CN107178107A - One kind, which is twisted, inhales the mixed gravel construction technology of ship excavation clay - Google Patents

One kind, which is twisted, inhales the mixed gravel construction technology of ship excavation clay Download PDF

Info

Publication number
CN107178107A
CN107178107A CN201710373860.3A CN201710373860A CN107178107A CN 107178107 A CN107178107 A CN 107178107A CN 201710373860 A CN201710373860 A CN 201710373860A CN 107178107 A CN107178107 A CN 107178107A
Authority
CN
China
Prior art keywords
reamer
ship
construction
excavation
inhales
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710373860.3A
Other languages
Chinese (zh)
Inventor
周志强
余奇
贾文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
CCCC TDC Binhai Environmental Channel Dredging Co Ltd
CCCC Tianjin Port and Shipping Survey and Design Institute Co Ltd
CCCC TDC Yantai Environmental Protection Dredging Co Ltd
CCCC TDC Environmental Engineering Co Ltd
CCCC TDC Southern Communications Construction Co Ltd
Original Assignee
CCCC Tianjin Dredging Co Ltd
CCCC Tianjin Harbour Engineering Co Ltd
CCCC TDC Binhai Environmental Channel Dredging Co Ltd
CCCC Tianjin Port and Shipping Survey and Design Institute Co Ltd
CCCC TDC Yantai Environmental Protection Dredging Co Ltd
CCCC TDC Environmental Engineering Co Ltd
CCCC TDC Southern Communications Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tianjin Dredging Co Ltd, CCCC Tianjin Harbour Engineering Co Ltd, CCCC TDC Binhai Environmental Channel Dredging Co Ltd, CCCC Tianjin Port and Shipping Survey and Design Institute Co Ltd, CCCC TDC Yantai Environmental Protection Dredging Co Ltd, CCCC TDC Environmental Engineering Co Ltd, CCCC TDC Southern Communications Construction Co Ltd filed Critical CCCC Tianjin Dredging Co Ltd
Priority to CN201710373860.3A priority Critical patent/CN107178107A/en
Publication of CN107178107A publication Critical patent/CN107178107A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/8833Floating installations
    • E02F3/885Floating installations self propelled, e.g. ship
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/90Component parts, e.g. arrangement or adaptation of pumps
    • E02F3/92Digging elements, e.g. suction heads
    • E02F3/9293Component parts of suction heads, e.g. edges, strainers for preventing the entry of stones or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Treatment Of Sludge (AREA)

Abstract

Twisted the present invention relates to one kind and inhale the mixed gravel construction technology of ship excavation clay.It will twist to inhale ship and sail to excavating including (1) and original position and cast anchor the step of in position;(2) pair twist inhales the step of vessel position is adjusted;(3) the step of decentralization reamer is dredged to top mud layer;Reamer is transferred to 2a/3 distance by original mud face, wherein a is the obtained mud layer average thickness of measurement, this layer is carried out by forward pitch of b and is dredged construction;(4) fall from power car the step of, chassis refunds positional distance origin position for 1.0m;(5) decentralization reamer carries out the step of constructing of dredging to lower section mud layer;Depth where when reamer is excavated by upper strata continues to transfer a/3 distance, and wherein a is the obtained mud layer average thickness of measurement, and this layer is carried out by forward pitch of c and is dredged construction;The 1.0m regions that lower floor leaves when upper strata being constructed when constructing connect a batch excavation construction again;(6) fall from power car the step of, chassis is refunded to origin position;(7) the step of moving traversing anchor;(8) the step of moving ship.

