CN107176568A - Bottle stopper installs equipment and medicine bottle system of processing - Google Patents

Bottle stopper installs equipment and medicine bottle system of processing Download PDF

Info

Publication number
CN107176568A
CN107176568A CN201710559108.8A CN201710559108A CN107176568A CN 107176568 A CN107176568 A CN 107176568A CN 201710559108 A CN201710559108 A CN 201710559108A CN 107176568 A CN107176568 A CN 107176568A
Authority
CN
China
Prior art keywords
bottle
bottle stopper
keeper
swing arm
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710559108.8A
Other languages
Chinese (zh)
Other versions
CN107176568B (en
Inventor
张岩
张晓敏
刘建岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sino British Arno Kang (ningxia) Biological Technology Co Ltd
Original Assignee
Sino British Arno Kang (ningxia) Biological Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sino British Arno Kang (ningxia) Biological Technology Co Ltd filed Critical Sino British Arno Kang (ningxia) Biological Technology Co Ltd
Priority to CN201710559108.8A priority Critical patent/CN107176568B/en
Publication of CN107176568A publication Critical patent/CN107176568A/en
Application granted granted Critical
Publication of CN107176568B publication Critical patent/CN107176568B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B67OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
    • B67BAPPLYING CLOSURE MEMBERS TO BOTTLES JARS, OR SIMILAR CONTAINERS; OPENING CLOSED CONTAINERS
    • B67B1/00Closing bottles, jars or similar containers by applying stoppers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Filling Of Jars Or Cans And Processes For Cleaning And Sealing Jars (AREA)

Abstract

Equipment and medicine bottle system of processing are installed the invention provides a kind of bottle stopper, belong to field of medical device, including supporting table, the first keeper, the second keeper, bearing part, swing arm and transmission mechanism, transmission mechanism includes meshed gears and rack, pinion rotation is arranged in supporting table, and rack is slidably connected to supporting table;First keeper has drain spout, and the first keeper is connected to rack, and bearing part is arranged in supporting table;Second keeper is installed on swing arm, and swing arm is articulated with supporting table, and swing arm is rotated with gear synchronous and is connected.During the installation of progress bottle stopper and bottle, bottle and bottle stopper are placed in after predeterminated position, swing arm is operated, bottle stopper can be made to be pressed into the bottleneck of bottle, complete to install, the automatic blanking of bottle can be realized after being completed, whole process is time saving and energy saving, improves packaging efficiency.

