CN107178374A - The auxiliary support structure and anterior shield component of double shield tunneling boring rock tunnel development machines - Google Patents
The auxiliary support structure and anterior shield component of double shield tunneling boring rock tunnel development machines Download PDFInfo
- Publication number
- CN107178374A CN107178374A CN201710551456.0A CN201710551456A CN107178374A CN 107178374 A CN107178374 A CN 107178374A CN 201710551456 A CN201710551456 A CN 201710551456A CN 107178374 A CN107178374 A CN 107178374A
- Authority
- CN
- China
- Prior art keywords
- shield
- anterior
- oil cylinder
- anterior shield
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0621—Shield advancing devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
- E21D9/0875—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket
- E21D9/0879—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket the shield being provided with devices for lining the tunnel, e.g. shuttering
Abstract
The auxiliary support structure and anterior shield component of a kind of pair of shield tunneling boring rock tunnel development machine, the auxiliary support structure includes oil cylinder and support block, the second jointed shaft for being used for being hinged inside the anterior shield shield body with development machine is provided with the cylinder base of oil cylinder, the piston rod top of oil cylinder is hinged by one end of the first jointed shaft and support block, the other end of support block near the periphery of anterior shield shield body by the 3rd jointed shaft with being hinged, and the support block can be after the piston rod of oil cylinder stretches out to deflection outside the periphery of anterior shield shield body.The anterior shield component includes anterior shield shield body, and two stabilizers circumferentially equipped with the 45 ° of central angles in interval on the end face of anterior shield shield body support boots, symmetrical equipped with two auxiliary support structures on the opposite semicircle of two stabilizers support boots.It is an advantage of the invention that:The structure of Auxiliary support itself causes it to form anchor structure with original stabilizer support boots, and anterior shield so can be more firmly fixed, so that promoting mainly supporting advance after oil cylinder is effectively dragged.
Description
Technical field
The present invention relates to the auxiliary support structure of a kind of pair of shield tunneling boring rock tunnel development machine, before in driving
The support of shield shield body and tunnel inner wall is fixed.
Background technology
Double shield tunneling boring rock tunnel development machines(Tunnel Boring Machine, hereinafter referred to as TBM)In China
The tunnel constructions such as water conservancy and hydropower, railway, traffic, city underground engineering, oil-gas pipeline, national defence are quickly grown, using increasingly wide
It is general.In tunnel construction use double-shielded TBM construction technology and equipment, with efficient, high-quality, safety, economy, to rock disturbance
It is small, the advantages of being conducive to environmental protection and reduction labor intensity.
TBM is to integrate broken rock driving, dregs transportation, the integrated equipment of section of jurisdiction supporting.In TBM tunneling process
In, the advance of Rear impact promotes section of jurisdiction to carry out by auxiliary push oil cylinder.In actual tunneling process, sometimes(Such as cross
When standing)Segment assembly is not needed, auxiliary push oil cylinder at this moment can not be leaned on to promote section of jurisdiction dragging Rear impact to advance.In order to solve this
Problem, the implementation of prior art is to support boots by using two stabilizers in anterior shield shield body, by stabilizer support boots and
The anterior shield shield body of boots opposite direction is supportted with stabilizer and the frictional force of tunnel inner wall fixes anterior shield, and oil is promoted mainly using on anterior shield
Cylinder retraction dragging Rear impact advances.Because such a method relies solely on the frictional force of metal and tunnel inner wall, easily skid,
The effect of dragging is bad.
The content of the invention
It is an object of the invention to provide the auxiliary support structure of a kind of pair of shield tunneling boring rock tunnel development machine, to solve
The stabilizer support boots that certainly prior art is present easily skid with tunnel inner wall and cause the problem of dragging effect is bad.
