CN107179437A - One kind operation power detecting method - Google Patents

One kind operation power detecting method Download PDF

Info

Publication number
CN107179437A
CN107179437A CN201710349238.9A CN201710349238A CN107179437A CN 107179437 A CN107179437 A CN 107179437A CN 201710349238 A CN201710349238 A CN 201710349238A CN 107179437 A CN107179437 A CN 107179437A
Authority
CN
China
Prior art keywords
switch
checked
measurement equipment
switching
detection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710349238.9A
Other languages
Chinese (zh)
Inventor
梁亮亮
臧兆安
付强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Universal Wisdom Technology Beijing Co Ltd
Original Assignee
Universal Wisdom Technology Beijing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Universal Wisdom Technology Beijing Co Ltd filed Critical Universal Wisdom Technology Beijing Co Ltd
Priority to CN201710349238.9A priority Critical patent/CN107179437A/en
Publication of CN107179437A publication Critical patent/CN107179437A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor

Abstract

The present embodiments relate to one kind operation power detecting method, including:Middle control unit exports the first switch-over control signal to switching switch;The switching switch is according to first switch-over control signal, and the switching connection end for controlling the switching to switch is connected to switch in preset time threshold Nei Youyu cities electrical cables to be connected with power meter;Wherein, the end that is fixedly connected of the switching switch connects the measurement equipment to be checked;When the first detection sensor monitors to be connected between the measurement equipment to be checked and the power meter, generation measurement enabling signal;The power meter carries out power detection according to the measurement enabling signal to the measurement equipment to be checked.

Description

One kind operation power detecting method
Technical field
The present invention relates to electricity field, more particularly to a kind of operation power detecting method.
Background technology
At present, currently because there are energy-conservation certification demand in many countries, and demand is more and more stricter, causes the power of TV Surplus is less and less, therefore online measuring start power of having to, and to ensure the accuracy of measured value, that is, measures obtained power Deviation between actual motion power is sufficiently small.
In common producing line, 220V electric wires are all TVs while on connecting line body, thus can not measure separate unit electricity Depending on power, therefore measurement when must by a TV individually it is offline after be connected to power meter, then start measurement.
Because television startup needs the time (function machine more than 10 seconds, intelligent machine more than 30 seconds), cause measurement start power Website is time-consuming very long, influences production line operational efficiency.And the offline power meter that is then connected to is tested to measure dependent on human users, Operation is not convenient, can also additionally increase human cost.
The content of the invention
Power detecting method is run it is an object of the invention to provide one kind, is carried for operation power measurement the problem of time-consuming Go out solution, realize the operation power measurement of automation, turned back on again without offline, the measurement power consumption time is very It is short, less than 3 seconds, therefore the efficiency of production line is greatly promoted, be conducive to production capacity to be lifted, and effectively lower human cost.In addition, this Invent provide operation power detecting method can compatible existing production line, very easily existing production line can be risen Level transformation.
To achieve the above object, power detecting method is run the invention provides one kind, including:
Middle control unit exports the first switch-over control signal to switching switch;
The switching switch controls the switching connection end of the switching switch pre- according to first switch-over control signal It is connected if time threshold Nei Youyu cities electrical cables are connected to switch to power meter;Wherein, the fixed company of the switching switch Connect the end connection measurement equipment to be checked;
When the first detection sensor monitors to be connected between the measurement equipment to be checked and the power meter, generation measurement Enabling signal;
The power meter carries out power detection according to the measurement enabling signal to the measurement equipment to be checked.
It is preferred that, the preset time threshold is 0.05S.
It is preferred that, methods described also includes:
The power meter will be sent to memory to the detection data that the measurement equipment detection to be checked is obtained and store.
Deposited it is further preferred that will be sent in the power meter to the detection data that the measurement equipment detection to be checked is obtained After reservoir is stored, methods described also includes:
The power meter generation detection completes signal and is sent to the middle control unit;
The middle control unit controls the switching of the switching switch to switching switch second switch-over control signal of output Connection end is switched to be connected with city's electrical cables.
It is preferred that, the middle control unit is specially to switching switch the first switch-over control signal of output:
Second detection sensor detects to the connection status between the measurement equipment to be checked and city's electrical cables, when When detecting the measurement equipment to be checked and being connected to city's electrical cables of power detection station section and complete boot action, generation first makes Energy signal is sent to the middle control unit;
The middle control unit enables the switch-over control signal of signal output first according to first, controls cutting for the switching switch Change connection end and switch to and be connected with the power meter.
It is further preferred that methods described also includes:
When second detection sensor, which detects the measurement equipment to be checked, is again connected to city's electrical cables, generation Second enable signal is sent to the middle control unit;
The middle control unit enables line control signal under signal output according to described second and used;
The switching switch disconnects the connection with the measurement equipment to be checked according to the lower line control signal.
It is preferred that, when being connected between the measurement equipment to be checked and the power meter, by the power meter to described Measurement equipment to be checked is powered.
Operation power detecting method provided in an embodiment of the present invention, can realize the operation power measurement of automation, without Offline to turn back on again, the measurement power consumption time is very short, less than 3 seconds, therefore greatly promotes the efficiency of production line, is conducive to Production capacity is lifted, and effectively lowers human cost.In addition, the operation power detecting method that the present invention is provided being capable of compatible existing life Producing line, very easily can carry out upgrading to existing production line.
Brief description of the drawings
Fig. 1 is the flow chart provided in an embodiment of the present invention for running power detecting method;
Fig. 2 is the schematic diagram provided in an embodiment of the present invention for running power detection device.
Embodiment
Below by drawings and examples, technical scheme is described in further detail.
Operation power detecting method provided in an embodiment of the present invention, can be used in the various household electrics for having and saving certification demand The operation power detection of device equipment.
Fig. 1 is the schematic diagram provided in an embodiment of the present invention for running power detecting method, as shown in figure 1, mainly including:
Step 110, middle control unit exports the first switch-over control signal to switching switch;
Specifically, it is middle control unit the first switch-over control signal output can be on line operating personnel control manually it is defeated Go out or automatically control switching after electricity detecting measurement equipment to be checked and running to test seat in the plane and connect.
For automatically switching, triggering can be realized by installing sensor additional.
Its detailed process can be:
The connection status between detection device and city's electrical cables is treated by a detection sensor to be detected, works as detection When being connected to city's electrical cables of power detection station section to measurement equipment to be checked and completing boot action, generation first enables signal hair Give middle control unit;Middle control unit enables the switch-over control signal of signal output first, the switching of control switching switch according to first Connection end is switched to be connected with power meter.Wherein, the end that is fixedly connected of switching switch is connected to measurement equipment to be checked.
Step 120, switching switch is according to the first switch-over control signal, and the switching connection end of control switching switch is when default Between threshold value Nei Youyu cities electrical cables be connected to switch to and be connected with power meter;
Specifically, in order to ensure measurement equipment not power down in handoff procedure to be checked, the handoff response speed of switching switch is needed Meet certain requirements, therefore switching switch uses and is switched fast switch.For the application on TV machine testing, switching The handoff response speed of switch is preferably no more than 0.05 second.
When measurement equipment to be checked, which is switched to, to be connected between power meter, detection device is treated by power meter and powered.
Step 130, when the first detection sensor monitors to be connected between measurement equipment to be checked and power meter, generation measurement Enabling signal;
Specifically, the first detection sensor is arranged at and connected with power meter, connection end and power meter phase are switched when detecting Connection, i.e., when measurement equipment to be checked to be detected is connected to power meter, generation measurement enabling signal is sent to power meter.
Step 140, power meter treats detection device according to measurement enabling signal and carries out power detection.
Because measurement equipment to be checked is not offline in handoff procedure, thus can save in this step it is existing required for again Start shooting the time that could be tested, thus improve testing efficiency, improve the efficiency of production line.
Step 150, power meter will treat detection device and detect that obtained detection data are sent to memory and stored.