Description

Bottle stopper installs equipment and medicine bottle system of processing
Technical field
The present invention relates to field of medical device, equipment and medicine bottle system of processing are installed in particular to a kind of bottle stopper.
Background technology
At present, there are the various bottles for being used to contain liquid or particulate matter, these bottles include bottle and bottle Lid, bottle cap lid is mounted in the bottle mouth position of bottle.The bottle of some types, the particularity used due to it in bottle mouth position, it is necessary to first set Put a bottle stopper.
Traditional bottle with bottle stopper is when being processed, using the inserting work for carrying out bottle stopper and bottle by hand, will Bottle stopper is pressed on bottle mouth position with hand.
Inventor has found that traditional bottle with bottle stopper at least has the disadvantage that when manufacturing processing under study for action:
Traditional bottle stopper is pressed when entering bottleneck, it is necessary to which the hand-held bottle of the hand-held bottle stopper one of operator one, bottle is directed at by bottle stopper Pressing is fastened on bottle mouth position after the bottleneck of body, and such operating efficiency is low, labor intensity big, and operator is also easy to produce sense of fatigue, and Repeating the operation several times can cause the hand of operator to have stronger pain.
The content of the invention
Equipment is installed it is an object of the invention to provide a kind of bottle stopper, installed with improving traditional bottle in bottle stopper and bottle During operate and waste time and energy, the problem of installation effectiveness is low.
It is an object of the invention to provide a kind of medicine bottle system of processing, installed with improving traditional bottle in bottle stopper and bottle During operate and waste time and energy, the problem of installation effectiveness is low.
What embodiments of the invention were realized in:
Based on above-mentioned first purpose, equipment is installed the invention provides a kind of bottle stopper, including supporting table, for positioning bottle The first keeper, the second keeper, bearing part, swing arm and transmission mechanism for positioning bottle stopper, the transmission mechanism Including gear and rack, the pinion rotation is arranged in the supporting table, and the rack is engaged with the gear, the tooth Bar is slidably connected to the supporting table;
First keeper has drain spout, and first keeper is connected to the rack, and the bearing part is installed In the supporting table, first keeper can be supported relative to bearing part described in the supporting table sliding process to be located at Bottle or bottle in the drain spout can be fallen at the drain spout;
Second keeper is installed on the swing arm, and the swing arm is articulated with the supporting table, the swing arm Rotate and be connected with the gear synchronous, the swing arm is relative to can make bearing part pass in the supporting table rotation process Close the drain spout and the bottle being located in first keeper is connected with the bottle stopper inserting in second keeper Connect.
In preferred embodiments of the present invention, the supporting table includes support frame and hinge bar, and the hinge bar is installed On support frame as described above, the gear is set in outside the hinge bar, and the gear is rotated with the hinge bar and is connected, the pendulum Swing arm is fixed on the gear.
In preferred embodiments of the present invention, support frame as described above includes two support units being oppositely arranged, two institutes Support unit is stated to connect by the hinge bar.
In preferred embodiments of the present invention, each support unit include the first supporting leg, the second supporting leg and Connection leg between first supporting leg and the second supporting leg, one end that the connection is moved back connects with first supporting leg Connect, the other end of the connection leg is connected with second supporting leg, the hinge bar is connected to first supporting leg and institute State at the link position of connection leg.
In preferred embodiments of the present invention, first keeper includes the positioning tube with positioning hole, the positioning Two apertures in hole are respectively on two end faces of the axis direction of the positioning tube.
In preferred embodiments of the present invention, first keeper also includes two symmetrically arranged flangings turned up, The symmetry axis of two flangings is the axis of the positioning tube, and two flangings be located at the positioning tube it is same always On footpath, two flangings, which are corresponded, is slidably connected to two connection legs.
In preferred embodiments of the present invention, the flanging is arc tabular.
In preferred embodiments of the present invention, the transmission mechanism also includes two connection components, each connection group Part includes slip cap, and the slip cap is set in outside the connection leg, and the rack is installed on two slip caps.
In preferred embodiments of the present invention, second keeper includes sleeve, and the sleeve has barrel chamber, the set One end of cylinder is arranged on the force arm, the axis of the axis of the sleeve perpendicular to the linking arm.
Based on above-mentioned second purpose, equipment is installed the invention provides a kind of medicine bottle system of processing, including described bottle stopper.
The beneficial effect of the embodiment of the present invention is:
In summary, equipment is installed the embodiments of the invention provide a kind of bottle stopper, its is simple and reasonable, is easy to manufacture to add Work, install with it is easy to use, meanwhile, the bottle stopper install equipment progress bottle stopper and bottle installation when, bottle and bottle stopper are put In after predeterminated position, swing arm is operated, bottle stopper can be made to be pressed into the bottleneck of bottle, complete to install, can after being completed The automatic blanking of bottle is realized, whole process is time saving and energy saving, improves packaging efficiency.It is specific as follows:
The bottle stopper that the present embodiment is provided installs equipment, and including to be provided with swing arm and supporting table, supporting table is used for The second keeper being provided with first keeper of bottle, swing arm for installing bottle stopper is installed, swing arm is articulated with support Platform.When carrying out the assembling of bottle, bottle is placed in the first keeper, bottle realizes positioning, bottle by the first keeper In drain spout, bottle realizes support, the side where the bottleneck towards swing arm of bottle by bearing part;In swing arm The bottle stopper matched with bottle is installed in second keeper, after the completion of bottle and bottle stopper are respectively mounted, swing arm is operated so that pendulum Swing arm is rotated relative to supporting table, meanwhile, pinion rotation band carry-over bar is moved, and in rack motion process, the first keeper is relative Slided in supporting table, the bottle stopper on swing arm and the bottle in supporting table are close to each other, when close to certain position Afterwards, bottle stopper is aligned with the bottleneck of bottle and contacted, and continues to exert a force, and swing arm and supporting table are further towards finally realizing that bottle stopper is inserted The bottle mouth position of bottle is connected on, the assembling of bottle is completed.Whole operation make use of lever principle, and operator's operation swing arm is swung Arm is rotated relative to supporting table, time saving and energy saving, greatly reduces the fatigue strength of operator, meanwhile, bottle and bottle stopper position are determined After good, it is only necessary to operate swing arm, swing arm rotates close to supporting table, turns to after certain angle and realize the group of bottle stopper and bottle Dress, whole process is time-consuming few, and packaging efficiency is high.After being completed, swing arm is rotated backward, the first keeper is relative to supporting table Slide, after drain spout leaves bearing part, the bottle being completed can be fallen at drain spout, realize automatic blanking.
The medicine bottle system of processing that the present embodiment is provided includes above-mentioned bottle stopper and installs equipment, and the institute of equipment is installed with bottle stopper There is advantage.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be attached to what is used required in embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore is not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 installs the structural representation of equipment for the bottle stopper of the embodiment of the present invention;
Fig. 2 installs the side schematic view of equipment for the bottle stopper of the embodiment of the present invention;
Fig. 3 installs the schematic diagram of the first keeper of equipment for the bottle stopper of the embodiment of the present invention;
Fig. 4 installs the schematic diagram of the distressed structure of the first keeper of equipment for the bottle stopper of the embodiment of the present invention.
Icon:10- supporting tables;11- support frames;111- support units;The supporting legs of 112- first;113- second Support leg;114- connection legs;12- hinge bars;The keepers of 13- first;131- drain spouts;132- flangings;133- positioning tubes; 134- elastic walls;20- swing arms;The keepers of 21- second;30- bearing parts;40- transmission mechanisms;41- gears;42- teeth Bar;43- connection components;50- extensible members;60- conveying assemblies.
Embodiment