The technical scheme is that:The auxiliary support structure of a kind of pair of shield tunneling boring rock tunnel development machine, it is special
Levy and be, including oil cylinder and support block, being provided with the cylinder base of oil cylinder is used for what is be hinged inside the anterior shield shield body with development machine
Second jointed shaft, the piston rod top of oil cylinder is hinged by the one end side of the first jointed shaft and support block, support block it is another
End near the periphery of anterior shield shield body by the 3rd jointed shaft with being hinged, and the support block can be after the piston rod of oil cylinder stretches out to preceding
Deflected outside the periphery of shield shield body.
A kind of anterior shield component of the auxiliary support structure equipped with described double shield tunneling boring rock tunnel development machines, including
Anterior shield shield body, two stabilizers circumferentially equipped with the 45 ° of central angles in interval on the end face of anterior shield shield body support boots, and its feature exists
In the symmetrical auxiliary support structure equipped with described in two on the opposite semicircle of described two stabilizers support boots.
It is an advantage of the invention that:The structure of Auxiliary support itself causes it to form an anchor with original stabilizer support boots
Fixing structure, so can more be firmly fixed anterior shield, so that promoting mainly supporting advance after oil cylinder is effectively dragged.
Brief description of the drawings
Fig. 1 is the overall structure of the embodiment of the present invention(Non- holding state)Schematic diagram;
Fig. 2 is the structural representation that the present invention shown in Fig. 1 is in holding state embodiment;
Fig. 3 is that the present invention applies the structural representation in anterior shield shield body(Non- holding state);
Fig. 4 is that the present invention applies the structural representation in anterior shield shield body(Holding state).
Embodiment
Referring to Fig. 1 and Fig. 2, the auxiliary support structure of a kind of pair of shield tunneling boring rock tunnel development machine of the invention, it is special
Levy and be, including oil cylinder 1 and support block 2, being provided with the cylinder base of oil cylinder 1 is used to cut with scissors inside the anterior shield shield body 6 with development machine
The second jointed shaft 4 connect, the piston rod top of oil cylinder 1 is hinged by the first jointed shaft 3 and the one end side of support block 2, support
The other end of block 2 is by the 3rd jointed shaft 5 with being hinged near the periphery of anterior shield shield body 6.
Referring to Fig. 3 and Fig. 4, a kind of anterior shield component equipped with described auxiliary support structure of the present invention, including anterior shield shield body
6, two stabilizers circumferentially equipped with the 45 ° of central angles in interval on the end face of anterior shield shield body 6 support boots 7, it is characterised in that in institute
The symmetrical auxiliary support structure equipped with described in two on the opposite semicircle for the two stabilizers support boots 7 stated.
The auxiliary support structure of the present invention operationally has two states, and a state is that the piston rod of oil cylinder 1 is not extended out
(As shown in Figure 1), now support block 2 is within the outer peripheral face 9 of anterior shield shield body 6.Another working condition is, the work of oil cylinder 1
Stopper rod stretches out driving support block 2 and deflected towards the outside of the outer peripheral face 9 of anterior shield shield body 6(As shown in Figure 2), the side of support block 2 is supported
Firmly(Penetrate)Tunnel inner wall, forms an anchor structure with original two stabilizers support boots 7, so can more firmly consolidate
Surely anterior shield is lived, so that promoting mainly oil cylinder retraction, dragging Rear impact advances.
The features of the present invention has:One is that support block 2 is to spin out to penetrate Dong Bi and prop up, branch when supporting after being dragged after propping up
The stress of bracer 2 is shearing force;Two be that support block 2 penetrates Dong Bi, coordinates with stabilizer support boots 7, forms anchoring.
Claims (2)
1. the auxiliary support structure of a kind of pair of shield tunneling boring rock tunnel development machine, it is characterised in that including oil cylinder and support
Block, the second jointed shaft for being used for being hinged inside the anterior shield shield body with development machine, the piston of oil cylinder are provided with the cylinder base of oil cylinder
Bar top is hinged by the one end side of the first jointed shaft and support block, and the other end of support block passes through the 3rd jointed shaft and anterior shield
The periphery annex of shield body is hinged, and the support block can be after the piston rod of oil cylinder stretches out to deflection outside the periphery of anterior shield shield body.
2. a kind of anterior shield group of the auxiliary support structure of double shield tunneling boring rock tunnel development machines equipped with described in claim 1
Part, including anterior shield shield body, two stabilizers circumferentially equipped with the 45 ° of central angles in interval on the end face of anterior shield shield body support boots, its
It is characterised by, the symmetrical auxiliary support structure equipped with described in two on the opposite semicircle of described two stabilizers support boots.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710551456.0A CN107178374B (en) | 2017-07-07 | 2017-07-07 | Auxiliary supporting structure and front shield assembly of double-shield full-face rock tunnel boring machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710551456.0A CN107178374B (en) | 2017-07-07 | 2017-07-07 | Auxiliary supporting structure and front shield assembly of double-shield full-face rock tunnel boring machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107178374A true CN107178374A (en) | 2017-09-19 |
CN107178374B CN107178374B (en) | 2023-10-20 |
Family
ID=59845647
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710551456.0A Active CN107178374B (en) | 2017-07-07 | 2017-07-07 | Auxiliary supporting structure and front shield assembly of double-shield full-face rock tunnel boring machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107178374B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108868802A (en) * | 2018-09-12 | 2018-11-23 | 中船重工(青岛)轨道交通装备有限公司 | Composite shield stabilizer |
CN110985034A (en) * | 2019-12-12 | 2020-04-10 | 中国铁建重工集团股份有限公司 | Development machine, and development machine supporting shoe slipping detection method and system |
CN113027474A (en) * | 2021-04-23 | 2021-06-25 | 国网新源控股有限公司 | Tunnel boring machine |
CN113107504A (en) * | 2021-04-27 | 2021-07-13 | 中铁工程装备集团有限公司 | Tunnel boring machine stabilizing method and stabilizer thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202039865U (en) * | 2011-05-19 | 2011-11-16 | 湖南五新重型装备有限公司 | Overload prevention pouring system |
CN202391431U (en) * | 2011-10-19 | 2012-08-22 | 中铁隧道装备制造有限公司 | Hard rock composite type TBM (tunnel boring machine) suitable for composite stratum |
CN102953735A (en) * | 2012-12-04 | 2013-03-06 | 大连华锐重工集团股份有限公司 | Composite soil pressure balance shield with front support and back support |
CN104196538A (en) * | 2014-09-05 | 2014-12-10 | 中船重工(青岛)轨道交通装备有限公司 | Combined type double-shield tunneling machine |
CN104727824A (en) * | 2015-03-25 | 2015-06-24 | 中铁工程装备集团有限公司 | Shape maintainer for large-section long rectangular shield |
CN204492829U (en) * | 2015-03-25 | 2015-07-22 | 中铁工程装备集团有限公司 | The shape keeper of big cross section long distance rectangular shield |
CN207177903U (en) * | 2017-07-07 | 2018-04-03 | 中船重工(青岛)轨道交通装备有限公司 | The auxiliary support structure and anterior shield component of double shield tunneling boring rock tunnel development machines |
-
2017
- 2017-07-07 CN CN201710551456.0A patent/CN107178374B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202039865U (en) * | 2011-05-19 | 2011-11-16 | 湖南五新重型装备有限公司 | Overload prevention pouring system |
CN202391431U (en) * | 2011-10-19 | 2012-08-22 | 中铁隧道装备制造有限公司 | Hard rock composite type TBM (tunnel boring machine) suitable for composite stratum |
CN102953735A (en) * | 2012-12-04 | 2013-03-06 | 大连华锐重工集团股份有限公司 | Composite soil pressure balance shield with front support and back support |
CN104196538A (en) * | 2014-09-05 | 2014-12-10 | 中船重工(青岛)轨道交通装备有限公司 | Combined type double-shield tunneling machine |
CN104727824A (en) * | 2015-03-25 | 2015-06-24 | 中铁工程装备集团有限公司 | Shape maintainer for large-section long rectangular shield |
CN204492829U (en) * | 2015-03-25 | 2015-07-22 | 中铁工程装备集团有限公司 | The shape keeper of big cross section long distance rectangular shield |
CN207177903U (en) * | 2017-07-07 | 2018-04-03 | 中船重工(青岛)轨道交通装备有限公司 | The auxiliary support structure and anterior shield component of double shield tunneling boring rock tunnel development machines |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108868802A (en) * | 2018-09-12 | 2018-11-23 | 中船重工(青岛)轨道交通装备有限公司 | Composite shield stabilizer |
CN108868802B (en) * | 2018-09-12 | 2024-04-16 | 中船(青岛)轨道交通装备有限公司 | Combined shield stabilizer |
CN110985034A (en) * | 2019-12-12 | 2020-04-10 | 中国铁建重工集团股份有限公司 | Development machine, and development machine supporting shoe slipping detection method and system |
CN110985034B (en) * | 2019-12-12 | 2021-09-24 | 中国铁建重工集团股份有限公司 | Detection method and system for slipping of supporting shoes of heading machine |
CN113027474A (en) * | 2021-04-23 | 2021-06-25 | 国网新源控股有限公司 | Tunnel boring machine |
CN113107504A (en) * | 2021-04-27 | 2021-07-13 | 中铁工程装备集团有限公司 | Tunnel boring machine stabilizing method and stabilizer thereof |
CN113107504B (en) * | 2021-04-27 | 2022-04-29 | 中铁工程装备集团有限公司 | Tunnel boring machine stabilizing method and stabilizer thereof |
Also Published As
Publication number | Publication date |
---|---|
CN107178374B (en) | 2023-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107178374A (en) | The auxiliary support structure and anterior shield component of double shield tunneling boring rock tunnel development machines | |
CN106939600B (en) | A kind of hydraulic buckling anchor pole | |
CN105134216B (en) | Anti- slump structure by the engineering method lane of breaking roof 110 | |
CN207177903U (en) | The auxiliary support structure and anterior shield component of double shield tunneling boring rock tunnel development machines | |
CN103306713B (en) | A kind of high prominent coal seam layer-through drilling networking reinforcement means | |
CN104929517B (en) | Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method | |
CN105240022A (en) | In-tunnel demounting method of TBM (tunnel boring machine) without expanding tunnel chamber | |
CN103643979A (en) | Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support | |
CN103382844A (en) | Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support | |
CN104373147B (en) | Folding extension type roadway hydraulic bracket | |
CN207018019U (en) | The advanced telescopic cantilever suspension device of tunnelling | |
CN204113319U (en) | A kind of folding telescopic alley hydraulic support | |
CN104847354A (en) | Method for improving performance of strip coal pillar by grouting combined support anchor rod | |
CN205089345U (en) | Anchor rope is put by pressure equipment | |
CN208793003U (en) | Advance borehole device in a kind of TBM cutterhead | |
CN2916134Y (en) | Advance-support front canopy in roadway | |
CN205260049U (en) | Deep roadway support uses novel concrete support | |
CN207111150U (en) | A kind of supporting coal mine underworkings device | |
CN103410529B (en) | A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method | |
CN205297608U (en) | Novel recoverable stock of hydraulic pressure inflation formula | |
CN207583398U (en) | A kind of weak surrounding rock combination supporting device | |
CN106703850A (en) | Novel hydraulic expanded recyclable anchor rod | |
CN114320323B (en) | Three-support shoe tightening shield for double-shield coal roadway heading machine | |
CN206694056U (en) | A kind of mine anchor rod with Telescopic | |
CN205154208U (en) | Novel multi -functional stock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: No. 801 Chunyang Road, High tech Zone, Qingdao, Shandong Province, 266000 Applicant after: China Ship (Qingdao) rail transportation equipment Co.,Ltd. Address before: 266000, north of Chunyang Road, High tech Industrial Development Zone, Qingdao, Shandong Province, east of Line 22 in the planning area Applicant before: CSIC (QINGDAO) TRACK TRAFFIC EQUIPMENT CO.,LTD. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |