CN107174913A - A kind of multistage integratedization coking emission-control equipment - Google Patents
A kind of multistage integratedization coking emission-control equipment Download PDFInfo
- Publication number
- CN107174913A CN107174913A CN201710619398.0A CN201710619398A CN107174913A CN 107174913 A CN107174913 A CN 107174913A CN 201710619398 A CN201710619398 A CN 201710619398A CN 107174913 A CN107174913 A CN 107174913A
- Authority
- CN
- China
- Prior art keywords
- section
- spray
- grades
- absorption
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D50/00—Combinations of methods or devices for separating particles from gases or vapours
- B01D50/40—Combinations of devices covered by groups B01D45/00 and B01D47/00
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/34—Chemical or biological purification of waste gases
- B01D53/46—Removing components of defined structure
- B01D53/60—Simultaneously removing sulfur oxides and nitrogen oxides
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/34—Chemical or biological purification of waste gases
- B01D53/74—General processes for purification of waste gases; Apparatus or devices specially adapted therefor
- B01D53/75—Multi-step processes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/34—Chemical or biological purification of waste gases
- B01D53/74—General processes for purification of waste gases; Apparatus or devices specially adapted therefor
- B01D53/77—Liquid phase processes
- B01D53/79—Injecting reactants
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2251/00—Reactants
- B01D2251/10—Oxidants
- B01D2251/11—Air
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2251/00—Reactants
- B01D2251/20—Reductants
- B01D2251/206—Ammonium compounds
- B01D2251/2067—Urea
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2258/00—Sources of waste gases
- B01D2258/02—Other waste gases
- B01D2258/0283—Flue gases
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- Analytical Chemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Separating Particles In Gases By Inertia (AREA)
- Treating Waste Gases (AREA)
Abstract
A kind of multistage integratedization coking emission-control equipment, belongs to coking waste gas treatment equipment field.It is characterized in that:Pre- dedusting section(2), one-level spray-absorption section(3)With two grades of spray-absorption sections(4)It is integral inclined to set;Two grades of spray-absorption sections(4)With one-level spray-absorption section(3)Between be provided with one-level transition apparatus(5), two grades of spray-absorption sections(4)The other end connects gas-liquid separation discharger(6).The multistage integratedization coking emission-control equipment of the present invention is integrally inclined, the effective residence time for extending one-level spray-absorption section and the liquid in two grades of spray-absorption sections, the burnt ash-laden gas dust removal process of system is combined by the present invention with waste gas pollution control and treatment process, independent desulphurization denitration process is not only suitable for, the situation of combined desulfurization and denitration also is adapted for;The present invention has also broken away from the limitation for the treatment of quantity simultaneously, has the advantages that small investment, the scope of application are wide, equipment is simple, easily controllable.
Description
Technical field
A kind of multistage integratedization coking emission-control equipment, belongs to coking waste gas treatment equipment field.
Background technology
China is the complicated country of an energy resource structure, but at present, coal and oil product consumption exist always
In occupation of consequence in China's energy resource structure.In conventional petroleum technique, coking process is always a kind of important residual oil
Process, bears the lighting of heavy oil, and one of its product petroleum coke is widely used in steel, metal refining industry, at present
Progressively develop in terms of new material is produced.On the other hand, the rich coal resources of China, are recognizing coal resources high efficiency profit
With and grade of oil severeization and petroleum industry price upheaval, the development of Chemical Industry is increasingly by every country
Attention.One of important means that carbonization of coal is converted as coal, meeting product market will go to the high-quality of coke chemicals, together
When coke chemicals coke be always social heavy industry development high requirement product.Since 21 century, China's chemical industry stone
Oil and coal industry occur advancing side by side the trend of development, and either residuum coking or carbonization of coal is all born important
Mission, but coking industry is also one high consumption, highly water intensive and high pollution industry, deals carefully with technology waste gas and environment
Relation pair national economic stability and energy security guarantee have great importance.
