CN107169027A - A kind of big data processing method and processing device - Google Patents

A kind of big data processing method and processing device Download PDF

Info

Publication number
CN107169027A
CN107169027A CN201710238551.5A CN201710238551A CN107169027A CN 107169027 A CN107169027 A CN 107169027A CN 201710238551 A CN201710238551 A CN 201710238551A CN 107169027 A CN107169027 A CN 107169027A
Authority
CN
China
Prior art keywords
user
pending
data
pending problem
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710238551.5A
Other languages
Chinese (zh)
Inventor
武丽芬
严学勇
常文萃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710238551.5A priority Critical patent/CN107169027A/en
Publication of CN107169027A publication Critical patent/CN107169027A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2465Query processing support for facilitating data mining operations in structured databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management

Abstract

The invention discloses a kind of big data processing method and processing device, it is related to Data Mining, the problem of to solve rapidly and accurately determine the evaluation user of pending problem in the prior art.This method includes:Reception processing is asked, asked according to the processing, each user data in the multiple user data counted in advance is matched with the data of the pending problem, if during the data match of at least one data and the pending problem in the user data, the user is defined as the first user, multiple first user data are matched with the data of the pending problem, if during the data match of at least two item datas and the pending problem in first user data, first user is defined as into second user;Multiple second user data are matched with the data of the pending problem, if the total data in the second user data is matched completely with the data of the pending problem, the second user is defined as the 3rd user.

Description

A kind of big data processing method and processing device
Technical field
The present invention relates to Data Mining, a kind of big data processing method and processing device is more particularly related to.
Background technology
In current scientific research R&D process, for some pending problem, generally require to elect some evaluation users The pending problem is evaluated.Specifically, existing competition user is generally determined by the method artificially screened.
But, in artificial screening process, due to without clearly screening specification and the accuracy artificially screened and can It is not high by property, it is often possible to cause that the research field of the user filtered out and pending problem is inconsistent, arrangement of time is clashed The problems such as, the waste of a large amount of human and material resources is caused, the efficiency of scientific research task evaluation is reduced.
In summary, in the prior art, it is impossible to rapidly and accurately determine the evaluation user of pending problem.
The content of the invention
The embodiment of the present invention provides a kind of big data processing method and processing device, to solve in the prior art can not quick standard The problem of really determining the evaluation user of pending problem.
The embodiment of the present invention provides a kind of method of big data processing, including:
Reception processing is asked, and the data of pending problem are carried in the processing request, and the data of the pending problem include The research field of the pending problem, pending unit information and evaluation temporal information;
Asked according to the processing, by each user data in the multiple user data counted in advance and the pending class The data of topic are matched, if during the data match of at least one data and the pending problem in the user data, The user is defined as the first user, the user data includes the user study field, affiliated unit's information, time peace Arrange information;
Multiple first user data are matched with the data of the pending problem, if first user data In at least two item datas and the pending problem data match when, first user is defined as second user;
Multiple second user data are matched with the data of the pending problem, if the second user data In total data matched completely with the data of the pending problem, the second user is defined as the 3rd user;
3rd user is defined as targeted customer, the targeted customer is the evaluation user of pending problem.
Preferably, if the data match of at least one data and the pending problem in the user data When, the user is defined as the first user, specifically included:
When the user study problem belongs to same research field with the pending problem, the user is defined as first User;Or
When the user affiliated unit matches with the pending unit of the pending problem, the user is defined as the first use Family;Or
When the customer timeline and the evaluation time match of the pending problem, the user is defined as the first use Family;Or
The user study problem belongs to same research field, and the user affiliated unit and institute with the pending problem When stating the pending unit matching of pending problem, the user is defined as the first user;Or
The user study problem belongs to same research field, and the customer timeline and institute with the pending problem When stating the evaluation time match of pending problem, the user is defined as the first user;Or
The user affiliated unit matches with the pending unit, and the arrangement of time of the user and the pending problem Evaluation time match when, the user is defined as the first user;Or
The user study problem belongs to same research field, and the user affiliated unit and institute with the pending problem , will when stating the matching of pending unit, the arrangement of time of the user and the evaluation time match of the pending problem of pending problem The user is defined as the first user.
Preferably, if at least two item datas and the data phase of the pending problem in first user data Timing, is defined as second user by first user, specifically includes:
The first user study problem belongs to same research field with the pending problem, and belonging to first user When unit is matched with the pending unit of the pending problem, first user is defined as second user;Or
The first user study problem belongs to same research field, and first user time with the pending problem When arranging the evaluation time match with the pending problem, first user is defined as second user;Or
The first user affiliated unit matches with the pending unit, and the arrangement of time of first user with it is described During the evaluation time match of pending problem, first user is defined as second user;Or
The first user study problem belongs to same research field with the pending problem, and belonging to first user Unit is matched with the pending unit of the pending problem, the evaluation of the arrangement of time of first user and the pending problem when Between when matching, first user is defined as second user.
Preferably, if the total data in the second user data is matched completely with the data of the pending problem When, the second user is defined as the 3rd user, including:
The second user research topic and the pending problem belong to same research field, single belonging to the second user Position is matched with the pending unit of the pending problem, the evaluation time of the second user arrangement of time and the pending problem Timing, the 3rd user is defined as by the second user.
Preferably, it is characterised in that the free time information of the schedule information of the user including the user and The busy temporal information of the user;The evaluation time match of the time of the user and the pending problem is specifically, described The free time of user includes the evaluation time of the pending problem.
The embodiment of the present invention provides a kind of device of big data processing, including:
Receiving module, for reception processing request, carries the data of pending problem, the pending class in the processing request The data of topic include the research field of the pending problem, pending unit information and evaluation temporal information;
First matching module, for being asked according to the processing, by each use in the multiple user data counted in advance User data is matched with the data of the pending problem;
First determining module, if the data match of at least one data and the pending problem in the user data When, the user is defined as the first user, the user data include the user study field, affiliated unit's information, when Between arrangement information;