Step 160, power meter generation detection completes signal and is sent to middle control unit;
Specifically, after power meter will detect that data are sent to and stored, can also realize measurement equipment to be checked oneself The dynamic civil power cable power supply that power detection station section is switched back into from the connection with power meter.
Step 170, middle control unit controls the switching connection of switching switch to switching switch the second switch-over control signal of output End is switched to be connected with city's electrical cables of power detection station section.
Thus, that is, the process of whole service power detection is completed, the measurement equipment to be checked in test seat in the plane completes test Afterwards, it will be moved to next detection seat in the plane, and there is next measurement equipment to be checked to move on the detection seat in the plane.
The basic process for running power detection is illustrated by foregoing description.Below, the operation with reference to shown in Fig. 2 The schematic diagram of power detection device, then the operation power detecting method of the present invention is described in detail.
Operation power detection device in the embodiment of the present invention, can be that the various household electrical appliance for having energy-conservation certification demand are set It is standby, in embodiments of the present invention, using television set as specific example, illustrate.
Fig. 2 is the schematic diagram provided in an embodiment of the present invention for running power detection device, as shown in Fig. 2 mainly including:Work( Rate meter 1, power meter power supply 2, switching switch 3 and middle control unit 4.
Power meter 1, the electrical power of the television set 100 to be detected for measuring;
Power meter power supply 2, is connected to power meter power supply, is that power meter 1 is powered by power meter power supply 2, and when to be detected Television set 100 when being connected to power meter 1, also by the power meter power supply 2 powered to power meter 1 to television set 100 to be detected Power supply.In the present embodiment, power meter power supply 2 is mains supply.
Switching switch 3, including it is fixedly connected with end 31 and switching connection end 32.
The end 31 that is fixedly connected of switching switch 3 connects television set 100 to be detected, and switching connection end 32 is connected to civil power electricity Cable 200 is connected to power meter 1.Wherein, city's electrical cables 200 refer in particular to city's electrical cables of power detection station section.In this implementation In example, switching switch 3 is using switch is switched fast, and handoff response speed, which needs to meet, is cutting television set 100 to be detected Not power down in changing.For the present embodiment for the application of television set, the handoff response speed of switching switch 3 is preferably no more than 0.05 second.
Middle control unit 4, is connected with switching switch 3, the middle control output switching control signal of unit 4, control switching switch 3 Switch the link position of connection end 32.
By middle control unit 4, can control the switching connection end 32 of switching switch 3 city's electrical cables 200 or power meter 1 it Between switch, detected so that television set 100 to be detected is accessed into civil power or access power.
In addition, operation power detection device also includes memory 5, it is connected with power meter 1, receives and storage power meter 1 Obtained detection data are detected to television set 100 to be detected.
The operation work(being made up of above-mentioned power meter 1, power meter power supply 2, switching switch 3, middle control unit 4 and memory 5 Rate detection means, you can realize the detection of the operation power to television set 100 to be detected.
Further, in order to improve the automaticity of on-line checking, sensor can also be installed additional, to TV to be detected The on-position of machine 100 carries out automatic detection, so as to trigger the automatic progress of on-line checking.
Therefore, as shown in Fig. 2 the operation power detection device that the present invention is provided also includes:First detection sensor 6 and Second detection sensor 7.
First detection sensor 6 is connected on power meter 1, to the connection between television set 100 to be detected and power meter State is detected.
Second detection sensor 7, is connected to city's electrical cables 200 and middle control unit 4, and the second detection sensor 7 is treated Connection status between the television set 100 of detection and the 200 of city's electrical cables is detected.
Before on-line testing, television set 100 to be detected runs to detection seat in the plane with conveyer belt, and city's electrical cables are connected to first 200, other performance detections can be carried out.Now the end 31 that is fixedly connected of switching switch 3 is connected to television set 100 to be detected.
When the second detection sensor 7, which detects television set 100 to be detected, is connected to city's electrical cables 200, generation first Enable signal and be sent to middle control unit 4.Signal transmission between second detection sensor 7 and middle control unit 4 can use wired The mode transmitted or be wirelessly transferred.
Middle control unit 4 enables the switch-over control signal of signal output first, the switching connection of control switching switch 3 according to first End 32 is connected with power meter 1.Further, the first switch-over control signal that middle control unit 4 is exported, can be enabled first In the state of signal is effective, receives handoff trigger signal and produce.Handoff trigger signal can be that user controls manually After the completion of foregoing other the described performance detections of input or middle control unit monitoring, automatically generate.
Be connected when the first detection sensor 6 detects switching connection end 32 with power meter 1, i.e., television set to be detected 100 when being connected to power meter 1, and generation measurement enabling signal is sent to power meter 1.
Power meter 1 starts according to measurement enabling signal carries out on-line checking to the electrical power of television set 100 to be detected.
After being measured, power meter 1 will detect that obtained detection data are sent to memory to television set 100 to be detected 5 storages.Now, middle control unit 4 exports the second switch-over control signal, the switching connection end of control switching switch 3 to switching switch 3 32 are connected with city's electrical cables 200 again.
When the second detection sensor 7, which detects television set 100 to be detected, is again connected to city's electrical cables 200, generation Second enable signal is sent to middle control unit 4;
Middle control unit 4 enables line control signal under signal output according to second, and 3 are switched and to be detected to disconnect switching The connection of television set 100.So as to which television set 100 to be detected can be moved to next detection website with conveyer belt.
Operation power detecting method provided in an embodiment of the present invention, measurement equipments to be checked all kinds of to television set etc. realize automation Online operation power measurement, turned back on again without offline, measurement the power consumption time it is very short, less than 3 seconds, therefore greatly The efficiency of big lifting production line, is conducive to production capacity to be lifted, and effectively lower human cost.In addition, the operation work(that the present invention is provided Rate detection means, can compatible existing production line, can very easily to existing production line carry out upgrading.
Professional should further appreciate that, each example described with reference to the embodiments described herein Unit and algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, hard in order to clearly demonstrate The interchangeability of part and software, generally describes the composition and step of each example according to function in the above description. These functions are performed with hardware or software mode actually, depending on the application-specific and design constraint of technical scheme. Professional and technical personnel can realize described function to each specific application using distinct methods, but this realize It is not considered that beyond the scope of this invention.
The method that is described with reference to the embodiments described herein can use hardware, computing device the step of algorithm Software module, or the two combination are implemented.Software module can be placed in random access memory (RAM), internal memory, read-only storage (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technical field In any other form of storage medium well known to interior.
Above-described embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc. all should be included Within protection scope of the present invention.

Claims (7)

1. one kind operation power detecting method, it is characterised in that methods described includes:
Middle control unit exports the first switch-over control signal to switching switch;
The switching switch controls the switching connection end of the switching switch when default according to first switch-over control signal Between threshold value Nei Youyu cities electrical cables be connected to switch to and be connected with power meter;Wherein, what the switching was switched is fixedly connected with end Connect the measurement equipment to be checked;
When the first detection sensor monitors to be connected between the measurement equipment to be checked and the power meter, generation measurement starts Signal;
The power meter carries out power detection according to the measurement enabling signal to the measurement equipment to be checked.
2. operation power detecting method according to claim 1, it is characterised in that the preset time threshold is 0.05S.
3. operation power detecting method according to claim 1, it is characterised in that methods described also includes:
The power meter will be sent to memory to the detection data that the measurement equipment detection to be checked is obtained and store.
4. operation power detecting method according to claim 3, it is characterised in that will be to described to be checked in the power meter The obtained detection data of measurement equipment detection are sent to after memory stored, and methods described also includes:
The power meter generation detection completes signal and is sent to the middle control unit;
The middle control unit controls the switching connection of the switching switch to switching switch second switch-over control signal of output End is switched to be connected with city's electrical cables.
5. operation power detecting method according to claim 1, it is characterised in that the middle control unit is defeated to switching switch Going out the first switch-over control signal is specially:
Second detection sensor is detected to the connection status between the measurement equipment to be checked and city's electrical cables, works as detection When being connected to city's electrical cables of power detection station section to the measurement equipment to be checked and completing boot action, generation first enables letter Number it is sent to the middle control unit;
The middle control unit enables the switch-over control signal of signal output first according to first, controls the switching of the switching switch to connect Connect end and switch to and be connected with the power meter.
6. operation power detecting method according to claim 5, it is characterised in that methods described also includes:
When second detection sensor, which detects the measurement equipment to be checked, is again connected to city's electrical cables, generation second Enable signal and be sent to the middle control unit;
The middle control unit enables line control signal under signal output according to described second and used;
The switching switch disconnects the connection with the measurement equipment to be checked according to the lower line control signal.
7. operation power detecting method according to claim 1, it is characterised in that when the measurement equipment to be checked and the work( When being connected between rate meter, the measurement equipment to be checked is powered by the power meter.
CN201710349238.9A 2017-05-17 2017-05-17 One kind operation power detecting method Pending CN107179437A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710349238.9A CN107179437A (en) 2017-05-17 2017-05-17 One kind operation power detecting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710349238.9A CN107179437A (en) 2017-05-17 2017-05-17 One kind operation power detecting method

