CN107152009A - A kind of anti-icing selection structure of High-cold regions earth and rockfill dam bank protection and its construction method - Google Patents

A kind of anti-icing selection structure of High-cold regions earth and rockfill dam bank protection and its construction method Download PDF

Info

Publication number
CN107152009A
CN107152009A CN201710306276.6A CN201710306276A CN107152009A CN 107152009 A CN107152009 A CN 107152009A CN 201710306276 A CN201710306276 A CN 201710306276A CN 107152009 A CN107152009 A CN 107152009A
Authority
CN
China
Prior art keywords
dam
icing
selection structure
control system
bank protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710306276.6A
Other languages
Chinese (zh)
Other versions
CN107152009B (en
CN107152009B8 (en
Inventor
李卓
何勇军
范光亚
杨阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Original Assignee
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources filed Critical Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority to CN201710306276.6A priority Critical patent/CN107152009B8/en
Publication of CN107152009A publication Critical patent/CN107152009A/en
Publication of CN107152009B publication Critical patent/CN107152009B/en
Application granted granted Critical
Publication of CN107152009B8 publication Critical patent/CN107152009B8/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • E02B1/003Mechanically induced gas or liquid streams in seas, lakes or water-courses for forming weirs or breakwaters; making or keeping water surfaces free from ice, aerating or circulating water, e.g. screens of air-bubbles against sludge formation or salt water entry, pump-assisted water circulation

Abstract

The present invention provides a kind of anti-icing selection structure of High-cold regions earth and rockfill dam bank protection, along dam body upstream dam slope provided with three anti-freeze expansion structures, solar control system and wind energy control system, three anti-freeze expansion structures are respectively the cast-in-place concrete structure for being laid on dam bottom and dam crest, it is cast in the reinforced concrete wall at dam slope, it is cast in the anti-icing selection structure at dam slope, the top embedded bar of reinforced concrete wall, reinforced concrete wall top surface is fixed with Novel heating material, anti-icing selection structure is reinforced concrete structure, solar control system and wind energy control system are switch type mode of operation.The beneficial effects of the invention are as follows:The present invention reaches antifreezing expansion effect using different structure form, novel anti-freezing is swollen concrete and heating arrangement, have with conventional earth and rockfill dam anti-freeze expansion structure compared with it is anti-icing push away, ice pulls out ability by force, the features such as antifreezing expansion effect is good.Present invention also offers a kind of construction method of the anti-icing selection structure of High-cold regions earth and rockfill dam bank protection.

Description

A kind of anti-icing selection structure of High-cold regions earth and rockfill dam bank protection and its construction method
Technical field
The present invention relates to water conservancy electrical engineering field, more specifically to a kind of anti-icing selection structure of High-cold regions earth and rockfill dam bank protection And its construction method, it is anti-icing using this method High-cold regions earth and rockfill dam bank protection when this method is applied to build earth and rockfill dam in High-cold regions Selection structure reaches earth and rockfill dam bank protection antifreezing expansion effect.
Background technology
Earth and rockfill dam bank protection frost heaving failure is common problem in the hydraulic engineering of High-cold regions.Earth and rockfill dam bank protection is born in the winter time Frost-heaving deformation can be produced under temperature effect and ice pulls out destruction, spring temperature, which rises, makes it melt generation thaw collapse deformation, and spring is in stormy waves Effect is lower to produce ice push, and destruction can be produced with earth and rockfill dam bank protection under wind wave action by being pushed away by multigelation, ice.
Antiseepage anti-freeze expansion structure is single in the prior art, and antifreezing expansion effect is poor, is pushed away by multigelation, frost heave, ice and ice Pull out effect earth and rockfill dam bank protection and produce destruction.Anti-freeze expansion is not solved the problems, such as from essence, earth and rockfill dam bank protection passes through several Frozen-thawed cycleds After effect and frost evil, earth and rockfill dam bank protection produces frost heaving failure, not only influences the on-road efficiency of reservoir but also adds maintenance expense With.
The content of the invention
Instant invention overcomes deficiency of the prior art, an object of the present invention there is provided a kind of High-cold regions earth and rockfill dam Protective slope structure, is contrasted to existing earth and rockfill dam bank protection anti-freeze expansion form with new earth and rockfill dam bank protection anti-freeze expansion structure type Experiment, result of the test shows earth and rockfill dam bank protection antifreezing expansion effect of the present invention substantially, is suppressed using solar energy and wind energy clean energy resource Banket frost heave, ice of dam body is pulled out and the advantages of bank protection anti-freeze expansion.The second object of the present invention there is provided a kind of cold area's earth and rockfill dam shield The construction method of slope structure.
The purpose of the present invention is achieved by following technical proposals.
A kind of anti-icing selection structure of High-cold regions earth and rockfill dam bank protection, in dam body upstream provided with three anti-freeze expansion structures, solar energy controls System and wind energy control system processed, three anti-freeze expansion structures are respectively the cast-in-place concrete knot for being laid on dam bottom and dam crest Structure, the reinforced concrete wall being cast at dam slope, the anti-icing selection structure being cast at dam slope, the reinforced concrete wall and Anti-icing selection structure is located at the corresponding Reservoir in winter water storage level icing area of the dam slope, the solar control system and wind energy control System is located at dam top and leans on upstream side.
Further, the top embedded bar of the reinforced concrete wall, the reinforced concrete wall top surface is consolidated Surely it is provided with Novel heating material.
Further, the reinforced concrete wall has anti-freeze expansion performance, and concrete strength is C40, and concrete strength is C40, freeze proof grade F200, concrete mix is cement:Sand:Stone:Water:Water reducer:Air entraining agent=450:650: 1150:150:4.51:2.7。
Further, the Novel heating material has waterproof, insulation, heating properties, is speciality heating board, and outer surface is black Color.
Further, the anti-icing selection structure is armored concrete, with anti-freeze expansion performance, is shaped as quadrangle, concrete Intensity is C40, freeze proof grade F200, and concrete mix is cement:Sand:Stone:Water:Water reducer:Air entraining agent=450: 650:1150:150:4.51:2.7。
Further, the solar control system and wind energy control system are alternation modular system, can be adaptively mutual Mutually it is switched to solar energy and the work of wind energy control system.
Further, it is the cast-in-place concrete structure includes laying successively on the dam body geomembrane, sand-gravel cushion, existing Pouring concrete.
Further, the cast-in-place concrete and the reinforced concrete wall top surface fix the outer of Novel heating material Surface is in approximately the same plane.
A kind of construction method of the anti-icing selection structure of High-cold regions earth and rockfill dam bank protection, its method and step includes:
1) dam body is filled, linear is made in the dam body;
2) in the corresponding Reservoir in winter water storage level icing area casting concrete wall of dam slope, the reinforced concrete wall Novel heating material is installed at top, and the electric power connection line of Novel heating material is extended into dam crest upstream side;
3) geomembrane, sand-gravel cushion are laid successively to dam crest on the surface of the dam body;
4) poured on the sand-gravel cushion along dam bottom to the reinforced concrete wall close to the side at the dam bottom Cast-in-place concrete;
5) anti-icing selection structure is poured in described reinforced concrete wall side;
6) cast-in-place concrete is poured in side to the dam crest of the anti-icing selection structure;
7) solar control system and wind energy control system are installed close to upstream side in described dam crest, it is added with new The electric power connection line of hot material is connected;
8) solar control system or wind energy control system are started when reservoir bank protection freezes in the winter time.
Further, the step 2) in reinforced concrete wall a width of 1-3m, a height of 1-3m, along axis of dam direction cloth Put.
Further, the step 2) described in reinforced concrete wall top embedded bar, the reinforced concrete wall Body top surface is fixed with Novel heating material, is arranged along axis of dam direction.
Further, the step 6) in the anti-icing a width of 0.5m of selection structure, a height of 0.8m, along axis of dam direction arrange.
Beneficial effects of the present invention are:
New material is heated using solar energy system and wind energy control system, by winter water storage level icing area bank protection surface Ice-out, anti-stagnant ice is to the washing away of bank protection, frost heave, ice are pushed away, ice pulls out destruction;
Anti-icing selection structure, further anti-stagnant ice push away the effect pulled out with ice so that realize ice push away with wind wave action to dam body Destruction is produced, antifreezing expansion effect is reached by double action.
The present invention reaches antifreezing expansion effect using different structure form and Novel heating material, with conventional earth and rockfill dam anti-freeze expansion Structure is small compared to having differential frost heave to deform, and the anti-icing ability of pushing away is strong, the characteristics of antifreezing expansion effect is good.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the structural representation of anti-freeze expansion structural plan of the present invention;
In figure:
1st, dam body;2nd, cast-in-place concrete;3rd, reinforced concrete wall;4th, embedded bar;5th, Novel heating material;6th, spiral shell It is female;7th, electric power connection line;8th, anti-icing selection structure;9th, geomembrane;10th, sand-gravel cushion;11st, solar control system;12nd, wind energy Control system.

Claims (12)

1. a kind of anti-icing selection structure of High-cold regions earth and rockfill dam bank protection, it is characterised in that:Dam body upstream provided with three anti-freeze expansion structures, Solar control system and wind energy control system, three anti-freeze expansion structures are respectively be laid on dam bottom and dam crest cast-in-place mixed Xtah Crude Clay structure, the reinforced concrete wall being cast at dam slope, the anti-icing selection structure being cast at dam slope, the armored concrete Wall and anti-icing selection structure are located at the corresponding Reservoir in winter water storage level icing area of the dam slope, the solar control system and wind Energy control system is located at dam top and leans on upstream side.
2. the anti-icing selection structure of High-cold regions earth and rockfill dam bank protection according to claim 1, it is characterised in that:The armored concrete The top embedded bar of wall, the reinforced concrete wall top surface is fixed with Novel heating material.
3. reinforced concrete wall according to claim 2, it is characterised in that:The reinforced concrete wall has antifreeze Swollen performance, concrete strength is C40, freeze proof grade F200, and concrete mix is cement:Sand:Stone:Water:Water reducer:Draw Gas agent=450:650:1150:150:4.51:2.7.
4. Novel heating material according to claim 2, it is characterised in that:The Novel heating material have waterproof, absolutely Edge, heating properties, are speciality heating board, and outer surface is black.
5. the anti-icing selection structure of High-cold regions earth and rockfill dam bank protection according to claim 1, it is characterised in that:The anti-icing selection structure For armored concrete, with anti-freeze expansion performance, quadrangle is shaped as, concrete strength is C40, freeze proof grade F200, concrete Match ratio is cement:Sand:Stone:Water:Water reducer:Air entraining agent=450:650:1150:150:4.51:2.7.
6. the anti-icing selection structure of High-cold regions earth and rockfill dam bank protection according to claim 1, it is characterised in that:The solar control System and wind energy control system are alternation modular system, and solar energy and wind energy control system work can be adaptively switched to mutually Make.
7. the anti-icing selection structure of High-cold regions earth and rockfill dam bank protection according to claim 1, it is characterised in that:The cast-in-place concrete Structure includes the geomembrane, sand-gravel cushion, cast-in-place concrete laid successively on the dam body.
8. the anti-icing selection structure of High-cold regions earth and rockfill dam bank protection according to claim 1, it is characterised in that:The cast-in-place concrete The outer surface of Novel heating material is fixed in approximately the same plane with the reinforced concrete wall top surface.
9. a kind of construction method of the anti-icing selection structure of High-cold regions earth and rockfill dam bank protection, it is characterised in that:Its method and step includes:
1)Dam body is filled, linear is made in the dam body;
2)In the corresponding Reservoir in winter water storage level icing area casting concrete wall of dam slope, the top of the reinforced concrete wall Novel heating material is installed, the electric power connection line of Novel heating material is extended into dam crest upstream side;
3)Geomembrane, sand-gravel cushion are laid successively on the surface of the dam body to dam crest;
4)Poured on the sand-gravel cushion close to the side at the dam bottom along dam bottom to the reinforced concrete wall cast-in-place Concrete;
5)Anti-icing selection structure is poured in described reinforced concrete wall side;
6)Cast-in-place concrete is poured in side to the dam crest of the anti-icing selection structure;
7)Solar control system and wind energy control system are installed close to upstream side in described dam crest, by itself and Novel heating material The electric power connection line of material is connected;
8)Start solar control system or wind energy control system when reservoir bank protection freezes in the winter time.
10. the construction method of the anti-icing selection structure of High-cold regions earth and rockfill dam bank protection according to claim 8, it is characterised in that:Institute State step 2)The middle a width of 1-3m of reinforced concrete wall, a height of 1-3m, are arranged along axis of dam direction.
11. the construction method of the anti-icing selection structure of High-cold regions earth and rockfill dam bank protection according to claim 8, it is characterised in that:Institute State step 2)Described in reinforced concrete wall top embedded bar, the reinforced concrete wall top surface is fixed with Novel heating material, is arranged along axis of dam direction.
12. the construction method of the anti-icing selection structure of High-cold regions earth and rockfill dam bank protection according to claim 8, it is characterised in that:Institute State step 6)In the anti-icing a width of 0.5m of selection structure, a height of 0.8m, along axis of dam direction arrange.
CN201710306276.6A 2017-05-04 2017-05-04 High and cold region earth and rockfill dam slope protection anti-icing push structure and construction method thereof Active CN107152009B8 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710306276.6A CN107152009B8 (en) 2017-05-04 2017-05-04 High and cold region earth and rockfill dam slope protection anti-icing push structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710306276.6A CN107152009B8 (en) 2017-05-04 2017-05-04 High and cold region earth and rockfill dam slope protection anti-icing push structure and construction method thereof

Publications (3)

Publication Number Publication Date
CN107152009A true CN107152009A (en) 2017-09-12
CN107152009B CN107152009B (en) 2022-01-18
CN107152009B8 CN107152009B8 (en) 2022-02-08

Family

ID=59794384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710306276.6A Active CN107152009B8 (en) 2017-05-04 2017-05-04 High and cold region earth and rockfill dam slope protection anti-icing push structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN107152009B8 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905179A (en) * 2017-11-22 2018-04-13 水利部交通运输部国家能源局南京水利科学研究院 A kind of cold area's earth and rockfill dam anti-freeze expansion structure and its construction method
CN109610415A (en) * 2018-12-11 2019-04-12 长春工程学院 The dam configuration that frost damage prevention destroys
CN110939112A (en) * 2019-12-11 2020-03-31 董金霞 Energy-saving anti-icing sluicing slope for water conservancy facilities
CN112962523A (en) * 2021-02-08 2021-06-15 水利部交通运输部国家能源局南京水利科学研究院 Dam frost heaving prevention protection structure and construction method
CN114000462A (en) * 2021-11-26 2022-02-01 中水北方勘测设计研究有限责任公司 Anti-ice-pushing method for protecting auxiliary steel pipe of reservoir slope protection water measuring facility
CN115045233A (en) * 2022-07-20 2022-09-13 水利部交通运输部国家能源局南京水利科学研究院 Anti-ice pushing and scouring dam slope protection and construction method thereof
CN116289790A (en) * 2022-12-27 2023-06-23 水利部交通运输部国家能源局南京水利科学研究院 Device for preventing ice from pushing and pulling on dam slope of earth-rock dam and ice pushing force calculation method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905179A (en) * 2017-11-22 2018-04-13 水利部交通运输部国家能源局南京水利科学研究院 A kind of cold area's earth and rockfill dam anti-freeze expansion structure and its construction method
CN109610415A (en) * 2018-12-11 2019-04-12 长春工程学院 The dam configuration that frost damage prevention destroys
CN110939112A (en) * 2019-12-11 2020-03-31 董金霞 Energy-saving anti-icing sluicing slope for water conservancy facilities
CN110939112B (en) * 2019-12-11 2021-04-27 宁夏捷丰建设工程有限公司 Energy-saving anti-icing sluicing slope for water conservancy facilities
CN112962523A (en) * 2021-02-08 2021-06-15 水利部交通运输部国家能源局南京水利科学研究院 Dam frost heaving prevention protection structure and construction method
CN112962523B (en) * 2021-02-08 2021-09-28 水利部交通运输部国家能源局南京水利科学研究院 Dam frost heaving prevention protection structure and construction method
CN114000462A (en) * 2021-11-26 2022-02-01 中水北方勘测设计研究有限责任公司 Anti-ice-pushing method for protecting auxiliary steel pipe of reservoir slope protection water measuring facility
CN115045233A (en) * 2022-07-20 2022-09-13 水利部交通运输部国家能源局南京水利科学研究院 Anti-ice pushing and scouring dam slope protection and construction method thereof
CN116289790A (en) * 2022-12-27 2023-06-23 水利部交通运输部国家能源局南京水利科学研究院 Device for preventing ice from pushing and pulling on dam slope of earth-rock dam and ice pushing force calculation method
CN116289790B (en) * 2022-12-27 2023-09-22 水利部交通运输部国家能源局南京水利科学研究院 Device for preventing ice from pushing and pulling on dam slope of earth-rock dam and ice pushing force calculation method

Also Published As

Publication number Publication date
CN107152009B (en) 2022-01-18
CN107152009B8 (en) 2022-02-08

Similar Documents

Publication Publication Date Title
CN107152009A (en) A kind of anti-icing selection structure of High-cold regions earth and rockfill dam bank protection and its construction method
CN205617318U (en) Panel rock -fill dam anti icing equipment
CN203960710U (en) Sidewalk solar pavement
CN107905179A (en) A kind of cold area's earth and rockfill dam anti-freeze expansion structure and its construction method
CN204703179U (en) A kind of composite geo-membrane sloping core cofferdam
CN208685679U (en) Compound anti-float anchor rod
CN106012829A (en) Heating system for bridge pavement and construction method
CN106436646B (en) A kind of anti-icing slope protection for pushing away destruction
CN102322155A (en) Unconcerned table sea, multi-functional Great Wall and sandstorm control
CN108221841B (en) Honeycomb type dam slope protection structure
CN105239557A (en) Device and method for accelerating consolidation of soft soil through combination of frost heaving and melting shrinking method and vacuum preloading
CN107034900B (en) Structure is administered to frozen soil side slope disease of slumping of hot melt
CN102839637B (en) Flexible channel
CN206521696U (en) A kind of bridge drainage system
CN211113468U (en) Concrete face dam surface layer seam prevention of seepage protective structure
CN201367576Y (en) Submersible ice-breaking device
CN205445088U (en) A anti -icing freezing is constructed that is used for cold area profundal zone transmission line iron tower and basis
CN106930234A (en) A kind of High-cold regions earth and rockfill dam protective slope structure and its construction method
CN203080482U (en) Roller compacted concrete dam structure applicable to cold environment
CN203256677U (en) Coastal protection building
CN205348275U (en) Water intaking structures, water intaking system and circulating water system
CN204940244U (en) The compacted device melting contracting fracturing method soft ground treatment of a kind of frost heave
CN209873690U (en) Anti-freezing air cushion and anti-freezing structure for upstream slope of dam
CN202787054U (en) Heating anti-freezing device
CN207567719U (en) The dykes and dams that a kind of gangue dead meal fills

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Zhuo

Inventor after: Yang Yang

Inventor after: Fan Guangya

Inventor after: Jiang Jingdong

Inventor after: Bi Chaoda

Inventor after: Long Zhifei

Inventor after: Sun Weiwei

Inventor before: Li Zhuo

Inventor before: He Yongjun

Inventor before: Fan Guangya

Inventor before: Yang Yang

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
CI03 Correction of invention patent

Correction item: Inventor

Correct: Li Zhuo|Yang Yang|Fan Guangya|Jiang Jingdong|Bi Chaoda|Long Zhifei|Sun Weiwei

False: Li Zhuo|Fan Guangya|Bi Chaoda|Long Zhifei|Sun Weiwei

Number: 03-01

Volume: 38

Correction item: Inventor

Correct: Li Zhuo|Yang Yang|Fan Guangya|Jiang Jingdong|Bi Chaoda|Long Zhifei|Sun Weiwei

False: Li Zhuo|Fan Guangya|Bi Chaoda|Long Zhifei|Sun Weiwei

Number: 03-01

Page: The title page

Volume: 38