Traditional bottle stopper is pressed when entering bottleneck, it is necessary to which the hand-held bottle of the hand-held bottle stopper one of operator one, bottle is directed at by bottle stopper Pressing is fastened on bottle mouth position after the bottleneck of body, and such operating efficiency is low, labor intensity big, and operator is also easy to produce sense of fatigue, and Repeating the operation several times can cause the hand of operator to have stronger pain.
In consideration of it, inventor, which devises a kind of bottle stopper, installs equipment and medicine bottle system of processing, by by bottle stopper and bottle The quick assembly and connection of bottle and bottle stopper is realized after positioning using lever principle, whole assembling process is time saving and energy saving, reduces tired Lao Du, improves the efficiency of assembling, saves cost.
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings The component of example can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiments of the invention below to providing in the accompanying drawings is not intended to limit claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
In the description of the invention, it is necessary to which explanation, the orientation or position relationship of the instruction such as term " interior ", " outer " are base In orientation shown in the drawings or position relationship, or the orientation usually put when using of the invention product or position relationship, only It is to be described for the ease of the description present invention with simplified, rather than indicates or imply that the device or element of meaning must be with specifically Orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.In addition, term " first ", " the Two ", etc. it is only used for distinguishing description, and it is not intended that indicating or implying relative importance.
In the description of the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ", " installation ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or integratedly be connected Connect;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, can To be the connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood with concrete condition Concrete meaning in the present invention.
It should be noted that in the case where not conflicting, the embodiment in the present invention and the feature in embodiment can phases Mutually combination.
Bottle stopper installs apparatus embodiments
Referring to Fig. 1, present embodiments providing a kind of bottle stopper installs equipment, bottle and bottle stopper are realized using lever principle Assembly and connection, bottle and bottle stopper assembling process simple and fast, use manpower and material resources sparingly, substantially increase packaging efficiency.
Referring to Fig. 1, bottle stopper installation equipment includes supporting table 10, swing arm 20, vacuum adsorption mechanism and (not shown in figure Go out), bearing part 30, extensible member 50 and transmission mechanism 40.
Fig. 1 and Fig. 2 are referred to, supporting table 10 includes support frame 11, the keeper 13 of hinge bar 12 and first.
Support frame 11 includes two support units 111 being oppositely arranged, and each support unit 111 includes the first support Leg 112, the second supporting leg 113, connection leg 114 and Anti-slip cover.First supporting leg 112 is that section is circular cylindrical steel Pipe, the second supporting leg 113 is that section is circular steel cylindrical tube, and connection leg 114 is that section is circular cylindrical steel Pipe, one end of connection leg 114 and one end of the first supporting leg 112 are welded, the other end of connection leg 114 and the second supporting leg 113 One end welding, the other end of the other end of the first supporting leg 112 and the second supporting leg 113 is located remotely from each other, the first supporting leg 112 The end of remote connection leg 114 be provided with Anti-slip cover, Anti-slip cover is rubber sleeve, and Anti-slip cover is set in outside the first supporting leg 112, In the present embodiment, Anti-slip cover is pressed on outside the first supporting leg 112 using its elastic deformation force, in other embodiments, Anti-slip cover It can also be screwed onto outside the first supporting leg 112.Similarly, it is bolted with the end of the remote connection leg 114 of the second supporting leg 113 anti- Sliding sleeve, the structure of the Anti-slip cover has been described above in the preamble, the attachment structure of Anti-slip cover and the second supporting leg 113 can with it is anti-skidding Set is identical with the attachment structure of the first supporting leg 112, herein without illustrating.First supporting leg 112, the and of connection leg 114 After the completion of the connection of second supporting leg 113, the trapezoidal shape of whole support unit 111, support process stabilization is reliable.
