CN107166356A - A kind of boiler for being used to handle papermaking wastewater - Google Patents

A kind of boiler for being used to handle papermaking wastewater Download PDF

Info

Publication number
CN107166356A
CN107166356A CN201710418660.5A CN201710418660A CN107166356A CN 107166356 A CN107166356 A CN 107166356A CN 201710418660 A CN201710418660 A CN 201710418660A CN 107166356 A CN107166356 A CN 107166356A
Authority
CN
China
Prior art keywords
header
lower header
drum
combustion chamber
convection bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710418660.5A
Other languages
Chinese (zh)
Inventor
程言龙
任少勇
刘凤
鲁金灿
王思远
刘小敏
姚焕乐
赵儒萍
郑晴晴
赵红利
朱春凤
程杰
周丽丽
王恩宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SIFANG BOILER CO Ltd
Original Assignee
JIANGSU SIFANG BOILER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SIFANG BOILER CO Ltd filed Critical JIANGSU SIFANG BOILER CO Ltd
Priority to CN201710418660.5A priority Critical patent/CN107166356A/en
Publication of CN107166356A publication Critical patent/CN107166356A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B31/00Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements of dispositions of combustion apparatus
    • F22B31/08Installation of heat-exchange apparatus or of means in boilers for heating air supplied for combustion
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G7/00Incinerators or other apparatus for consuming industrial waste, e.g. chemicals
    • F23G7/04Incinerators or other apparatus for consuming industrial waste, e.g. chemicals of waste liquors, e.g. sulfite liquors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2206/00Waste heat recuperation
    • F23G2206/20Waste heat recuperation using the heat in association with another installation
    • F23G2206/203Waste heat recuperation using the heat in association with another installation with a power/heat generating installation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2209/00Specific waste
    • F23G2209/10Liquid waste
    • F23G2209/101Waste liquor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/12Heat utilisation in combustion or incineration of waste

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Gasification And Melting Of Waste (AREA)

Abstract

The invention discloses a kind of boiler for being used to handle papermaking wastewater, including body of heater, drum, convection bank, convection bank lower header I, convection bank lower header II, energy-saving appliance, air preheater and support assembly, the body of heater by combustion chamber and flue gas buffer set into, combustion chamber is connected with flue gas buffering area, and multiple convection banks are disposed side by side in flue gas buffering area;Water separator is provided with drum, combustion chamber is fixed on support assembly, drum is arranged on top of combustion chamber, convection bank lower header I and convection bank lower header II are each attached to combustion chamber bottom, connected between convection bank lower header I and convection bank lower header II, the combustion chamber is mutually fastened the square frame body surrounded by antetheca, rear wall, left wall and right wall.The present invention can as far as possible burn to papermaking wastewater, so as to be reclaimed to the heat of organic matter in waste liquid, can not only reduce the temperature of flue gas during fume emission in addition, can also reduce flue gas flow rate, be easy to the sedimentation trapping to soda ash in flue gas.

Description

A kind of boiler for being used to handle papermaking wastewater
Technical field
The present invention relates to a kind of boiler, specifically a kind of boiler for being used to handle papermaking wastewater.
Background technology
It can be polluted because the waste liquid that papermaking is produced such as is directly discharged into rivers, should be handled, soda ash is contained in black liquor And organic matter, the heat of soda ash and organic matter in Recycling of waste liquid, it is necessary to burnt to waste liquid.If directly selecting existing pot Stove burning black liquor, then in the presence of following deficiency:One is that combustion chamber is larger, and waste liquid calorific value is low is difficult to catch fire, the spy of combustion instability Property mismatch;Two be that environmental protection and energy saving is bad, high fume temperature, if being directly discharged into air, and both dangerous is also a kind of Energy waste;Three be that flue gas flow rate is too high, and soda ash is carried by flue gas, it is impossible to sedimentation trapping.Therefore urgent need one kind had both adapted to black Liquid burning can collect soda ash, and the low energy-saving boiler of exhaust gas temperature again.
The content of the invention
In view of the above-mentioned problems of the prior art, the present invention provides a kind of boiler for being used to handle papermaking wastewater, can be right Papermaking wastewater burns as far as possible, so as to be reclaimed to the heat of organic matter in waste liquid, in addition the fume emission process in burning In can not only reduce the temperature value of flue gas, can also reduce flue gas flow rate, be easy to in flue gas soda ash sedimentation trapping.
To achieve these goals, the technical solution adopted by the present invention is:This kind is used for the boiler for handling papermaking wastewater, bag Include body of heater, drum, convection bank, convection bank lower header I, convection bank lower header II, energy-saving appliance, air preheater and support total Into the body of heater is by combustion chamber with flue gas buffer set into combustion chamber is connected with flue gas buffering area, and multiple convection banks are set side by side Put in flue gas buffering area;
Water separator is provided with drum, combustion chamber is fixed on support assembly, and drum is arranged on top of combustion chamber, right Flowing bundle lower header I and convection bank lower header II are each attached under combustion chamber bottom, convection bank lower header I and convection bank Connected between header II, the combustion chamber is mutually fastened by antetheca, rear wall, left wall and right wall and surrounded, the antetheca, rear wall, a left side Wall and right wall are fin panel casing, and the top and the bottom of antetheca are respectively equipped with above and below antetheca upper collecting chamber and antetheca lower header, rear wall Portion is respectively equipped with rear wall upper collecting chamber and rear wall lower header, the upper and lower side mouth of pipe of antetheca respectively with antetheca upper collecting chamber and antetheca lower header It is connected, the upper and lower side mouth of pipe of rear wall is connected with rear wall upper collecting chamber and antetheca lower header respectively, antetheca upper collecting chamber and rear wall upper collecting chamber Be connected with drum, antetheca lower header and rear wall lower header are connected with convection bank lower header I, the upper and lower side mouth of pipe of left wall and The upper and lower side mouth of pipe of right wall is connected with drum and convection bank lower header I respectively;
The bottom of the combustion chamber is provided with multiple ash output openings, and the lower section of each ash output opening is connected with an ash bucket I;It is described right Flowing bundle is made up of tube bank I and tube bank II, and the upper and lower side of tube bank I is connected with drum and convection bank lower header I respectively, tube bank II Upper and lower side be connected respectively with drum and convection bank lower header II;
The energy-saving appliance includes pipe group and bobbin carriage, and the inlet end of the bobbin carriage is connected by pipeline with flue gas buffering area, institute Pipe group is stated by helical fin coiled pipe, import header and outlet header, helical fin coiled pipe is staggered in arrangement in bobbin carriage, import Header and outlet header are separately positioned on the two ends of bobbin carriage, the two ends mouth of pipe of the helical fin coiled pipe respectively with import header It is connected with outlet header, outlet header is connected by connecting tube with drum, import header is connected with feed-tank;
The air preheater includes hot arc bobbin carriage, cold section of bobbin carriage, heated steel pipe and air communication case, and steel pipe of being heated is set In hot arc bobbin carriage and cold section of bobbin carriage, the inlet end of heated steel pipe is connected by pipeline with the outlet side of bobbin carriage, hot arc bobbin carriage One end and one end of cold section of bobbin carriage be connected with air communication case, the other end of the cold section of bobbin carriage is provided with cold wind import, heat The other end of section bobbin carriage is provided with hot-blast outlet.
Further, the combustion chamber, convection bank and air communication case are equipped with manhole.
Further, the bottom of the convection bank is provided with multiple ash buckets II.
Further, the tube bank I and tube bank II are arranged side by side by multiple convection tubes and constituted.
Further, pressure gauge, safety valve, stop valve, auxiliary steam valve and emergency blowoff valve are provided with the top of the drum.
Further, the bottom of the combustion chamber is provided with the adjustable wall with refractory lining, refracto of area.
Further, the support assembly is by boiler supports, outsourcing steelframe, inspection platform, guardrail and staircase, and outsourcing steelframe is consolidated Boiler supports top is scheduled on, inspection platform is fixed on the side of boiler supports, and staircase is fixed on the sidepiece of inspection platform, the shield Column is arranged on staircase.
Compared with prior art, the present invention is using combustion chamber, drum, convection bank, convection bank lower header I, convection tube Beam lower header II, energy-saving appliance, air preheater and support assembly are combined mode, when carrying out papermaking wastewater burning in combustion chamber, film Water in formula water-cooling wall is thermally generated vapor, and the vapor that antetheca and rear wall are produced on antetheca upper collecting chamber and rear wall respectively through collecting Case enters drum, and the vapor that left wall and right wall are produced is directly entered drum, by the water separator in drum, after separation Hot water through the tube bank I in convection bank or tube bank II as down-comer, into convection bank lower header I or convection bank next part Case II, cold water is transported in drum by another as tedge, so that drum, convection bank, convection bank lower header I With convection bank lower header II formation circulation loop, in addition convection bank lower header I and convection bank lower header II also with antetheca Lower header is connected with rear wall lower header, therefore also forms circulation loop with antetheca and rear wall;So as to effectively utilize the temperature of flue gas Degree, while reducing the flue-gas temperature of discharge, the flue gas of discharge enters energy-saving appliance through pipeline, and flue gas washes away spiral wing in energy-saving appliance Outside piece coiled pipe, water enters in helical fin coiled pipe from import header flow to outlet header, complete during this with The heat exchange of flue gas, the water after then heating is utilized through outlet header into drum interior circulation, and flue gas temperature after energy-saving appliance Air preheater is further lowered into, flue gas flows in the heated steel pipe in air preheater, and normal temperature air enters through cold wind import Enter cold section of bobbin carriage, and sequentially pass through air communication case and hot arc bobbin carriage and discharged from hot-blast outlet, in hot arc bobbin carriage and cold section of bobbin carriage Outside air and heated steel pipe external contact, and then the heat exchange between the interior flowing flue gas of heated steel pipe is completed, make The flue-gas temperature finally discharged reaches safety dumping temperature, therefore the present invention can as far as possible burn to papermaking wastewater, so as to useless The heat of organic matter is reclaimed in liquid, can not only reduce the temperature value of flue gas during fume emission in burning in addition, by Spacing when by flue gas buffering area between convection bank can make flue gas increase contact area, so as to can also reduce flue gas stream Speed, is easy to the sedimentation trapping to soda ash in flue gas.Other combustion chamber is constituted using fin panel casing, and it substantially reduces the whole of equipment Body weight, is easily installed maintenance.
Brief description of the drawings
Fig. 1 is the structural representation of body of heater in the present invention;
Fig. 2 is that Fig. 1 loads onto the bowing to sectional view of energy-saving appliance and air preheater;
Fig. 3 is Fig. 2 left-handed rotation sectional views.
In figure:1st, staircase, 2, guardrail, 3, inspection platform, 4, boiler supports, 5, outsourcing steelframe, 6, pressure gauge, 7, safety Valve, 8, main steam valve, 9, auxiliary steam valve, 10, emergency blowoff valve, 11, antetheca lower header, 12, ash bucket I, 13, convection bank lower header I, 14, ash bucket II, 15, convection bank lower header II, 16, left wall, 17, antetheca upper collecting chamber, 18, right wall, 19, steam-water separation dress Put, 20, drum, 21, pipeline, 22, energy-saving appliance, 23, antetheca, 24, convection bank, 25, rear wall, 26, outlet header, 27, spiral Fin coiled pipe, 28, pipe group, 29, bobbin carriage, 30, import header, 31, hot arc bobbin carriage, 32, air communication case, 33, cold section of bobbin carriage, 34th, hot-blast outlet, 35, cold wind import.
Embodiment
The invention will be further described below.
As shown in Figure 1 to Figure 3, the present invention include body of heater, it is drum 20, convection bank 24, convection bank lower header I 13, right Flowing bundle lower header II 15, energy-saving appliance 22, air preheater and support assembly, the body of heater by combustion chamber and flue gas buffer set into, Combustion chamber is connected with flue gas buffering area, and multiple convection banks 24 are disposed side by side in flue gas buffering area;
Water separator 19 is provided with drum 20, combustion chamber is fixed on support assembly, and drum 20 is arranged on combustion chamber Top, convection bank lower header I 13 and convection bank lower header II 15 are each attached to combustion chamber bottom, convection bank lower header I Connected between 13 and convection bank lower header II 15, the combustion chamber is mutually detained by antetheca 23, rear wall 25, left wall 16 and right wall 18 It is encircled into, the antetheca 23, rear wall 25, left wall 16 and right wall 18 are fin panel casing, the top and the bottom of antetheca 16 are respectively equipped with Antetheca upper collecting chamber 17 and antetheca lower header 11, the top and the bottom of rear wall 25 are respectively equipped with rear wall upper collecting chamber and rear wall lower header, antetheca The 23 upper and lower side mouth of pipe is connected with antetheca upper collecting chamber 17 and antetheca lower header 11 respectively, the upper and lower side mouth of pipe of rear wall 25 respectively with it is rear Wall upper collecting chamber is connected with antetheca lower header, and antetheca upper collecting chamber 17 and rear wall upper collecting chamber are connected with drum 20, antetheca lower header 11 It is connected with rear wall lower header with convection bank lower header I 13, the upper and lower side mouth of pipe of left wall 16 and the upper and lower side mouth of pipe of right wall 18 It is connected respectively with drum 20 and convection bank lower header I 13;
The bottom of the combustion chamber is provided with multiple ash output openings, and the lower section of each ash output opening is connected with an ash bucket I 12;It is described Convection bank 24 II is made up of tube bank I and tube bank, the upper and lower side of tube bank I respectively with drum 20 and the phase of convection bank lower header I 13 Even, the upper and lower side of tube bank II is connected with drum 20 and convection bank lower header II 15 respectively;
The energy-saving appliance 22 includes pipe group 28 and bobbin carriage 29, and the inlet end of the bobbin carriage 29 is buffered by pipeline 21 and flue gas Area is connected, and the pipe group 28 is by helical fin coiled pipe 27, import header 30 and outlet header 26, and helical fin coiled pipe 27 is wrong Row are arranged in bobbin carriage 29, and import header 30 and outlet header 26 are separately positioned on the two ends of bobbin carriage 29, the helical fin snake The two ends mouth of pipe of shape pipe 27 is connected with import header 30 and outlet header 26 respectively, and outlet header 26 passes through connecting tube and drum 20 Connection, import header 30 is connected with feed-tank;
The air preheater includes hot arc bobbin carriage 31, cold section of bobbin carriage 33, heated steel pipe and air communication case 32, and be heated steel pipe Group is arranged in hot arc bobbin carriage 31 and cold section of bobbin carriage 33, and the inlet end for steel pipe of being heated passes through the outlet side of pipeline 21 and bobbin carriage 29 One end of connection, one end of hot arc bobbin carriage 31 and cold section of bobbin carriage 33 is connected with air communication case 32, the cold section of bobbin carriage 33 The other end is provided with cold wind import 35, and the other end of hot arc bobbin carriage 31 is provided with hot-blast outlet 34.
Further, the combustion chamber, convection bank 24 and air communication case 32 are equipped with manhole.Provided with manhole, just In maintenance and repair of the staff to the said equipment.
Further, the bottom of the convection bank 24 is provided with multiple ash buckets II 14.Multiple ash buckets II 14 are set to be easy to flue gas Flue gas buffering area is flowed through, convection bank 24 can reduce flue gas flow rate, trapped so as to the soda ash to sedimentation.
Further, the tube bank I and tube bank II are arranged side by side by multiple convection tubes and constituted.
Further, the top of drum 20 is provided with pressure gauge 6, safety valve 7, stop valve 8, auxiliary steam valve 9 and emergency blowoff valve 10.It is monitored when provided with pressure gauge 6 staff can be made to run drum 20, once while the pressure of the interior gas of drum 20 or water Power scope can be discharged when occurring abnormal by safety valve 7, stop valve 8, auxiliary steam valve 9 and emergency blowoff valve 10, it is ensured that drum The stability of 20 operations.
Further, the bottom of the combustion chamber is provided with the adjustable wall with refractory lining, refracto of area.Can root using the adjustable wall with refractory lining, refracto of area The area needed according to needing to adjust, so as to play raising fire area temperature, helps fuel fire, stable burning;Reduce simultaneously Abrasion of the fuel to the region fin panel casing.
Further, the support assembly is by boiler supports 4, outsourcing steelframe 5, inspection platform 3, guardrail 2 and staircase 1, outsourcing Steelframe 4 is fixed on the top of boiler supports 4, and inspection platform 3 is fixed on the side of boiler supports 4, and staircase 1 is fixed on inspection platform 3 Sidepiece, the guardrail 2 is arranged on staircase 1.The using and to the overall dimension of boiler of staff is easy to using said structure Repair.
When carrying out papermaking wastewater burning in combustion chamber, the water in fin panel casing is thermally generated vapor, antetheca 23 and The vapor that rear wall 25 is produced enters drum 20 through antetheca upper collecting chamber 17 and rear wall upper collecting chamber respectively, and left wall 16 and right wall 18 are produced Vapor be directly entered drum 20, by the water separator 19 in drum 20, the hot water after separation is through convection bank 24 In tube bank I or tube bank II as down-comer, into convection bank lower header I 13 or convection bank lower header II 15, another As tedge, cold water is transported in drum 20, so that drum 20, convection bank 24, convection bank lower header I 13 and right Flowing bundle lower header II 15 formation circulation loop, in addition convection bank lower header I 13 and convection bank lower header II 15 also with it is preceding Wall lower header 11 is connected with rear wall lower header, therefore also forms circulation loop with antetheca and rear wall;So as to effectively utilize flue gas Temperature, while when flue gas flows through flue gas buffering area, flue gas is contacted with the outer surface of convection bank 24 to be completed and its internal water Heat exchange, and then the flue-gas temperature and flow velocity of discharge can be reduced, so as to collect soda ash in ash bucket I 12 and ash bucket II 14;Row The flue gas gone out enters energy-saving appliance 22 through pipeline 21, and flue gas is washed away in energy-saving appliance 22 outside helical fin coiled pipe 27, and water is in spiral shell Enter in rotation fin coiled pipe 27 from import header 30 and flow to outlet header 26, the heat exchange with flue gas is completed during this, Then the water after heating enters the interior circulation of drum 20 through outlet header 26 and utilized, and flue gas temperature after energy-saving appliance 22 further drops Low and enter air preheater, flue gas flows in the heated steel pipe in air preheater, and normal temperature air enters cold section through cold wind import 35 Bobbin carriage 33, and sequentially pass through air communication case 32 and hot arc bobbin carriage 31 is discharged from hot-blast outlet 34, in hot arc bobbin carriage 31 and cold section Extraneous air and heated steel pipe external contact in bobbin carriage 33, and then complete the heat between the interior flowing flue gas of heated steel pipe Exchange, the flue-gas temperature finally discharged is reached safety dumping temperature, therefore the present invention can as far as possible burn to papermaking wastewater, from And the heat of organic matter in waste liquid is reclaimed, it can not only reduce the temperature of flue gas during fume emission in burning in addition Value, can also reduce flue gas flow rate, be easy to the sedimentation trapping to soda ash in flue gas.

Claims (7)

1. a kind of be used to handle the boiler of papermaking wastewater, it is characterised in that including body of heater, drum (20), convection bank (24), right Flowing bundle lower header I (13), convection bank lower header II (15), energy-saving appliance (22), air preheater and support assembly, the body of heater by Combustion chamber and flue gas buffer set are into combustion chamber is connected with flue gas buffering area, and multiple convection banks (24) are disposed side by side on flue gas In buffering area;
Water separator (19) is provided with drum (20), combustion chamber is fixed on support assembly, and drum (20) is arranged on burning Ceiling portion, convection bank lower header I (13) and convection bank lower header II (15) are each attached to combustion chamber bottom, under convection bank Connected between header I (13) and convection bank lower header II (15), the combustion chamber is by antetheca (23), rear wall (25), left wall (16) mutually fasten and surround with right wall (18), the antetheca (23), rear wall (25), left wall (16) and right wall (18) are membrane type water Cold wall, the top and the bottom of antetheca (16) are respectively equipped with antetheca upper collecting chamber (17) and antetheca lower header (11), the top and the bottom of rear wall (25) Be respectively equipped with rear wall upper collecting chamber and rear wall lower header, the upper and lower side mouth of pipe of antetheca (23) respectively with antetheca upper collecting chamber (17) and antetheca Lower header (11) is connected, and the upper and lower side mouth of pipe of rear wall (25) is connected with rear wall upper collecting chamber and antetheca lower header respectively, collects on antetheca Case (17) and rear wall upper collecting chamber are connected with drum (20), antetheca lower header (11) and rear wall lower header with convection bank next part Case I (13) is connected, the upper and lower side mouth of pipe of left wall (16) and the upper and lower side mouth of pipe of right wall (18) respectively with drum (20) and convection tube Beam lower header I (13) is connected;
The bottom of the combustion chamber is provided with multiple ash output openings, and the lower section of each ash output opening is connected with an ash bucket I (12);It is described right Flowing bundle (24) II is made up of tube bank I and tube bank, the upper and lower side of tube bank I respectively with drum (20) and convection bank lower header I (13) it is connected, the upper and lower side of tube bank II is connected with drum (20) and convection bank lower header II (15) respectively;
The energy-saving appliance (22) includes pipe group (28) and bobbin carriage (29), and the inlet end of the bobbin carriage (29) passes through pipeline (21) and cigarette Gas buffering area is connected, and the pipe group (28) is by helical fin coiled pipe (27), import header (30) and outlet header (26), spiral Fin coiled pipe (27) is staggered in arrangement in bobbin carriage (29), and import header (30) and outlet header (26) are separately positioned on bobbin carriage (29) two ends, the two ends mouth of pipe of the helical fin coiled pipe (27) respectively with import header (30) and outlet header (26) phase Even, outlet header (26) is connected by connecting tube with drum (20), and import header (30) is connected with feed-tank;
The air preheater includes hot arc bobbin carriage (31), cold section of bobbin carriage (33), heated steel pipe and air communication case (32), and be heated steel Pipe group is arranged in hot arc bobbin carriage (31) and cold section of bobbin carriage (33), and the inlet end of heated steel pipe passes through pipeline (21) and bobbin carriage (29) outlet side connection, one end of one end of hot arc bobbin carriage (31) and cold section of bobbin carriage (33) with air communication case (32) phase Even, the other end of the cold section of bobbin carriage (33) is provided with cold wind import (35), and the other end of hot arc bobbin carriage (31) is provided with hot-blast outlet (34)。
2. a kind of it is used to handle the boiler of papermaking wastewater according to claim 1, it is characterised in that the combustion chamber, right Flowing bundle (24) and air communication case (32) are equipped with manhole.
3. a kind of boiler for being used to handle papermaking wastewater according to claim 1, it is characterised in that the convection bank (24) bottom is provided with multiple ash buckets II (14).
4. a kind of boiler for being used to handle papermaking wastewater according to claim 1, it is characterised in that the tube bank I and pipe Beam II is arranged side by side by multiple convection tubes and constituted.
5. a kind of boiler for being used to handle papermaking wastewater according to claim 1, it is characterised in that drum (20) top Portion is provided with pressure gauge (6), safety valve (7), stop valve (8), auxiliary steam valve (9) and emergency blowoff valve (10).
6. a kind of boiler for being used to handle papermaking wastewater according to claim 1, it is characterised in that the bottom of the combustion chamber Portion is provided with the adjustable wall with refractory lining, refracto of area.
A kind of be used to handle the boiler of papermaking wastewater 7. according to claim 1, it is characterised in that the support assembly by Boiler supports (4), outsourcing steelframe (5), inspection platform (3), guardrail (2) and staircase (1), outsourcing steelframe (5) are fixed on boiler branch (4) top is supportted, inspection platform (3) is fixed on the side of boiler supports (4), and staircase (1) is fixed on the sidepiece of inspection platform (3), The guardrail (2) is arranged on staircase (1).
CN201710418660.5A 2017-06-06 2017-06-06 A kind of boiler for being used to handle papermaking wastewater Pending CN107166356A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710418660.5A CN107166356A (en) 2017-06-06 2017-06-06 A kind of boiler for being used to handle papermaking wastewater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710418660.5A CN107166356A (en) 2017-06-06 2017-06-06 A kind of boiler for being used to handle papermaking wastewater

Publications (1)

Publication Number Publication Date
CN107166356A true CN107166356A (en) 2017-09-15

Family

ID=59824668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710418660.5A Pending CN107166356A (en) 2017-06-06 2017-06-06 A kind of boiler for being used to handle papermaking wastewater

Country Status (1)

Country Link
CN (1) CN107166356A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006322678A (en) * 2005-05-20 2006-11-30 Seiji Ohara Oil burning tube nest combustion boiler
CN102062386A (en) * 2011-01-27 2011-05-18 张家港格林沙洲锅炉有限公司 Rapid-installation water pipe boiler with medium and high pressure single-boiler barrel structure
CN102252306A (en) * 2011-07-08 2011-11-23 江苏四方锅炉有限公司 Energy-saving boiler for combustion test
CN102252522A (en) * 2011-07-08 2011-11-23 江苏四方锅炉有限公司 Energy-saving boiler special for combustion test stand
CN104501397A (en) * 2014-11-25 2015-04-08 江苏四方锅炉有限公司 Membrane water-wall compound return water condensing type natural gas hot water boiler
CN205403515U (en) * 2016-02-29 2016-07-27 四川东方锅炉工业锅炉集团有限公司 A exhaust -heat boiler for closeburning stove

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006322678A (en) * 2005-05-20 2006-11-30 Seiji Ohara Oil burning tube nest combustion boiler
CN102062386A (en) * 2011-01-27 2011-05-18 张家港格林沙洲锅炉有限公司 Rapid-installation water pipe boiler with medium and high pressure single-boiler barrel structure
CN102252306A (en) * 2011-07-08 2011-11-23 江苏四方锅炉有限公司 Energy-saving boiler for combustion test
CN102252522A (en) * 2011-07-08 2011-11-23 江苏四方锅炉有限公司 Energy-saving boiler special for combustion test stand
CN104501397A (en) * 2014-11-25 2015-04-08 江苏四方锅炉有限公司 Membrane water-wall compound return water condensing type natural gas hot water boiler
CN205403515U (en) * 2016-02-29 2016-07-27 四川东方锅炉工业锅炉集团有限公司 A exhaust -heat boiler for closeburning stove

Similar Documents

Publication Publication Date Title
WO2012139383A1 (en) Inverted layout structure for pulverized coal boiler adapted to ultra-high temperature steam parameters
CN204388046U (en) Biomass recirculating fluidized bed boiler
CN102635844A (en) Boiler system using waste heat of flue gas of rotary hearth furnace
WO2021258647A1 (en) Natural circulation box structure for ferrosilicon waste heat boiler
CN108489290A (en) A kind of high-temperature flue gas residual neat recovering system
CN205710804U (en) A kind of waste-heat recovery device after Converter Residual Heat Boiler
CN206398683U (en) Low-heat value gas superhigh-pressure high-temp electricity generation system
CN106500318A (en) A kind of built-in water-fire pipe gas-steam boiler of condenser
CN205560784U (en) Four unification sulfur recovery waste heat utilization processing apparatus
CN102128439B (en) Assembly type heat-pipe steam generator of kiln furnace
CN107166356A (en) A kind of boiler for being used to handle papermaking wastewater
CN215177009U (en) Exhaust-heat boiler of hot stove of ferrosilicon ore
CN105737642A (en) Urea pyrolysis ammonia preparation energy saving device for boiler smoke denitrification
CN206439798U (en) Low calorific value coal gas electric generating apparatus
CN210398859U (en) Multi-group spiral finned tube combined waste heat steam boiler
CN207438550U (en) A kind of vertical corner tube type bubbling bed boiler
CN111207373A (en) Waste incineration waste heat boiler system with flue gas reheating function
CN109029024A (en) Biomass boiler energy-saving appliance
CN206369199U (en) Low-heat value gas HTHP electricity generation system
CN100458342C (en) High temperature heat furnace
CN205425859U (en) Sintering exhaust -heat boiler
CN209026785U (en) A kind of steam boiler that can recycle thermal energy
CN219889530U (en) Reinforced heat exchange steam boiler with steel fins
CN213930861U (en) Angle tube boiler with tail quenching heating surface
CN105783534B (en) Vertical Converter Residual Heat Boiler and its application method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915