CN107154834B - A kind of transmission of CAD, GIS, SWMM data collaborative and organization and management method - Google Patents

A kind of transmission of CAD, GIS, SWMM data collaborative and organization and management method Download PDF

Info

Publication number
CN107154834B
CN107154834B CN201710236456.1A CN201710236456A CN107154834B CN 107154834 B CN107154834 B CN 107154834B CN 201710236456 A CN201710236456 A CN 201710236456A CN 107154834 B CN107154834 B CN 107154834B
Authority
CN
China
Prior art keywords
data
receiving terminal
transmission
transmission end
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710236456.1A
Other languages
Chinese (zh)
Other versions
CN107154834A (en
Inventor
邓仕虎
颜文涛
王小勇
朱俊丰
冯琳耀
谭易双
向其权
程宇翔
邵知宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Knowing Technology Co Ltd
Chongqing University
Original Assignee
Chongqing Knowing Technology Co Ltd
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Knowing Technology Co Ltd, Chongqing University filed Critical Chongqing Knowing Technology Co Ltd
Priority to CN201710236456.1A priority Critical patent/CN107154834B/en
Publication of CN107154834A publication Critical patent/CN107154834A/en
Application granted granted Critical
Publication of CN107154834B publication Critical patent/CN107154834B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L69/00Network arrangements, protocols or services independent of the application payload and not provided for in the other groups of this subclass
    • H04L69/06Notations for structuring of protocol data, e.g. abstract syntax notation one [ASN.1]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0001Systems modifying transmission characteristics according to link quality, e.g. power backoff
    • H04L1/0006Systems modifying transmission characteristics according to link quality, e.g. power backoff by adapting the transmission format
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/004Arrangements for detecting or preventing errors in the information received by using forward error control
    • H04L1/0076Distributed coding, e.g. network coding, involving channel coding
    • H04L1/0077Cooperative coding
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0078Avoidance of errors by organising the transmitted data in a format specifically designed to deal with errors, e.g. location
    • H04L1/0079Formats for control data
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/12Applying verification of the received information

Abstract

Include that corresponding data of model or Systematic selection according to transmission end and receiving terminal are packaged into data packet the invention discloses a kind of transmission of CAD, GIS, SWMM data collaborative and organization and management method;Receiving terminal judges the data that receive, if invalid data then record log and feedback transmission end, is then compared according to current version data, old version data and valid data if valid data, then carry out versions merging;Space drafting is finally carried out according to new data in receiving terminal.To realize transmission and organization and administration of the data in different system or model.Pattern of the present invention is new, efficient, establish data collaborative transmission mechanism and the organization and administration between CAD, GIS, SWMM software, it got through from Urban Rainwater Pipe Networks, low influence development facility from design, drawn to the rapid modeling of design scheme, a whole set of data processing and inversion flow such as analysis, assess, go out figure, working efficiency is greatly promoted, manpower is saved.

