CN107143093B - Colored finish concrete cracking resistance protects system and its construction method - Google Patents

Colored finish concrete cracking resistance protects system and its construction method Download PDF

Info

Publication number
CN107143093B
CN107143093B CN201710407155.0A CN201710407155A CN107143093B CN 107143093 B CN107143093 B CN 107143093B CN 201710407155 A CN201710407155 A CN 201710407155A CN 107143093 B CN107143093 B CN 107143093B
Authority
CN
China
Prior art keywords
reinforcing bar
cracking resistance
horizontal
positioning device
colored finish
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710407155.0A
Other languages
Chinese (zh)
Other versions
CN107143093A (en
Inventor
崔建滨
王云磊
王俊林
王宪武
李东
蓝斌
艾云忠
闻兴业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing No 3 Construction Engineering Co Ltd
Original Assignee
Beijing No 3 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing No 3 Construction Engineering Co Ltd filed Critical Beijing No 3 Construction Engineering Co Ltd
Priority to CN201710407155.0A priority Critical patent/CN107143093B/en
Publication of CN107143093A publication Critical patent/CN107143093A/en
Application granted granted Critical
Publication of CN107143093B publication Critical patent/CN107143093B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/20Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups of material other than metal or with only additional metal parts, e.g. concrete or plastics spacers with metal binding wires
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/168Spacers connecting parts for reinforcements and spacing the reinforcements from the form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A kind of colored finish concrete cracking resistance protection system and its construction method, horizontal cracking resistance reinforcing bar and vertical crack reinforcing bar are bound on the outer layer steel bar stress of colored finish concrete, it binds and completes to cracking resistance reinforcing bar, steel reinforced concrete protective layer positioning device is fixed at the right-angled intersection of vertical crack reinforcing bar and horizontal cracking resistance reinforcing bar by spacing, first horizontal cracking resistance reinforcing bar is caught in opposite two low card slots, vertical crack reinforcing bar is caught in opposite two high card slots, steel reinforced concrete protective layer positioning device and vertical crack reinforcing bar and horizontal cracking resistance reinforcing bar are tied with tying up silk again, tie up the interior recess that an end is placed in positioning device lower part.The present invention is on the arrangement of reinforcement basis of wall original design reinforcing bar; in horizontal direction and vertically to adding cracking resistance reinforcing bar; and cooperate steel reinforced concrete protective layer positioning device collective effect; substantially increase the effect of prestressed of colored finish concrete, very good solution cover to reinforcement increases and colored finish concrete prevents problem conflicting between cracking.

Description

Colored finish concrete cracking resistance protects system and its construction method
Technical field
The present invention relates to a kind of cracking resistance of colored finish concrete protection system and its construction methods.
Background technique
A kind of environment category area normal concrete is protected in GB50010-2010 " Code for design of concrete structures " Layer thickness wallboard is generally 15mm, and beam column is generally 20mm, but colored finish concrete metope is straight due to eliminating finish coat It connects and is exposed in air, the carbonization of concrete certainly will be accelerated, and concrete can be made to lose the protective effect to reinforcing bar too early, make reinforcing bar The problems such as generation takes off blunt, corrosion, protective layer cracks along muscle.So colored finish concrete thickness of protection tier is than common coagulation Soil is big, and generally 30mm, this just has tightened up requirement to thickness of protection tier, has to guarantee its thickness.And protective layer The increasing of thickness will certainly aggravate the cracking degree that colored finish concrete pours rear surface, this not only will affect later period colour The protectant spraying of dry wall also will affect colored finish concrete metope entirety artistic effect.So in colored clear water coagulation In native work progress, it is ensured that the smooth beauty of concrete surface should just reduce face checking to the greatest extent, this just needs to reduce reinforcing bar guarantor Covering thickness;Simultaneously to prevent metope concrete carbonization too fast, its protective effect to internal reinforcing bar is influenced, protection need to be just increased Thickness degree, and increase protective layer thickness and will lead to face checking.Therefore taking which kind of measure both can guarantee colored clear water coagulation Cob wall face thickness of protection tier is avoided that crack occurs in colored finish concrete metope again, is to do colored finish concrete building A great problem.
It is many kinds of for the device of steel reinforced concrete protective layer currently on the market, there are spacer, plastic cushion etc., but Their moulding are simple, and fixed effect is bad, and mobile, inclination is easy when casting concrete, to not can guarantee cover to reinforcement thickness Degree.Sometimes cushion block unbalance stress in wedging template, causes demoulding rear surface to generate bulge, dry wall flatness requirement is not achieved.
Existing common shear force wall reinforcing steel bar protective layer thickness is generally 15 or 20mm, after the completion of the binding of steel bar stress net, uses Galvanized wire is fixed on the spacers such as long strip type, circle on the outside of steel mesh, and spacer spacing is depending on the circumstances, Huo Zhe It is online that round sheet or square plastic cushion block are stuck in steel bar stress by outside.
Existing cover to reinforcement tectonic system there are the problem of: 1, cushion block intensity is low, and insecure with reinforcing bar binding and fixing, Thickness of protection tier is not can guarantee.2, only cushion block and steel bar stress are fixed, not only thickness of protection tier is difficult to control, It can not play the role of surface cracking resistance.
More elegant The Mirror Lake campus Libraries engineering is domestic rare colored finish concrete project, the clear-water concrete scale of construction Greatly, periphery mainly includes four white clear-water concrete door heads, and 36 yellow clear-water concrete open tubular columns are internal mainly red by glaze The double-faced toothed dry wall of color and true qualities annular dry wall and hall lead to high one meter thick true qualities dry wall composition.The engineering structure moulding Complexity, need new cracking structure and construction method solve thickness of protection tier not enough and concrete surface occur protrusion, The mass defects such as cracking.
Summary of the invention
The present invention provides a kind of colored finish concrete cracking resistance protection system and its construction method, is protected by concrete reinforcement Sheath positioning device and cracking resistance reinforcing bar cooperate, and solve colored finish concrete thickness of protection tier and increase and colored clear water Concrete surface leads to the problem of crack.
The technical solution adopted by the present invention to solve the technical problems is:
This colored finish concrete cracking resistance protects system, including binding the outer layer steel bar stress in colored finish concrete On horizontal cracking resistance reinforcing bar and vertical crack reinforcing bar and steel reinforced concrete protective layer positioning device.
The horizontal cracking resistance reinforcing bar binding is on the outside of vertical applied force reinforcing bar, between adjacent two horizontal forces reinforcing bar.
The vertical crack reinforcing bar binding is on the inside of horizontal cracking resistance reinforcing bar, between adjacent two vertical applied forces reinforcing bar, with level Cracking resistance reinforcing bar right-angled intersection.
The steel reinforced concrete protective layer positioning device 8 is whole to use nylon material, by supporting plate, card slot, supporting leg and floor It constitutes;Four card slots in cross distribution are vertically connected on the supporting plate, notch is opposite two-by-two and sets in high infraversion malposition for card slot It sets, the notch of opposite two card slots is located on horizontal linear, supports wherein being equipped with U-shaped in opposite two high card slot notches Plate;Corresponding four groove positions are vertically connected with four supporting legs under the supporting plate, and height of landing leg is mutually fitted with thickness of protection tier It answers, is connected with each other between four supporting legs by four floors, four floors intersect at the vertical axial line of the device, supporting leg in cross The floor of lower part concaves.
The steel reinforced concrete protective layer positioning device is fixed on vertical crack reinforcing bar and the cross of horizontal cracking resistance reinforcing bar is handed over At fork, horizontal cracking resistance reinforcing bar is caught in opposite two low card slots, and vertical crack reinforcing bar is caught in opposite two high card slots, and Steel reinforced concrete protective layer positioning device and vertical crack reinforcing bar and horizontal cracking resistance reinforcing bar are tied by tying up silk, an end is tied up and is placed in The interior recess of positioning device lower part.
The horizontal cracking resistance reinforcing bar binding is in the spacing middle position of adjacent two horizontal forces reinforcing bar;The vertical crack steel Muscle is bound in the spacing middle position of adjacent two vertical applied forces reinforcing bar.
The round steel that the vertical crack reinforcing bar and horizontal cracking resistance reinforcing bar are diameter 8mm.
The supporting plate is cross, supporting plate and floor with a thickness of 2~5mm.
The notch of the card slot is U-shaped.
The cross section of the supporting leg is rectangle.
The construction method of this colored finish concrete cracking resistance protection system, construction procedure are as follows:
Step 1 arranges colored finish concrete steel bar stress using double-layer double-direction;
Step 2 binds horizontal cracking resistance reinforcing bar and vertical crack steel on the outer layer steel bar stress of colored finish concrete Muscle, first by the binding of horizontal cracking resistance reinforcing bar on the outside of vertical applied force reinforcing bar, between adjacent two horizontal forces reinforcing bar, then by vertical crack Reinforcing bar is bound on the inside of horizontal cracking resistance reinforcing bar, between adjacent two vertical applied forces reinforcing bar, with horizontal cracking resistance reinforcing bar right-angled intersection;
Step 3 binds to cracking resistance reinforcing bar and completes, is fixed on steel reinforced concrete protective layer positioning device vertically by spacing At the right-angled intersection of cracking resistance reinforcing bar and horizontal cracking resistance reinforcing bar, first horizontal cracking resistance reinforcing bar is caught in opposite two low card slots, is erected It is caught in opposite two high card slots to cracking resistance reinforcing bar, then with tying up silk for steel reinforced concrete protective layer positioning device and vertical crack Reinforcing bar and horizontal cracking resistance reinforcing bar tie, and tie up the interior recess that an end is placed in positioning device lower part.
The steel bar stress horizontal direction and vertical spacing are 200mm, are bound using plum-blossom-shape button tripping, and the lap of splice is 49D, D are steel bar stress diameter.
The cracking resistance reinforcing bar is bound using plum-blossom-shape button tripping, and the lap of splice 42D, D are cracking resistance muscle diameter, and overlap joint end is curved 180 ° of folding.
The arrangement spacing of the steel reinforced concrete protective layer positioning device is 600mm.
Beneficial effects of the present invention are as follows:
The big feature of present invention combination colored finish concrete thickness of protection tier, in the arrangement of reinforcement of wall original design reinforcing bar On basis, in horizontal direction and vertically to adding cracking resistance reinforcing bar, and cooperate steel reinforced concrete protective layer positioning device collective effect, Substantially increase the effect of prestressed of colored finish concrete, very good solution cover to reinforcement increases and colored finish concrete Problem conflicting between cracking is prevented, not only can guarantee colored finish concrete thickness of protection tier, but also be avoided that coagulation Soil cracking.
The use of cracking resistance reinforcing bar of the present invention is greatly reduced to be mixed because color concrete thickness of protection tier increases bring The problem of solidifying soil face checking, substantially increases color concrete building whole effect and aesthetic.
Notch is opposite two-by-two for card slot on steel reinforced concrete protective layer positioning device supporting plate of the invention, sets in high infraversion malposition It sets, is adapted with the cracking resistance steel bar arrangement shape of right-angled intersection, so as to which the reinforcing bar of right-angled intersection is all caught in card slot slot In mouthful, consolidates device, is not easy to fall off from reinforcing bar.U-shaped support plate, U-shaped support plate are equipped in opposite two high card slot notches The rigidity of card slot can be increased, guarantee reinforcing bar firm position in notch.The supporting leg lower part floor of positioning device concaves, and only stays four A supporting leg bottom surface and template contacts.The design of inner recess can conveniently tie up silk and bind device and reinforcing bar securely, while conveniently The placement of an end is tied up, binding effect and surface smoothness are improved.Positioning device uses nylon material, compared with concrete and common modeling Material has the advantages that light weight, intensity are big, is unlikely to deform.
The present invention fully takes into account different bar diameters in design, and positioning device uses feelings under different protective layer thickness The shortcomings that condition fully takes into account common cushion block and is easily deformed, tilts in stress, wedging template, is meeting the same of intensity requirement When taken into account economic benefit and saved consumptive material etc. content.Steel reinforced concrete protective layer positioning device of the invention has The advantages of light weight, intensity is big, and mounting technique is easy, good fixing effect, with cracking resistance reinforcing bar collective effect, can guarantee reinforcing bar very well The advantages of protective layer thickness requires, avoids generating bulge there is a situation where cushion block wedging template.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the structural schematic diagram of steel reinforced concrete protective layer positioning device.
Fig. 3 is the side structure schematic view of Fig. 2.
Fig. 4 is the schematic perspective view of steel reinforced concrete protective layer positioning device.
Fig. 5 is the installation diagram of steel reinforced concrete protective layer positioning device.
Appended drawing reference: 1- supporting plate, 2- card slot, 2.1-U shape support plate, 3- supporting leg, 4- floor, the horizontal cracking resistance steel of 5- It is perpendicular that muscle, 6- vertical crack reinforcing bar, 7- tie up silk, 8- steel reinforced concrete protective layer positioning device, 9- horizontal force reinforcing bar, 10- To steel bar stress.
Specific embodiment
Embodiment is shown in Figure 1, and this colored finish concrete cracking resistance protects system, including binding to mix in colored clear water The horizontal cracking resistance reinforcing bar 5 and vertical crack reinforcing bar 6 and steel reinforced concrete protective layer positioning coagulated on the outer layer steel bar stress of soil fills Set 8.
The horizontal binding of cracking resistance reinforcing bar 5 is between 10 outside of vertical applied force reinforcing bar, adjacent two horizontal forces reinforcing bar 9.
The vertical crack reinforcing bar 6 is bound between horizontal 5 inside of cracking resistance reinforcing bar, adjacent two vertical applied forces reinforcing bar 10, with Horizontal 5 right-angled intersection of cracking resistance reinforcing bar.
The horizontal cracking resistance reinforcing bar 5 can be bound in the spacing middle position of adjacent two horizontal forces reinforcing bar 9;It is described vertical anti- Splitting reinforcing bar 6 can bind in the spacing middle position of adjacent two vertical applied forces reinforcing bar 10.
The round steel of diameter 8mm can be used with horizontal cracking resistance reinforcing bar 5 for the vertical crack reinforcing bar 6.
Referring to fig. 2 shown in -4, the steel reinforced concrete protective layer positioning device 8 is whole to use nylon material, by supporting plate 1, Card slot 2, supporting leg 3 and floor 4 are constituted;The supporting plate 1 is cross, with a thickness of 2mm.Four are vertically connected on supporting plate 1 in ten The U-shaped card slot 2 of word distribution, notch is opposite two-by-two and shifts to install in height for card slot 2, and the notch of opposite two card slots 2 is located at water On flat line, wherein being equipped with U-shaped support plate 2.1 in opposite two high 2 notches of card slot;Lower corresponding four cards of the supporting plate 1 Groove location is vertically connected with four supporting legs 3, and the cross section of the supporting leg 3 is rectangle, 3 height of supporting leg and thickness of protection tier phase It adapts to, is connected with each other between four supporting legs 3 by four floors 4, floor 4 is with a thickness of 2mm.Four floors 4 are intersected in cross The floor 4 of the vertical axial line of the device, 3 lower part of supporting leg concaves.
Shown in Figure 5, the steel reinforced concrete protective layer positioning device 8 is fixed on vertical crack reinforcing bar 6 and level is anti- At the right-angled intersection for splitting reinforcing bar 5, horizontal cracking resistance reinforcing bar 5 is caught in opposite two low card slots, and vertical crack reinforcing bar 6 is caught in relatively In two high card slots, and by tying up silk 7 for steel reinforced concrete protective layer positioning device 8 and vertical crack reinforcing bar 6 and horizontal cracking resistance Reinforcing bar 5 ties, and ties up the interior recess that 7 end of silk is placed in positioning device lower part.
The construction method of this colored finish concrete cracking resistance protection system, construction procedure are as follows:
Step 1 arranges colored finish concrete steel bar stress using double-layer double-direction.The steel bar stress horizontal direction and perpendicular It is 200mm to spacing, is bound using plum-blossom-shape button tripping, the lap of splice 49D, D is steel bar stress diameter.
Step 2 binds horizontal cracking resistance reinforcing bar 5 and vertical crack steel on the outer layer steel bar stress of colored finish concrete Horizontal cracking resistance reinforcing bar 5 is first bound between 10 outside of vertical applied force reinforcing bar, adjacent two horizontal forces reinforcing bar 9, then will erected by muscle 6 To the binding of cracking resistance reinforcing bar 6 between horizontal 5 inside of cracking resistance reinforcing bar, adjacent two vertical applied forces reinforcing bar 10, with horizontal cracking resistance reinforcing bar 50 Word intersects.The cracking resistance reinforcing bar is bound using plum-blossom-shape button tripping, and the lap of splice 42D, D are cracking resistance muscle diameter, and overlap joint end is curved 180 ° of folding.
Step 3 binds to cracking resistance reinforcing bar and completes, is fixed on steel reinforced concrete protective layer positioning device 8 vertically by spacing At the right-angled intersection of cracking resistance reinforcing bar 6 and horizontal cracking resistance reinforcing bar 5, arrangement spacing is 600mm.Horizontal cracking resistance reinforcing bar 5 is first caught in phase To in two low card slots, vertical crack reinforcing bar 6 is caught in opposite two high card slots, then is protected concrete reinforcement with silk 7 is tied up Sheath positioning device 8 is tied with vertical crack reinforcing bar 6 and horizontal cracking resistance reinforcing bar 5, is tied up 7 end of silk and is placed in the interior of positioning device lower part Recess.

Claims (8)

1. a kind of colored finish concrete cracking resistance protects system, it is characterised in that: including binding in the outer of colored finish concrete Horizontal cracking resistance reinforcing bar (5) and vertical crack reinforcing bar (6) and steel reinforced concrete protective layer positioning device on layer steel bar stress (8);Horizontal cracking resistance reinforcing bar (5) binding is on the outside of vertical applied force reinforcing bar (10), between adjacent two horizontal forces reinforcing bar (9); Vertical crack reinforcing bar (6) binding is on the inside of horizontal cracking resistance reinforcing bar (5), between adjacent two vertical applied forces reinforcing bar (10), with water Flat cracking resistance reinforcing bar (5) right-angled intersection;The steel reinforced concrete protective layer positioning device (8) integrally uses nylon material, by supporting plate (1), card slot (2), supporting leg (3) and floor (4) are constituted;Four card slots in cross distribution are vertically connected on the supporting plate (1) (2), notch is opposite two-by-two and shifts to install in height for card slot (2), and the notch of opposite two card slots (2) is located on horizontal linear, Wherein U-shaped support plate (2.1) are equipped in opposite two high card slot (2) notches;Corresponding four slots under the supporting plate (1) It sets and is vertically connected with four supporting legs (3), supporting leg (3) is highly adapted with thickness of protection tier, by four between four supporting legs (3) A floor (4) is connected with each other, and four floors (4) intersect at the vertical axial line of the device, the floor of supporting leg (3) lower part in cross (4) it concaves;The steel reinforced concrete protective layer positioning device (8) is fixed on vertical crack reinforcing bar (6) and horizontal cracking resistance reinforcing bar (5) at right-angled intersection, horizontal cracking resistance reinforcing bar (5) is caught in opposite two low card slots, and vertical crack reinforcing bar (6) is caught in relatively In two high card slots, and by tying up silk (7) for steel reinforced concrete protective layer positioning device (8) and vertical crack reinforcing bar (6) and water Flat cracking resistance reinforcing bar (5) ties, and ties up the interior recess that silk (7) end is placed in positioning device lower part;
The supporting plate (1) is cross, supporting plate (1) and floor (4) with a thickness of 2~5mm;
The notch of the card slot (2) is U-shaped.
2. colored finish concrete cracking resistance according to claim 1 protects system, it is characterised in that: the horizontal cracking resistance steel Muscle (5) is bound in the spacing middle position of adjacent two horizontal forces reinforcing bar (9);Vertical crack reinforcing bar (6) binding is adjacent The spacing middle position of two vertical applied force reinforcing bars (10).
3. colored finish concrete cracking resistance according to claim 1 protects system, it is characterised in that: the vertical crack steel The round steel that muscle (6) and horizontal cracking resistance reinforcing bar (5) are diameter 8mm.
4. colored finish concrete cracking resistance according to claim 1 protects system, it is characterised in that: the supporting leg (3) Cross section is rectangle.
5. a kind of construction method of the protection of the colored finish concrete cracking resistance as described in Claims 1 to 4 any one system, special Sign is that construction procedure is as follows:
Step 1 arranges colored finish concrete steel bar stress using double-layer double-direction;
Step 2 binds horizontal cracking resistance reinforcing bar (5) and vertical crack reinforcing bar on the outer layer steel bar stress of colored finish concrete (6), first horizontal cracking resistance reinforcing bar (5) is bound on the outside of vertical applied force reinforcing bar (10), between adjacent two horizontal forces reinforcing bar (9), Vertical crack reinforcing bar (6) are bound on the inside of horizontal cracking resistance reinforcing bar (5), between adjacent two vertical applied forces reinforcing bar (10) again, with water Flat cracking resistance reinforcing bar (5) right-angled intersection;
Step 3 binds to cracking resistance reinforcing bar and completes, and steel reinforced concrete protective layer positioning device (8) is fixed on vertical resist by spacing At the right-angled intersection for splitting reinforcing bar (6) and horizontal cracking resistance reinforcing bar (5), horizontal cracking resistance reinforcing bar (5) is first caught in opposite two low cards In slot, vertical crack reinforcing bar (6) is caught in opposite two high card slots, then is positioned steel reinforced concrete protective layer with silk (7) is tied up Device (8) is tied with vertical crack reinforcing bar (6) and horizontal cracking resistance reinforcing bar (5), is tied up silk (7) end and is placed in the interior of positioning device lower part Recess.
6. according to claim 5 colored finish concrete cracking resistance protection system construction method, it is characterised in that: it is described by Power reinforcing bar horizontal direction and vertical spacing are 200mm, are bound using plum-blossom-shape button tripping, the lap of splice 49D, D are steel bar stress Diameter.
7. the construction method of colored finish concrete cracking resistance protection system according to claim 5, it is characterised in that: described anti- It splits reinforcing bar to bind using plum-blossom-shape button tripping, the lap of splice 42D, D are cracking resistance muscle diameter, and overlap joint end bends 180 °.
8. the construction method of colored finish concrete cracking resistance protection system according to claim 5, it is characterised in that: described mixed The arrangement spacing of solidifying soil cover to reinforcement positioning device (8) is 600mm.
CN201710407155.0A 2017-06-02 2017-06-02 Colored finish concrete cracking resistance protects system and its construction method Active CN107143093B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710407155.0A CN107143093B (en) 2017-06-02 2017-06-02 Colored finish concrete cracking resistance protects system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710407155.0A CN107143093B (en) 2017-06-02 2017-06-02 Colored finish concrete cracking resistance protects system and its construction method

Publications (2)

Publication Number Publication Date
CN107143093A CN107143093A (en) 2017-09-08
CN107143093B true CN107143093B (en) 2019-10-01

Family

ID=59779736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710407155.0A Active CN107143093B (en) 2017-06-02 2017-06-02 Colored finish concrete cracking resistance protects system and its construction method

Country Status (1)

Country Link
CN (1) CN107143093B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678289B (en) * 2018-07-17 2021-12-28 中国建筑第四工程局有限公司 Steel bar positioning integrated device for building construction and use method thereof
CN109435047A (en) * 2018-12-18 2019-03-08 中铁十四局集团大盾构工程有限公司 A kind of cover to reinforcement construction auxiliary device of precast concrete
CN110424669B (en) * 2019-08-28 2024-06-11 成都建工第七建筑工程有限公司 Terrace crack resistance limiter
CN112922350B (en) * 2021-03-05 2022-05-03 重庆第二师范学院 Secondary structure wall lacing wire structure for building engineering and construction method
WO2024081855A1 (en) * 2022-10-14 2024-04-18 Step Ahead Tools, LLC Multi-diameter rebar brace with vertical rebar positioner and system for rebar securement

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09302886A (en) * 1996-05-10 1997-11-25 Hideyasu Matsumoto Wall face bed treatment method for finishing exposed concrete
CN2693878Y (en) * 2004-04-28 2005-04-20 陆金星 Three-layer reinforced concrete protection course raiser block
CN205530844U (en) * 2016-03-15 2016-08-31 中国建筑第七工程局有限公司 Basement outer wall
CN205935351U (en) * 2016-08-27 2017-02-08 戴勤友 Reinforcing bar net of laying on building construction formwork
CN206873770U (en) * 2017-06-02 2018-01-12 北京市第三建筑工程有限公司 Colored finish concrete cracking resistance protects system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09302886A (en) * 1996-05-10 1997-11-25 Hideyasu Matsumoto Wall face bed treatment method for finishing exposed concrete
CN2693878Y (en) * 2004-04-28 2005-04-20 陆金星 Three-layer reinforced concrete protection course raiser block
CN205530844U (en) * 2016-03-15 2016-08-31 中国建筑第七工程局有限公司 Basement outer wall
CN205935351U (en) * 2016-08-27 2017-02-08 戴勤友 Reinforcing bar net of laying on building construction formwork
CN206873770U (en) * 2017-06-02 2018-01-12 北京市第三建筑工程有限公司 Colored finish concrete cracking resistance protects system

Also Published As

Publication number Publication date
CN107143093A (en) 2017-09-08

Similar Documents

Publication Publication Date Title
CN107143093B (en) Colored finish concrete cracking resistance protects system and its construction method
US9909265B2 (en) Concrete slab panel forming, reinforcing, joint sealing and edge protecting framing system
CN105155853B (en) A kind of high-rise residential building reinforced concrete positioning construction process
CN110965685A (en) Construction method of prestressed thick plate hollow floor
KR20160124035A (en) Shear-reinforcement half pc slab structure and construction method
CN206873770U (en) Colored finish concrete cracking resistance protects system
CN104674997B (en) A kind of supporting construction and its construction method on timber buildings roof modelled after an antique
CN208777557U (en) Exposed inversion reinforcing bar grout sleeve precast concrete column
GB2371313A (en) Partially prefabricated waffle slab
CN106284653B (en) A kind of construction method that balcony construct capital interspaces in advance
CN103161322B (en) The reinforcement means of a kind of improvement of original construction floor and ruggedized construction
CN208792505U (en) A kind of precast wall body and assembling structure of assembled architecture
CN107012991A (en) A kind of accurate spacing and strip thickness control device of concreting floor bar skeleton
CN207296184U (en) A kind of beam steel positioner
CN108374522B (en) Protective layer framework of building structure and plate member construction scheme thereof
EP2174777A1 (en) Sandwich concrete panel and method of making the same
CN206220240U (en) A kind of assembled steel concrete frame panel structure system
CN107100285A (en) A kind of prefabricated toilet water seepage prevention construction method
CN204163113U (en) A kind of nethike embrane formula ater-casting being applied to basement wall slab
CN202970006U (en) L-shaped prefabricated clear water bleacher plate installation construction structure
TW201420848A (en) Steel structure for reinforced concrete wall panel and method thereof
CN206722225U (en) A kind of accurate spacing and strip thickness control device of concreting floor bar skeleton
CN108396900A (en) A kind of double Shell roof boarding and its construction method
CN104929363B (en) A kind of board-like stair sliding support of cast-in-place concrete and its template
CZ2021552A3 (en) Viewed wood-concrete ceiling panel for mounting a monolithic folded wood-concrete static ceiling structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant