CN107143100A - Rail post built-in fitting and rail post installation method that a kind of brick, stone are marked time - Google Patents
Rail post built-in fitting and rail post installation method that a kind of brick, stone are marked time Download PDFInfo
- Publication number
- CN107143100A CN107143100A CN201710390180.2A CN201710390180A CN107143100A CN 107143100 A CN107143100 A CN 107143100A CN 201710390180 A CN201710390180 A CN 201710390180A CN 107143100 A CN107143100 A CN 107143100A
- Authority
- CN
- China
- Prior art keywords
- brick
- stone
- pipe
- rail post
- square tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1812—Details of anchoring to the wall or floor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1842—Balusters; Grille-type elements
- E04F11/1846—Balusters with means for fixing to the floor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Repair (AREA)
Abstract
The present invention relates to a kind of decoration technology, rail post built-in fitting and rail post installation method that particularly a kind of brick, stone are marked time.The rail post bottom is provided with columnar projections portion, and columnar projections portion insertion brick, stone, which are marked time, middle to be fixed rail post;The built-in fitting top is square tube or pipe, and the endoporus size of the square tube or pipe is can accommodate columnar projections portion;Built-in fitting bottom is installing plate, and the installing plate is fixedly connected with square tube or pipe, and square tube or pipe are fixedly mounted on into basic unit ground of marking time;After the completion of the brick, stone laying, square tube or pipe penetrate the brick, rock layers, and the lug boss insertion square tube or pipe of the rail post fix rail post.The installation method of the present invention, before brick, the stone laying marked time, first installs built-in fitting marking time in basic unit, reduce brick, stone chip, cracking chance, the ground of marking time of installation is attractive in appearance, and rail post accurate positioning, and fastness is good, improves efficiency of construction.
Description
Technical field
The present invention relates to a kind of decoration technology, the rail post built-in fitting and rail post that particularly a kind of brick, stone are marked time are installed
Method.
Background technology
The both sides of stair usually require to install wooden railing, announce the utility model patent for CN206090858U, entitled
" a kind of stair spats built-in fitting " discloses a kind of Protective angle for stairs built-in fitting, can not be to stairway step skirt mainly for built-in fitting
Outer rim concrete is effectively protected, the problems such as skirt edge is easily damaged, therefore is devised with riser plate and skirt panel
Built-in fitting.The shortcoming of this built-in fitting is must be pre-buried when making the casting concrete of room construction.
However, for the laying floor tile in fitting-out work, marmorean stair step, due to stairway step upper surface and side
Face is all laid in floor tile or marble, then in the absence of it is such the problem of.Brick, stone mark time install built-in fitting subject matter it is as follows:
Traditional installation of embedded parts method adds built-in fitting method after being, i.e., according to following steps:1)In stair basic unit complete floor tile,
Marmorean laying;2)Unwrapping wire determines the position of column fixing point on floor tile, marble;3)With punching on floor tile, marble
Hit brill drilling;4)Expansion bolt and steel plate built-in fitting are installed in hole, it is ensured that bolt has enough length;5)Rail post is fixed
On expansion bolt.
Traditional installation method has the disadvantages that:In drilling, because drilling force and direction are difficult to control, easily cause ground
Brick, marble chip, cracking, or co-occurrence hollowing during drilling;Moreover, expansion bolt is when fixing, and it is uneven because expanding, also easily make
Damaged into floor tile, marble cracking, corner, insecure after installation, ground is unsightly;Secondly, such a installation method is easily caused
Positioning is incorrect, and interval error is big, inconsistent from nosing mouthful spacing, therefore, before column is installed, it usually needs relay
Line, to determine buried plate position and the accuracy of welding vertical rod, troublesome poeration takes, schedule delays.
The content of the invention
The rail post installation method marked time for not enough above, of the invention brick, stone, takes in the concrete base layer marked time
Laying first pre-buried built-in fitting before completing, reduces brick, stone chip, cracking chance, makes rail post accurate positioning, improve construction effect
Rate.
The technical scheme is that:
A kind of rail post built-in fitting that brick, stone are marked time, the rail post bottom is provided with columnar projections portion, the columnar projections portion
Insertion brick, stone, which are marked time, middle to be fixed rail post;The built-in fitting top is square tube or pipe, and the endoporus of the square tube or pipe is big
Small is that can accommodate columnar projections portion;Built-in fitting bottom is installing plate, and the installing plate is fixedly connected with square tube or pipe, by square tube
Or pipe is fixedly mounted on basic unit ground of marking time;After the completion of the brick, stone laying, square tube or pipe penetrate the brick, rock layers, institute
The lug boss insertion square tube or pipe for stating rail post fix rail post.
The installing plate is surrounded by screw hole, and basic unit ground of marking time is fixed on by expansion bolt.
The square tube or pipe length are at least 5cm, and the installation plate thickness is at least 2cm.
The square tube or pipe, installing plate are metalwork.
The square tube or pipe, installing plate are stainless steel part.
A kind of built-in fitting using the present invention carries out the rail post installation method that brick, stone are marked time, and is marked time laying in brick, stone
Before, first built-in fitting is installed marking time in basic unit, specifically includes following steps:
Step 1:In unwrapping wire in basic unit of marking time, the position of rail post fixing point is determined;
Step 2:In the position installation built-in fitting in basic unit according to fixing point of marking time;
Step 3:According to square tube or the size of pipe and installing plate, drilled in the corresponding site of brick, stone, wherein square tube or pipe pair
The square hole or circular hole answered are through hole, and the corresponding hole of installing plate is counterbore;
Step 4:Brick, stone are placed on and mark time in basic unit and post fixation, the top of square tube or pipe is flushed with brick, stone surface;
Step 5:The columnar projections portion of railing column bottom is inserted into square tube or pipe, rail post is fixed.
Technical scheme has advantages below:
1. the built-in fitting of the present invention is produced in batches for mechanization, simple in construction, can accelerating construction progress.
2. it is pre-buried that the installation method of the present invention carries out positioning before paving tread tile, marble, then again in floor tile, big
Drill, because floor tile, marble are not yet attached on ground, effective stress external force and can expand with heat and contract with cold, it is not easy to produce in reason stone
Raw chip, cracking or hollowing, also allow for repairing or replace even if there is this phenomenon, so ground is attractive in appearance after installing;
3. the installation method of the present invention is embedded in before paving tread tile, marble due to positioning, it is accurate that built-in fitting is positioned
Property be not easily susceptible to influence, fixed position zero deflection, the location accuracy for installing rail post is high, and fastness is good;
4. the process that the installation method of the present invention reduces again city's roads, installs simple and convenient, efficiency of construction is high.
Brief description of the drawings
Fig. 1 is the mounting structure figure for the rail post installation method marked time with brick of the present invention, stone;
Fig. 2 is Fig. 1 A portions enlarged drawing;
Fig. 3 is built-in fitting construction profile of the present invention.
Embodiment
The technique effect of the design of the present invention, concrete structure and generation is described further below with reference to accompanying drawing, with
It is fully understood from the purpose of the present invention, feature and effect.
Fig. 1-Fig. 3 is embodiments of the invention.
With reference to Fig. 1, Fig. 2 and Fig. 3, the rail post built-in fitting that brick of the invention, stone are marked time, the top of built-in fitting 10 is
6cm stainless pipe 11, bottom is square installing plate 12, and the thickness of installing plate 12 is 3cm, and installing plate 12 is surrounded by screw
Pipe 11, the ground of basic unit 20 of marking time is fixed on by expansion bolt 13 by hole.Stainless pipe 11 is integrated into installing plate 12
Shape, or weld together after being formed separately.
The rail post installation method that brick, the stone of the present invention is marked time, before brick, stone 30 mark time laying, first in basic unit 20 of marking time
Upper installation built-in fitting 10, after the completion of brick, stone 30 are laid, pipe 11 penetrates 30 layers of brick, stone;Rail post bottom is provided with lug boss
31, the insertion pipe 11 of lug boss 31 fixes rail post.
Specifically include following steps:
Step 1:In unwrapping wire in basic unit 20 of marking time, the position of rail post fixing point is determined;
Step 2:In the position installation built-in fitting 10 in basic unit 20 according to fixing point of marking time,
Step 3:According to the size of pipe 11 and installing plate 12, drilled in the corresponding site of brick, stone 30, wherein pipe 11 is corresponding
Circular hole is through hole, and the corresponding hole of installing plate 12 is counterbore;
Step 4:Brick, stone 30 are placed on and mark time in basic unit 20 and post fixation, the top and brick, the surface of stone 30 of pipe 11 are neat
It is flat;
Step 5:The lug boss 31 of railing column bottom is inserted into pipe 11, rail post is fixed.
Disclosed above is only embodiments of the invention, and still, the present invention is not limited to this, the technology of any this area
What personnel can think change should all fall into protection scope of the present invention.
Claims (6)
1. a kind of rail post built-in fitting that brick, stone are marked time, the rail post bottom is provided with columnar projections portion(31), the column
Lug boss(31)Insert brick, stone(30)Mark time and middle fix rail post;Characterized in that, the built-in fitting(10)Top is square tube
Or pipe(11), the square tube or pipe(11)Endoporus size for columnar projections portion can be accommodated(31);Built-in fitting(10)Bottom
For installing plate(12), the installing plate(12)With square tube or pipe(11)It is fixedly connected, by square tube or pipe(11)It is fixedly mounted
In basic unit of marking time(20)Ground;The brick, stone(30)After the completion of laying, square tube or pipe(11)Penetrate the brick, stone(30)Layer,
The lug boss of the rail post(31)Insert square tube or pipe(11)Rail post is fixed.
2. the rail post built-in fitting that brick according to claim 1, stone are marked time, it is characterised in that the installing plate(12)Four
Week is provided with screw hole, passes through expansion bolt(13)It is fixed on basic unit of marking time(20)Ground.
3. the rail post built-in fitting that brick according to claim 1, stone are marked time, it is characterised in that the square tube or pipe
(11)Length is at least 5cm, the installing plate(12)Thickness is at least 2cm.
4. the rail post built-in fitting that brick according to claim 1, stone are marked time, it is characterised in that the square tube or pipe
(11), installing plate(12)For metalwork.
5. the rail post built-in fitting that brick according to claim 4, stone are marked time, it is characterised in that the square tube or pipe
(11), installing plate(12)For stainless steel part.
The rail post installation method that 6. a kind of built-in fitting using any one of claim 1-5 carries out brick, stone is marked time, its
It is characterised by, in brick, stone(30)Mark time before laying, elder generation is in basic unit of marking time(20)Upper installation built-in fitting(10), specifically include following
Step:
Step 1:In basic unit of marking time(20)Upper unwrapping wire, determines the position of rail post fixing point;
Step 2:In basic unit of marking time(20)On according to fixing point position install built-in fitting(10);
Step 3:According to square tube or pipe(11)And installing plate(12)Size, in brick, stone(30)Corresponding site drilling, wherein
Square tube or pipe(11)Corresponding square hole or circular hole are through hole, installing plate(12)Corresponding hole is counterbore;
Step 4:By brick, stone(30)It is placed on basic unit of marking time(20)Go up and post fixation, square tube or pipe(11)Top and brick,
Stone(30)Surface is flushed;
Step 5:By the columnar projections portion of railing column bottom(31)Square tube or pipe are inserted, rail post is fixed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710390180.2A CN107143100A (en) | 2017-05-27 | 2017-05-27 | Rail post built-in fitting and rail post installation method that a kind of brick, stone are marked time |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710390180.2A CN107143100A (en) | 2017-05-27 | 2017-05-27 | Rail post built-in fitting and rail post installation method that a kind of brick, stone are marked time |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107143100A true CN107143100A (en) | 2017-09-08 |
Family
ID=59780634
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710390180.2A Pending CN107143100A (en) | 2017-05-27 | 2017-05-27 | Rail post built-in fitting and rail post installation method that a kind of brick, stone are marked time |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107143100A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108625555A (en) * | 2018-06-20 | 2018-10-09 | 长葛市长润钢结构有限公司 | A kind of stair built-in fitting of perforation type |
CN112065080A (en) * | 2020-09-14 | 2020-12-11 | 山东道远建设工程集团有限公司 | Fixing piece of safety protection skirting board for stairs in construction site and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2555223A1 (en) * | 1983-11-18 | 1985-05-24 | Cava Oberdan | Upright provided with a threaded base element and intended for the mounting of a guard-rail, handrail or the like |
EP0489251A1 (en) * | 1990-12-05 | 1992-06-10 | NEUCON Maschinen- und Bausysteme G.m.b.H. u. Co. Kommanditgesellschaft | Method for manufacturing stairs with stringers |
CN2642906Y (en) * | 2003-09-15 | 2004-09-22 | 曹胜 | Assembled stairs |
KR100608096B1 (en) * | 2005-11-24 | 2006-08-02 | (주)동화종합건축사사무소 | Handrail structure for installed at stair of building |
CN203097153U (en) * | 2013-03-08 | 2013-07-31 | 孔建光 | Stair railing connected through bolts |
CN203097154U (en) * | 2013-03-09 | 2013-07-31 | 孔建光 | Stair railing |
-
2017
- 2017-05-27 CN CN201710390180.2A patent/CN107143100A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2555223A1 (en) * | 1983-11-18 | 1985-05-24 | Cava Oberdan | Upright provided with a threaded base element and intended for the mounting of a guard-rail, handrail or the like |
CH664594A5 (en) * | 1983-11-18 | 1988-03-15 | Oberdan Cava | STRUCTURES TO BE APPLIED TO CONCRETE MANUFACTURED FOR THE ASSEMBLY OF FENCING, RAILING OR SIMILAR. |
EP0489251A1 (en) * | 1990-12-05 | 1992-06-10 | NEUCON Maschinen- und Bausysteme G.m.b.H. u. Co. Kommanditgesellschaft | Method for manufacturing stairs with stringers |
CN2642906Y (en) * | 2003-09-15 | 2004-09-22 | 曹胜 | Assembled stairs |
KR100608096B1 (en) * | 2005-11-24 | 2006-08-02 | (주)동화종합건축사사무소 | Handrail structure for installed at stair of building |
CN203097153U (en) * | 2013-03-08 | 2013-07-31 | 孔建光 | Stair railing connected through bolts |
CN203097154U (en) * | 2013-03-09 | 2013-07-31 | 孔建光 | Stair railing |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108625555A (en) * | 2018-06-20 | 2018-10-09 | 长葛市长润钢结构有限公司 | A kind of stair built-in fitting of perforation type |
CN112065080A (en) * | 2020-09-14 | 2020-12-11 | 山东道远建设工程集团有限公司 | Fixing piece of safety protection skirting board for stairs in construction site and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10329718B2 (en) | Modular platform deck for traffic | |
US6971818B1 (en) | Tactile warning surfaces for walkways and method | |
MX2008010910A (en) | Mock shower drain and associated methods. | |
US7546713B2 (en) | Swimming pool coping support extender | |
CN107143100A (en) | Rail post built-in fitting and rail post installation method that a kind of brick, stone are marked time | |
WO2017083903A1 (en) | Improvements in slab on ground formwork design and installation | |
CN204080841U (en) | The fixed structure of basis GRC fetal membrane | |
US20050269558A1 (en) | System and apparatus for reinforcing fence components | |
JP2018028254A (en) | Repair method of existing canal | |
CN104790555B (en) | Light steel keel and lightweight concrete prefabricated combining wall and construction method thereof | |
CN106677558A (en) | Construction method for deep foundation pit assembling type stairway used for people | |
US20120011800A1 (en) | Precise patient table cavity form | |
CN108442738A (en) | Assembled toilet and its installation method | |
KR101436119B1 (en) | Holding apparatus for CFT column and the construction method of the CFT column using it | |
JP6473877B2 (en) | Precast concrete foundation beam members | |
KR101663374B1 (en) | Streetlight Foundation Structure | |
CN206308570U (en) | The Prefabricated road installed for city pedestrian guardrail is mated formation plate | |
KR101485868B1 (en) | Connection structure of road boundary stones using the union pin and connection method thereof | |
CN107460949B (en) | Chassis system of light steel structure assembly and decoration integrated building | |
CN105350784B (en) | Utilize skirt location technology one-shot forming service sleeve installation method | |
CN206468037U (en) | People's stair in deep basal pit pin-connected panel | |
CN221799206U (en) | Once leveling device for building construction floor | |
Smithline | El-Kabri | |
CN221168464U (en) | Railing and stair provided with same | |
KR102583751B1 (en) | Fixed structure for the completed toilet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170908 |
|
RJ01 | Rejection of invention patent application after publication |