydraulic compressing cylinder in hydraulic pressure retaining clip rail combination unit Rail is clamped in progress, and rise is adjusted using the adjustable hydraulic oil cylinder on lifting landing leg, passes through active force and reaction force Principle carries out lifting rail, and the offset distance of raise track height and the track lining calculated by total station survey data, in lifting rail While, the adjustable hydraulic compressing cylinder for the oblique supporting leg that stretches carries out track lining, and total powerstation carries out check data by the prism on equipment top, And it is collected data, computer analysis, calculating, it is ensured that disposably reach setting using the various inductors being arranged in equipment Track lifting, track lining amount.
After the completion of track lifting, track lining, computer will issue an order again to be made to make system operation, two eight groups of rows totally 16 insertions firm by ramming Formula is made rod firm by ramming and run simultaneously, each group individually control, while being dropped to using adjustable hydraulic compressing cylinder in railway ballast according to computer The frequency of setting carries out layering and made firm by ramming, makes firm by ramming for every layer and reaches after the stipulated time, adjustable hydraulic compressing cylinder ascends into next automatically Layer continues to make firm by ramming, until last layer of track lifting height makes completion firm by ramming, after the completion of making firm by ramming, total powerstation will check rail level mark again High and track offset distance, untill meeting design requirement, a kind of Ballast track quick multifunctional construction equipment applies this section of railway roadbed The track lifting of work, track lining and after the completion of making firm by ramming, computer will start stop push-button, and equipment unloading is restored to original state, after the completion of, Computer command moves forward equipment, using total hydraulic jack to equipment dynamic, and accurate operation is repeated to next construction section Above-mentioned operation continues to construct.
The design requirement that equipment reaches is:
1)Equipment construction production overall process is controlled in real time using operating personnel's control computer, can be to Ballast track road Bed engineering accurate measurement, track lifting, track lining and make progress Automated condtrol and management firm by ramming.
2)Each working procedure process shows that key frame and each subsystem picture dynamic show construction work using CRT pictures Skill data and running situation operation, stopping, failure etc..
3)Collection, analysis, statistics, record and the printing of work progress data are carried out by computer, and completes it to each The position and time that process breaks down are recorded automatically.
In construction early stage, treat after the completion of the tiny fragments of stone, coal, etc. laying of Ballast track railway roadbed bottom, track laying construction, Ballast track is carried out first Railway roadbed track lifting, track lining, make firm by ramming test section construction, by test section construction determine suitable for a kind of Ballast track quick multifunctional The construction parameter of each process of construction equipment, after parameter to be onstructed is determined, can be set using the construction of Ballast track quick multifunctional Standby to carry out large-area construction, specific work progress point following steps are implemented:
The first step:Check that device automation control system operation program is normal, and the construction parameter of each operation of determination is inputted In quick multifunctional construction equipment computer program, it is ensured that import data errorless.
Second step:At Ballast track railway roadbed bottom, tiny fragments of stone, coal, etc. laying, track laying are completed, and adjusted, are checked according to design specification requirement Afterwards, and by survey crew in gear Zha Qiang top setting-outs go out circuit pile No., be easy to check orbital position during railway roadbed engineering construction.
3rd step:Using artificial or crane by Ballast track quick multifunctional construction equipment structural framework and each sub-device Job site is transported to, progress assembly is manually started, after the completion of assembly, preliminary adjustment steel structure skeleton is first carried out and each system is filled Put.
4th step:It is artificial that quick multifunctional construction equipment steel structure skeleton and each system and device are subjected to secondary accurate adjustment, essence After the completion of tune, opening is released the button, and is started diesel-driven generator and is generated electricity, and drives dynamic equipment operation, in normal walking, is adopted Run, in construction, changed by the electric energy for providing generator with electric energy driving equipment, set using hydraulic means driving Standby walking, the distance for facilitating control device to run, when equipment is run to construction section, operating personnel first carry out checking each device Whether be installed in place carry out initial adjustment, and start each device and dallied, check each device whether normal operation, in initial adjustment Meanwhile, survey crew has set up total powerstation, and check, backsight, while operating personnel carry out setting up LAN, connected by computer Measuring instrument and remote control device are connect, and checks whether control device meets requirement.
5th step:After the completion of initial adjustment, operating personnel's starting device prism automatic leveling button leads to the prism on equipment top Cross automatic hydraulic support frame and carry out automatic leveling, after leveling, computer controlled automatic total powerstation measures the front and rear of equipment top Prism checks equipment, and during check, the data that operating personnel can show according to CRT pictures are adjusted equipment, so as to reach To the effect of secondary accurate adjustment.
6th step:After the completion of equipment and the secondary accurate adjustment of measuring instrument, operating personnel measure equipment using total powerstation Front and rear 100m rail top faces absolute altitude and track offset distance, computer journey is carried out by importing the parameter in computer program inner orbit line Sequence analysis, calculating, show in computer CRT pictures and show related data on remote manipulator, measured by total Station Precise, The related data that computer program analysis is calculated, computer assigns equipment operating instruction automatically, raises track first, track lining system is carried out Operation, first order lifting combination supporting leg drops to railway ballast face stress, then passes through the adjustable hydraulic in hydraulic pressure retaining clip rail combination unit Compressing cylinder carries out clamping rail, and rise is adjusted using the adjustable hydraulic oil cylinder on lifting landing leg, passes through active force and anti-work Principle firmly carries out lifting rail, and the offset distance of raise track height and the track lining calculated by total station survey data, is carrying While rising rail, the adjustable hydraulic compressing cylinder for the oblique supporting leg that stretches carries out track lining, and total powerstation carries out school by the prism on equipment top Nuclear Data, and it is collected data, computer analysis, calculating, it is ensured that disposable using the various inductors being arranged in equipment Reach track lifting, the track lining amount of setting.
7th step:After the completion of track lifting, track lining, computer will issue an order again to be made to make system operation firm by ramming, and two eight groups of rows are total to 16 plug-in types are made rod firm by ramming and run simultaneously, each group individually control, while using adjustable hydraulic compressing cylinder drop in railway ballast by Frequency progress layering according to computer installation is made firm by ramming, is made firm by ramming for every layer and is reached after the stipulated time, adjustable hydraulic compressing cylinder rises automatically Continue to make firm by ramming into next layer, until last layer of track lifting height makes completion firm by ramming, after the completion of making firm by ramming, total powerstation will be answered again Core rail level absolute altitude and track offset distance, untill meeting design requirement, a kind of Ballast track quick multifunctional construction equipment should The track lifting of section railway roadbed construction, track lining and after the completion of making firm by ramming, computer will start stop push-button, and equipment unloading is restored to initial shape State, after the completion of, computer command moves forward equipment, using total hydraulic jack to equipment dynamic, accurate to run to next Construction section, repeats above-mentioned operation step and continues to construct.
The equipment of the present embodiment is applied to Ballast track railway roadbed engineering large area Ballast track quick multifunctional construction equipment Main track is constructed, it can also be used to track switch, safety line, to the railway roadbed engineering construction such as hair line and big machine parking line, and can be effectively accomplished Automatic technology controls the accurate measurement of Ballast track railway roadbed engineering, plays track lining and make firm by ramming and combine together, is effectively accomplished once The effect of property construction molding, by inventing the Ballast track quick multifunctional construction equipment, not only solves traditional construction technique The drawbacks of and shortcoming, more realize work progress information system management, be both effectively accomplished job site collect data with applying Work process experiment detection data are checked, and are easy to again in inspection of the later stage to railway roadbed construction quality and checking and accepting;The equipment structure Simple, safe and reliable to operation, easy construction is made, Construction quality and safety requirement has both been ensure that, and effectively improves operating efficiency, plus Fast construction speed, reduces construction cost.

Claims (7)

1. a kind of Ballast track quick multifunctional construction equipment, it is characterised in that including horizontally disposed rectangle main framing(1), Main framing(1)Support frame is respectively equipped with the crossbeam both sides of front-end and back-end, support frame bottom is provided with for clamping steel Rail(2)Hydraulic pressure rail clamping device(5);Also include being arranged on main framing(1)On it is multigroup be supported on railway ballast face lifting combination Supporting leg(4), lifting combination supporting leg(4)Including movable support rod(42)And it is arranged on movable support rod(42)On supporting leg hydraulic oil Cylinder(41);Movable support rod(42)Including the vertical leg for equipment and rail to be integrally lifted up being raised track, and will Equipment and the overall skew to the left or to the right of rail carry out the diagonal brace supporting leg of track lining;Also include being suspended to main framing by link (1)The combination unit that vibrates on crossbeam(6), vibrate combination unit(6)Rod is made firm by ramming including multiple(61), use is provided with link In controlling and adjust to make rod firm by ramming(61)Insert the reduction hydraulic jack of the depth of railway ballast(63), make rod firm by ramming(61)Upper end is provided with use The motor of frequency is made firm by ramming in control(62).
2. Ballast track quick multifunctional construction equipment according to claim 1, it is characterised in that the main framing(1) Between the support frame of front end two reduction Electronic track forces are equipped between the support frame of rear end two(11).
3. Ballast track quick multifunctional construction equipment according to claim 1, it is characterised in that also including Running System System, running gear includes control device, running gear and power set;Control device is used to control running gear and power to fill Put;Running gear includes being arranged on main framing(1)The road wheel of priority;Power set include the bavin that kinetic energy is provided for running gear Fry dried food ingredients motor and total hydraulic jack.
4. Ballast track quick multifunctional construction equipment according to claim 1, it is characterised in that also including accurate measurement System, precision measurement system includes mechanical prism(3)And total powerstation;Mechanical prism(3)Including being fixed on automatic hydraulic support frame (32)On prism head(31), and mechanical prism(3)There are two groups, be respectively arranged in the preceding left end of equipment and rear right-hand member;Total powerstation and Automatic hydraulic support frame(32)Pass through remote control control.
5. Ballast track quick multifunctional construction equipment according to claim 1, it is characterised in that the hydraulic clip rail dress Put(5)Including being folded in rail(2)On railway clamp(52), railway clamp(52)Pass through adjustable hydraulic compressing cylinder(51)Regulation is clamped Or unclamp.
6. Ballast track quick multifunctional construction equipment according to claim 1, it is characterised in that the main framing(1) Crossbeam is provided with longitudinally running track(7)With horizontal running track(8), it is respectively used to make rod firm by ramming(61)Vertically move and horizontal It is mobile.
7. Ballast track quick multifunctional construction equipment according to claim 1, it is characterised in that on the link also Provided with for collect make rod firm by ramming(61)Vibration frequency and insertion railway ballast depth inductor.
CN201710593919.XA 2017-07-20 2017-07-20 A kind of Ballast track quick multifunctional construction equipment Pending CN107190597A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710593919.XA CN107190597A (en) 2017-07-20 2017-07-20 A kind of Ballast track quick multifunctional construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710593919.XA CN107190597A (en) 2017-07-20 2017-07-20 A kind of Ballast track quick multifunctional construction equipment

Publications (1)

Publication Number Publication Date
CN107190597A true CN107190597A (en) 2017-09-22

Family

ID=59884437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710593919.XA Pending CN107190597A (en) 2017-07-20 2017-07-20 A kind of Ballast track quick multifunctional construction equipment

Country Status (1)

Country Link
CN (1) CN107190597A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110077796A (en) * 2019-05-20 2019-08-02 中交路桥华东工程有限公司 A kind of transport of materials trolley for the non-fragment orbit on protecting wall of walking
CN110242053A (en) * 2019-06-24 2019-09-17 江苏阳湖建设项目管理有限公司 A kind of urban track traffic concrete multiple spot automatic vibrating device and method
CN111523243A (en) * 2020-04-29 2020-08-11 中国国家铁路集团有限公司 Intelligent maintenance analysis system for ballast track bed
WO2020177967A1 (en) * 2019-03-06 2020-09-10 Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. Track construction machine and method for stabilizing a ballast bed
CN114543771A (en) * 2022-03-07 2022-05-27 中建安装集团有限公司 Novel intelligent multi-functional location device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4094250A (en) * 1975-06-20 1978-06-13 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile track tamping machine
CN1317611A (en) * 2000-04-07 2001-10-17 弗兰茨普拉塞铁路机械工业股份有限公司 Tamping vehicle
CN202989705U (en) * 2012-11-12 2013-06-12 什邡瑞邦机械有限责任公司 High-travel hydraulic track lifting and lining machine and switch laying unit
CN106489006A (en) * 2014-12-12 2017-03-08 Hp3真实有限责任公司 The method for calibrating the equipment for measure track
CN106914598A (en) * 2017-05-11 2017-07-04 昆山盛事达机械有限公司 The preparing mechanism of the semi solid slurry of aluminium alloy and magnesium alloy
CN206986639U (en) * 2017-07-20 2018-02-09 中国水利水电第五工程局有限公司 A kind of Ballast track quick multifunctional construction equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4094250A (en) * 1975-06-20 1978-06-13 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile track tamping machine
CN1317611A (en) * 2000-04-07 2001-10-17 弗兰茨普拉塞铁路机械工业股份有限公司 Tamping vehicle
CN202989705U (en) * 2012-11-12 2013-06-12 什邡瑞邦机械有限责任公司 High-travel hydraulic track lifting and lining machine and switch laying unit
CN106489006A (en) * 2014-12-12 2017-03-08 Hp3真实有限责任公司 The method for calibrating the equipment for measure track
CN106914598A (en) * 2017-05-11 2017-07-04 昆山盛事达机械有限公司 The preparing mechanism of the semi solid slurry of aluminium alloy and magnesium alloy
CN206986639U (en) * 2017-07-20 2018-02-09 中国水利水电第五工程局有限公司 A kind of Ballast track quick multifunctional construction equipment

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020177967A1 (en) * 2019-03-06 2020-09-10 Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. Track construction machine and method for stabilizing a ballast bed
CN110077796A (en) * 2019-05-20 2019-08-02 中交路桥华东工程有限公司 A kind of transport of materials trolley for the non-fragment orbit on protecting wall of walking
CN110242053A (en) * 2019-06-24 2019-09-17 江苏阳湖建设项目管理有限公司 A kind of urban track traffic concrete multiple spot automatic vibrating device and method
CN110242053B (en) * 2019-06-24 2021-07-16 江苏阳湖建设项目管理有限公司 Urban rail transit concrete multipoint automatic vibrating device and method
CN111523243A (en) * 2020-04-29 2020-08-11 中国国家铁路集团有限公司 Intelligent maintenance analysis system for ballast track bed
CN111523243B (en) * 2020-04-29 2023-08-25 中国国家铁路集团有限公司 Intelligent maintenance analysis system for ballast bed
CN114543771A (en) * 2022-03-07 2022-05-27 中建安装集团有限公司 Novel intelligent multi-functional location device
CN114543771B (en) * 2022-03-07 2024-03-19 中建安装集团有限公司 Intelligent multifunctional positioning device

Similar Documents

Publication Publication Date Title
CN107190597A (en) A kind of Ballast track quick multifunctional construction equipment
CN101705650B (en) Full-automatic ballastless track plate fine adjustor
CN105888706B (en) A kind of the functional steel trolley and crown arc slab cover installation method of mobile liftable
CN106812120A (en) Hydraulic self-lifting truss-like cantilever heavy type arch dam template system
CN107642037A (en) A kind of intelligence system for bridge machinery
CN208054811U (en) A kind of portable hinge connecting rod lifting device
CN104943877B (en) General satellite sun wing expanding frame automatically adjusting levelness
RU2554205C2 (en) Controlled sleeper tamping machine
CN104198310A (en) Cyclic loading tamping teststand for indoor crushed stone ballast track beds
CN206986639U (en) A kind of Ballast track quick multifunctional construction equipment
CN103952954A (en) Method for replacing subway track plate, subway plate replacing vehicle and plate replacing unit
CN102296587A (en) Vibration-free ramming hole-expansion device
CN106625648A (en) Full-electric replacing manipulator for walking boards of aerial railways
CN109940570A (en) A kind of gate robot for overhauling
CN203929538U (en) A kind of indoor prose style free from parallelism ballast track bed CYCLIC LOADING is made firm by ramming test bed
CN102071780B (en) Method for manufacturing and mounting 120-meter long roof tile at high altitude
CN207405485U (en) A kind of intelligence system for bridge machinery
KR101195194B1 (en) Dynamic Loading Apparatus For Paving The Road
CN105479598A (en) Automatic sleeper prestressed reinforcement tensioning device
CN206407167U (en) A kind of aircraft wing automatic detection labelling apparatus
CN207760871U (en) A kind of subway station prefabricated board assembly trolley
CN211714567U (en) Interval adjustable creeping formwork device
CN106836011A (en) Hanging Basket running gear and its construction method
CN110231788A (en) A kind of tele-control system and method based on from rail sander of walking
CN1135003A (en) Tamping machine, machine arrangement and method for tamping track

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922