CN107143150A - The ruggedized construction of C-type steel/Z-shape steel purlin - Google Patents
The ruggedized construction of C-type steel/Z-shape steel purlin Download PDFInfo
- Publication number
- CN107143150A CN107143150A CN201710511589.5A CN201710511589A CN107143150A CN 107143150 A CN107143150 A CN 107143150A CN 201710511589 A CN201710511589 A CN 201710511589A CN 107143150 A CN107143150 A CN 107143150A
- Authority
- CN
- China
- Prior art keywords
- steel
- shape
- type
- bar
- purlin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 152
- 239000010959 steel Substances 0.000 title claims abstract description 152
- 238000010276 construction Methods 0.000 title claims abstract description 23
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 19
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 2
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 claims 1
- 239000010931 gold Substances 0.000 claims 1
- 229910052737 gold Inorganic materials 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a kind of ruggedized construction of C-type steel/Z-shape steel purlin, including C-type steel/Z-shape steel body, on the intrinsic top of C-type steel/Z-shape steel, set and reinforce steel bar, and reinforce steel bar and fixed by the connecting hole on C-type steel/Z-shape steel with building beam or post, reinforce steel bar and held out against by top-fastening rod and C-type steel/Z-shape steel top.The present invention is rational in infrastructure, can effectively improve C-type steel/Z-shape steel purlin bearing capacity, and it is very convenient, reliable to construct.
Description
Technical field
The present invention relates to a kind of ruggedized construction of C-type steel/Z-shape steel purlin.
Background technology
Existing C-type steel/Z-shape steel purlin, in the case where bearing larger pressure, it appears compare thin, Lack of support,
The need for large-sized workshop building etc. can not be met.
The content of the invention
It is an object of the invention to provide C-type steel/Z-type that one kind can effectively improve C-type steel/Z-shape steel purlin bearing capacity
The ruggedized construction of steel purlin bar.
The present invention technical solution be:
A kind of C-type steel/Z-shape steel(That is C-type steel or Z-shape steel)The ruggedized construction of purlin, including C-type steel/Z-shape steel body, its feature
It is:On the intrinsic top of C-type steel/Z-shape steel, set and reinforce steel bar, and reinforce steel bar by C-type steel/Z-shape steel with building
The connecting hole of thing beam or post is fixed, and reinforces steel bar by top-fastening rod with being held out against at the top of C-type steel/Z-shape steel.
The reinforcing steel bar is tabular or angle steel.
The top-fastening rod is bolt, and the reinforcing steel bar is one layer, reinforces the bolt hole for setting and coordinating with bolt on steel bar,
Bolt is held out against at the top of C-type steel/Z-shape steel through the bolt hole reinforced on steel bar.
The top-fastening rod is bolt, and the reinforcing steel bar is upper and lower two stratified form, and lower floor reinforces on steel bar and set and bolt
Upper strata reinforcing steel bar is held out against and is fitted in C-type steel/Z-type by the bolt hole of cooperation, bolt through the bolt hole that lower floor is reinforced on steel bar
At the top of steel.
The top-fastening rod is metallic rod, and the reinforcing steel bar is one layer, and metallic rod upper end at the top of C-type steel/Z-shape steel with welding
Connect, metallic rod bottom is connected with reinforcing steel bar, set and worn in the construction for installing steel wire rope, steel wire penetrating metallic rod in metallic rod
The construction of steel loading cord, the two ends of steel wire rope are connected with steel wire rope stretching device.
The construction of steel wire rope is installed for the perforation in metallic rod or the arc of metallic rod lower end is recessed or metallic rod lower end is connected
Downwardly open arc.
The steel wire rope stretching device is Double-ended nut or gaily decorated basket nut, and one end of Double-ended nut or gaily decorated basket nut passes through even
Fitting is connected with C-type steel/Z-shape steel(It can be fixed on the connecting hole with building beam or post on C-type steel/Z-shape steel), the other end
It is connected with steel wire rope.
The present invention is rational in infrastructure, can effectively improve C-type steel/Z-shape steel purlin bearing capacity, and it is very convenient, reliable to construct.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of the embodiment of the present invention 1.
Fig. 2 is Fig. 1 cross-sectional view.
Fig. 3 is the structural representation of embodiment 2.
Fig. 4 is Fig. 3 cross-sectional view.
Fig. 5 is the structural representation of embodiment 3.
Fig. 6 is Fig. 5 cross-sectional view.
Fig. 7 is that embodiment 1 reinforces steel bar using schematic diagram during angle steel.
Fig. 8 is Fig. 7 cross-sectional view.
Fig. 9 is embodiment 1 using schematic diagram during Z-shape steel purlin.
Figure 10 is Fig. 9 cross-sectional view.
Embodiment
Embodiment 1:
A kind of ruggedized construction of C-type steel/Z-shape steel purlin, including C-type steel/Z-shape steel body 1, it is intrinsic in C-type steel/Z-shape steel
Top, sets and reinforces steel bar, and reinforces steel bar and fixed by the connecting hole 2 on C-type steel/Z-shape steel with building beam or post, plus
Gu steel bar is by top-fastening rod with being held out against at the top of C-type steel/Z-shape steel.
The reinforcing steel bar is tabular(Shown in Fig. 1, Fig. 2)Or angle steel(Shown in Fig. 7, Fig. 8).
The top-fastening rod is bolt 3, and the reinforcing steel bar 4 is one layer, reinforces the bolt for setting and coordinating with bolt on steel bar
Hole, bolt is held out against at the top of C-type steel/Z-shape steel through the bolt hole reinforced on steel bar.
Embodiment 2:
The top-fastening rod is bolt 5, and the reinforcing steel bar is upper and lower two stratified form 6,7, and lower floor reinforces on steel bar and set and bolt
Upper strata reinforcing steel bar is held out against and is fitted in C-type steel/Z-type by the bolt hole of cooperation, bolt through the bolt hole that lower floor is reinforced on steel bar
At the top of steel.
Remaining be the same as Example 1.
Embodiment 3:
The top-fastening rod is metallic rod 8, and the reinforcing steel bar 9 is one layer, and metallic rod upper end is welded with C-type steel/Z-shape steel top,
Metallic rod bottom is connected with reinforcing steel bar, is set and is worn in the construction for installing steel wire rope 10, steel wire penetrating metallic rod in metallic rod
The construction of steel loading cord, the two ends of steel wire rope are connected with steel wire rope stretching device.
The construction of steel wire rope is installed for the perforation in metallic rod or the arc of metallic rod lower end is recessed or metallic rod lower end is connected
Downwardly open arc.
The steel wire rope stretching device is Double-ended nut or gaily decorated basket nut 11, and one end of Double-ended nut or gaily decorated basket nut passes through
Connector is connected with C-type steel/Z-shape steel(It can be fixed on the connecting hole with building beam or post on C-type steel/Z-shape steel), it is another
End is connected with steel wire rope.By adjusting Double-ended nut or gaily decorated basket nut, steel wire rope is tensioned, and then hold out against top-fastening rod.
Claims (7)
1. a kind of ruggedized construction of C-type steel/Z-shape steel purlin, including C-type steel/Z-shape steel body, it is characterized in that:In C-type steel/Z-type
The intrinsic top of steel, sets and reinforces steel bar, and reinforcing steel bar passes through the connection with building beam or post on C-type steel/Z-shape steel
Hole is fixed, and reinforces steel bar by top-fastening rod with being held out against at the top of C-type steel/Z-shape steel.
2. the ruggedized construction of C-type steel according to claim 1/Z-shape steel purlin, it is characterized in that:The reinforcing steel bar is plate
Shape or angle steel.
3. the ruggedized construction of C-type steel according to claim 1 or 2/Z-shape steel purlin, it is characterized in that:The top-fastening rod is spiral shell
Bolt, the reinforcing steel bar is one layer, reinforces the bolt hole for setting and coordinating with bolt on steel bar, and bolt passes through the spiral shell reinforced on steel bar
Keyhole is held out against at the top of C-type steel/Z-shape steel.
4. the ruggedized construction of C-type steel according to claim 1 or 2/Z-shape steel purlin, it is characterized in that:The top-fastening rod is spiral shell
Bolt, the reinforcing steel bar is upper and lower two stratified form, and lower floor reinforces the bolt hole for setting and coordinating with bolt on steel bar, and bolt is passed through
Upper strata reinforcing steel bar is held out against and is fitted in C-type steel/Z-shape steel top by the bolt hole that lower floor is reinforced on steel bar.
5. the ruggedized construction of C-type steel according to claim 1 or 2/Z-shape steel purlin, it is characterized in that:The top-fastening rod is gold
Belong to bar, the reinforcing steel bar is one layer, and metallic rod upper end at the top of C-type steel/Z-shape steel with welding, and metallic rod bottom is with reinforcing steel bar
The construction that steel wire rope is installed in the construction for installing steel wire rope, steel wire penetrating metallic rod is set in connection, metallic rod, steel wire rope
Two ends are connected with steel wire rope stretching device.
6. the ruggedized construction of C-type steel according to claim 5/Z-shape steel purlin, it is characterized in that:Install the construction of steel wire rope
Arc for the perforation in metallic rod or metallic rod lower end is recessed or the downwardly open arc of metallic rod lower end connection.
7. the ruggedized construction of C-type steel according to claim 5/Z-shape steel purlin, it is characterized in that:The steel wire tensioning dress
It is set to Double-ended nut or gaily decorated basket nut, one end of Double-ended nut or gaily decorated basket nut is connected by connector with C-type steel/Z-shape steel, separately
One end is connected with steel wire rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710511589.5A CN107143150A (en) | 2017-06-29 | 2017-06-29 | The ruggedized construction of C-type steel/Z-shape steel purlin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710511589.5A CN107143150A (en) | 2017-06-29 | 2017-06-29 | The ruggedized construction of C-type steel/Z-shape steel purlin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107143150A true CN107143150A (en) | 2017-09-08 |
Family
ID=59785196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710511589.5A Pending CN107143150A (en) | 2017-06-29 | 2017-06-29 | The ruggedized construction of C-type steel/Z-shape steel purlin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107143150A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374495A (en) * | 2018-03-06 | 2018-08-07 | 王新宇 | It is a kind of to be connected and fixed device for Z-shaped purlin and crossbeam |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0762610A (en) * | 1993-08-23 | 1995-03-07 | Yoshiyuki Ogushi | Reinforced girder structure |
JPH0849345A (en) * | 1994-08-05 | 1996-02-20 | Sekisui House Ltd | Member for reinforcing beam |
CN104533023A (en) * | 2015-01-06 | 2015-04-22 | 沈阳建筑大学 | Connecting structure of purline, roof panel and steel beam |
CN205224412U (en) * | 2015-08-13 | 2016-05-11 | 光正集团股份有限公司 | Improved angle steel purlin support plate structure |
CN205654117U (en) * | 2016-03-14 | 2016-10-19 | 中冶建筑研究总院有限公司 | Purlin or wall beam that increase C, Z shaped steel is connected with self -tapping screw |
CN205857413U (en) * | 2016-08-03 | 2017-01-04 | 广东精工钢结构有限公司 | Square tube purlin and Z-shaped purline, c-type purlin attachment structure |
CN106639348A (en) * | 2016-11-02 | 2017-05-10 | 北京清华同衡规划设计研究院有限公司 | Purline reinforcing structure |
CN207092589U (en) * | 2017-06-29 | 2018-03-13 | 虞建石 | The ruggedized construction of C-type steel/Z-shape steel purlin |
-
2017
- 2017-06-29 CN CN201710511589.5A patent/CN107143150A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0762610A (en) * | 1993-08-23 | 1995-03-07 | Yoshiyuki Ogushi | Reinforced girder structure |
JPH0849345A (en) * | 1994-08-05 | 1996-02-20 | Sekisui House Ltd | Member for reinforcing beam |
CN104533023A (en) * | 2015-01-06 | 2015-04-22 | 沈阳建筑大学 | Connecting structure of purline, roof panel and steel beam |
CN205224412U (en) * | 2015-08-13 | 2016-05-11 | 光正集团股份有限公司 | Improved angle steel purlin support plate structure |
CN205654117U (en) * | 2016-03-14 | 2016-10-19 | 中冶建筑研究总院有限公司 | Purlin or wall beam that increase C, Z shaped steel is connected with self -tapping screw |
CN205857413U (en) * | 2016-08-03 | 2017-01-04 | 广东精工钢结构有限公司 | Square tube purlin and Z-shaped purline, c-type purlin attachment structure |
CN106639348A (en) * | 2016-11-02 | 2017-05-10 | 北京清华同衡规划设计研究院有限公司 | Purline reinforcing structure |
CN207092589U (en) * | 2017-06-29 | 2018-03-13 | 虞建石 | The ruggedized construction of C-type steel/Z-shape steel purlin |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374495A (en) * | 2018-03-06 | 2018-08-07 | 王新宇 | It is a kind of to be connected and fixed device for Z-shaped purlin and crossbeam |
CN108374495B (en) * | 2018-03-06 | 2019-07-26 | 徐超 | It is a kind of to be connected and fixed device for Z-shaped purlin and crossbeam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112727539B (en) | Construction method for filling false roof by using shrinkable mesh material | |
CN207092589U (en) | The ruggedized construction of C-type steel/Z-shape steel purlin | |
CN103075165A (en) | Composite supporting method of vertical beam of coal road | |
CN107143150A (en) | The ruggedized construction of C-type steel/Z-shape steel purlin | |
CN110985078A (en) | High-resistance yielding large-deformation surface supporting system and mounting method thereof | |
CN203248177U (en) | Pressure avoidable type liner plate device | |
CN202925954U (en) | Steel structure factory building assembly | |
CN107268853A (en) | A kind of full bolts assemblies formula steel skeleton light-duty plate and preparation method thereof | |
CN201546368U (en) | Steel-structure column body | |
CN206737271U (en) | A kind of a chain of bar connecting of bolt is buckled | |
CN208330412U (en) | One kind being used for half-edge coal seam tunnelling supporting metal integral support | |
CN211777497U (en) | Shield constructs section of jurisdiction hole for hoist built-in fitting position arrangement of reinforcement and improves structure | |
CN204326498U (en) | Screw outrigger oblique pull wire rope fixing device | |
CN209686924U (en) | A kind of large volume arc concrete steel lattice supporting framework | |
CN203113368U (en) | Communication tower valve base | |
CN203452066U (en) | Non-prestressed high-strength centrifugal concrete square pile | |
CN201292674Y (en) | Pull cable head stretching oblique-splicing reaction frame | |
CN206428814U (en) | High intensity square tube Roof system | |
CN220581069U (en) | Equal-strength anchor cable and steel bar connecting beam | |
CN201407060Y (en) | Ultrahigh-strength plastic supporting mesh | |
CN215803087U (en) | Safe operation platform for open caisson | |
CN205655092U (en) | High strength steel board | |
CN204940821U (en) | One can be had enough to meet the need and utilize Finalized rebar operating desk | |
CN212002344U (en) | Supplementary muscle device of wearing of muscle on assembled precast beam | |
CN110295923B (en) | Supporting device and supporting method for stoping of underground pillar filling method of metal mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210413 Address after: Room 349, 3 / F, building 301-2, No. 301, Fute South Road, Pudong New Area pilot Free Trade Zone, Shanghai 200131 Applicant after: Shanghai Shangfu equipment Machinery Co.,Ltd. Address before: 226200 No. 818 Huashi Road, Huilong Town, Qidong City, Nantong City, Jiangsu Province Applicant before: Yu Jianshi Applicant before: Lu Aiping |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170908 |