Publications (1)

Publication Number Publication Date
CN107179437A true CN107179437A (en) 2017-09-19

Family

ID=59832775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710349238.9A Pending CN107179437A (en) 2017-05-17 2017-05-17 One kind operation power detecting method

Country Status (1)

Country Link
CN (1) CN107179437A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1815247A (en) * 2006-03-10 2006-08-09 中国航天科技集团公司第五研究院第五一四研究所 Electric power measuring method and its measuring device
CN202267709U (en) * 2011-09-23 2012-06-06 冠捷科技(北京)有限公司 Automatic test system for power of display device on production line
US20140015517A1 (en) * 2012-07-13 2014-01-16 Atsuki Iwata Power detecting apparatus
CN104242661A (en) * 2013-06-19 2014-12-24 戴乐格半导体公司 Precise output power detection

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1815247A (en) * 2006-03-10 2006-08-09 中国航天科技集团公司第五研究院第五一四研究所 Electric power measuring method and its measuring device
CN202267709U (en) * 2011-09-23 2012-06-06 冠捷科技(北京)有限公司 Automatic test system for power of display device on production line
US20140015517A1 (en) * 2012-07-13 2014-01-16 Atsuki Iwata Power detecting apparatus
CN104242661A (en) * 2013-06-19 2014-12-24 戴乐格半导体公司 Precise output power detection

Similar Documents

Publication Publication Date Title
CN107167677A (en) Simulating test device and method of testing for battery management system
CN105067928A (en) Automobile electronic product dark current automatic test method and device
CN104730366A (en) Fault diagnosis and maintenance assisting device for household appliances
CN103453998B (en) A kind of self-energizing radio temperature sensor and its implementation
CN104281513A (en) Application power consumption detection method and system
CN104237797A (en) Detection system and detection method of battery capacity of super capacitor
CN107209537A (en) Power supply for computer feedway and operation method with the fan control circuitry that stand-by power supply portion is cooled down under computer closed mode
CN103576092A (en) Remote controller and device and method for detecting electricity capacity of battery of remote controller
CN204179672U (en) A kind of power factor controller
CN104408824A (en) Cost control intelligent electric energy meter payment function reliability test device and test method
CN103869197A (en) Electric vehicle charging-discharging device double-energy-feeding testing system
CN104578377B (en) Cabinet power-supply system, power supply method for handover control and cabinet
CN204882853U (en) Electric energy meter pressure resistance test installation
CN205791802U (en) A kind of electric power apparatus monitoring device
CN107179437A (en) One kind operation power detecting method
CN203037844U (en) Intelligent testing device for electric energy meter built-in load switch
CN203502046U (en) Power transformer on-line state monitoring system base on vibration method
CN107179436A (en) One kind operation power detecting method
CN107192875A (en) One kind operation power detecting method
CN106932638A (en) One kind operation power detection device
CN205317216U (en) Pedometer standby current test system
CN107703456A (en) A kind of button cell circuit for detecting and method for detecting
CN202444272U (en) Intelligent low-voltage power capacitor
CN106932637A (en) One kind operation power detection device
CN107121592A (en) One kind operation power detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170919

WD01 Invention patent application deemed withdrawn after publication