The pollution control problem in chemical industry coking field can not be ignored as China's prevention and cure of pollution problem.It can be produced in coking
Raw many pollution environment and the toxic gas for damaging human physical and mental health, such as SO2And NOxAcid rain can be formed by being discharged into air
Or acid mist, while can also damage the ozone layer and wait simultaneously, be accompanied by during system is burnt greatly with hydrocarbon formation optical smoke
Amount dust pollution thing is discharged into air, once amount is big and spreads apart to suck respiratory tract by people, can cause breathing problem.
According to national environmental protection method and《Coking chemistry emission of industrial pollutants standard》Regulation, discharge waste gas in particulate matter, sulfur dioxide and
The concentration of nitride should be strict controlled in Solid≤50mg/m3, SO2≤50mg/m3And NOx≤500mg/m3.The burnt flue gas of system is different
In other waste gas, its dust-laden, SO2Content is not high, NOxContent is unstable, and flue-gas temperature is at 160 DEG C ~ 300 DEG C, existing waste gas
Reason mode is broadly divided into independent desulphurization denitration, and joint carries out desulphurization denitration, and its subject matter is exactly not account in flue gas
The processing of grain pollutant and floor space are big, and cost of equipment is high, and operating maintenance expense is big, and it is empty that the field possesses certain lifting
Between.
The content of the invention
The technical problems to be solved by the invention are:The deficiencies in the prior art are overcome there is provided a kind of three-in-one integrated, it is synchronous
Particulate pollutant, desulphurization denitration in flue gas are handled, the multistage one of floor space and equipment investment expense and maintenance cost is reduced
Body coking emission-control equipment.
The technical solution adopted for the present invention to solve the technical problems is:A kind of multistage integratedization coking exhaust-gas treatment dress
Put, it is characterised in that:Including the pre- dedusting section being linked in sequence, one-level spray-absorption section and two grades of spray-absorptions sections, pre- dedusting section,
One-level spray-absorption section and two grades of integral inclined settings of spray-absorption section;Between two grades of spray-absorption sections and one-level spray-absorption section
Provided with one-level transition apparatus, two grades of spray-absorption section other end connection gas-liquid separation dischargers.
The present invention is used as support using support so that multistage integratedization coking emission-control equipment is integrally inclined,
So as to effectively extend the residence time of the liquid in one-level spray-absorption section and two grades of spray-absorption sections, one-level spray-absorption
Absorbing liquid in section and two grades of spray-absorption sections can sufficiently absorb the SO2 and NOx in waste gas.Furthermore, using multistage
Progressively the pattern of advanced treating, of the invention to be combined the burnt ash-laden gas dust removal process of system with waste gas pollution control and treatment process, is not only suitable for
Independent desulphurization denitration process, also is adapted for the situation of combined desulfurization and denitration;The present invention has also broken away from the limitation for the treatment of quantity simultaneously,
In face of the difference of processing, there can be different embodiments.The present invention has small investment, the scope of application is wide, equipment is simple, be easy to
The advantages of control.
Described pre- dedusting section includes dedusting cone section, the first air entraining pipe, ash-laden gas entrance and dedusting reaction straight section,
Dedusting cone section top connection dedusting reaction straight section, dedusting reaction straight section top side enters provided with tangentially-arranged ash-laden gas pipeline
Mouthful, dedusting reaction straight section upper inner installs the first air entraining pipe, and the first air entraining pipe top connects two grades of spray-absorption sections.
The burnt ash-laden gas of system enters pre- dedusting section, ash-laden gas entrance and pre- dedusting section from ash-laden gas entrance
Tangent, due to the effect of centrifugal force, dust granules slide along side wall and finally discharged from dedusting cone section, and gas componant is then due to the conical surface
Section shrinkage effect then move obliquely, one-level spray-absorption section is passed through by the first air entraining pipe.Dedusting cone section is drawn with first
Play pipe to be engaged, can both complete the purpose of rough dusting, the purpose for drawing gas componant is reached again.
The first described air entraining pipe is provided with two or more, and two the first air entraining pipes are axially set along dedusting reaction straight section
Put.It is preferred that, the arrangement mode of the first air entraining pipe arrangement mode and the second air entraining pipe is identical, one-level spray-absorption section and two grades of sprays
Drench absorber portion join domain and only design two air entraining pipes, its boundary face closure prevents gas band liquid from acting on.
Described one-level spray-absorption section includes one-level and delays the slow pendular ring of pendular ring tangential inlet, one-level, one-level spray-absorption section
Nozzle, reverse stator, first order absorption area and one-level spray delivery line, described pre- dedusting section outlet and first order absorption area entrance it
Between delay pendular ring provided with one-level, one-level delays pendular ring side and delays pendular ring tangential inlet provided with one-level, and the outlet of first order absorption area passes through reverse
Stator connection one-level spray delivery line, and one-level delays pendular ring inner side provided with multiple one-level spray-absorptions section nozzle.
Described two grades of spray-absorptions section include two grades of spray-absorptions section nozzles, two grades of slow pendular ring tangential inlets, two grades delay
Pendular ring, atomized liquid tangential inlet and two grades of uptake zones, the porch of two grades of uptake zones provided with two grades of slow pendular rings, two grades of slow pendular rings
Lower section is provided with atomized liquid tangential inlet provided with multiple two grades of spray-absorptions section nozzle, the inner side of two grades of slow pendular rings, and two grades of sprays are inhaled
Section nozzle side is received provided with two grades of slow pendular ring tangential inlets.
It is atomized liquid pipe and tangential inlet is set, it is ensured that atomized liquid is by larger shear action so that liquid crushing effect is good,
Increase gas liquid interfacial area, and have enough centrifugal force so that atomized liquid becomes wall.
Described atomized liquid tangential inlet axial direction be arranged in parallel with two grades of slow pendular ring tangential inlets.
Described one-level transition apparatus includes one-level spray-absorption section discharging tube, the second air entraining pipe and First Transition taper
Section, one-level spray-absorption section discharging tube is arranged on the top side of described one-level spray-absorption section, and is set with its exit normal
Put, First Transition conical section two ends are respectively communicated with the outlet of one-level spray-absorption section and the entrance of two grades of spray-absorptions sections, the
One transition conical section is provided with multiple second air entraining pipes.
Described gas-liquid separation discharger includes two grades of spray-absorption section discharging tubes, blast pipe, second transition conical sections
And discharge pipe, the second transition conical section is connected to discharge pipe porch, and discharge pipe exit side is provided with vertically disposed two grades
Spray-absorption section discharging tube, discharge pipe exit top connection blast pipe.
One-level transition apparatus and gas-liquid separation discharger are respectively equipped with transition conical section, and main function is to make gas componant
In the change of pipe diameter, by different size of centrifugal action, so as to reach in one-level spray-absorption section and two grades of sprays
Drenching has shorter residence time and higher separative efficiency in absorber portion, and has longer in two grades of spray-absorption section uptake zones
Residence time.
The cone angle of the second described transition conical section is between 20 ° ~ 75 °.
The common connecting bracket in bottom of described pre- dedusting section, one-level spray-absorption section and two grades of spray-absorption sections, and branch
The top mounting surface of frame is is obliquely installed, and the angle of inclination of mounting surface is 30 ~ 40 degree.Cradle top mounting surface is obliquely installed, from
And causing the residence time increase of liquid in one-level spray-absorption section and two grades of spray-absorption sections, absorbing liquid can sufficiently absorb
SO2 and NOx in waste gas.
Compared with prior art, the present invention is had an advantageous effect in that:The present invention is used as support using support so that many
The integrated coking emission-control equipment of level is integrally inclined, so as to effectively extend one-level spray-absorption section and two grades of sprays
Absorbing liquid in the residence time of the liquid drenched in absorber portion, one-level spray-absorption section and two grades of spray-absorption sections can be sufficient
Absorb the SO2 and NOx in waste gas.Furthermore, using the pattern of multistage progressively advanced treating, the present invention will the burnt dust constaining of system
Gas dust removal process is combined with waste gas pollution control and treatment process, is not only suitable for independent desulphurization denitration process, also is adapted for combined desulfurization and denitration
Situation;The present invention has also broken away from the limitation for the treatment of quantity simultaneously, in face of the difference of processing, can there is different embodiments.
The present invention has the advantages that small investment, the scope of application are wide, equipment is simple, easily controllable.