Hinge bar 12 is steel pipe, and the cross sectional shape perpendicular to its axis direction of hinge bar 12 is annular shape, hinge bar 12 Two ends be welded and fixed respectively with support unit 111, the end of hinge bar 12 the first supporting leg with same support unit 111 simultaneously 112 and connection leg 114 weld, i.e., hinge bar 12, the first supporting leg 112 and connection leg 114 collect locates on one point, overall structure jail Gu it is reliable.After hinge bar 12 and two installations of support unit 111, two support units 111 be arranged in parallel, and hinge bar 12 hangs down The straight plane in the place of support unit 111.
Fig. 1 and Fig. 3 are referred to, the first keeper 13 includes the flanging 132 that positioning tube 133 and two are turned up.Positioning tube 133 are provided with positioning hole, and positioning hole can be circular port, square opening etc., and two ports of positioning hole are located at positioning tube 133 respectively Axis direction two ends, one of port be drain spout 131.Two flangings 132 turned up are arranged on the cylinder of positioning tube 133 On wall, two axis of flanging 132 using positioning tube 133 turned up are symmetrical arranged as symmetry axis, when positioning hole is circular port, Two flangings 132 for turning up be located at positioning hole it is same diametrically, when positioning hole is square opening, two flangings 132 are located at side On position corresponding to relative two hole wall in shape hole.
Further, each flanging 132 is arc tabular, and two flangings 132 are set close to the another port of positioning hole, often The inner concave of individual flanging 132 is towards drain spout 131.In the present embodiment, the cross sectional shape perpendicular to its axis direction of flanging 132 For semicircle, radius and the radius of connection leg 114 of flanging 132 match.
First keeper 13 is arranged on support frame 11, and two flangings 132 of the first keeper 13 are slidably mounted on respectively On the connection leg 114 of two support units 111.
Referring to Fig. 1, the swing arm 20 of 20 20 swing arm of swing arm 20 second keeper, 21 swing arm of swing arm 20 is shaft-like, Handheld Division is set on swing arm 20, rubber sleeve is arranged on Handheld Division, the outer peripheral face of rubber sleeve is provided with multiple projections, rubber Gum cover is set in outside Handheld Division, multiple projection projecting radially outward along swing arm 20.Further, swing arm 20 is designed as Stretching structure, is, for example, two pipes being mutually spirally connected, the adjustment of entire length is realized by the length being spirally connected, the scope of application is more Extensively.Or, swing arm 20 is designed as two two be mutually inserted bars, screw, screw are bolted with the bar positioned at outer layer It can be pushed against on the outer peripheral face of the bar of inner side in its end during screwing, it is necessary to when adjusting the length of swing arm 20, Screw is unscrewed, then operates two pipes mutually to slide, slides into tightening screw after correct position.
Second keeper 21 includes sleeve, and sleeve has circular barrel chamber, and one end of sleeve is arranged on swing arm 20, set The other end of cylinder is opening.Obviously, in order to ensure not interfering with the position of the second keeper 21 when swing arm 20 adjusts length, The matching relationship of the first keeper 13 and the second keeper 21 is not interfered with, and the second keeper 21 is arranged on swing arm 20 In the bar portion being connected with linking arm, during the length adjustment of swing arm 20, the second keeper 21 is relative to hinge bar 12 Position will not change.
Transmission mechanism 40 includes gear 41, rack 42 and connection component 43.Gear 41 is intermeshed with rack 42, is needed It is noted that therefore, illustrate only gear in Fig. 1 and Fig. 2 just for the sake of expression gear 41 and the position relationship of rack 42 41 and the schematic diagram of rack 42, gear 41 carries out manufacture assembling in actual application with rack 42 according to matching relationship.Even Connected components 43 include slip cap, and the inside pipe wall of slip cap is provided with multiple balls.
During actual installation, gear 41 is set on hinge bar 12, and gear 41 is rotated with hinge bar 12 and is connected, and rack 42 passes through Two groups of connection components 43 are connected with supporting table 10, specifically, two groups of connection components 43 are located at the both sides of the width of rack 42, The slip cap of every group of connection component 43 is set on connection leg 114, and rack 42 is connected with two slip caps.Meanwhile, rack 42 with The first keeper 13 being slidably mounted on connection leg 114 is connected.Swing arm 20 is connected with gear 41, the rotation process of swing arm 20 In, gear 41 and the synchronous axial system of swing arm 20, the length direction with carry-over bar 42 along connection leg 114 reciprocatingly slide.In order to protect Card gear 41 is difficult the axis direction slip along hinge bar 12, limiting section is provided with hinge bar 12, limiting section can be Gear 41, is first set on hinge bar 12 by the combination of spacing preiection and nut, and then nut is screwed onto on hinge bar 12, is turned Dynamic nut, gear 41 is fastened between nut and spacing preiection.Further, spacing preiection is annular projection.
Bearing part 30 is tabular, and bearing part 30 is arranged in supporting table 10 by two groups of extensible members 50.Every group of extensible member 50 One end be arranged on connection leg 114, the other end of every group of extensible member 50 is installed on the load bearing member 30, flexible by regulation The length of part 50 adjusts height of the bearing part 30 relative to connection leg 114.
Vacuum adsorption mechanism includes vavuum pump and flexible pipe, and a port of vavuum pump and flexible pipe is connected, flexible pipe another Port connects the barrel chamber of sleeve from the side wall of sleeve, and vacuum pump work can make to produce negative pressure in barrel chamber.
The bottle stopper that the present embodiment is provided installs equipment, rotates swing arm 20, and swing arm 20 can be rotated around hinge bar 12, Now, gear 41 and the synchronous axial system of swing arm 20, and then slided with carry-over bar 42 relative to connection leg 114, are slided in rack 42 During, because the first keeper 13 is arranged on rack 42, rack 42 drives the first keeper 13 to slide.In the first keeper In 13 sliding processes, bearing part 30 can optionally support the bottle in drain spout 131.I.e. in sliding process, the Positioning piece 13 is slided relative to bearing part 30, and the bottom of the bottle in drain spout 131 can contact bearing part 30, is relied on Bearing part 30 is supported, and can now carry out push action, when the first keeper 13 relative to bearing part 30 slides into certain distance Afterwards, drain spout 131 leaves bearing part 30, and the bottle in drain spout 131 is fallen at drain spout 131 under gravity. Bottle stopper and bottle assembling process are corresponded to, swing arm 20 is rotated forward, rack 42 is moved, and the bottle in drain spout 131 exists Slided on bearing part, bottle is moved close to hinge bar 12, after swing arm 20 turns to predeterminated position, namely bottle stopper and bottle pair Behind position, being rotated further swing arm 20 makes bottle stopper be pressed into the bottleneck of bottle, and bearing part is located at the lower section of drain spout 131 during being somebody's turn to do, Play a part of supporting bottle, realize the action of the bottleneck of bottle stopper press-in bottle;After being completed, namely bottle stopper is pressed into bottle After body, swing arm 20 is rotated backward, the bottle for completing assembling is slided away from hinge bar 12 on the load bearing member 30, when sliding into material leakage When mouth 131 leaves the position of bearing part 30, bottle is fallen at drain spout 131, realizes automatic blanking.Swing arm is rotated forward again 20, the first keeper 13 is slid into above bearing part, adds new bottle and bottle stopper, carries out the assembling of next bottle, So circulation.Obviously, for the ease of the transport of bottle, conveying assembly 60 is set below drain spout 131, for example, can be Conveyer belt assembly.
The transmission mechanism 40 that the present embodiment is formed using gear 41 with rack 42 can realize bottle in combination with lever principle Body and the quick assembling of bottle stopper and quickly discharging material, whole process are easy to operate, substantially increase efficiency.
During practical operation, height of the bearing part 30 relative to drain spout 131 can be adjusted according to the height of bottle, is operated It is convenient, flexible, it is wide using scope.
In other embodiments, swing arm 20 can be fixedly connected with hinge bar 12, and hinge bar 12 passes through bearing and two Support unit 111 rotates connection, can equally realize the bottle cap on swing arm 20 and the bottle in supporting table 10 Complete assembling.
In other embodiments, gear 41 can be designed as partial gear 41, after bottle stopper is contacted with bottle, this When, swing arm 20 is rotated further band moving gear 41 and rotated, and gear 41 is rotated and slided without carry-over bar 42, and swing arm 20 continues to turn Bottle stopper is pressed in the bottleneck of bottle by dynamic realize.
Referring to Fig. 4, in other embodiments, in order to ensure the cooperation degree of accuracy of bottle stopper and bottle, in the first keeper Elastic wall 134 is set on 13, and elastic wall 134 is located in positioning hole, and after bottle is arranged in positioning hole, elastic wall 134 makes bottle The movement tendency away from hinge bar 12 with the length direction along rack 42.After swing arm 20 turns to predeterminated position, bottle stopper Contacted with bottle, bottle stopper part is inserted into the bottleneck of bottle, be rotated further swing arm 20, being capable of band in the presence of bottle stopper Dynamic bottle extruding elastic wall 134, bottle moves a segment distance together with bottle stopper, in bottle stopper and bottle complete inserting engagement process The position of bottle stopper and bottle can be adjusted automatically, improve the assembling quality of bottle stopper and bottle.Elastic wall 134 can be steel The shell fragment being made, can be combined by spring and platy structure.
Medicine bottle system of processing embodiment
A kind of medicine bottle system of processing is present embodiments provided, including the bottle stopper that above-described embodiment is provided installs equipment, by bottle After plug and bottle are machined respectively, transported to bottle stopper and installed at equipment using conveying equipment, bottle and bottle stopper are completed to assemble.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of bottle stopper installs equipment, it is characterised in that the first keeper including supporting table, for positioning bottle, for fixed The second keeper, bearing part, swing arm and the transmission mechanism of position bottle stopper, the transmission mechanism include gear and rack, institute Pinion rotation is stated in the supporting table, the rack is engaged with the gear, and the rack is slidably connected to the branch Support platform;
First keeper has drain spout, and first keeper is connected to the rack, and the bearing part is arranged on institute State in supporting table, first keeper is optionally supported relative to bearing part described in the supporting table sliding process to be located at Bottle in the drain spout;
Second keeper is installed on the swing arm, and the swing arm is articulated with the supporting table, the swing arm and institute State gear synchronous rotate connection, the swing arm relative to can make in the supporting table rotation process be located at described first positioning Bottle in part is connected with the bottle stopper inserting in second keeper.
2. bottle stopper according to claim 1 installs equipment, it is characterised in that the supporting table includes support frame and is hinged Bar, the hinge bar is arranged on support frame as described above, and the gear is set in outside the hinge bar, and the gear is hinged with described Bar rotates connection, and the swing arm is fixed on the gear.
3. bottle stopper according to claim 2 installs equipment, it is characterised in that support frame as described above includes two be oppositely arranged Individual support unit, two support units are connected by the hinge bar.
4. bottle stopper according to claim 3 installs equipment, it is characterised in that each support unit includes the first support Leg, the second supporting leg and the connection leg between first supporting leg and the second supporting leg, one end that the connection is moved back It is connected with first supporting leg, the other end of the connection leg is connected with second supporting leg, and the hinge bar is connected to At the link position of first supporting leg and the connection leg.
5. bottle stopper according to claim 4 installs equipment, it is characterised in that first keeper includes having positioning hole Positioning tube, two apertures of the positioning hole are respectively on two end faces of the axis direction of the positioning tube.
6. bottle stopper according to claim 5 installs equipment, it is characterised in that first keeper also includes two symmetrically The flanging turned up set, the symmetry axis of two flangings is the axis of the positioning tube, and two flangings are located at The positioning tube it is same diametrically, two flangings, which are corresponded, is slidably connected to two connection legs.
7. bottle stopper according to claim 6 installs equipment, it is characterised in that the flanging is arc tabular.
8. bottle stopper according to claim 4 installs equipment, it is characterised in that the transmission mechanism also includes two connection groups Part, each connection component includes slip cap, and the slip cap is set in outside the connection leg, and the rack is installed on two On the individual slip cap.
9. bottle stopper according to claim 4 installs equipment, it is characterised in that the bottle stopper is installed equipment and also stretched including two Contracting part, the bearing part is connected one to one by two extensible members with two connection legs, two extensible members It is opposing parallel to set.
10. a kind of medicine bottle system of processing, it is characterised in that install and set including the bottle stopper according to claim any one of 1-9 It is standby.
CN201710559108.8A 2017-07-11 2017-07-11 Bottle plug mounting equipment and medicine bottle processing system Active CN107176568B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710559108.8A CN107176568B (en) 2017-07-11 2017-07-11 Bottle plug mounting equipment and medicine bottle processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710559108.8A CN107176568B (en) 2017-07-11 2017-07-11 Bottle plug mounting equipment and medicine bottle processing system

Publications (2)

Publication Number Publication Date
CN107176568A true CN107176568A (en) 2017-09-19
CN107176568B CN107176568B (en) 2022-11-15

Family

ID=59845811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710559108.8A Active CN107176568B (en) 2017-07-11 2017-07-11 Bottle plug mounting equipment and medicine bottle processing system

Country Status (1)

Country Link
CN (1) CN107176568B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB421265A (en) * 1933-03-13 1934-12-13 Paul Wintenberger Improvements relating to corking machines
FR2572378A3 (en) * 1984-10-26 1986-05-02 Larix Srl Manual lever-type corking device with improved hinge system for the insertion of corks into bottles
CN2094541U (en) * 1991-06-08 1992-01-29 李祖修 Cork setting machine
JPH0621885U (en) * 1992-08-25 1994-03-22 株式会社モリ・エンジニアリング Cutting machine
CN101734587A (en) * 2008-11-14 2010-06-16 中国长城葡萄酒有限公司 Multi-bottle type manual cork pressing device
CN103879933A (en) * 2012-12-21 2014-06-25 上海市航头学校 Double-rack wine stopper plugging device
CN204873772U (en) * 2015-06-24 2015-12-16 永泰县丘山酒业有限责任公司 Stopper machine is made to domestic fruit wine cork
CN105170828A (en) * 2015-09-18 2015-12-23 济南准冠试验仪器有限公司 Multifunctional press machine
CN206915717U (en) * 2017-07-11 2018-01-23 中英阿诺康(宁夏)生物科技有限公司 Bottle stopper installs equipment and medicine bottle system of processing

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB421265A (en) * 1933-03-13 1934-12-13 Paul Wintenberger Improvements relating to corking machines
FR2572378A3 (en) * 1984-10-26 1986-05-02 Larix Srl Manual lever-type corking device with improved hinge system for the insertion of corks into bottles
CN2094541U (en) * 1991-06-08 1992-01-29 李祖修 Cork setting machine
JPH0621885U (en) * 1992-08-25 1994-03-22 株式会社モリ・エンジニアリング Cutting machine
CN101734587A (en) * 2008-11-14 2010-06-16 中国长城葡萄酒有限公司 Multi-bottle type manual cork pressing device
CN103879933A (en) * 2012-12-21 2014-06-25 上海市航头学校 Double-rack wine stopper plugging device
CN204873772U (en) * 2015-06-24 2015-12-16 永泰县丘山酒业有限责任公司 Stopper machine is made to domestic fruit wine cork
CN105170828A (en) * 2015-09-18 2015-12-23 济南准冠试验仪器有限公司 Multifunctional press machine
CN206915717U (en) * 2017-07-11 2018-01-23 中英阿诺康(宁夏)生物科技有限公司 Bottle stopper installs equipment and medicine bottle system of processing

Also Published As

Publication number Publication date
CN107176568B (en) 2022-11-15

Similar Documents

Publication Publication Date Title
EP0689904A1 (en) Glove box
CN206915717U (en) Bottle stopper installs equipment and medicine bottle system of processing
CN106141380A (en) A kind of all-directional robot welding
CN211302565U (en) Industrial waste gas adsorbs processing apparatus
CN107176568A (en) Bottle stopper installs equipment and medicine bottle system of processing
CN215220438U (en) 110KV mutual inductor supporting flange
CN109718973A (en) A kind of paint-spray robot
CN113264489A (en) Food packaging machinery
CN208859171U (en) A kind of inner liner stainless steel movable pipe joint facilitating installation
CN210860627U (en) Emergency reaction container
CN206915718U (en) Bottle stopper installing mechanism and medicine bottle system of processing
CN208985818U (en) A kind of box type transformer easy to remove
CN108816841B (en) A kind of intelligent cleaning device
TWI687618B (en) Adapter and device for automatic replacement adapter
CN104058142B (en) A kind of filling apparatus possessing Quick Changeover function
CN209064744U (en) A kind of full-automatic withdrawing device of medical cotton stick
CN209444924U (en) A kind of chemical industry effluent outfall
CN104189978A (en) Assembling device for flow velocity regulator of infusion apparatus
CN218011929U (en) Organic waste gas condensation recovery plant
CN216279887U (en) Waste gas treatment conveying device for environment-friendly equipment
CN211189171U (en) Quick blowing device of rectifying column raffinate
CN204819298U (en) Dysmorphism spanner
CN216459520U (en) Steel wire flaw detection point identification paint spraying apparatus
CN211226292U (en) Automatic ink bottle filling device
CN218408566U (en) Large-diameter spray-guiding sampling valve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant