CN107165423A - It is a kind of to be used to run the construction method that light rail station special-shaped steel structure traction sliding is installed on line - Google Patents
It is a kind of to be used to run the construction method that light rail station special-shaped steel structure traction sliding is installed on line Download PDFInfo
- Publication number
- CN107165423A CN107165423A CN201710314940.1A CN201710314940A CN107165423A CN 107165423 A CN107165423 A CN 107165423A CN 201710314940 A CN201710314940 A CN 201710314940A CN 107165423 A CN107165423 A CN 107165423A
- Authority
- CN
- China
- Prior art keywords
- steel
- construction
- bracket
- sliding
- light rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
This method discloses a kind of for running the construction method that light rail station special-shaped steel structure traction sliding is installed on line, this method relies on special-shaped steel structure installing engineering, it is big according to long-span special Steel Structure Installation engineering difficulty of construction, duration is nervous, construction site is narrow and small, it is impossible to the new method for carrying out the requirement of lifting in situ and designing.Sliding construction is drawn for steel construction, innovation is in steel structural upright column side increase bracket structure, it is used as the support power transmission point and stopping means of integral slipping, by analyzing under each working condition, structural internal force, deformation distribution, the control of steel construction posture analysis and resistance to overturning can adjust Structure Attitude in time, it can play a part of spacing preventing steel construction overall offset again, it is ensured that traction security.
Description
Technical field
It is used to run the construction method that light rail station special-shaped steel structure traction sliding is installed on line, category the present invention relates to a kind of
In light rail station technical field of construction.
Background technology
Jing-Bin light rail Zhang Guizhuan stations engineering is Tianjin City to Binhai New District rail rapid transit first stage of the project Zhang Guizhuan stations
Project to be continued, the engineering mainly builds reserved station in the case where ensuring that Zhang Guizhuan stations are normally run.Wherein station across
Spend for 17.20 meters, post is away from for 9.6 meters, and 12.8 meters, and overall structure is " bridge of standing unification " frame structure, it is necessary to normal in light rail
It is pin-ended arch-shaped steel frame that load-carrying members are installed under running situation.No. 9 line Zhang Guizhuan stations project to be continued large spans of Jing-Bin light rail
Different formed steel construction installation mainly faces construction safety risk greatly, and the duration is nervous, and surrounding environment is complicated, it is impossible to carry out steel construction
The problems such as original position lifting.
The content of the invention
The present invention is to solve the technical problem that train in light rail enlarging is normally run, and the one kind provided is used to run line
The construction method that upper light rail station special-shaped steel structure is installed.
It is a kind of to be used to run the construction method that light rail station special-shaped steel structure traction sliding is installed on line, by steel column
Upper setting bracket, in the long 16#a channel-section steels of bracket lower weld 200mm as sliding block, patch weldering stainless steel plate, passes through inside channel-section steel
Bracket, channel-section steel realize sliding of the steelframe on slideway.Slideway is located on beams of concrete center line, and 24#b works are set up in slipway beam bottom
Word steel makes track be higher than beams of concrete 20cm as support.304 stainless steel plates are completely spread on slipway beam and weld jail with slipway beam
Gu.Silicone grease lubricant is smeared when using on stainless steel.
By increasing bracket device on steel column, steel construction need not remove cunning immediately after jack jacking is fixedly mounted
Duct device, constructs in steel construction all sliding installation process, is installed on girder steel bracket and FY15-7 folders are installed in anchor slot, groove
Piece anchor tool system fixes steel strand wires, the effect of anchor existing anchorage steel strand wires, while also there is adjustment steel strand wires position.
Pass through fixed steel strand wires, it is ensured that azimuth deviation does not occur for pulling force when steel construction is drawn, effectively prevent that clamp rail phenomenon occurs during sliding.
The duration is saved compared to conventional construction method;Meanwhile, jack jacking position be bracket, the change of stress point and by
The increase of power area, substantially increases stability during steelframe jack-up, construction safety has been effectively ensured;Compared to steel column, bracket
Lifting surface area is larger, and steel column is more prone to ensure installation accuracy and speed when being fixedly mounted.
Brief description of the drawings
Fig. 1 is main span steel roof truss upright column bracket and slide block structure figure.
Fig. 2 is main span steel roof truss upright column bracket and slide block structure A-A schematic diagrames.
Embodiment
The 1st, bracket and sliding block are set on the inside of girder steel
Creative is respectively provided with bracket on the inside of every root posts of Pin 2, in the long 16#a channel-section steels conducts of bracket lower weld 200mm
Sliding block, the patch weldering stainless steel plate inside channel-section steel.Meanwhile, installation of slide track is on the inside of the steel column of both sides.Slideway is located at beams of concrete center
On line, 24#b I-steel is set up as support in slipway beam bottom, track is higher than beams of concrete 20cm.Completely spread on slipway beam
304 stainless steel plates and slipway beam firm welding.Silicone grease lubricant is smeared when using on stainless steel.Main span steel roof truss upright column bracket
And slide block structure figure is shown in Fig. 1-Fig. 2.
As shown in figure 1, setting bracket device on the inside of steel column, slid by the use of bracket device as steel construction integrally dragging
Power transmission point, control steel construction horizontal sliding displacement.
2nd, girder steel assembly and pushing tow
Steel structure assembling place is assembled into Pin, and installation bracket and sliding block on steel column to steel column girder steel at the construction field (site).
Installed on girder steel bracket and FY15-7 intermediate plates anchor tool system fixation steel strand wires are installed in anchor slot, groove.Led using 3 steel strand wires
Draw pushing tow operation., will be per Pin steel constructions for connecting bracket and steel strand wires by installing anchor slab, anchor slot and steel construction slideway
Connect as one, wherein anchor existing anchorage steel strand wires are acted on, while also there is adjustment steel strand wires position.
Claims (1)
1. a kind of be used to run the construction method that light rail station special-shaped steel structure traction sliding is installed on line, it is characterised in that:It is logical
Cross and bracket is set on steel column, in the long 16#a channel-section steels of bracket lower weld 200mm as sliding block, patch weldering is stainless inside channel-section steel
Steel plate, sliding of the steelframe on slideway is realized by bracket, channel-section steel;Slideway is located on beams of concrete center line, slipway beam bottom
24#b I-steel is set up as support, track is higher than beams of concrete 20cm;304 stainless steel plates and cunning are completely spread on slipway beam
Road beam firm welding;Silicone grease lubricant is smeared when using on stainless steel;
By increasing bracket device on steel column, steel construction, which is fixedly mounted after jack jacking, need not remove slideway dress immediately
Put, constructed in steel construction all sliding installation process, installed on girder steel bracket and FY15-7 intermediate plate anchors are installed in anchor slot, groove
Tool system fixes steel strand wires.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710314940.1A CN107165423A (en) | 2017-05-07 | 2017-05-07 | It is a kind of to be used to run the construction method that light rail station special-shaped steel structure traction sliding is installed on line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710314940.1A CN107165423A (en) | 2017-05-07 | 2017-05-07 | It is a kind of to be used to run the construction method that light rail station special-shaped steel structure traction sliding is installed on line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107165423A true CN107165423A (en) | 2017-09-15 |
Family
ID=59812705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710314940.1A Pending CN107165423A (en) | 2017-05-07 | 2017-05-07 | It is a kind of to be used to run the construction method that light rail station special-shaped steel structure traction sliding is installed on line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107165423A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806530A (en) * | 2014-03-14 | 2014-05-21 | 中国建筑第二工程局有限公司 | Special-shaped cantilevered steel structure and construction method thereof |
CN105201074A (en) * | 2015-07-27 | 2015-12-30 | 上海十三冶建设有限公司 | Replacing support seat for steel structure sliding construction and construction method |
-
2017
- 2017-05-07 CN CN201710314940.1A patent/CN107165423A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806530A (en) * | 2014-03-14 | 2014-05-21 | 中国建筑第二工程局有限公司 | Special-shaped cantilevered steel structure and construction method thereof |
CN103806530B (en) * | 2014-03-14 | 2015-11-18 | 中国建筑第二工程局有限公司 | A kind of special-shaped overhanging steel structure and construction method thereof |
CN105201074A (en) * | 2015-07-27 | 2015-12-30 | 上海十三冶建设有限公司 | Replacing support seat for steel structure sliding construction and construction method |
Non-Patent Citations (1)
Title |
---|
吴涛: "大跨度钢屋盖定点吊装与整体滑移施工技术分析", 《邢台职业技术学院学报》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103541308B (en) | Variable cross-section cantilever bridge box girder self-locking synchronization pushing system and construction method | |
CN101914897B (en) | Construction method of single main cable inclined-suspender earth anchored suspension bridge | |
CN203583371U (en) | Box girder self-locking synchronous pushing system of variable-cross-section cantilever bridge | |
CN207079483U (en) | Guiding and deviation correcting device available for Large-span Steel Box Beam construction | |
CN105568853A (en) | Large-span steel concrete combined truss girder side position transverse movement and girder dropping construction method | |
CN102041782B (en) | Multi-point pushing system of large-span steel truss girders and pushing process thereof | |
CN104594918A (en) | Split integrated underground passage steel mold plate trolley and construction method thereof | |
CN104213508A (en) | Method for controlling displacement of tower columns through cross braces and external cables | |
KR102015007B1 (en) | Moving type inspection equipment for maintaining of bridge | |
US8584963B2 (en) | Support structure | |
CN102659027B (en) | Variable-span transit method for girder-erecting gantry crane | |
CN105648925A (en) | Bridge girder erection machine for erecting sectional assembled box beam | |
CN107165423A (en) | It is a kind of to be used to run the construction method that light rail station special-shaped steel structure traction sliding is installed on line | |
CN108086168A (en) | Ride cable-styled erection crane | |
CN101892634B (en) | Top pushing mechanism of steel box girder of single longitudinal clapboard on wide bridge deck and top pushing method | |
CN210477296U (en) | Special guardrail of mould and special mould is pour to high security roof beam body | |
CN210368664U (en) | Wide-body bridge girder erection machine | |
CN201770946U (en) | Pushing mechanism for broad-bridge-deck steel box girder with single longitudinal partition | |
CN106245531A (en) | Steel structural bridge installation method is hung under bilateral derrick type | |
CN114134811B (en) | Steel truss girder traction frame and erection method of steel truss girder for bridge | |
CN110847045A (en) | Large-spread-arm bent cap self-propelled portal template system for urban viaduct and construction method | |
CN205369946U (en) | Self -propelled modularization subway station roofing steel structure installation support frame | |
CN107815968B (en) | Large-beam combined steel plate beam bridge deck cast-in-place construction sliding formwork system and application thereof | |
CN218621884U (en) | Become steel reinforced concrete composite beam top pushes away system | |
CN220166687U (en) | Cast-in-situ construction arch frame for upper beam of cable tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170915 |
|
RJ01 | Rejection of invention patent application after publication |