Description

One kind, which is twisted, inhales the mixed gravel construction technology of ship excavation clay
Technical field
The mixed gravel construction technology of ship excavation clay is inhaled the invention belongs to ship dredging construction technical field, more particularly to a kind of twist.
Background technology
As a kind of special desilting material, clay, gravel composite soil are relatively common in dredging work, particularly Dalian Port near zone.Because more harbour is proposed in the mixed soil property littoral zone of clay gravel, therefore research clay gravel mixes soil property construction technology There is very important realistic meaning with method.
Existing ship dredging construction technique does not consider that clay mixes the particular/special requirement that gravel soil property is brought, using traditional construction When technique is excavated, easily produce the stifled reamer of paste, suppress the problems such as quick-fried fluid pressure line.Therefore develop a kind of suitable for clay The construction technology of mixed gravel soil property is the active demand of current this area, it may have broader market prospects.
The content of the invention
The technical problem of the invention present in solution known technology provides a kind of mixed gravel of suction ship excavation clay that twists and applied Work technique, solves to paste stifled reamer under existing excavation technology, suppresses the problems such as quick-fried fluid pressure line, the economic benefit of Improving Project, Ship production capacity is effectively improved by Optimizing construction technique, the useless side of dredging is reduced, equipment is excavated while protecting, reduces reamer, reamer The abrasion of tooth, reamer toothholder, reaches the construction quality of stable Construction control and high-quality.
The present invention is adopted the technical scheme that to solve technical problem present in known technology:One kind, which is twisted, inhales ship excavation Clay mixes gravel construction technology and comprised the following steps, and (1) will twist suction ship and sail to excavation original position and cast anchor the step of in position; (2) pair twist inhales the step of vessel position is adjusted;(3) decentralization reamer carries out the step of constructing of dredging to top mud layer;It will twist Knife is transferred 2a/3 distance by original mud face, and the mud layer average thickness that wherein a obtains for measurement carries out this layer by forward pitch of b Dredge construction;(4) fall from power car the step of, chassis refunds positional distance origin position for 1.0m;(5) decentralization reamer is to lower section mud layer Progress dredge construction the step of;Depth where when reamer is excavated by upper strata continues to transfer a/3 distance, and wherein a is to measure The mud layer average thickness arrived, this layer is carried out by forward pitch of c and is dredged construction;The 1.0m that lower floor leaves when upper strata being constructed when constructing Region connects a batch excavation construction again;(6) fall from power car the step of, chassis is refunded to origin position;(7) the step of moving traversing anchor;(8) The step of moving ship.
Advantages and positive effects of the present invention are:Twisted the invention provides one kind and inhale the mixed gravel construction work of ship excavation clay Skill, compared with existing construction technology, the technical program solves paste stifled reamer when excavation clay gravel mixes soil property, suppresses quick-fried hydraulic tube The problems such as road;Ship production capacity is effectively increased using " small progress is swung soon " and " separate unit in-car draws drawer " construction method, reduced The useless side of dredging;Excavation equipment can be protected using this construction technology, reamer, reamer tooth, the abrasion of reamer toothholder, construction is reduced Control is steady, and Engineering Quality Control is preferable.
Preferably:B is 1.0~1.2m, and c is 0.5~0.6m.
Preferably:Upper strata single digging distance is 5.0m, and lower floor's single digging distance is 6.0m.
Preferably:Twist and inhale ship using pointed tooth type reamer tooth, anti-stone ring is installed on reamer.
Embodiment
In order to further understand the content, features and effects of the present invention, it is as follows hereby to lift following examples detailed description:
The strand of the present invention, which inhales ship and excavates clay and mix gravel construction technology, to be comprised the following steps, and (1), which will be twisted, inhales ship and sail to opening Dig original position and cast anchor the step of in position;(2) pair twist inhales the step of vessel position is adjusted;(3) decentralization reamer is to top Mud layer carries out the step of constructing of dredging;Reamer is transferred to 2a/3 distance by original mud face, wherein a puts down for the mud layer that measurement is obtained Equal thickness, this layer is carried out by forward pitch of b and is dredged construction;(4) fall from power car the step of, chassis refunds positional distance origin position and is 1.0m;(5) decentralization reamer carries out the step of constructing of dredging to lower section mud layer;Under depth continues where when reamer is excavated by upper strata Put a/3 distance, the mud layer average thickness that wherein a obtains for measurement carries out this layer by forward pitch of c and dredged construction;Lower floor applies The 1.0m regions left when man-hour constructs upper strata connect a batch excavation construction again;(6) fall from power car the step of, chassis is refunded to origin Position;(7) the step of moving traversing anchor;(8) the step of moving ship.
In the present embodiment, b is 1.0~1.2m, and c is 0.5~0.6m.
In the present embodiment, upper strata single digging distance is 5.0m, and lower floor's single digging distance is 6.0m.
In the present embodiment, twist and inhale ship using pointed tooth type reamer tooth, anti-stone ring is installed on reamer.
Technological principle is as follows:
The rotation that cutter suction dredger is constructed mainly by reamer excavate and dredge pump suction it is defeated complete, twist and inhale ship and excavate production Rate it is main with forward pitch, to cut the factors such as mud thickness, transverse moving speed relevant.In excavation mud face during relatively thin soil layer, using " small progress The construction technology of fast swing ", i.e., by controlling forward pitch, cutting mud thickness and transverse moving speed, make reamer load relatively steady, obtains Stable construction concentration, can obtain ideal effect.In excavation mud face during thicker soil layer, using " separate unit in-car is drawn The construction technology of drawer ", i.e. upper strata are entered after 5.0m, receive chassis construction lower floor and enter 6.0m, while the 1m that upper strata is left connects again Stubble is excavated, it is to avoid is caused the wide phenomenon being gradually reduced of pendulum because the viscous hard, residual layer of soil property is thicker, is improved the excavation productivity ratio of ship.
Concrete application example is as follows:
Measurement obtains dredging thickness degree for 5.5m, for save the layering shifting ships caused more, move anchor, the productivity such as car of falling from power is stopped Have a rest the time, take the grooving technology construction of drawing drawer one time of two layers of separate unit in-car point.
1) the first separate unit car is layered:Reamer is once transferred to -6.8m (to prevent from back-silting, when upper strata is constructed from original mud face The many lower 0.3m of reamer decentralization depth) forward pitch is 1.2m.Reamer electric current and suction vacuum and concentration are controlled according to transverse moving speed, First step forward pitch than moving forward apart from big 0.3m or so below after zapping car, and other reaches are apart from of substantially equal.
2) the second separate unit car is layered:Reamer once transfers to -8.7m that (the timely depth measurement of measured ship, is being opened from -6.8m When reamer decentralization depth is -8.6m when digging down layer, sound the depth of the water as 8.0~8.1m.Consider the phenomenon of back-silting before the acceptance of work, Reamer transfers to -8.7m to ensure construction quality when excavating lower floor), forward pitch is 0.6m (because lower floor's shale is silty clay Mixed circle gravel, reamer head easily pastes dead and to reamer centrum and weares and teares very big, so when excavating lower floor, forward pitch is than upper strata excavation Suitably reduced during construction).
After the analysis sounding chart depth of water in time and by multiple practice test, " the new construction work of upper 5 times 6 " is taken now Chassis, i.e., received 1.0m, upper strata enters 5.0m, lower floor and enters 6.0m when so doing upper strata by method when lower floor falls from power car.Excavate The 1.0m left when upper chassis being excavated 5.0m again during lower floor connects stubble and excavated again, and prevention is led because soil property is viscous firmly, residual layer is thicker Causing pendulum width to be gradually reduced causes ship to shoulder neck phenomenon, and construction quality is effectively ensured.
When strand suction ship excavation clay gravel mixes soil property, larger to reamer, reamer tooth, toothholder, the abrasion of reamer cone, part is easily collapsed Collapse and cause suction vacuum moment rapidly to increase to form shake car phenomenon, it is to excavate clay gravel to mix to solve landslide, shoulder neck, wear problem The key of soil property, construction ship uses pointed tooth type reamer tooth, and installs on reamer anti-stone net.
Contain a large amount of quartzy dusts, circle gravel to the reamer tooth of ship, reamer toothholder, reamer body, hull suction in construction area Mud pipeline, rubber pipe nipple, it is waterborne under water and land mud delivery pipeline abrasion than more serious.For ensure ship improve when interest rate have with What time it is worth noting down:
1) reamer tooth and toothholder should use wear resistant products, extend monodentate service life, and tooth number of times and time are changed in reduction;
2) workshop repairing is entered in the abrasion reamer requirement under changeing.It is existing because reparation of freezing has temperature requirement when weather is cooler Easy fracture during the toothholder work repaired under the open-air condition of field;
3) increase the spares provisioning of corresponding ship rubber hose, improve spare part quality, it is to avoid ship is caused by waiting spare part Shut-down phenomenon occur;
4) due to it is waterborne, under water, terrestrial pipeline abrasion it is more serious, live project management department to respective lines increase spot thickness measurement Check, the service life to pipeline position easy to wear carries out shifting to an earlier date anticipation, and welding liner plate thickeies pipeline position easy to wear in advance, The improvement face of doing work, face is turned to respective lines using ship downtime and used, reduce due to issue pipeline cause when resting Between.

Claims (4)

1. one kind, which is twisted, inhales the mixed gravel construction technology of ship excavation clay, it is characterized in that:Comprise the following steps,
(1) suction ship will be twisted to sail to excavation original position and cast anchor the step of in position;
(2) pair twist inhales the step of vessel position is adjusted;
(3) decentralization reamer carries out the step of constructing of dredging to top mud layer;Reamer is transferred to 2a/3 distance by original mud face, its Middle a is the obtained mud layer average thickness of measurement, and this layer is carried out by forward pitch of b and is dredged construction;
(4) fall from power car the step of, chassis refunds positional distance origin position for 1.0m;
(5) decentralization reamer carries out the step of constructing of dredging to lower section mud layer;Under depth continues where when reamer is excavated by upper strata Put a/3 distance, the mud layer average thickness that wherein a obtains for measurement carries out this layer by forward pitch of c and dredged construction;Lower floor applies The 1.0m regions left when man-hour constructs upper strata connect a batch excavation construction again;
(6) fall from power car the step of, chassis is refunded to origin position;
(7) the step of moving traversing anchor;
(8) the step of moving ship.
2. as claimed in claim 1 twist inhales the mixed gravel construction technology of ship excavation clay, it is characterized in that:B is 1.0~1.2m, and c is 0.5~0.6m.
3. as claimed in claim 1 twist inhales the mixed gravel construction technology of ship excavation clay, it is characterized in that:Upper strata single digging distance For 5.0m, lower floor's single digging distance is 6.0m.
4. the strand as described in any one of claims 1 to 3, which inhales ship, excavates the mixed gravel construction technology of clay, it is characterized in that:Twist and inhale ship Oceangoing ship uses pointed tooth type reamer tooth, and anti-stone ring is provided with reamer.
CN201710373860.3A 2017-05-24 2017-05-24 One kind, which is twisted, inhales the mixed gravel construction technology of ship excavation clay Pending CN107178107A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710373860.3A CN107178107A (en) 2017-05-24 2017-05-24 One kind, which is twisted, inhales the mixed gravel construction technology of ship excavation clay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710373860.3A CN107178107A (en) 2017-05-24 2017-05-24 One kind, which is twisted, inhales the mixed gravel construction technology of ship excavation clay

Publications (1)

Publication Number Publication Date
CN107178107A true CN107178107A (en) 2017-09-19

Family

ID=59831872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710373860.3A Pending CN107178107A (en) 2017-05-24 2017-05-24 One kind, which is twisted, inhales the mixed gravel construction technology of ship excavation clay

Country Status (1)

Country Link
CN (1) CN107178107A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403401A (en) * 2018-09-25 2019-03-01 中交天航滨海环保浚航工程有限公司 A method of it twists and inhales ship excavation cobble sand
CN109750706A (en) * 2019-03-12 2019-05-14 中交天津航道局有限公司 A kind of more drilling depths of cutter suction dredger single layer are dredged control method automatically

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5841124A (en) * 1981-09-07 1983-03-10 Nippon Kokan Kk <Nkk> Dredging bucket wheel
JPS59154236A (en) * 1983-02-21 1984-09-03 Mitsubishi Heavy Ind Ltd Cutter of cutter dredger
CN102162264A (en) * 2011-02-28 2011-08-24 中交天津航道局有限公司 A rock digging method for a reamer of a cutter suction boat in coral reefs and rock constructions
CN202012096U (en) * 2011-02-28 2011-10-19 中交天津航道局有限公司 Stone-resistant ring of suction dredge reamer mud-sucking mouth

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5841124A (en) * 1981-09-07 1983-03-10 Nippon Kokan Kk <Nkk> Dredging bucket wheel
JPS59154236A (en) * 1983-02-21 1984-09-03 Mitsubishi Heavy Ind Ltd Cutter of cutter dredger
CN102162264A (en) * 2011-02-28 2011-08-24 中交天津航道局有限公司 A rock digging method for a reamer of a cutter suction boat in coral reefs and rock constructions
CN202012096U (en) * 2011-02-28 2011-10-19 中交天津航道局有限公司 Stone-resistant ring of suction dredge reamer mud-sucking mouth

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马腾跃: "绞吸船开挖粘性土混砾石施工方法", 《城市建设理论研究》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403401A (en) * 2018-09-25 2019-03-01 中交天航滨海环保浚航工程有限公司 A method of it twists and inhales ship excavation cobble sand
CN109750706A (en) * 2019-03-12 2019-05-14 中交天津航道局有限公司 A kind of more drilling depths of cutter suction dredger single layer are dredged control method automatically

Similar Documents

Publication Publication Date Title
CN102052079B (en) Method for exchanging tool of shield machine for tunnel construction
US20140079485A1 (en) Method for Preventing Shield Casing Catching Due to Too Large Frictional Resistance in Earth Pressure Balance Shield Machine
CN106638751A (en) Riverbed sludge cutter suction dredger
CN105421286B (en) A kind of backhoe type dredger is combined with rig ship digs rock construction method
CN110080789A (en) A kind of shield sky, which pushes away, spells section of jurisdiction construction
CN109779651A (en) A kind of sand ginger cohesive soil stratum low coverage Slurry Balanced Pipe Jacking Construction method
CN107178107A (en) One kind, which is twisted, inhales the mixed gravel construction technology of ship excavation clay
CN106121662B (en) Shield digging is locally backbreak, and dynamically control method is filled in compensation to region synchronous grouting
CN102758462A (en) Stem punching device for self-propelled trailing suction hopper dredgers and construction method thereof
CN109750701A (en) A kind of cutter suction dredger maximum production is dredged control method automatically
CN108005670A (en) A kind of shield cuts armored concrete clump of piles system
CN111636502A (en) Sand mining construction process based on cutter suction dredger
CN109812271B (en) Construction method for shield-crossing limited box culvert
CN204728382U (en) A kind of hinge suction nozzle peculiar to vessel
CN112176954A (en) Construction method for newly excavated channel
CN202787354U (en) Self-propelled trailing suction dredger bow thrust device
CN201534974U (en) High-pressure jet and mixing foundation seepage-proofing reinforcing equipment with multiple drill bits
CN108993974A (en) Clear up the system and method for cutter suction dredger reamer head automatically using high-pressure jet
CN106400807B (en) Extra large work barge grouting method and its equipment
CN108222954B (en) Construction method for shield to penetrate through sandstone material backfill area
CN116876486A (en) Free angle soft soil foundation reinforcement construction equipment, construction method and reinforcement pile
CN116892226A (en) Submarine cable flushing plow
CN115492590A (en) Novel method for shield to directly pass through existing operation station
CN109750703A (en) A kind of more drilling depths of cutter suction dredger multilayer are dredged control method automatically
CN110331754A (en) Drag head construction simulation experimental rig

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Room 346, Chentang technology incubator, 17 Yujiang Road, Hexi District, Tianjin, 300221

Applicant after: CCCC (Tianjin) Dredging Engineering Co.,Ltd.

Applicant after: CCCC TIANJIN DREDGING Co.,Ltd.

Applicant after: CCCC-TDC ENVIRONMENTAL ENGINEERING Co.,Ltd.

Applicant after: CCCC TIANJIN DREDGING HARBOUR CONSTRUCTION ENGINEERING Co.,Ltd.

Applicant after: CCCC TIANJIN PORT & WATERWAY PROSPECTION & DESIGN RESEARCH INSTITUTE Co.,Ltd.

Applicant after: CCCC TDC SOUTHERN COMMUNICATIONS CONSTRUCTION Co.,Ltd.

Applicant after: CCCC TDC ENVIRONMENTAL PROTECTION DREDGING Co.,Ltd.

Address before: Tianhang building, No.1, Zhongxin Road, Tanggu District, Tianjin 300450

Applicant before: CCCC-TDC BINHAI ENVIRONMENTAL CHANNEL DREDGING Co.,Ltd.

Applicant before: CCCC TIANJIN DREDGING Co.,Ltd.

Applicant before: CCCC-TDC ENVIRONMENTAL ENGINEERING Co.,Ltd.

Applicant before: CCCC TIANJIN DREDGING HARBOUR CONSTRUCTION ENGINEERING Co.,Ltd.

Applicant before: CCCC TIANJIN PORT & WATERWAY PROSPECTION & DESIGN RESEARCH INSTITUTE Co.,Ltd.

Applicant before: CCCC TDC SOUTHERN COMMUNICATIONS CONSTRUCTION Co.,Ltd.

Applicant before: CCCC TDC ENVIRONMENTAL PROTECTION DREDGING Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170919