CN107153905A - A kind of information system and implementation method optimized for power distribution network investment control - Google Patents

A kind of information system and implementation method optimized for power distribution network investment control Download PDF

Info

Publication number
CN107153905A
CN107153905A CN201710076286.5A CN201710076286A CN107153905A CN 107153905 A CN107153905 A CN 107153905A CN 201710076286 A CN201710076286 A CN 201710076286A CN 107153905 A CN107153905 A CN 107153905A
Authority
CN
China
Prior art keywords
module
power distribution
distribution network
analysis
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710076286.5A
Other languages
Chinese (zh)
Inventor
朱永娟
李成仁
李有华
王刚
杨扬
郑天娇
陈挺
陈茜
张俊民
李阳
葛延玲
郭渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Energy Research Institute Co Ltd
Original Assignee
State Grid Energy Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Energy Research Institute Co Ltd filed Critical State Grid Energy Research Institute Co Ltd
Priority to CN201710076286.5A priority Critical patent/CN107153905A/en
Publication of CN107153905A publication Critical patent/CN107153905A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/06Asset management; Financial planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Accounting & Taxation (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Finance (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Technology Law (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of information system and implementation method optimized for power distribution network investment control, its system includes calculating designs module with analysis model, data source acquisition module, data storage processing module, data calculate analysis and processing module, model running module, key message calculates module, results of measuring comparative analysis module and operating analysis result output display module, the calculating designs module with analysis model, data source acquisition module, data storage processing module, data calculate analysis and processing module, model running module and operating analysis result output display module are sequentially connected.The present invention can calculate automatically with analysis power distribution network investment Correlation method for data processing process, so as to automatically generate the power distribution network capital project end value of optimization, can accurately, quickly, investment reference foundation is provided multi-scheme, it is easy to use.

Description

A kind of information system and implementation method optimized for power distribution network investment control
Technical field
The present invention relates to power distribution network investment technology field, more particularly to a kind of information optimized for power distribution network investment control System and implementation method.
Background technology
In recent years, with the economic development and improvement of living standards, need for electricity is continuously increased, distribution investment is passed year by year Increase, in face of huge investment, power distribution network investment science reasonably optimizing turns into key issue.
The Investment calculation analysis of current power distribution network is calculated by manual form mostly, is calculated and is updated stagnant with analysis model optimization Afterwards, it is impossible to quick, accurate to obtain multi information measuring and calculating scenario outcomes.
Therefore, it is used to solve we have proposed a kind of information system optimized for power distribution network investment control and implementation method Above mentioned problem.
The content of the invention
The technical problem existed based on background technology, the present invention proposes a kind of letter optimized for power distribution network investment control Breath system and implementation method.
A kind of information system optimized for power distribution network investment control proposed by the present invention, including calculating are set with analysis model Count module, data source acquisition module, data storage processing module, data and calculate analysis and processing module, model running module, key Information measuring and calculating module, results of measuring comparative analysis module and operating analysis result output display module, the calculating and analysis mould Type design module, data source acquisition module, data storage processing module, data calculate analysis and processing module, model running module It is sequentially connected with operating analysis result output display module, and data calculate analysis and processing module, key message measuring and calculating module, mould Type operation module, results of measuring comparative analysis module and operating analysis result output display module are sequentially connected.
Preferably, it is described calculating with analysis model design module be used for by achievement in research, power distribution network invest job specification with The set of the experience and wisdom of management method, expert and the formation of business backbone's working experience, passes through data mining algorithm statistical Analysis method, design group aspect power distribution network investment control optimization analysis and measurement model;The data source acquisition module be used for Electric grid investment project related data is acquired, and then transmits the power distribution network investment project related data of collection to data storage Processing module.
Preferably, the data storage processing module is used for the power distribution network investment project phase gathered to data source acquisition module Data are closed to be stored and handled.
Preferably, the data, which calculate analysis and processing module, is used for matching somebody with somebody for called data storage processing module memory storage processing Electric grid investment project related data, then carries out calculating analyzing and processing to it, will then calculate the power distribution network after analyzing and processing and throws Money project related data is transmitted separately to model running module and key message measuring and calculating module.
Preferably, the key message measuring and calculating module is used to calculate data at the calculating analysis of analysis and processing module transmission The key message data of power distribution network investment project related data after reason are calculated, and then transmit results of measuring to model and transport Row module.
Preferably, the model running module is used to respectively calculate data at the calculating analysis of analysis and processing module transmission The results of measuring of power distribution network investment project related data and key message measuring and calculating module transfer after reason, which is transmitted to group's aspect, matches somebody with somebody Electric grid investment management and control optimizes analysis and measurement model and results of measuring comparative analysis module, meanwhile, model running module control group Aspect power distribution network investment control optimizes analysis and measurement model running.
Preferably, the results of measuring comparative analysis module is used for the results of measuring progress pair to model running module transfer Than analysis, then comparative analysis result is transmitted to operating analysis result and exports display module;The output of operating analysis result shows Module is used to transferring the excellent of group aspect power distribution network investment control optimization analysis and measurement model and results of measuring comparative analysis module Change comparative analysis result, then carry out output and show.
The invention also provides a kind of implementation method optimized for power distribution network investment control, comprise the following steps:
S1:Design construction group aspect power distribution network investment control optimization analysis and measurement model;
S2:Power distribution network investment project related data is acquired, then to the power distribution network investment project dependency number of collection According to being stored and being handled, calculating analyzing and processing then is carried out to the power distribution network investment project related data after storage and processing, The key message data for calculating the power distribution network investment project related data after analyzing and processing are calculated again, measuring and calculating knot is obtained Really;
S3:Control group's aspect power distribution network investment control optimization analysis and measurement model running;
S4:The power distribution network investment project related data calculated after analyzing and processing is transmitted to group's aspect power distribution network investment pipe Control optimization analysis and measurement model, meanwhile, results of measuring is analyzed;
S5:Output shows optimization comparative analysis result;
S6:Complete the management and control optimization of power distribution network investment.
In the present invention, a kind of information system optimized for power distribution network investment control and implementation method pass through data source Collection, model running and key message measuring and calculating can obtain the power distribution network capital project result of optimization, be calculated by key message Can allow measuring and calculating end value accurately and reliably, the present invention can calculate automatically with analysis power distribution network investment Correlation method for data processing mistake Journey, so as to automatically generate the power distribution network capital project end value of optimization, can provide investment reference accurately, quickly, multi-scheme Foundation, it is easy to use.
Brief description of the drawings
Fig. 1 is a kind of work of the information system and implementation method optimized for power distribution network investment control proposed by the present invention Theory diagram.
Embodiment
The present invention is made with reference to specific embodiment further to explain.
Embodiment
Reference picture 1, the present embodiment propose it is a kind of for power distribution network investment control optimize information system, including calculate with Analysis model design module, data source acquisition module, data storage processing module, data calculate analysis and processing module, model fortune Row module, key message measuring and calculating module, results of measuring comparative analysis module and operating analysis result output display module, calculate with Analysis model design module, data source acquisition module, data storage processing module, data calculate analysis and processing module, model fortune Row module and operating analysis result output display module are sequentially connected, and data calculate analysis and processing module, key message measuring and calculating Module, model running module, results of measuring comparative analysis module and operating analysis result output display module are sequentially connected;Calculate With analysis model design module design group aspect power distribution network investment control optimization analysis and measurement model;Data source acquisition module pair Power distribution network investment project related data is acquired, and is then transmitted the power distribution network investment project related data of collection to data and is deposited Processing module is stored up, the power distribution network investment project related data that data storage processing module is gathered to data source acquisition module is deposited Storage and processing, data calculate the power distribution network investment project phase of analysis and processing module called data storage processing module memory storage processing Data are closed, calculating analyzing and processing then is carried out to it, will then the power distribution network investment project related data after analyzing and processing be calculated Model running module and key message measuring and calculating module are transmitted separately to, key message calculates module and data are calculated with analyzing and processing mould The key message data of power distribution network investment project related data after the calculating analyzing and processing of block transmission are calculated, and then will survey Calculate result to transmit to model running module, the calculating that data are calculated analysis and processing module transmission by model running module respectively is analyzed The results of measuring of power distribution network investment project related data and key message measuring and calculating module transfer after processing is transmitted to group's aspect Power distribution network investment control optimizes analysis and measurement model and results of measuring comparative analysis module, meanwhile, model running module domination set Group's aspect power distribution network investment control optimization analysis and measurement model running, results of measuring comparative analysis module is passed to model running module Defeated results of measuring is analyzed, and then comparative analysis result is transmitted to operating analysis result to exporting display module;Fortune Row analysis result output display module transfers group's aspect power distribution network investment control optimization analysis and measurement model and results of measuring pair Than the optimization comparative analysis result of analysis module, then carry out output and show, complete the management and control optimization of power distribution network investment.
In the present embodiment, calculate with analysis model design module be used for by achievement in research, power distribution network invest job specification with The set of the experience and wisdom of management method, expert and the formation of business backbone's working experience, passes through data mining algorithm statistical Analysis method, design group aspect power distribution network investment control optimization analysis and measurement model;Data source acquisition module is used for power distribution network Investment project related data is acquired, and then transmits the power distribution network investment project related data of collection to data storage processing Module, data storage processing module is used to store the power distribution network investment project related data that data source acquisition module is gathered And processing, data, which calculate analysis and processing module, is used for the power distribution network investment project that called data stores the processing of processing module memory storage Related data, then carries out calculating analyzing and processing to it, will then calculate the power distribution network investment project dependency number after analyzing and processing According to model running module and key message measuring and calculating module is transmitted separately to, key message measuring and calculating module, which is used to calculate data, to be analyzed The key message data of power distribution network investment project related data after the calculating analyzing and processing of processing module transmission are calculated, so Results of measuring is transmitted to model running module afterwards, model running module is used to data are calculated into analysis and processing module transmission respectively Calculating analyzing and processing after power distribution network investment project related data and key message measuring and calculating module transfer results of measuring transmission To group's aspect power distribution network investment control optimization analysis and measurement model and results of measuring comparative analysis module, meanwhile, model running Module control group aspect power distribution network investment control optimization analysis and measurement model running, results of measuring comparative analysis module is used for pair The results of measuring of model running module transfer is analyzed, and then transmits comparative analysis result defeated to operating analysis result Go out display module;Operating analysis result output display module is used to transfer group's aspect power distribution network investment control optimization analysis and measurement The optimization comparative analysis result of model and results of measuring comparative analysis module, then carries out output and shows, one kind is used for power distribution network The information system and implementation method of investment control optimization are gathered by data source, model running and key message measuring and calculating can be obtained The power distribution network capital project result of optimization, by key message calculate can allow measuring and calculating end value accurately and reliably, energy of the present invention Enough automatic calculating and analysis power distribution network investment Correlation method for data processing process, so as to automatically generate the power distribution network capital project knot of optimization Fruit be worth, can accurately, quickly, investment reference foundation is provided multi-scheme, it is easy to use.
The present embodiment also proposed a kind of implementation method optimized for power distribution network investment control, comprise the following steps:
S1:Design construction group aspect power distribution network investment control optimization analysis and measurement model;
S2:Power distribution network investment project related data is acquired, then to the power distribution network investment project dependency number of collection According to being stored and being handled, calculating analyzing and processing then is carried out to the power distribution network investment project related data after storage and processing, The key message data for calculating the power distribution network investment project related data after analyzing and processing are calculated again, measuring and calculating knot is obtained Really;
S3:Control group's aspect power distribution network investment control optimization analysis and measurement model running;
S4:The power distribution network investment project related data calculated after analyzing and processing is transmitted to group's aspect power distribution network investment pipe Control optimization analysis and measurement model, meanwhile, results of measuring is analyzed;
S5:Output shows optimization comparative analysis result;
S6:Complete the management and control optimization of power distribution network investment.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (8)

1. a kind of information system optimized for power distribution network investment control, including calculate and analysis model design module, data source Acquisition module, data storage processing module, data calculate analysis and processing module, model running module, key message measuring and calculating module, Results of measuring comparative analysis module and operating analysis result output display module, it is characterised in that the calculating and analysis model Design module, data source acquisition module, data storage processing module, data calculate analysis and processing module, model running module and Operating analysis result output display module is sequentially connected, and data calculate analysis and processing module, key message measuring and calculating module, model Operation module, results of measuring comparative analysis module and operating analysis result output display module are sequentially connected.
2. a kind of information system optimized for power distribution network investment control according to claim 1, it is characterised in that described Calculate is used to invest job specification and management method, expert and business by achievement in research, power distribution network with analysis model design module The set of the experience and wisdom of key working experience formation, passes through data mining algorithm statistical analysis technique, design group aspect Power distribution network investment control optimizes analysis and measurement model;The data source acquisition module is used for power distribution network investment project related data It is acquired, then transmits the power distribution network investment project related data of collection to data storage processing module.
3. a kind of information system optimized for power distribution network investment control according to claim 1, it is characterised in that described Data storage processing module is used to the power distribution network investment project related data that data source acquisition module is gathered is stored and located Reason.
4. a kind of information system optimized for power distribution network investment control according to claim 1, it is characterised in that described Data, which calculate analysis and processing module, is used for the power distribution network investment project dependency number that called data stores the processing of processing module memory storage According to, calculating analyzing and processing then is carried out to it, then will calculate analyzing and processing after power distribution network investment project related data difference Transmit to model running module and key message measuring and calculating module.
5. a kind of information system optimized for power distribution network investment control according to claim 1, it is characterised in that described The power distribution network that key message measuring and calculating module is used to calculate data after the calculating analyzing and processing of analysis and processing module transmission invests item The key message data of mesh related data are calculated, and then transmit results of measuring to model running module.
6. a kind of information system optimized for power distribution network investment control according to claim 1, it is characterised in that described The power distribution network that model running module is used to respectively calculate data after the calculating analyzing and processing of analysis and processing module transmission invests item The results of measuring of mesh related data and key message measuring and calculating module transfer is transmitted to group's aspect power distribution network investment control optimization point Calculating model and results of measuring comparative analysis module are analysed, meanwhile, model running module control group aspect power distribution network investment control Optimize analysis and measurement model running.
7. a kind of information system optimized for power distribution network investment control according to claim 1, it is characterised in that described Results of measuring comparative analysis module is used to the results of measuring of model running module transfer is analyzed, then will be to score Analysis result, which is transmitted to operating analysis result, exports display module;Operating analysis result output display module is used to transfer group's aspect Power distribution network investment control optimizes the optimization comparative analysis result of analysis and measurement model and results of measuring comparative analysis module, Ran Houjin Row output shows.
8. a kind of implementation method optimized for power distribution network investment control, it is characterised in that comprise the following steps:
S1:Design construction group aspect power distribution network investment control optimization analysis and measurement model;
S2:Power distribution network investment project related data is acquired, then the power distribution network investment project related data to collection is entered Row storage and processing, then carry out calculating analyzing and processing to the power distribution network investment project related data after storage and processing, then will The key message data for calculating the power distribution network investment project related data after analyzing and processing are calculated, and obtain results of measuring;
S3:Control group's aspect power distribution network investment control optimization analysis and measurement model running;
S4:The power distribution network investment project related data calculated after analyzing and processing is transmitted excellent to group's aspect power distribution network investment control Change analysis and measurement model, meanwhile, results of measuring is analyzed;
S5:Output shows optimization comparative analysis result;
S6:Complete the management and control optimization of power distribution network investment.
CN201710076286.5A 2017-02-13 2017-02-13 A kind of information system and implementation method optimized for power distribution network investment control Pending CN107153905A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710076286.5A CN107153905A (en) 2017-02-13 2017-02-13 A kind of information system and implementation method optimized for power distribution network investment control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710076286.5A CN107153905A (en) 2017-02-13 2017-02-13 A kind of information system and implementation method optimized for power distribution network investment control

Publications (1)

Publication Number Publication Date
CN107153905A true CN107153905A (en) 2017-09-12

Family

ID=59792363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710076286.5A Pending CN107153905A (en) 2017-02-13 2017-02-13 A kind of information system and implementation method optimized for power distribution network investment control

Country Status (1)

Country Link
CN (1) CN107153905A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955777A (en) * 2014-05-16 2014-07-30 天津大学 Photovoltaic power generation access power distribution network scheme design and analysis assessment auxiliary system
CN104050608A (en) * 2014-06-26 2014-09-17 国家电网公司 Power distribution network investment method based on reliability planning
KR20150135750A (en) * 2015-11-10 2015-12-03 동국대학교 산학협력단 Apparatus and method for managing a research and development project
CN105574652A (en) * 2015-12-10 2016-05-11 国网山东省电力公司经济技术研究院 Planning big data management and control system of smart power distribution network and method
CN105719090A (en) * 2016-01-25 2016-06-29 江苏省电力公司电力经济技术研究院 Decision-making method for social capital investment of power distribution network based on economical efficiency
CN105989419A (en) * 2015-01-27 2016-10-05 国家电网公司 Investment correction and optimization method for engineering project of intelligent power distribution network

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955777A (en) * 2014-05-16 2014-07-30 天津大学 Photovoltaic power generation access power distribution network scheme design and analysis assessment auxiliary system
CN104050608A (en) * 2014-06-26 2014-09-17 国家电网公司 Power distribution network investment method based on reliability planning
CN105989419A (en) * 2015-01-27 2016-10-05 国家电网公司 Investment correction and optimization method for engineering project of intelligent power distribution network
KR20150135750A (en) * 2015-11-10 2015-12-03 동국대학교 산학협력단 Apparatus and method for managing a research and development project
CN105574652A (en) * 2015-12-10 2016-05-11 国网山东省电力公司经济技术研究院 Planning big data management and control system of smart power distribution network and method
CN105719090A (en) * 2016-01-25 2016-06-29 江苏省电力公司电力经济技术研究院 Decision-making method for social capital investment of power distribution network based on economical efficiency

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
汤亚芳: "基于年预期最大收益的配电网分年度投资决策优化模型", 《电网与清洁能源》 *

Similar Documents

Publication Publication Date Title
CN105117988A (en) Method for interpolating missing data in electric power system
CN112859822B (en) Equipment health analysis and fault diagnosis method and system based on artificial intelligence
CN111079977A (en) Heterogeneous federated learning mine electromagnetic radiation trend tracking method based on SVD algorithm
CN102183621A (en) Aquaculture dissolved oxygen concentration online forecasting method and system
CN104503406B (en) Thermal power plant optimizes postitallation evaluation system and method
CN107194600A (en) A kind of electric load Seasonal Characteristics sorting technique
CN112614011B (en) Power distribution network material demand prediction method and device, storage medium and electronic equipment
CN106936127A (en) A kind of line load regression analysis and Forecasting Methodology and system
CN108647809A (en) A kind of exhaust enthalpy of turbine real-time computing technique based on least square method supporting vector machine
CN110570133A (en) building engineering dynamic cost analysis and control system based on big data
CN103246740B (en) The Optimizing Search clicked on based on user of iteration and satisfaction method for improving and system
Feng et al. [Retracted] Design and Simulation of Human Resource Allocation Model Based on Double‐Cycle Neural Network
CN105207197B (en) Model in Reliability Evaluation of Power Systems method comprising wind power plant
CN114418177B (en) New product material distribution prediction method based on digital twin workshops for generating countermeasure network
CN113837464A (en) Load prediction method of cogeneration boiler based on CNN-LSTM-Attention
CN104537432A (en) Decision-making method for electric system multi-objective optimization dispatching and based on evidence reasoning
CN105890819A (en) Back-pressure steam turbine heat consumption rate on-line monitoring method
CN116599151A (en) Source network storage safety management method based on multi-source data
CN103593550A (en) Pierced billet quality modeling and prediction method based on integrated mean value staged RPLS-OS-ELM
CN105186463B (en) A kind of method for preventing relay protection device of intelligent substation maloperation
CN107122919A (en) A kind of distribution efficiency estimation method and system based on intelligence operation
CN107153905A (en) A kind of information system and implementation method optimized for power distribution network investment control
CN117273422A (en) Supply chain cooperative control method and system for digital production
CN115994459A (en) Method, system and equipment for optimizing construction time sequence of mass power grid infrastructure projects
CN105868921A (en) Method for hydropower station cluster stochastic programming model mode tree branch trimming under limited precision loss

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170912