Second matching module, for multiple first user data to be matched with the data of the pending problem;
Second determining module, if at least two item datas in first user data and the number of the pending problem During according to matching, first user is defined as second user;
3rd matching module, for multiple second user data to be matched with the data of the pending problem;
3rd determining module, if the data for the total data in the second user data and the pending problem are complete Full matching, the 3rd user is defined as by the second user;
4th determining module, for the 3rd user to be defined as into targeted customer, the targeted customer is pending problem Evaluation user.
Preferably, first determining module is used for:
When the user study problem belongs to same research field with the pending problem, the user is defined as first User;Or
When the user affiliated unit matches with the pending unit of the pending problem, the user is defined as the first use Family;Or
When the customer timeline and the evaluation time match of the pending problem, the user is defined as the first use Family;Or
The user study problem belongs to same research field, and the user affiliated unit and institute with the pending problem When stating the pending unit matching of pending problem, the user is defined as the first user;Or
The user study problem belongs to same research field, and the customer timeline and institute with the pending problem When stating the evaluation time match of pending problem, the user is defined as the first user;Or
The user affiliated unit matches with the pending unit, and the arrangement of time of the user and the pending problem Evaluation time match when, the user is defined as the first user;Or
The user study problem belongs to same research field, and the user affiliated unit and institute with the pending problem , will when stating the matching of pending unit, the arrangement of time of the user and the evaluation time match of the pending problem of pending problem The user is defined as the first user.
Preferably, second determining module is used for:
The first user study problem belongs to same research field with the pending problem, and belonging to first user When unit is matched with the pending unit of the pending problem, first user is defined as second user;Or
The first user study problem belongs to same research field, and first user time with the pending problem When arranging the evaluation time match with the pending problem, first user is defined as second user;Or
The first user affiliated unit matches with the pending unit, and the arrangement of time of first user with it is described During the evaluation time match of pending problem;Or
When the first user study problem and the pending problem belong to same research field, and the first user institute Category unit is matched with the pending unit of the pending problem, the evaluation of the arrangement of time of first user and the pending problem Time match, first user is defined as second user.
Preferably, the 3rd determining module is used for:
The second user research topic and the pending problem belong to same research field, single belonging to the second user Position is matched with the pending unit of the pending problem, the evaluation time of the second user arrangement of time and the pending problem Timing, the 3rd user is defined as by the second user.
Preferably, the schedule information of the user includes the free time information of the user and doing for the user Commonplace temporal information;The evaluation time match of the time of the user and the pending problem is specifically, during the free time of the user Between include the evaluation time of the pending problem..
In the embodiment of the present invention, asked according to the processing received, inquire about the user data of each user counted in advance, from The first user is determined in the user data counted in advance, second user is determined from the first user, is determined from second user Three users, using the 3rd user as the evaluation user of pending problem technical scheme, without manually being screened, and can be quick The evaluation user of pending problem, and then the resource that uses manpower and material resources sparingly are accurately determined out, the efficiency of problem evaluation is effectively improved.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of flow chart of big data processing method provided in an embodiment of the present invention;
Fig. 2 is a kind of block diagram of big data processing unit provided in an embodiment of the present invention.
Embodiment
The embodiment of the present invention provides a big data processing method, including:Reception processing is asked, and is carried and is treated in processing request The data of problem are examined, the data of the pending problem include the research field of the pending problem, pending unit information and evaluation time Information;Asked according to the processing, by each user data in the multiple user data counted in advance and the number of the pending problem According to being matched, if in the user data at least one of the data match of data and the pending problem when, the user is true It is set to the first user, the user data includes the user study field, affiliated unit's information, schedule information;It is somebody's turn to do multiple First user data is matched with the data of the pending problem, if at least two item datas in first user data are treated with this When examining the data match of problem, first user is defined as second user;Multiple second user data are pending with this The data of problem are matched, if the total data in the second user data is matched completely with the data of the pending problem, will The second user is defined as the 3rd user;3rd user is defined as targeted customer, the targeted customer comments for pending problem Examine user.So as to the problem of solving rapidly and accurately determine the evaluation user of pending problem in the prior art.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
The schematic flow sheet for showing a kind of big data processing method provided in an embodiment of the present invention exemplary Fig. 1, should Method may at least apply in the determination of pending problem reviewer.
As shown in figure 1, a kind of big data processing method provided in an embodiment of the present invention comprises the following steps:
Step 101, reception processing is asked, and the data of pending problem, the data of the pending problem are carried in processing request Include the research field of the pending problem, pending unit information and evaluation temporal information.
In actual process of scientific research, it is determined that before studying a certain problem, it is thus necessary to determine that go out some evaluation users and come The problem is evaluated.In the present embodiment, the pending problem is the problem for needing to evaluate, and the pending unit is that application is ground Study carefully the unit of the pending problem, the evaluation time is the time evaluated to the pending problem.
Step 102, each user data and the data of the pending problem in the multiple user data counted in advance are entered Row is matched, if during the data match of at least one data and the pending problem in the user data, the user is defined as First user.
Wherein, user data includes the user study field, affiliated unit's information, schedule information.
If in addition, during data match of at least one in the user data with the pending problem, the user is determined For the first user, following form is specifically included:
1) when, the user study problem and the pending problem belong to same research field, the user is defined as the first use Family;
2) when, the user affiliated unit matches with the pending unit of the pending problem, the user is defined as the first user;
Wherein, user affiliated unit matches with the pending unit of the pending problem and is embodied as, user affiliated unit with The pending unit of pending problem is different, and limits the user affiliated unit and the pending unit difference of the pending problem and can prevent The conflict of interest is produced, the reliability of evaluation is improved.
3), the customer timeline and during the evaluation time match of the pending problem, the first user is defined as by the user;
4), the user study problem and the pending problem belong to same research field, and the user affiliated unit treats with this When examining the pending unit matching of problem, the user is defined as the first user;
5), the user study problem and the pending problem belong to same research field, and the customer timeline is treated with this When examining the evaluation time match of problem, the user is defined as the first user;
6), the user affiliated unit is matched with the pending unit, and the arrangement of time of the user and the pending problem are commented When examining time match, the user is defined as the first user;
7), the user study problem and the pending problem belong to same research field, and the user affiliated unit treats with this It is when examining the evaluation time match of the matching of pending unit, the arrangement of time of the user and the pending problem of problem, the user is true It is set to the first user.
In practical application, the user data of each user can rely on computer technology, create corresponding experts database, so that Realize and storage and maintenance is carried out to the user basic information in user data, specifically, in practical application scene, the number of users According to can specifically include:The essential informations such as name, academic title, research direction, the telephone number of user.
Step 103, multiple first user data are matched with the data of the pending problem, if first number of users During the data match of at least two item datas and the pending problem in, first user is defined as second user.
Wherein, if at least two in first user data with the data match of the pending problem, by this first User is defined as second user, specifically includes:
1), when the first user study problem and the pending problem belong to same research field, and belonging to first user Unit is matched with the pending unit of the pending problem, and first user is defined as into second user;
2), when the first user study problem and the pending problem belong to same research field, and first user time The evaluation time match with the pending problem is arranged, first user is defined as second user;
3), when the first user affiliated unit matches with the pending unit, and the arrangement of time of first user is treated with this The evaluation time match of problem is examined, first user is defined as second user;
4), when the first user study problem and the pending problem belong to same research field, and belonging to first user Unit is matched with the pending unit of the pending problem, the evaluation time of the arrangement of time of first user and the pending problem Match somebody with somebody, first user is defined as second user.
Step 104, multiple second user data are matched with the data of the pending problem, if the second user number Total data in is matched completely with the data of the pending problem, and the second user is defined as into the 3rd user.
Wherein, if the total data in the second user data is matched completely with the data of the pending problem, by this Two users are defined as the 3rd user, including:
The second user research topic belongs to same research field, the second user affiliated unit with being somebody's turn to do with the pending problem The pending unit matching of pending problem, the evaluation time match of the second user arrangement of time and the pending problem, by this second User is defined as the 3rd user.
It should be noted that in order to improve the evaluation user's efficiency rapidly and accurately determined with pending problem, will be advance The user of statistics carries out once advance, and the first user is determined from pre-selecting, in the true second user from the first user, then from the The 3rd user is determined in two users, which determines that evaluation user's is accurate due to being not only increased using principle progressive step by step Degree, can also improve the efficiency for determining evaluation user.
Step 105, the 3rd user is defined as targeted customer, the targeted customer is the evaluation user of pending problem.
In the embodiment of the present invention, asked according to the processing received, inquire about the user data of each user counted in advance, from The first user is determined in the user data counted in advance, second user is determined from the first user, is determined from second user Three users, using the 3rd user as pending problem evaluation user technical scheme, without manually being screened, and quick and precisely The evaluation user for evaluating pending problem, and then the resource that uses manpower and material resources sparingly are determined in ground, effectively improve the efficiency of problem evaluation.
Based on same inventive concept, the embodiments of the invention provide a kind of device of big data processing, due to the device solution Certainly the principle of technical problem is similar to a kind of method that big data is handled, therefore the implementation of the device may refer to the reality of method Apply, repeat part and repeat no more.
Fig. 2 is a kind of big data processing unit block diagram according to an exemplary embodiment.Reference picture 2, the big data Processing unit includes:
Receiving module 201, for reception processing request, carries the data of pending problem, the pending class in processing request The data of topic include the research field of the pending problem, when the pending unit information of the pending problem and the evaluation of the pending problem Between information;
First matching module 202, will be each in the multiple user data counted in advance for being asked according to the processing User data is matched with the data of the pending problem, and the user data of the user includes the research field of the user, is somebody's turn to do Affiliated unit's information of user, the schedule information of the user;
First determining module 203, if the data phase of at least one data and the pending problem in the user data During matching, the user is defined as the first user, the user data, which includes the user study field, affiliated unit, to be believed Breath, schedule information;
Second matching module 204, for the data of multiple first user data and the pending problem to be carried out Match somebody with somebody;
Second determining module 205, if at least two item datas in first user data and the pending problem Data match when, first user is defined as second user;
3rd matching module 206, for the data of multiple second user data and the pending problem to be carried out Match somebody with somebody;
3rd determining module 207, if the number for the total data in the second user data and the pending problem According to complete matching, the second user is defined as the 3rd user;
4th determining module 208, for the 3rd user to be defined as into targeted customer, the targeted customer is pending class The evaluation user of topic.
Alternatively, the first determining module 203 is used for:
When the user study problem and the pending problem belong to same research field, the user is defined as first User;
When the user affiliated unit matches with the pending unit of the pending problem, the user is defined as the first use Family;
When the customer timeline and the evaluation time match of the pending problem, the user is defined as the first use Family;
When the user study problem and the pending problem belong to same research field, and the user affiliated unit with The pending unit matching of the pending problem, the first user is defined as by the user;
When the user study problem and the pending problem belong to same research field, and the customer timeline with The evaluation time match of the pending problem;
When the user affiliated unit matches with the pending unit, and the arrangement of time of the user and the pending class The evaluation time match of topic, the first user is defined as by the user;
When the user study problem and the pending problem belong to same research field, and the user affiliated unit with The matching of pending unit, the arrangement of time of the user and the evaluation time match of the pending problem of the pending problem, will The user is defined as the first user.
Alternatively, second determining module 205 is used for:
When the first user study problem and the pending problem belong to same research field, and the first user institute Category unit is matched with the pending unit of the pending problem, and first user is defined as second user;
When the first user study problem and the pending problem belong to same research field, and during first user Between arrange to be defined as second user with the evaluation time match of the pending problem, first user;
When the first user affiliated unit matches with the pending unit, and arrangement of time and the institute of first user State the evaluation time match of pending problem;
When the first user study problem and the pending problem belong to same research field, and the first user institute Category unit is matched with the pending unit of the pending problem, the evaluation of the arrangement of time of first user and the pending problem Time match, first user is defined as second user.
Alternatively, the 3rd determining module 207 is used for:
The second user research topic and the pending problem belong to same research field, single belonging to the second user Position is matched with the pending unit of the pending problem, the evaluation time of the second user arrangement of time and the pending problem Timing, the 3rd user is defined as by the second user.
Alternatively, the schedule information of user includes the free time information of the user and the busy time of the user believes Breath;The arrangement of time of the user does not conflict with the evaluation time of the pending problem specifically, the free time of the user includes being somebody's turn to do The evaluation time of pending problem.
In the embodiment of the present invention, asked according to the processing received, inquire about the user data of each user counted in advance, from The first user is determined in the user data counted in advance, second user is determined from the first user, is determined from second user Three users, using the 3rd user as pending problem evaluation user technical scheme, without manually being screened, and quick and precisely The evaluation user for evaluating pending problem, and then the resource that uses manpower and material resources sparingly are determined in ground, effectively improve the efficiency of problem evaluation.
It should be understood by those skilled in the art that, embodiments of the invention can be provided as method, system or computer program Product.Therefore, the present invention can be using the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.Moreover, the present invention can be used in one or more computers for wherein including computer usable program code The computer program production that usable storage medium is implemented on (including but is not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The present invention is the flow with reference to method according to embodiments of the present invention, equipment (system) and computer program product Figure and/or block diagram are described.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which is produced, to be included referring to Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, thus in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
, but those skilled in the art once know basic creation although preferred embodiments of the present invention have been described Property concept, then can make other change and modification to these embodiments.So, appended claims are intended to be construed to include excellent Select embodiment and fall into having altered and changing for the scope of the invention.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (10)

1. a kind of method of big data processing, it is characterised in that including:
Reception processing is asked, and the data of pending problem is carried in the processing request, the data of the pending problem are including described The research field of pending problem, pending unit information and evaluation temporal information;
Asked according to the processing, by each user data in the multiple user data counted in advance and the pending problem Data are matched, if during the data match of at least one data and the pending problem in the user data, by institute State user and be defined as the first user, the user data includes the user study field, affiliated unit's information, arrangement of time letter Breath;
Multiple first user data are matched with the data of the pending problem, if in first user data When at least two item datas and the data match of the pending problem, first user is defined as second user;
Multiple second user data are matched with the data of the pending problem, if in the second user data Total data is matched completely with the data of the pending problem, and the second user is defined as into the 3rd user;
3rd user is defined as targeted customer, the targeted customer is the evaluation user of pending problem.
2. the method as described in claim 1, it is characterised in that if at least one data and institute in the user data When stating the data match of pending problem, the user is defined as the first user, specifically included:
When the user study problem belongs to same research field with the pending problem, the user is defined as the first use Family;Or
When the user affiliated unit matches with the pending unit of the pending problem, the user is defined as the first user; Or
When the customer timeline and the evaluation time match of the pending problem, the user is defined as the first user; Or
The user study problem belongs to same research field with the pending problem, and the user affiliated unit treats with described When examining the pending unit matching of problem, the user is defined as the first user;Or
The user study problem belongs to same research field with the pending problem, and the customer timeline is treated with described When examining the evaluation time match of problem, the user is defined as the first user;Or
The user affiliated unit is matched with the pending unit, and the arrangement of time of the user and the pending problem are commented When examining time match, the user is defined as the first user;Or
The user study problem belongs to same research field with the pending problem, and the user affiliated unit treats with described , will be described when examining the matching of pending unit, the arrangement of time of the user and the evaluation time match of the pending problem of problem User is defined as the first user.
3. the method as described in claim 1, it is characterised in that if at least two item datas in first user data During with the data match of the pending problem, first user is defined as second user, specifically included:
The first user study problem belongs to same research field, and the first user affiliated unit with the pending problem When being matched with the pending unit of the pending problem, first user is defined as second user;Or
The first user study problem belongs to same research field, and first customer timeline with the pending problem During with the evaluation time match of the pending problem, first user is defined as second user;Or
The first user affiliated unit matches with the pending unit, and the arrangement of time of first user with it is described pending During the evaluation time match of problem, first user is defined as second user;Or
The first user study problem belongs to same research field, and the first user affiliated unit with the pending problem Matched with the pending unit of the pending problem, the evaluation time of the arrangement of time of first user and the pending problem Timing, second user is defined as by first user.
4. the method as described in claim 1, it is characterised in that if total data and institute in the second user data When the data for stating pending problem are matched completely, the second user is defined as the 3rd user, including:
The second user research topic and the pending problem belong to same research field, the second user affiliated unit with The matching of pending unit, the second user arrangement of time and the evaluation time match of the pending problem of the pending problem When, the second user is defined as the 3rd user.
5. the method as any one of claim 1-4, it is characterised in that the schedule information of the user includes institute State the free time information of user and the busy temporal information of the user;The time of the user comments with the pending problem Time match is examined specifically, the free time of the user includes the evaluation time of the pending problem.
6. a kind of device of big data processing, it is characterised in that including:
Receiving module, for reception processing request, carries the data of pending problem in the processing request, the pending problem Data include the research field of the pending problem, pending unit information and evaluation temporal information;
First matching module, for being asked according to the processing, by each number of users in the multiple user data counted in advance Matched according to the data with the pending problem;
First determining module, if in the user data at least one of the data match of data and the pending problem when, The user is defined as the first user, the user data includes the user study field, affiliated unit's information, time peace Arrange information;
Second matching module, for multiple first user data to be matched with the data of the pending problem;
Second determining module, if at least two item datas and the data phase of the pending problem in first user data During matching, first user is defined as second user;
3rd matching module, for multiple second user data to be matched with the data of the pending problem;
3rd determining module, if for the total data in the second user data and complete of the data of the pending problem Match somebody with somebody, the second user is defined as the 3rd user;
4th determining module, for the 3rd user to be defined as into targeted customer, the targeted customer comments for pending problem Examine user.
7. device as claimed in claim 6, it is characterised in that first determining module is used for:
When the user study problem belongs to same research field with the pending problem, the user is defined as the first use Family;Or
When the user affiliated unit matches with the pending unit of the pending problem, the user is defined as the first user; Or
When the customer timeline and the evaluation time match of the pending problem, the user is defined as the first user; Or
The user study problem belongs to same research field with the pending problem, and the user affiliated unit treats with described When examining the pending unit matching of problem, the user is defined as the first user;Or
The user study problem belongs to same research field with the pending problem, and the customer timeline is treated with described When examining the evaluation time match of problem, the user is defined as the first user;Or
The user affiliated unit is matched with the pending unit, and the arrangement of time of the user and the pending problem are commented When examining time match, the user is defined as the first user;Or
The user study problem belongs to same research field with the pending problem, and the user affiliated unit treats with described , will be described when examining the matching of pending unit, the arrangement of time of the user and the evaluation time match of the pending problem of problem User is defined as the first user.
8. device as claimed in claim 6, it is characterised in that second determining module is used for:
The first user study problem belongs to same research field, and the first user affiliated unit with the pending problem When being matched with the pending unit of the pending problem, first user is defined as second user;Or
The first user study problem belongs to same research field, and first customer timeline with the pending problem During with the evaluation time match of the pending problem, first user is defined as second user;Or
The first user affiliated unit matches with the pending unit, and the arrangement of time of first user with it is described pending During the evaluation time match of problem, first user is defined as second user;Or
The first user study problem belongs to same research field, and the first user affiliated unit with the pending problem Matched with the pending unit of the pending problem, the evaluation time of the arrangement of time of first user and the pending problem Timing, second user is defined as by first user.
9. device as claimed in claim 9, it is characterised in that the 3rd determining module is used for:
The second user research topic and the pending problem belong to same research field, the second user affiliated unit with The matching of pending unit, the second user arrangement of time and the evaluation time match of the pending problem of the pending problem When, the second user is defined as the 3rd user.
10. the device as any one of claim 6-9, it is characterised in that the schedule information of the user includes The free time information of the user and the busy temporal information of the user;The time of the user and the pending problem Time match is evaluated specifically, the free time of the user includes the evaluation time of the pending problem.
CN201710238551.5A 2017-04-13 2017-04-13 A kind of big data processing method and processing device Pending CN107169027A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710238551.5A CN107169027A (en) 2017-04-13 2017-04-13 A kind of big data processing method and processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710238551.5A CN107169027A (en) 2017-04-13 2017-04-13 A kind of big data processing method and processing device

Publications (1)

Publication Number Publication Date
CN107169027A true CN107169027A (en) 2017-09-15

Family

ID=59849576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710238551.5A Pending CN107169027A (en) 2017-04-13 2017-04-13 A kind of big data processing method and processing device

Country Status (1)

Country Link
CN (1) CN107169027A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103605665A (en) * 2013-10-24 2014-02-26 杭州电子科技大学 Keyword based evaluation expert intelligent search and recommendation method
CN104699689A (en) * 2013-12-04 2015-06-10 国家计算机网络与信息安全管理中心 Data processing method and device
US9336310B2 (en) * 2009-07-06 2016-05-10 Google Inc. Monitoring of negative feedback systems

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9336310B2 (en) * 2009-07-06 2016-05-10 Google Inc. Monitoring of negative feedback systems
CN103605665A (en) * 2013-10-24 2014-02-26 杭州电子科技大学 Keyword based evaluation expert intelligent search and recommendation method
CN104699689A (en) * 2013-12-04 2015-06-10 国家计算机网络与信息安全管理中心 Data processing method and device

Similar Documents

Publication Publication Date Title
CN107992415B (en) Fault positioning and analyzing method of transaction system and related server
CN106354616B (en) Monitor the method, apparatus and high performance computing system of application execution performance
CN107832216A (en) One kind buries a method of testing and device
CN110378343A (en) A kind of finance reimbursement data processing method, apparatus and system
CN110278201B (en) Security policy evaluation method and device, computer readable medium and electronic device
CN106980571A (en) The construction method and equipment of a kind of test use cases
CN110225394A (en) The processing method and processing device of recorded broadcast video knowledge point
CN109982361A (en) Signal interference analysis method, device, equipment and medium
CN109739989A (en) File classification method and computer equipment
CN106649342A (en) Data processing method and apparatus in data acquisition platform
CN109324959A (en) A kind of method, server and the computer readable storage medium of automatic transfer data
CN106571146A (en) Noise signal determining method, and voice de-noising method and apparatus
CN107038108A (en) The method of testing and device of software
CN103870563B (en) It is determined that the method and apparatus of the theme distribution of given text
CN109214634A (en) A kind of information processing method, device and information processing readable medium
CN110008362A (en) A kind of case classifying method and device
CN106611021B (en) Data processing method and equipment
CN108614810A (en) Complain hot spot automatic identifying method and device
CN111882113B (en) Enterprise mobile banking user prediction method and device
CN107169027A (en) A kind of big data processing method and processing device
CN110520806A (en) Identification to the deviation engineering modification of programmable logic controller (PLC)
CN106604126A (en) Intelligent video screenshot capture method and device
CN111612387A (en) Flow direction distribution method, device, equipment and storage medium
CN108108175A (en) A kind of method and apparatus for gray scale issue
CN108229586B (en) The detection method and system of a kind of exceptional data point in data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915