Description

A kind of transmission of CAD, GIS, SWMM data collaborative and organization and management method
Technical field
The present invention relates to information technology fields, more particularly to a kind of CAD, GIS, SWMM data collaborative transmission method.
Background technology
In recent years, the Development of Urbanization of high speed brings the protrusions such as flooding risk, water environment pollution, Ecology destruction and asks Topic has seriously threatened urban safety operation and people life property safety, and country has carried out a series of sponge cities and builds thus If thinking and correlation technique, sponge city is to establish the city with nature accumulation, naturally osmotic, self-purification, is a kind of new City development pattern, Developing is carried out under the premise of complying with the nature, realizes the harmonious development and coexistence of man and nature.Sea Continuous urban construction be related to city always advise, ad hoc planning, Project design, the links such as scheme evaluation, and planning, municipal administration, Multiple industries such as government and department have the characteristics that construction area is wide, range is big, flow is complicated, data are more, format disunity, It needs to get through the technical barrier between links, each department.At present CAD and third party CAD is mostly used in design field Plug-in unit carrys out implementation design, it is advantageous that drawing is convenient, effect is intuitive, in terms of having arrived audit and assessment, often uses GIS Technology and SWMM models, SWMM are flash flood model, are simulated for design scheme, and GIS can be based on analog result and carry out a system Row analysis and assessment, and result displaying is carried out using method for visualizing, including dynamically floods analysis, pipe network visualization assessment etc.. Data format disunity is connected difficult between causing links, and existing data transfer device, practicability is not strong, it is difficult to simultaneous The data constraint between CAD, GIS, SWMM and related request are cared for, manual processing is many times needed, causes data error excessive, Inefficiency really realizes a kind of number by the invention it is possible to fast implement the data transmission problems between CAD, GIS, SWMM According to multidirectional transmission, freely convenient data collaborative transmission and organization and management method are updated.
Invention content
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description Obviously, or practice through the invention is recognized.
A kind of transmission of CAD, GIS, SWMM data collaborative and organization and management method, include the following steps:
S1, the data type for identifying data transmission terminal and receiving terminal, the data type includes CAD, GIS, SWMM, will be passed The data type information of defeated end and receiving terminal is transferred to transmission end data packaging unit;
S2, the transmission end data packaging unit will need transmission data according to the transmission end and the data type of receiving terminal It is packaged into data packet, described to need transmission data include system data and instance data;The system data includes system time version Originally, instance data field sum, the system data are non-null value;The instance data includes code field, field name, often One code field is corresponding with a field name;When the transmission end data packaging unit is packaged, extraction is all System data and one or all instance data;
The data packet is transferred to transmission end transmission unit, the transmission end by S3, the transmission end data packaging unit The connection that link layer is completed between transmission unit and receiving terminal data receipt unit, to establish transmission channel;
S4, receiving terminal data receipt unit receive data and are examined to the data by receiving terminal DCU data control unit It looks into, the generation error information if the data are invalid data;If the data are valid data, it is single to receive end data control First the data of the data of the current version in receiving terminal data storage cell and old version are compared for member, work as described in taking-up The data of preceding version are compared current corresponding to the code field to change and respective field coding with the data of old version Data and historical data are as transaction data, and the data then transmitted again with transmission end are compared, if the conjunction of transmission end There is code field identical with transaction data in method data, and respectively corresponding data are different under field number, then receive End data control unit generates the information for needing secondary-confirmation, and the secondary-confirmation information is passed through by receiving terminal data outputting unit Dedicated channel transfer is crossed to the data receipt unit of transmission end, when user transmission end DCU data control unit make confirmation or After abort operation, the DCU data control unit of transmission end by the confirmation or abandons data transmission unit warp of the information by transmission end The dedicated channel is sent to the data receipt unit of the receiving terminal, and the data receipt unit of the receiving terminal will be described true The DCU data control unit that information is transmitted to the receiving terminal is recognized, if the DCU data control unit reception of the receiving terminal is confirmation letter All data under the current version are stored in the reception end data as the data backup of old version and store list by breath Member, all data in the transmission end receiving unit are corresponding by its by the data by receiving terminal data storage cell The data of number filling current version;If what the receiving terminal DCU data control unit received is to give up information, the biography is deleted In defeated end receiving unit the data abandoned are selected through secondary-confirmation;If in the transaction data and the valid data, do not have The number repeated, then be stored in the receiving terminal using all data under the current version as the data backup of old version Data storage cell, will be described by receiving terminal data storage cell by the valid data in the transmission end receiving unit Data insert the data of current version by its corresponding number, and generate new version number;It generates and successfully records simultaneously, and pass through The successfully record is returned to transmission end receiving unit by the dedicated channel, and the transmission end receiving unit is successfully remembered described Record is stored in log space by receiving terminal data storage cell.
The method achieve the data transmission problems between CAD, GIS, SWMM between arbitrary two system or model, really It realizes a kind of multidirectional transmission of data, updates freely convenient data collaborative transmission and organization and management method, and realize transmission end Respectively occur to need to carry out the unified management of version after data change with receiving terminal.
In a kind of preferred embodiment of the present invention, the invalid data includes that there are null field, institutes in the system data State the inconsistent quantity that instance data actual quantity and the instance data field sum are filled in, the system data and/or Data formatting error in the instance data, the error message include type of error, mistake time of origin, and by described special The error message is returned to transmission end data receipt unit by channel, and the transmission end data receipt unit is by the mistake Information is stored in log space by receiving terminal data storage cell.
The program can allow user mistake occur in data generate, transmit and receive each link and can be returned in real time Feedback, and log recording is provided to check and to correct in time.
In another preferred embodiment of the present invention, when the transmission end or receiving terminal are any one in CAD or GIS When, field name described in the instance data includes inspection shaft, drainage pipeline, surface water channel, water pump, aperture, weir, other classes Type water outlet, water catchment area, underlying surface, low influence development facility;It is described when it is SWMM that transmission end or receiving terminal, which arbitrarily have one end, Field name described in instance data includes engineering title, analysis option, output report instruction, interface document option, rainfall gauge Parameter, low influence exploitation control letter are oozed under information, water catchment area geological information, water catchment area permeable face/impermeable face data, water catchment area It ceases, low influence development facility information, connecting node information, connecting pipeline information, the cross section information of water catchment area.
The program is different in view of different systems or model data structures, therefore needs the field transmitted to do it Standardized management according to different system or the model extraction data information different with transmission can be real without artificially defining Existing automatic business processing.
Description of the drawings
The above-mentioned and/or additional aspect and advantage of the utility model will in the description from combination following accompanying drawings to embodiment Become apparent and is readily appreciated that, wherein:
Fig. 1 is data collaborative transmission and the organization and management method flow chart of the present invention;
Fig. 2 is that the receiving terminal of the present invention receives the versions merging method flow diagram after data;
Fig. 3 be the present invention according to transmission end and receiving terminal different system or model to choosing the logic judgment figure of field;
Specific implementation mode
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng The embodiment for examining attached drawing description is exemplary, and is only used for explaining the utility model, and should not be understood as to the utility model Limitation.
In the description of the present invention, unless otherwise specified and limited, it should be noted that term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be mechanical connection or electrical connection, can also be the company inside two elements It is logical, it can be directly connected, can also indirectly connected through an intermediary, for the ordinary skill in the art, it can To understand the concrete meaning of above-mentioned term as the case may be.
The present invention provides a kind of transmission of CAD, GIS, SWMM data collaborative and organization and management methods, as shown in Figure 1, it is wrapped Include following steps:
S1, the data type for identifying data transmission terminal and receiving terminal, the data type includes CAD, GIS, SWMM, will be passed The data type information of defeated end and receiving terminal is transferred to transmission end data packaging unit.
S2, the transmission end data packaging unit will need to pass according to the system or model information of the transmission end and receiving terminal Transmission of data is packaged into data packet, and described to need transmission data include system data and instance data;The system data includes system Time version, instance data field sum, the system data is non-null value;The instance data includes code field, field Title, each code field are corresponding with a field name;When the data packaging unit is packaged, described in extraction Whole system datas and one or all instance data.It is specific select as shown in figure 3, work as the transmission end and transmission end for In CAD or GIS any one when, field name described in the instance data include inspection shaft, drainage pipeline, surface water channel, Water pump, aperture, weir, other types water outlet, water catchment area, underlying surface, low influence development facility;When transmission end or receiving terminal are arbitrary Have one end be SWMM when, field name described in the instance data include engineering title, analysis option, output report instruction, Ginseng is oozed under interface document option, rainfall gauge information, water catchment area geological information, water catchment area permeable face/impermeable face data, water catchment area Several, low influence exploitation control information, the low influence development facility information of water catchment area, connecting node information, connecting pipeline information, cross Section information.
The data packet is transferred to transmission end transmission unit, the transmission end by S3, the transmission end data packaging unit According to the workflow of SOCKET transport protocol defineds between data receipt unit in transmission unit and data receiver The connection of link layer is completed, and establishes the dedicated channel of SOCKET transport protocols institute.
S4, receiving terminal data receipt unit receive data and are examined to the data by receiving terminal DCU data control unit Look into, specific steps as shown in Fig. 2, if the data be invalid data if generation error information;If the data are valid data, Then DCU data control unit first by data storage cell described in receiving terminal current version and old version be compared, take out institute State that current version compares historical data corresponding to the coding to change and corresponding encoded with old version and current data is made For transaction data, then the data that transmission end is transmitted are compared again, if changing in the valid data of transmission end Number there is also and respectively corresponding data are different under number, then it is single to receive end data control in the transaction data First then generation needs the information of secondary-confirmation, and the secondary-confirmation information is i.e. by receiving terminal data outputting unit by described special Channel transfer to transmission end data receipt unit, when user transmission end DCU data control unit make confirmation or abandon grasping After work, the control unit of transmission end by the confirmation or abandons information by the data transmission unit of transmission end through described dedicated Channel is sent to the data receipt unit of the receiving terminal, and the data receipt unit of the receiving terminal transmits the confirmation message It, will be described if the DCU data control unit reception of the receiving terminal is confirmation message to the DCU data control unit of the receiving terminal All data under current time version are stored in the data storage cell as old version backup, by the transmission end The data are inserted current version by all data in receiving unit by data storage cell by its corresponding number;If institute That states the reception of receiving terminal DCU data control unit is to give up information, then deletes being selected through secondary-confirmation in the transmission end receiving unit Select the data abandoned;If in the transaction data and the valid data, the number not repeated, or have number but the institute of repetition It is identical to state corresponding data under the number of repetition, then using all data under the current time version as history version This backup is stored in the data storage cell, and the valid data in the transmission end receiving unit is stored by data The data are inserted current version by unit by its corresponding number, and generate new version number.
S5, receiving terminal DCU data control unit by the data of current version in the data storage cell press its said system Re-start space drafting.
In a preferred embodiment of the present invention, if transmission end data format is CAD, receiving terminal data format is SWMM, then transmission end is when initiating transmission operation, by the control unit of transmission end according to the system information of the transmitting-receiving two-end of typing Notification data encapsulation unit, flow chart according to fig. 2, data packaging unit extraction need the data transmitted, system data packet System time version, instance data field sum are included, system time version is 20170405102800 in the present embodiment, embodiment Field sum is 5;This instance data include oozed under water catchment area parameter (being encoded to 209), low influence exploitation control information (be encoded to 210), the low influence development facility information (being encoded to 211) of water catchment area, connecting node information (being encoded to 212), connecting pipeline letter It ceases (being encoded to 213).Data packaging unit will be transferred to transmission end after the completion of the system information and example information encapsulation Transmission unit, and by between the transmission unit and receiving terminal data receipt unit according to the work of SOCKET transport protocol defineds Make the connection that flow completes link layer.After receiving terminal data receipt unit obtains data packet, receiving terminal DCU data control unit pair The data are checked, judge whether it is invalid data, the invalid data situation includes having information to lose in system data It loses or format error, there are the fields of actual transmissions in mistake or instance data and field sum for format in the instance data In numerical value describe it is inconsistent, as in instance data in the present embodiment only have 5 fields below if also be invalid data, if It is all correct and system data is also correct for 5 and data format in instance data, then it is judged as valid data.Then data control Unit first by data storage cell described in receiving terminal current version and old version be compared, current version in the present embodiment This system time version is 20170403120005, and the system time version of old version is 20170305091500, is taken out The current version compares the historical data and current data corresponding to the coding to change and corresponding encoded with old version As transaction data, in the present embodiment, it is found that the field of transaction data is that water catchment area permeable face/impermeable face data (is encoded to 208) parameter (being encoded to 209), is oozed under water catchment area, the low low influence for influencing exploitation control information (being encoded to 210), water catchment area is opened Facilities information (being encoded to 211) is sent out, then the data that transmission end is transmitted are compared again, finds valid data and transaction data Middle coding respectively 209,210,211 codings all exist, wherein 209 times corresponding data contents of coding are consistent, coding 210, Data corresponding to 211 are inconsistent, then receiving terminal DCU data control unit then generates the information for needing secondary-confirmation, pass through receiving terminal number Data receipt unit according to output unit by the dedicated channel transfer to transmission end, user is in transmission end data control Unit, which is made, abandons 210, confirms that 211 operations, the control unit of transmission end will abandon data legend list of the information by transmission end Member is sent to the data receipt unit of the receiving terminal through the dedicated channel, and the data receipt unit of the receiving terminal is by institute The DCU data control unit that confirmation message is transmitted to the receiving terminal is stated, corresponding 210 in the transmission end receiving unit are deleted The lower corresponding data of coding, all data under current version are copied and stored in old version, the transmission end is received The data are inserted current version by corresponding data by data storage cell by its corresponding number under 211 codings in unit This, and new version number is generated, such as 20170406171700;It generates and successfully records simultaneously, and will by the dedicated channel The successfully record returns to transmission end data receipt unit, and the data receipt unit stores the successfully record by data Unit is stored in log space.Last receiving terminal is according to all parametric synthesis in newest current version 20170406171700 Space drafting is carried out, newest image is formed.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example Point is contained at least one embodiment or example of the utility model.In the present specification, to the schematic table of above-mentioned term It states and may not refer to the same embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be It can be combined in any suitable manner in any one or more embodiments or example.
While there has been shown and described that the embodiments of the present invention, it will be understood by those skilled in the art that: Can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and objective, modification, replaced And modification, the scope of the utility model are limited by claim and its equivalent.

Claims (2)

1. a kind of CAD, GIS, SWMM data collaborative transmission and organization and management method, which is characterized in that include the following steps:
S1, the data type for identifying data transmission terminal and receiving terminal, the data type includes CAD, GIS, SWMM, by transmission end It is transferred to transmission end data packaging unit with the data type information of receiving terminal;
S2, the transmission end data packaging unit will need transmission data to encapsulate according to the transmission end and the data type of receiving terminal At data packet, described to need transmission data include system data and instance data;The system data includes system time version, reality Example data field sum, the system data are non-null value;The instance data includes code field, field name, each Code field is corresponding with a field name;When the transmission end data packaging unit is packaged, whole systems are extracted Data and one or all instance data;
The data packet is transferred to transmission end transmission unit, the transmission end transmission by S3, the transmission end data packaging unit The connection that link layer is completed between unit and receiving terminal data receipt unit, to establish transmission channel;
S4, receiving terminal data receipt unit receive data and are checked the data by receiving terminal DCU data control unit, if The data are invalid data then generation error information;If the data are valid data, receiving terminal DCU data control unit is first The data of the data of current version in receiving terminal data storage cell and old version are compared, the current version is taken out This data compare the current data corresponding to the code field to change and respective field coding with the data of old version With historical data as transaction data, the data then transmitted again with transmission end are compared, if existing in the valid data Code field identical with transaction data, and corresponding data are different under each code field, then receiving terminal DCU data control unit Then generating needs the information of secondary-confirmation, and the secondary-confirmation information passes through dedicated channel by receiving terminal data outputting unit It is transmitted to transmission end receiving unit, when user is after transmission end DCU data control unit makes confirmation or abort operation, transmission end DCU data control unit by the confirmation or abandon information institute be sent to through the dedicated channel by transmission end transmission unit The data receipt unit of receiving terminal is stated, the confirmation message is transmitted to the receiving terminal by the data receipt unit of the receiving terminal DCU data control unit, if the receiving terminal DCU data control unit receive be confirmation message, will be under the current version All data are stored in the receiving terminal data storage cell as old version backup, will be in the transmission end receiving unit The data are inserted current version by all data by receiving terminal data storage cell by its corresponding code field;If described What receiving terminal DCU data control unit received is to give up information, then deletes and selected through secondary-confirmation in the transmission end receiving unit The data abandoned;If in the transaction data and the valid data, the code field not repeated, then by the current version Under all data as old version backup be stored in the receiving terminal data storage cell, by the valid data by connecing The data are inserted current version by receiving end data storage cell by its corresponding code field, and generate new version number;Together Shi Shengcheng is successfully recorded, and the successfully record is returned to transmission end receiving unit, the transmission by the dedicated channel The successfully record is stored in log space by end receiving unit by receiving terminal data storage cell;
S5, receiving terminal DCU data control unit by the data of current version in the receiving terminal data storage cell by system belonging to its System re-starts space drafting;
When the transmission end or receiving terminal be in CAD or GIS any one when, field name includes described in the instance data Inspection shaft, drainage pipeline, surface water channel, water pump, aperture, weir, other types water outlet, water catchment area, underlying surface, low influence exploitation Facility;
When it is SWMM that transmission end or receiving terminal, which arbitrarily have one end, field name described in the instance data includes engineering mark Topic, analysis option, output report instruction, interface document option, rainfall gauge information, water catchment area geological information, water catchment area permeable face/ Parameter is oozed under impermeable face data, water catchment area, low influence exploitation control information, the low influence development facility information of water catchment area, is connected Connect nodal information, connecting pipeline information, cross section information.
2. a kind of CAD, GIS, SWMM data collaborative transmission according to claim 1 and organization and management method, feature exist In the situation of, the invalid data include in the system data there are null field, the instance data actual quantity with it is described Quantity that instance data field sum is filled in is inconsistent, data format is wrong in the system data and/or the instance data Accidentally, the error message includes type of error, mistake time of origin, and is returned the error message by the dedicated channel Transmission back end receiving unit, the transmission end receiving unit deposit the error message by the receiving terminal data storage cell Storage is in log space.
CN201710236456.1A 2017-04-12 2017-04-12 A kind of transmission of CAD, GIS, SWMM data collaborative and organization and management method Expired - Fee Related CN107154834B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710236456.1A CN107154834B (en) 2017-04-12 2017-04-12 A kind of transmission of CAD, GIS, SWMM data collaborative and organization and management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710236456.1A CN107154834B (en) 2017-04-12 2017-04-12 A kind of transmission of CAD, GIS, SWMM data collaborative and organization and management method

Publications (2)

Publication Number Publication Date
CN107154834A CN107154834A (en) 2017-09-12
CN107154834B true CN107154834B (en) 2018-11-13

Family

ID=59793593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710236456.1A Expired - Fee Related CN107154834B (en) 2017-04-12 2017-04-12 A kind of transmission of CAD, GIS, SWMM data collaborative and organization and management method

Country Status (1)

Country Link
CN (1) CN107154834B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108733932A (en) * 2018-05-24 2018-11-02 奥克斯空调股份有限公司 Circuit design method and apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102480505A (en) * 2010-11-30 2012-05-30 金蝶软件(中国)有限公司 Data increment transmission method and device
CN103259708A (en) * 2013-04-11 2013-08-21 江苏中科惠软信息技术有限公司 System and method for government affair data exchange
CN104579993A (en) * 2013-10-29 2015-04-29 大连生容享科技有限公司 Implementation method for high-speed communication
CN105677679A (en) * 2014-11-20 2016-06-15 航天信息股份有限公司 Data transmission method and system based on XML isomerous data system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003178222A (en) * 2001-12-11 2003-06-27 Hitachi Ltd Data converting method and device between business protocols and its processing program
JP5198929B2 (en) * 2008-04-25 2013-05-15 株式会社日立製作所 Stream data processing method and computer system
CN105117572B (en) * 2015-10-06 2017-12-29 北京工业大学 Automatic SWMM hydraulic models construction method based on Storm Sewer Network design schedule

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102480505A (en) * 2010-11-30 2012-05-30 金蝶软件(中国)有限公司 Data increment transmission method and device
CN103259708A (en) * 2013-04-11 2013-08-21 江苏中科惠软信息技术有限公司 System and method for government affair data exchange
CN104579993A (en) * 2013-10-29 2015-04-29 大连生容享科技有限公司 Implementation method for high-speed communication
CN105677679A (en) * 2014-11-20 2016-06-15 航天信息股份有限公司 Data transmission method and system based on XML isomerous data system

Also Published As

Publication number Publication date
CN107154834A (en) 2017-09-12

Similar Documents

Publication Publication Date Title
Guidotti et al. Modeling the resilience of critical infrastructure: The role of network dependencies
KR100706300B1 (en) A mobile terminal unit for water resource management
Montaser et al. Truck+ for earthmoving operations
CN109902138B (en) Urban one-dimensional hydrodynamic simulation basic data topological relation construction and encoding method based on GIS
CN105139325A (en) Management method of self-starting disaster recovery plans and searching system
CN106504124A (en) A kind of water conservancy industry methods of exhibiting based on virtual reality technology
CN107154834B (en) A kind of transmission of CAD, GIS, SWMM data collaborative and organization and management method
KR20190060650A (en) Scenario based Disaster Prediction System and the Method
KR100361990B1 (en) System and method for sewerage management using a gis
CN110080071A (en) A kind of road collapsion method for early warning, system and terminal device
CN112905726B (en) Modeling analysis method and network model updating method for equipment management network
Kim et al. RnR-SMART: Resilient smart city evacuation plan based on road network reconfiguration in outbreak response
CN110795848A (en) Large-scale commercial complex logistics intelligent operation and maintenance method based on building information model
Assad et al. Resilience-driven multiobjective restoration planning for water distribution networks
Hijazi et al. Use cases and their requirements on the semantic modeling of 3D supply and disposal networks
US20190163847A1 (en) Method, apparatus, and system for predicting spread of disaster using scenario
Luo et al. Productivity study of microtunneling pipe installation using simulation
Lara-Valencia et al. Integrating urban planning and water management through green infrastructure in the United States-Mexico border
CN101251795A (en) Extensive type space network analysis model and algorithm
Kvartsberg On the use of engineering geological information in rock grouting design
CN106052709A (en) Congestion information processing method and device
Abdalla et al. WebGIS-based flood emergency management scenario
CN116305498B (en) Construction method and analysis method for tunnel digital twin modeling index judgment network model
CN105101475A (en) Method and apparatus for identifying WLAN (Wireless Local Area Network) potential users
Russell et al. Computer system for the selection of trenchless and conventional methods for underground utilities

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No. 70, No. 70, No. 70, Zhongshan four, Yuzhong District, Chongqing City, No. 2 and 3

Applicant after: CHONGQING ZHIXING HONGTU TECHNOLOGY CO.,LTD.

Applicant after: Chongqing University

Address before: 401120 Neptune technology building, Yubei District, Chongqing, Yubei District, Chongqing

Applicant before: CHONGQING ZHIXING GEOGRAPHIC INFORMATION CONSULTING SERVICE CO.,LTD.

Applicant before: Chongqing University

CB02 Change of applicant information
CB02 Change of applicant information

Address after: 400030 Shapingba District, Sha Sha Street, No. 174, Chongqing

Applicant after: Chongqing University

Applicant after: CHONGQING ZHIXING HONGTU TECHNOLOGY CO.,LTD.

Address before: No. 70, No. 70, No. 70, Zhongshan four, Yuzhong District, Chongqing City, No. 2 and 3

Applicant before: CHONGQING ZHIXING HONGTU TECHNOLOGY CO.,LTD.

Applicant before: Chongqing University

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181113

CF01 Termination of patent right due to non-payment of annual fee