When the burnt amount of sulfur contenting in smoke of system is little, reach that flue gas ash removal is acted on by dedusting section first, gas componant is passing through
During one-level spray-absorption section, desulfurized effect is reached in uptake zone first with absorbing liquid, by the effect of reverse stator, is obtained larger
Axial velocity and tangential velocity, to obtain preferable separating effect, residual gas composition passes through two grades of spray-absorption Duan Shiyu
Absorbing liquid reaches denitration effect in uptake zone, and final liquid composition is discharged by discharging tube, and purification gas is discharged by blast pipe.
When the burnt amount of sulfur contenting in smoke of system is larger, now, absorbing liquid and simultaneous SO_2 and NO removal liquid is used, one-level spray-absorption section is as pre-
Absorber portion, two grades of spray-absorption sections are used as deep desulfuration denitration section.
Brief description of the drawings
Fig. 1 is multistage integratedization coking emission-control equipment structural representation.
Fig. 2 is Fig. 1 A-A schematic cross-sectional views.
Fig. 3 is Fig. 1 B-B schematic cross-sectional views.
Fig. 4 is the second air entraining pipe schematic view of the mounting position.
Wherein, 1, support 2, pre- dedusting section 201, dedusting cone section 202, the first air entraining pipe 203, ash-laden gas pipeline enter
Mouth 204, dedusting reaction straight section 3, one-level spray-absorption section 301, one-level delay pendular ring tangential inlet 302, one-level and delay pendular ring
303rd, one-level spray-absorption section nozzle 304, reverse stator 305, first order absorption area 306, one-level spray delivery line 4, two grades
Spray-absorption section 401, two grades of spray-absorption section nozzles 402, two grades of slow pendular ring tangential inlets 403, two grades of slow pendular rings 404,
Atomized liquid tangential inlet 405, two grades of uptake zones 5, one-level transition apparatus 501, one-level spray-absorption section discharging tube 502, the
Two air entraining pipes 503, First Transition conical section 6, gas-liquid separation discharger 601, two grades of spray-absorptions section discharging tube 602,
Blast pipe 603, the second transition conical section 604, discharge pipe.
Embodiment
Fig. 1 ~ 4 are highly preferred embodiment of the present invention, and 1 ~ 4 the present invention will be further described below in conjunction with the accompanying drawings.
Embodiment 1
Referring to the drawings 1 ~ 4:A kind of multistage integratedization coking emission-control equipment, including the pre- dedusting section 2, the one-level that are linked in sequence are sprayed
Absorber portion 3 and two grades of spray-absorption sections 4 are drenched, the bottom of pre- dedusting section 2, one-level spray-absorption section 3 and two grades of spray-absorption sections 4 is total to
Top mounting surface with connecting bracket 1, and support 1 is to be obliquely installed;Two grades of spray-absorptions section 4 and one-level spray-absorption section 3 it
Between be provided with one-level transition apparatus 5, two grades of spray-absorptions section 4 other ends connection gas-liquid separation dischargers 6.The top peace of support 1
The angle of inclination in dress face is 30 ~ 40 degree.
Pre- dedusting section 2 includes dedusting cone section 201, the first air entraining pipe 202, ash-laden gas entrance 203 and dedusting reaction
Straight section 204, dedusting cone section 201 top connection dedusting reaction straight section 204, dedusting reaction straight section 204 top side, which is provided with, tangentially to be set
The ash-laden gas entrance 203 put, dedusting reaction straight section 204 upper inner installs the first air entraining pipe 202, the first air entraining pipe
202 tops connect two grades of spray-absorption sections 4.First air entraining pipe 202 is provided with two or more, and two equal edges of the first air entraining pipe 202
Dedusting reaction straight section 204 is axially arranged.Dedusting cone section 201 is that upper opening is big, the small inverted cone-shaped structure of lower openings.
One-level spray-absorption section 3 includes one-level and delays the slow pendular ring 302 of pendular ring tangential inlet 301, one-level, one-level spray-absorption section
Nozzle 303, reverse stator 304, first order absorption area 305 and one-level spray delivery line 306, the pre- outlet of dedusting section 2 and first order absorption
Delay pendular ring 302 provided with one-level between the entrance of area 305, one-level delays the side of pendular ring 302 and delays pendular ring tangential inlet 301, one provided with one-level
The outlet of level uptake zone 305 connects one-level by reverse stator 304 and sprays delivery line 306, and one-level delays the inner side of pendular ring 302 provided with many
Individual one-level spray-absorption section nozzle 303.
Two grades of spray-absorptions section 4 include two grades of spray-absorptions section nozzles 401, two grades of slow pendular ring tangential inlets 402, two grades delay
Pendular ring 403, atomized liquid tangential inlet 404 and two grades of uptake zones 405, the porch of two grades of uptake zones 405 is provided with two grades of slow pendular rings
403, the lower section of two grades of slow pendular rings 403 is provided with multiple two grades of spray-absorptions section nozzle 401, and the inner side of two grades of slow pendular rings 403 is provided with
Atomized liquid tangential inlet 404, two grades of spray-absorption section nozzle 401 sides are provided with two grades of slow pendular ring tangential inlets 402.Atomized liquid is cut
It is be arranged in parallel to the axial direction of entrance 404 with two grades of slow pendular ring tangential inlets 402.
One-level transition apparatus 5 includes one-level spray-absorption section discharging tube 501, the second air entraining pipe 502 and First Transition taper
Section 503, one-level spray-absorption section discharging tube 501 is arranged on the top side of described one-level spray-absorption section 3, and is exported with it
Be vertically arranged, the two ends of First Transition conical section 503 be respectively communicated with one-level spray-absorption section 3 outlet and two grades of spray-absorptions sections 4
Entrance, on First Transition conical section 503 be provided with multiple second air entraining pipes 502.
Gas-liquid separation discharger 6 includes two grades of spray-absorption section discharging tubes 601, blast pipe 602, second transition conical sections
603 and discharge pipe 604, the second transition conical section 603 is connected to the porch of discharge pipe 604, and the exit side of discharge pipe 604 is provided with
Vertically disposed two grades of spray-absorptions section discharging tube 601, the exit top of discharge pipe 604 connection blast pipe 602.Second transition is bored
The cone angle of shape section 603 is between 20 ° ~ 75 °.
The incline direction of First Transition conical section 503 and the second transition conical section 603 is oppositely arranged, specifically, the first mistake
It is that upper opening is big to cross conical section 503, and the small back taper of lower openings is set, and the second transition conical section 603 is that upper opening is small,
The big taper of lower openings is set.
The course of work and operation principle:The burnt ash-laden gas of system enters pre- dedusting section, dust-laden from ash-laden gas entrance 203
Flue entrance 203 and pre- dedusting section 2 are tangent, due to the effect of centrifugal force, and dust granules slide final from dedusting along side wall
Cone section 201 is discharged, and gas componant then transfers to move obliquely due to the section shrinkage effect of the conical surface, is led to by the first air entraining pipe 202
Enter one-level spray-absorption section 3.In one-level spray-absorption section 3, urea/air delays pendular ring tangential inlet 301 through one-level and is introduced into one
The slow pendular ring 302 of level, now fluid possess certain dynamic head, absorbing liquid is sprayed into by three one-level spray-absorption section nozzles 303
First order absorption area 305, one-level spray-absorption section arrangement such as Fig. 2 of nozzle 303, delays near pendular ring tangential inlet 301 in one-level
The reason for not arranging nozzle is to prevent short-circuit flow.Because annular cutting type design ensures that absorbing liquid kinetic energy is big, preferable atomization is reached
Effect, the waste gas entered in the absorbing liquid of first order absorption area 305 and the first air entraining pipe 202 carries out preliminary desulphurization denitration process, afterwards
By reverse stator 304, liquid component is acted on by more high centrifugal force, and final liquid composition can be quick from one-level spray-absorption section
Discharging tube 501 is discharged, and gas componant enters two grades of spray-absorption sections 4 through the second air entraining pipe 502.
In two grades of spray-absorption sections 4, urea/air is introduced into two grades of slow pendular rings through two grades of slow pendular ring tangential inlets 402
403, preferable atomizing effect is reached by two grades of spray-absorption section nozzles 401, then enter two grades by atomized liquid tangential inlet 404
Uptake zone 405 and one-level spray-absorption section 3 and the gas componant reaction that comes and the purpose for reaching deep desulfuration denitration, last liquid stream
Discharged under the wall effect that becomes of centrifugal force by two grades of spray-absorption section discharging tubes 601, purification gas is discharged by blast pipe 602.
Embodiment 2
The outlet of one-level spray-absorption section discharging tube 501 and two grades of spray-absorption section discharging tubes 601 can be connected by pipeline reclaims
The discharge that device, the discharge liquor that one-level spray-absorption section discharging tube 501 is discharged and two grades of spray-absorption section discharging tubes 601 are discharged
Liquid can be again discharged into one-level spray-absorption section 3 as the circulation fluid of the preliminary desulphurization denitration of one-level spray-absorption section 3.
Embodiment described above 1 is adapted to sulfur-bearing composition and is more or less the same with composition containing nitre, and the larger situation of amount;Or containing nitre
Composition too big situation.Embodiment 2 is adapted to the relatively low situation of composition containing nitre.The present invention will make burnt ash-laden gas dust removal process and useless
Gas governance process is combined, and is not only suitable for independent desulphurization denitration process, also is adapted for the situation of combined desulfurization and denitration;It is simultaneously of the invention
Also the limitation for the treatment of quantity has been broken away from, in face of the difference of processing, there can be different embodiments.The present invention has investment
Less, the scope of application is wide, equipment is simple, it is easily controllable the advantages of.
The above described is only a preferred embodiment of the present invention, being not the limitation for making other forms to the present invention, appoint
What those skilled in the art changed or be modified as possibly also with the technology contents of the disclosure above equivalent variations etc.
Imitate embodiment.But it is every without departing from technical solution of the present invention content, the technical spirit according to the present invention is to above example institute
Any simple modification, equivalent variations and the remodeling made, still fall within the protection domain of technical solution of the present invention.
Claims (10)
1. a kind of multistage integratedization coking emission-control equipment, it is characterised in that:Including the pre- dedusting section being linked in sequence(2), one
Level spray-absorption section(3)With two grades of spray-absorption sections(4), pre- dedusting section(2), one-level spray-absorption section(3)Inhaled with two grades of sprays
Receive section(4)It is integral inclined to set, two grades of spray-absorption sections(4)With one-level spray-absorption section(3)Between be provided with one-level transition apparatus
(5), two grades of spray-absorption sections(4)The other end connects gas-liquid separation discharger(6).
2. one kind multistage integratedization coking emission-control equipment according to claim 1, it is characterised in that:It is described pre- to remove
Dirt section(2)Section is bored including dedusting(201), the first air entraining pipe(202), ash-laden gas entrance(203)Straight section is reacted with dedusting
(204), dedusting cone section(201)Top connection dedusting reaction straight section(204), dedusting reaction straight section(204)Top side is provided with and cut
To the ash-laden gas entrance of setting(203), dedusting reaction straight section(204)Upper inner installs the first air entraining pipe(202), the
One air entraining pipe(202)Top connects two grades of spray-absorption sections(4).
3. one kind multistage integratedization coking emission-control equipment according to claim 2, it is characterised in that:Described first
Air entraining pipe(202)Provided with two or more, and two the first air entraining pipes(202)Straight section is reacted along dedusting(204)It is axially arranged.
4. one kind multistage integratedization coking emission-control equipment according to claim 1, it is characterised in that:Described one-level
Spray-absorption section(3)Delay pendular ring tangential inlet including one-level(301), one-level delay pendular ring(302), one-level spray-absorption section nozzle
(303), reverse stator(304), first order absorption area(305)Delivery line is sprayed with one-level(306), described pre- dedusting section(2)Go out
Mouth and first order absorption area(305)Delay pendular ring provided with one-level between entrance(302), one-level delays pendular ring(302)Side is slow provided with one-level
Pendular ring tangential inlet(301), first order absorption area(305)Outlet passes through reverse stator(304)Connect one-level spray delivery line
(306), and one-level delays pendular ring(302)Inner side is provided with multiple one-level spray-absorptions section nozzle(303).
5. one kind multistage integratedization coking emission-control equipment according to claim 1, it is characterised in that:Described two grades
Spray-absorption section(4)Including two grades of spray-absorption section nozzles(401), two grades of slow pendular ring tangential inlets(402), two grades of slow pendular rings
(403), atomized liquid tangential inlet(404)With two grades of uptake zones(405), two grades of uptake zones(405)Porch provided with two grades delay
Pendular ring(403), two grades of slow pendular rings(403)Lower section provided with multiple two grades of spray-absorptions section nozzle(401), two grades of slow pendular rings
(403)Inner side be provided with atomized liquid tangential inlet(404), two grades of spray-absorption section nozzles(401)Side is provided with two grades of slow pendular rings
Tangential inlet(402).
6. one kind multistage integratedization coking emission-control equipment according to claim 5, it is characterised in that:Described atomization
Liquid tangential inlet(404)Axial direction and two grades of slow pendular ring tangential inlets(402)It is arranged in parallel.
7. one kind multistage integratedization coking emission-control equipment according to claim 1, it is characterised in that:Described one-level
Transition apparatus(5)Including one-level spray-absorption section discharging tube(501), the second air entraining pipe(502)With First Transition conical section
(503), one-level spray-absorption section discharging tube(501)It is arranged on described one-level spray-absorption section(3)Top side, and and its
Exit normal is set, First Transition conical section(503)Two ends are respectively communicated with one-level spray-absorption section(3)Outlet and two grades spray
Absorber portion(4)Entrance, in First Transition conical section(503)It is provided with multiple second air entraining pipes(502).
8. one kind multistage integratedization coking emission-control equipment according to claim 1, it is characterised in that:Described gas-liquid
Separate discharger(6)Including two grades of spray-absorption section discharging tubes(601), blast pipe(602), the second transition conical section(603)
And discharge pipe(604), the second transition conical section(603)It is connected to discharge pipe(604)Porch, discharge pipe(604)Exit one
Side is provided with vertically disposed two grades of spray-absorptions section discharging tube(601), discharge pipe(604)Exit top connects blast pipe
(602).
9. one kind multistage integratedization coking emission-control equipment according to claim 8, it is characterised in that:Described second
Transition conical section(603)Cone angle be 20 ° ~ 75 ° between.
10. one kind multistage integratedization coking emission-control equipment according to claim 1, it is characterised in that:Described is pre-
Dedusting section(2), one-level spray-absorption section(3)With two grades of spray-absorption sections(4)The common connecting bracket in bottom(1), and support(1)
Top mounting surface to be obliquely installed, the angle of inclination of mounting surface is 30 ~ 40 degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710619398.0A CN107174913B (en) | 2017-07-26 | 2017-07-26 | Multistage integrated coking waste gas treatment device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710619398.0A CN107174913B (en) | 2017-07-26 | 2017-07-26 | Multistage integrated coking waste gas treatment device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107174913A true CN107174913A (en) | 2017-09-19 |
CN107174913B CN107174913B (en) | 2022-11-11 |
Family
ID=59838562
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710619398.0A Active CN107174913B (en) | 2017-07-26 | 2017-07-26 | Multistage integrated coking waste gas treatment device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107174913B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110624347A (en) * | 2019-08-23 | 2019-12-31 | 上海超高环保科技股份有限公司 | Multi-stage water-spraying dust-removing, dewatering, demisting and purifying device and method |
CN111346479A (en) * | 2020-03-16 | 2020-06-30 | 上海化工研究院有限公司 | Marine diesel engine waste gas foam washing cooling dust removal desulfurization integrated device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000061237A (en) * | 1998-08-18 | 2000-02-29 | Honda Lock Mfg Co Ltd | Wet type dust collector |
CN203155019U (en) * | 2013-02-20 | 2013-08-28 | 江苏克莱斯克能源装备有限公司 | Exhaust gas purifier |
CN103418227A (en) * | 2012-05-23 | 2013-12-04 | 现代自动车株式会社 | System for pre-treating malodorous substances in pollution control facility |
CN103463910A (en) * | 2013-09-02 | 2013-12-25 | 浙江天蓝环保技术股份有限公司 | Comprehensive treatment device and method for cooling desulfurization of high-temperature and high-humidity flue gas |
CN105013312A (en) * | 2015-07-27 | 2015-11-04 | 航天环境工程有限公司 | Desulfurization and denitration integration absorbing device and application |
CN207119229U (en) * | 2017-07-26 | 2018-03-20 | 中国石油大学(华东) | A kind of multistage integratedization coking emission-control equipment |
-
2017
- 2017-07-26 CN CN201710619398.0A patent/CN107174913B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000061237A (en) * | 1998-08-18 | 2000-02-29 | Honda Lock Mfg Co Ltd | Wet type dust collector |
CN103418227A (en) * | 2012-05-23 | 2013-12-04 | 现代自动车株式会社 | System for pre-treating malodorous substances in pollution control facility |
CN203155019U (en) * | 2013-02-20 | 2013-08-28 | 江苏克莱斯克能源装备有限公司 | Exhaust gas purifier |
CN103463910A (en) * | 2013-09-02 | 2013-12-25 | 浙江天蓝环保技术股份有限公司 | Comprehensive treatment device and method for cooling desulfurization of high-temperature and high-humidity flue gas |
CN105013312A (en) * | 2015-07-27 | 2015-11-04 | 航天环境工程有限公司 | Desulfurization and denitration integration absorbing device and application |
CN207119229U (en) * | 2017-07-26 | 2018-03-20 | 中国石油大学(华东) | A kind of multistage integratedization coking emission-control equipment |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110624347A (en) * | 2019-08-23 | 2019-12-31 | 上海超高环保科技股份有限公司 | Multi-stage water-spraying dust-removing, dewatering, demisting and purifying device and method |
CN111346479A (en) * | 2020-03-16 | 2020-06-30 | 上海化工研究院有限公司 | Marine diesel engine waste gas foam washing cooling dust removal desulfurization integrated device |
Also Published As
Publication number | Publication date |
---|---|
CN107174913B (en) | 2022-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105498501B (en) | A kind of desulfation dust-extraction device based on rotating spraying and spiral gas-liquid separation principle | |
CN205730730U (en) | A kind of multitube Venturi | |
US7985282B2 (en) | Apparatus and method for separating solids from gas streams | |
CN105435610B (en) | A kind of integrated multiple-effect device for meeting the denitration of industrial smoke deep desulfuration and dedusting | |
CN207871876U (en) | A kind of wet desulphurization swirling flow atomizing spray equipment | |
CN205886590U (en) | Gas wash tower and SOx/NOx control system | |
CN108619872A (en) | A kind of fume desulfurizing tower and flue gas desulfurization and wastewater treatment method | |
CN107174913A (en) | A kind of multistage integratedization coking emission-control equipment | |
CN108786398A (en) | Flue gas desulfurization regenerates integrated tower and Regeneratable wet fuel gas desulfurizing method | |
CN207119229U (en) | A kind of multistage integratedization coking emission-control equipment | |
CN206950881U (en) | A kind of equipment for improving efficiency of dust collection | |
CN101108302A (en) | High-efficiency desulfurizing dust-collector | |
CN105944551A (en) | Bidirectional flow straightening and liquid guiding device of double pH spray desulfurizing tower | |
CN105833719A (en) | Industrial smoke multi-pollutant deep purification device and technology | |
CN108421397A (en) | Dedusting, desulphurization and denitration integrated fume purifier | |
CN107096378A (en) | The flue gas desulphurization system and sulfur method of a kind of floatation glass production line | |
CN108686492A (en) | Flue-gas dust-removing and desulfurization tower and dust-collecting sulfur-removing method | |
CN104084031A (en) | A flue gas purification device of a lime shaft kiln adopting soft coal as fuel | |
CN201026439Y (en) | High-efficiency desulfurizing dust-collector | |
CN208727154U (en) | Dedusting, desulphurization and denitration integrated fume purification device | |
CN108283881A (en) | A kind of desulfurization integrated purifying column of high-effective dust-removing | |
CN207012780U (en) | A kind of gas cleaning reactor and flue gas purification system | |
CN2658145Y (en) | Desulfurization dust removal device for smoke of glass smelting kiln | |
CN106731430A (en) | A kind of venturi bundled tube dedusting demister | |
CN205815455U (en) | Furnace flue gas desulfurizer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |