CN107142925A CN201710433536.6A CN201710433536A CN107142925A CN 107142925 A CN107142925 A CN 107142925A CN 201710433536 A CN201710433536 A CN 201710433536A CN 107142925 A CN107142925 A CN 107142925A
Authority
CN
China
Prior art keywords
steel reinforcement
reinforcement cage
connector
fixedly connected
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710433536.6A
Other languages
Chinese (zh)
Other versions
CN107142925B (en
Inventor
陈晓明
李操
王涛
金晶
沈恺达
周蓉峰
徐阿弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN201710433536.6A priority Critical patent/CN107142925B/en
Publication of CN107142925A publication Critical patent/CN107142925A/en
Application granted granted Critical
Publication of CN107142925B publication Critical patent/CN107142925B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1607Shapes round, e.g. circle
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1628Shapes rectangular
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

The preparation method that the present invention provides a kind of steel reinforcement cage and steel reinforcement cage.The steel reinforcement cage includes at least two section steel reinforcement cage units and at least one attachment means.The steel reinforcement cage unit joins end to end.Each attachment means are used to be fixedly connected with two adjacent section steel reinforcement cage units.The attachment means include:At least one first connector, at least one second connector and at least one fixture.First connector is fixedly connected with least one reinforcing bar of a steel reinforcement cage unit.Second connector is fixedly connected with least one reinforcing bar of another steel reinforcement cage unit.Multiple fixtures are fixedly connected with first connector and second connector respectively.The preparation method of steel reinforcement cage and steel reinforcement cage in the present invention saves the time that a steel reinforcement cage unit is fixedly connected with another steel reinforcement cage unit.

Description

The preparation method of steel reinforcement cage and steel reinforcement cage
Technical field
The present invention relates to Construction Technology field, the preparation method of more particularly to a kind of steel reinforcement cage and steel reinforcement cage.
Background technology
Diaphram wall is to utilize various trench machines, is acted on by means of the retaining wall of mud, digs out narrow and deep in underground Groove, and the continuous underground wall body that one formed by appropriate material of cast has antiseepage, earth-retaining and weight-bearing function in it. Generally, diaphram wall section construction, during every section of construction of diaphragm wall, first hangs steel reinforcement cage in groove, is then filled in groove Note concrete builds up a unit groove section, and so construction paragraph by paragraph builds up continuous armored concrete wall together in underground.For Some ultra-deep foundation pit engineerings, the length of the steel reinforcement cage of construction of diaphragm wall is also longer.Be typically due to construction space limitation and Lifting machine performance is limited, and steel reinforcement cage is unable to integral hoisting, therefore steel reinforcement cage needs merogenesis to make, then merogenesis lifting, by steel When muscle cage is transferred to groove, namely during lower cage, steel reinforcement cage is connected at groove section face.
Generally, merogenesis makes, the steel reinforcement cage of merogenesis lifting includes at least two section steel reinforcement cage units, and the steel reinforcement cage list Member joins end to end.Often section steel reinforcement cage unit includes longitudinal reinforcement and transverse steel.The usual transverse steel and longitudinal steel Muscle is fixedly connected by way of welding.Vertical reinforcement perpendicular to the ground is longitudinal reinforcement, reinforcing bar in reinforced concrete structure Horizontal reinforcement parallel to the ground (stirrup) is transverse steel in concrete structure.
For the steel reinforcement cage of merogenesis making, merogenesis lifting, first precast reinforced cage unit, then in lower cage by each steel reinforcement cage Unit head and the tail at groove section face are connected.Wherein, two adjacent section steel reinforcement cage units are to be saved two in steel reinforcement cage unit in connection Corresponding longitudinal reinforcement is fixedly connected, and ensure as far as possible two save the mechanical properties of steel reinforcement cage unit junctions relative to Two section steel reinforcement cage units in corresponding longitudinal reinforcement mechanical property for do not change, with cause steel reinforcement cage integrally have compared with Good mechanical property.For example, two section steel reinforcement cage units are consolidated for only having during the steel reinforcement cage of two section steel reinforcement cage units, lower cage Fixed connection, will be located at all longitudinal reinforcements on the steel reinforcement cage unit on steel reinforcement cage top with being located on the steel reinforcement cage unit of bottom All longitudinal reinforcements align and be fixedly connected one by one.In order that the mechanical property of steel reinforcement cage does not change, therefore by two When section steel reinforcement cage unit is fixedly connected, the longitudinal reinforcement and the reinforcing bar positioned at bottom of superposed steel reinforcement cage unit are made as far as possible The longitudinal reinforcement alignment of cage unit, and reduce termination and the steel of bottom of the longitudinal reinforcement of the steel reinforcement cage unit on top as far as possible Gap between the termination of the longitudinal reinforcement of muscle cage unit.
It is less efficient that current merogenesis making, the steel reinforcement cage of merogenesis lifting are connected at channel section so that by steel reinforcement cage The time that steel reinforcement cage unit is connected section by section occupies the 80% of the lower cage time of whole steel reinforcement cage.However, the length of lower cage time Directly affect the stability of the cell wall of diaphram wall and the total quality of diaphram wall.Therefore, it is badly in need of to existing reinforcing bar The structure of cage is improved, to shorten the time that steel reinforcement cage is connected at groove section face.
The content of the invention
It is an object of the invention to provide the preparation method of a kind of attachment means of steel reinforcement cage, steel reinforcement cage and steel reinforcement cage, with Shorten the Connection Time of steel reinforcement cage.
In order to solve the above technical problems, the present invention provides a kind of steel reinforcement cage, the steel reinforcement cage includes at least two section steel reinforcement cages Unit, the steel reinforcement cage unit joins end to end, and the steel reinforcement cage also includes at least one attachment means, each attachment means The two section steel reinforcement cage units adjacent for being fixedly connected;The attachment means include:At least one first connector, described first Connector is fixedly connected with least one reinforcing bar of a steel reinforcement cage unit, at least one second connector, second connection Part is fixedly connected with least one reinforcing bar of another steel reinforcement cage unit, and at least one fixture, the fixture difference It is fixedly connected with first connector and second connector.
Optionally, the radial section of the steel reinforcement cage for circle, multiple first connectors be fixedly connected as one it is whole Body, and/or multiple second connectors are fixedly connected as an entirety.
Optionally, the radial section of the steel reinforcement cage is the first company in rectangle, a steel reinforcement cage unit at least one side The second connector that fitting is fixedly connected as in an entirety, and/or another steel reinforcement cage unit at least one side is fixedly connected as One entirety.
Optionally, it is fixedly installed on the first keeper, second connector and is fixedly installed on first connector There is the second keeper, first keeper and second keeper coordinate relatively described for limiting first connector The position of second connector.
Optionally, first keeper is the groove opened up on first connector, and second keeper is One extended on second connector is raised, and the groove and the male cooperation are used to limit first connector and institute State the position between the second connector.
Optionally, offered on first connector at least one be used for accommodate a steel reinforcement cage unit reinforcing bar the At least one second appearance for being used to accommodate the reinforcing bar of another steel reinforcement cage unit is offered on one holding tank, second connector Receive groove.
Optionally, the reinforcement welding of first connector and a steel reinforcement cage unit, and/or second connection The reinforcement welding of part and another steel reinforcement cage unit.
Optionally, the fixture is connected by screw bolts with first connector and second connector.
Optionally, first connector, the second connector and fixture are plate.
Optionally, the two sides of first connector and the second connector is respectively and fixedly provided with fixture.
Optionally, multiple through holes are offered on first connector, the second connector and fixture.
The present invention also provides a kind of manufacture method of above-mentioned steel reinforcement cage, and this method includes:Make steel reinforcement cage unit, the steel Muscle cage includes at least two section steel reinforcement cage units;During lower cage, two adjacent section steel reinforcement cage units are fixedly connected, make multiple steel reinforcement cages Unit joins end to end;Wherein, steel reinforcement cage at least is fixedly connected with using an attachment means, and an attachment means are fixedly connected with phase Two adjacent section steel reinforcement cage units, the steel reinforcement cage unit that adjacent use attachment means are fixedly connected is when making, by multiple first Connector is fixedly connected with the reinforcing bar of a steel reinforcement cage unit, and first connector connects at least one reinforcing bar, by multiple the Two connectors are fixedly connected with the reinforcing bar of a steel reinforcement cage unit, and second connector connects at least one reinforcing bar, during lower cage, The first connector and the second connector are fixedly connected using at least one fixture, adjacent steel reinforcement cage unit is fixed and connects Connect.
Optionally, the radial section of the steel reinforcement cage is circle, the steel reinforcement cage that adjacent use attachment means are fixedly connected Multiple first connectors are first fixedly connected as an entirety by unit when making, and/or multiple second connectors are fixedly connected For an entirety, then it is fixedly connected multiple first connectors are adjacent with a steel reinforcement cage unit, and multiple second is connected Part is fixedly connected with another steel reinforcement cage unit.
Optionally, the radial section of the steel reinforcement cage is rectangle, the reinforcing bar that adjacent use attachment means are fixedly connected The first connector in one steel reinforcement cage unit at least one side is first fixedly connected as an entirety by cage unit when making, and/ Or the second connector in another steel reinforcement cage unit at least one side is fixedly connected as an entirety, then by multiple first connectors It is fixedly connected with a steel reinforcement cage unit, and multiple second connectors is fixedly connected with another steel reinforcement cage unit.
Optionally, the steel reinforcement cage unit that adjacent use attachment means are fixedly connected is when making, on the first connector The first keeper is fixedly installed, the second keeper is fixedly installed on the second connector;During lower cage, first by the first keeper and Two keepers coordinate, and are relatively fixed the position between the first connector and the second connector, then using at least one fixed plate First connector and the second connector are fixedly connected.
Optionally, the steel reinforcement cage unit that adjacent use attachment means are fixedly connected is when making, using same mould bases system Make two and save steel reinforcement cage unit, after the first connector and the second connector are fixedly connected with corresponding steel reinforcement cage unit respectively, then Unload lower mold holder.
Optionally, the first connector and the second connector are fixed with steel reinforcement cage unit respectively by the way of welding and connected Connect.
A kind of steel reinforcement cage and the preparation method of steel reinforcement cage that the present invention is provided, have the advantages that:
At least one reinforcing bar of one steel reinforcement cage unit is fixedly connected with the first connector, and another steel reinforcement cage unit is extremely A few reinforcing bar is fixedly connected with the second connector, multiple fixtures respectively with first connector and second connector Be fixedly connected, therefore first can be fixedly connected with the first connector with a steel reinforcement cage unit, and first by the second connector with Another steel reinforcement cage unit is fixedly connected, when then connecting steel reinforcement cage unit, only with fixture by the first connector and the Two connectors are connected.So only need by the first connector and second connection alignment, you can so that steel reinforcement cage unit have compared with Good quality of connection (reinforcing bar aligns, and the gap of steel bar end can be small), therefore save a steel reinforcement cage unit and another The time that steel reinforcement cage unit is fixedly connected, and make the stable mechanical property of steel reinforcement cage unit junction.
Brief description of the drawings
Fig. 1 is the front view of the steel reinforcement cage of one embodiment of the invention;
Fig. 2 is the partial structural diagram of the steel reinforcement cage in one embodiment of the invention;
Fig. 3 is the front view of the first connector of the steel reinforcement cage of one embodiment of the invention;
Fig. 4 is the upward view of the first connector of the steel reinforcement cage shown in Fig. 3.
Description of reference numerals:
100- steel reinforcement cage units;
110- reinforcing bars;
200- attachment means;
The connectors of 210- first;
The keepers of 211- first;
The holding tanks of 212- first;
The connectors of 220- second;
The keepers of 221- second;
The holding tanks of 222- second;
230- fixtures;
240- through holes.
Embodiment
The preparation method that steel reinforcement cage and steel reinforcement cage are proposed to the present invention below in conjunction with the drawings and specific embodiments makees further Describe in detail.According to following explanation and claims, advantages and features of the invention will become apparent from.It should be noted that, accompanying drawing Using very simplified form and using non-accurately ratio, only implement conveniently, lucidly to aid in illustrating the present invention The purpose of example.
Embodiment one
Fig. 1 is the front view of the steel reinforcement cage of the embodiment of the present invention one, and Fig. 2 is the office of the steel reinforcement cage in the embodiment of the present invention one Portion's structural representation.With reference to Fig. 1 and Fig. 2, a kind of steel reinforcement cage includes at least two section steel reinforcement cage units 100 and at least one connection dress Put 200.The steel reinforcement cage unit 100 joins end to end.Each attachment means 200 are used to be fixedly connected with two adjacent section reinforcing bars Cage unit 100.The attachment means 200 include:At least one first connector 210, at least one second connector 220 and extremely A few fixture 230.First connector 210 is fixedly connected with least one reinforcing bar of a steel reinforcement cage unit 100.Institute The second connector 220 is stated to be fixedly connected with least one reinforcing bar of another steel reinforcement cage unit 100.Multiple fixtures 230 It is fixedly connected respectively with first connector 210 and second connector 220.Herein, it is connected with the first connector 210 The reinforcing bar that reinforcing bar and the second connector 220 are connected is longitudinal reinforcement.By first by the first connector 210 and a steel reinforcement cage list Member 100 is fixedly connected, and is first fixedly connected with the second connector 220 with another steel reinforcement cage unit 100, then makes steel reinforcement cage When unit 100 is connected at channel section, first connector 210 and the second connector 220 have been connected only with fixture 230 Come, so only need the first connector 210 and the second connection alignment, you can so that steel reinforcement cage unit 100 has preferable connection Quality (reinforcing bar aligns, and the gap of steel bar end can be small), therefore save a steel reinforcement cage unit 100 and another steel reinforcement cage The time that unit 100 is fixedly connected, and make the stable mechanical property of the junction of steel reinforcement cage unit 100.
It is preferred that, in the present embodiment, the radial section (face parallel with transverse steel) of the steel reinforcement cage is rectangle, The first connector 210 in one at least one side of steel reinforcement cage unit 100 is fixedly connected as an entirety.In this case, a side When face steel reinforcement cage unit 100 is connected at channel section, it is easy to fixture 230 to be fixedly connected with the first connector 210, further Shorten the time that a steel reinforcement cage unit 100 is fixedly connected with another steel reinforcement cage unit 100.On the other hand a whole steel Reinforcing bar 110 at least one side of muscle cage unit 100 is all connected with as an entirety with multiple first connectors 210 so that a steel Spacing between the reinforcing bar 110 of muscle cage unit 100 is fixed, and avoids the reinforcing bar 110 of a steel reinforcement cage unit 100 from being connected with first The reinforcing bar 110 of the junction of part 210 is deformed upon, so the convenient reinforcing bar 110 by a steel reinforcement cage unit 100 and another reinforcing bar The reinforcing bar 110 of cage unit 100 aligns, and both further shorten 100 pairs of a steel reinforcement cage unit 100 and another steel reinforcement cage unit The neat time, while alignment effect is good, the quality that a steel reinforcement cage unit 100 is fixedly connected with another steel reinforcement cage unit 100 Improve.
It is preferred that, in the present embodiment, the radial section (face parallel with transverse steel) of the steel reinforcement cage is rectangle, The second connector 220 in another at least one side of steel reinforcement cage unit 100 can be fixedly connected as an entirety.In this case, When one side steel reinforcement cage unit 100 is connected at channel section, it is easy to fixture 230 to be fixedly connected with the second connector 220, enters one What is walked shortens the time that a steel reinforcement cage unit 100 is fixedly connected with another steel reinforcement cage unit 100.On the other hand it is whole another Reinforcing bar 110 in one at least one side of steel reinforcement cage unit 100 is all connected with as an entirety with multiple second connectors 220 so that Spacing between the reinforcing bar 110 of another steel reinforcement cage unit 100 is fixed, and avoids the reinforcing bar 100 of another steel reinforcement cage unit 100 Deformed upon with the reinforcing bar of the junction of the second connector 220, it is so convenient by the reinforcing bar 110 of a steel reinforcement cage unit 100 and another The reinforcing bar 110 of one steel reinforcement cage unit 100 aligns, and both further shorten a steel reinforcement cage unit 100 and another steel reinforcement cage The time that unit 100 aligns, while alignment effect is good, a steel reinforcement cage unit 100 is fixed with another steel reinforcement cage unit 100 to be connected The Quality advance connect.
Further, the radial section (face parallel with transverse steel) of the steel reinforcement cage described in the present embodiment is rectangular The first connector 210 in shape, an at least one side of steel reinforcement cage unit 100 is fixedly connected as an entirety, and another reinforcing bar When the second connector 220 at least one side of cage unit 100 is also fixedly connected as an entirety, steel reinforcement cage unit 100 with The time that another steel reinforcement cage unit 100 is fixedly connected is most short, and the mechanical property of the junction of steel reinforcement cage unit 100 is most stable.
It is preferred that, it is fixedly installed on first connector 210 on first keeper 211, second connector 220 The second keeper 221 is fixedly installed, first keeper 211 and second keeper 221 coordinate described for limiting The position of relatively described second connector 220 of first connector 210.When a steel reinforcement cage unit 100 and another steel reinforcement cage list When member 100 is connected at channel section, the first keeper 211 can be first passed through and the second keeper 221 limits the He of the first connector 210 Position between second connector 220, in this way, can facilitate the reinforcing bar of a steel reinforcement cage unit 100 and another reinforcing bar The reinforcing bar alignment of cage unit 100, and reliability of aliging is high, has both saved a steel reinforcement cage unit 100 and another steel reinforcement cage The time that unit 100 is connected at channel section, also improve a steel reinforcement cage unit 100 and consolidate with another steel reinforcement cage unit 100 Surely the quality connected.For example, with reference to Fig. 1 and Fig. 2, the first keeper 211 is the groove opened up on the first connector 210, the Two keepers 221 are that one extended on the second connector 220 is raised, and the groove and the male cooperation are used to limiting described the Position between a connection piece 210 and second connector 220.Certainly, in the present embodiment, the He of the first keeper 211 Second keeper 221 can be the guide pillars and bushes cooperated, or the alignment pin and positioning hole of mutual cooperation.
Fig. 3 is the front view of the first connector of the steel reinforcement cage of the embodiment of the present invention one, and Fig. 4 is the steel reinforcement cage shown in Fig. 3 The first connector upward view.It is preferred that, with reference to Fig. 3 and Fig. 4, at least one use is offered on first connector 210 At least one is offered in the first holding tank 212 of the reinforcing bar for accommodating a steel reinforcement cage unit 100, on second connector 220 Individual the second holding tank 222 for being used to accommodate the reinforcing bar of another steel reinforcement cage unit 100.In this way, when the reinforcing bar of steel reinforcement cage unit 100 Thickness it is uneven when, thicker reinforcing bar can be placed in the first holding tank 212 or the second holding tank 222, be so easy to the A connection piece 210 is fixedly connected with the reinforcing bar of a steel reinforcement cage unit 100, also allows for the second connector 220 and another reinforcing bar The reinforcing bar of cage unit 100 is fixedly connected.
It is preferred that, the reinforcement welding of first connector 210 and a steel reinforcement cage unit 100, and/or described The reinforcement welding of two connectors 220 and another steel reinforcement cage unit 100.Weld this mode and reduce and reinforcing bar is broken It is bad, further improve quality of connection.Certainly, the steel of first connector 210 and a steel reinforcement cage unit 100 Muscle, and second connector 220 and another steel reinforcement cage unit 100 reinforcing bar, can also be in other way Connection, is such as mechanically connected by bolt.
It is preferred that, the fixture 230 uses bolt with first connector 210 and second connector 220 Connection.A steel reinforcement cage unit 100 can be easy to be connected with another steel reinforcement cage unit 100 at channel section, a steel is saved The time that muscle cage unit 100 is connected with another steel reinforcement cage unit 100 at channel section.It is corresponding in the first connector 210th, it is provided with bolt hole on the second connector 220 and fixture 230.In the present embodiment, the connection of the first connector 210, second Part 220, fixture 230, the size and number of bolt and bolt hole calculate determination according to equicohesive mode, even if also two section steel The corresponding longitudinal reinforcement of muscle cage unit the mechanical property of junction be equivalent to longitudinal reinforcement two section steel reinforcement cage units in it is other Mechanical property at position.
Certainly, fixture 230 can also be connected with the first connector 210 and the second connector 220 using other modes, For example, welding, riveting, mode connects for screw etc..
It is preferred that, referring to figs. 1 to Fig. 4, first connector 210, the second connector 220 and fixture 230 are plate Part.In this way, attachment means is simple in construction, and plate is easily manufactured.Certainly, the first connector 210, the and of the second connector 220 Fixture 230 can also be other shapes, not be limited herein.Further, reinforcing bar respectively with the first connector 210, The larger side of area is fixedly connected on two connectors 220, can improve reinforcing bar and the first connector 210 and the second connector 220 Bonding strength.The connector 220 of first connector 210 and second is preferably welded by plate.The plate is preferred For steel plate.
It is preferred that, the two sides of the connector 220 of the first connector 210 and second can be respectively and fixedly provided with fixture 230. The two sides of first connector 210 and the second connector 220 is respectively provided with fixture 230 and can improve steel reinforcement cage to be connected at attachment means Stability.
It is preferred that, referring to figs. 1 to Fig. 4, opened on first connector 210, the second connector 220 and fixture 230 Provided with multiple through holes 240.Open up logical on first connector 210 or second connector 220 or fixture 230 One reason in hole 240 is to reduce the intensity of the first connector 210, the second connector 220 and fixture 230, makes steel reinforcement cage Mechanical property of the reinforcing bar in the fixed connection place of attachment means 200 is not sent out relative to the mechanical property of reinforcing bar at steel reinforcement cage other positions It is raw to change.In addition, opening up another of multiple through holes 240 on the first connector 210, the second connector 220, fixture 230 Reason is after steel reinforcement cage is put into groove, into groove during concrete perfusion, to be easy to concrete to circulate, in this way, adding the first company The snap-in force of fitting 210, the second connector 220 and fixture 230 and concrete, improves the overall rigidity of diaphram wall And intensity.
The through hole 240 can be circular port, square opening, or other shapes.The through hole 240 can be evenly distributed on On first connector 210, the second connector 220 and fixture 230, it can also be distributed according to other rules.It is, of course, also possible to logical The intensity that other manner reduces steel plate is crossed, such as opens up multiple on the first connector 210, the second connector 220 and fixture 230 Groove, the groove can run through the first connector 210, the second connector 220 and fixture 230, can also only be opened in institute State on a surface of groove.Certainly, it can both be opened up on first connector 210, the second connector 220 and fixture 230 It is fluted to offer through hole 240.
In the present embodiment, the reinforcing bar of a steel reinforcement cage unit 100 can be distributed in the side of the first connector 210, also may be used It is interspersed with the both sides in first connector 210.The reinforcing bar of another steel reinforcement cage unit 100 can be distributed in the first connection The side of part 210, can also be interspersed in the both sides of first connector 210.
Embodiment two
In the present embodiment, the radial section (face parallel with transverse steel) of the steel reinforcement cage is circle, multiple described First connector 210 is fixedly connected as an entirety, and/or multiple second connectors 220 are fixedly connected as an entirety. In this case, when one side steel reinforcement cage unit 100 is connected at channel section, be easy to fixture 230 respectively with the first connector 210 are fixedly connected with the second connector 220, further shorten a steel reinforcement cage unit 100 and another steel reinforcement cage unit 100 times being fixedly connected.On the other hand the reinforcing bar of a whole steel reinforcement cage unit 100 is connected with multiple first connectors 210 For an entirety so that the spacing between the reinforcing bar of a steel reinforcement cage unit 100 is fixed, also, a steel reinforcement cage list can be avoided The reinforcing bar and the reinforcing bar of the junction of the first connector 210 of member 100 are deformed upon;The reinforcing bar of another whole steel reinforcement cage unit 100 An entirety is connected as with multiple second connectors 220 so that the spacing between the reinforcing bar of another steel reinforcement cage unit 100 is consolidated It is fixed, and avoid the reinforcing bar and the reinforcing bar of the junction of the second connector 220 of another steel reinforcement cage unit 100 from deforming upon;In this way, side Just the reinforcing bar of a steel reinforcement cage unit 100 is alignd with the reinforcing bar of another steel reinforcement cage unit 100, has both further shorten one The time that steel reinforcement cage unit 100 aligns with another steel reinforcement cage unit 100, while alignment effect is good, a steel reinforcement cage can be improved The quality that unit 100 is fixedly connected with another steel reinforcement cage unit 100.
Embodiment three
The present embodiment provides a kind of manufacture method of steel reinforcement cage.The manufacture method of the steel reinforcement cage includes:Make steel reinforcement cage Unit, the steel reinforcement cage includes at least two section steel reinforcement cage units;During lower cage, two adjacent section steel reinforcement cage units are fixedly connected, Multiple steel reinforcement cage units are made to join end to end.Wherein, steel reinforcement cage, and a connection dress at least are fixedly connected with using an attachment means Put and be fixedly connected with two adjacent section steel reinforcement cage units.The steel reinforcement cage unit that adjacent use attachment means are fixedly connected is making When, multiple first connectors are fixedly connected with the reinforcing bar of a steel reinforcement cage unit, first connector connects at least one Reinforcing bar;Multiple second connectors are fixedly connected with the reinforcing bar of a steel reinforcement cage unit, the second connector connection at least one Root reinforcing bar.During lower cage, the first connector and the second connector are fixedly connected using at least one fixture, make adjacent reinforcing bar Cage unit is fixedly connected.
It is preferred that, the radial section of steel reinforcement cage is circle, the steel reinforcement cage unit that adjacent use attachment means are fixedly connected When making, multiple first connectors are first fixedly connected as an entirety, and/or multiple second connectors are fixedly connected as one Individual entirety, then be fixedly connected multiple first connectors are adjacent with a steel reinforcement cage unit, and again by multiple second connectors It is fixedly connected with another steel reinforcement cage unit.
It is preferred that, the radial section of the steel reinforcement cage is rectangle, the reinforcing bar that adjacent use attachment means are fixedly connected The first connector in one steel reinforcement cage unit at least one side is first fixedly connected as an entirety by cage unit when making, and/ Or the second connector in another steel reinforcement cage unit at least one side is fixedly connected as an entirety, then by multiple first connectors It is fixedly connected with a steel reinforcement cage unit, and multiple second connectors is fixedly connected with another steel reinforcement cage unit.
It is preferred that, the steel reinforcement cage unit that adjacent use attachment means are fixedly connected is when making, on the first connector The first keeper is fixedly installed, the second keeper is fixedly installed on the second connector;During lower cage, first by the first keeper and Two keepers coordinate, and are relatively fixed the position between the first connector and the second connector, then using at least one fixed plate First connector and the second connector are fixedly connected.
It is preferred that, the steel reinforcement cage unit that adjacent use attachment means are fixedly connected is when making, using same mould bases system Make two and save steel reinforcement cage unit, after the first connector and the second connector are fixedly connected with corresponding steel reinforcement cage unit respectively, then Unload lower mold holder.Making two section steel reinforcement cage units using same mould bases can make the spacing between the reinforcing bar of steel reinforcement cage unit keep one Cause, be easy to two section steel reinforcement cage units to align, both improved and be fixedly connected with quality, and also saved the Connection Time.
Further, when multiple first connectors are fixedly connected as an entirety, and/or multiple second connectors are fixed It is connected as after an entirety, then unloads lower mold holder.It should be appreciated that multiple first connectors are fixedly connected as an entirety herein Can be before multiple first connectors are fixedly connected with a steel reinforcement cage unit or multiple first connectors and one After individual steel reinforcement cage unit is fixedly connected.Both the steel reinforcement cage unit that adjacent use attachment means are fixedly connected can further have been made Spacing between reinforcing bar is consistent, while so that the reinforcement location of steel reinforcement cage unit is fixed, it is to avoid the reinforcing bar of steel reinforcement cage unit Stagger after the corresponding reinforcing bar deformation for making two section steel reinforcement cage units after deformation, be easy to two section steel reinforcement cage units to align, both improved The quality that steel reinforcement cage is fixedly connected, also saves the Connection Time.It is preferred that, multiple first connectors be fixedly connected as one it is whole Body is before multiple first connectors are fixedly connected with a steel reinforcement cage unit.It should be appreciated that herein, multiple first connect Fitting can be the different piece on same part.
It is preferred that, the first connector and the second connector are fixed with steel reinforcement cage unit respectively by the way of welding and connected Connect.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Scope.

Claims (17)

1. a kind of steel reinforcement cage, the steel reinforcement cage includes at least two section steel reinforcement cage units, the steel reinforcement cage unit joins end to end, and it is special Levy and be, the steel reinforcement cage also includes at least one attachment means, each attachment means are used to be fixedly connected with adjacent two Steel reinforcement cage unit is saved, the attachment means include:
At least one first connector, first connector is fixedly connected with least one reinforcing bar of a steel reinforcement cage unit;
At least one reinforcing bar of at least one second connector, second connector and another steel reinforcement cage unit, which is fixed, to be connected Connect;And
At least one fixture, the fixture is fixedly connected with first connector and second connector respectively.
2. steel reinforcement cage as claimed in claim 1, it is characterised in that the radial section of the steel reinforcement cage is circle, multiple described First connector is fixedly connected as an entirety, and/or multiple second connectors are fixedly connected as an entirety.
3. steel reinforcement cage as claimed in claim 1, it is characterised in that the radial section of the steel reinforcement cage is rectangle, a steel The first connector in muscle cage unit at least one side is fixedly connected as an entirety, and/or another steel reinforcement cage unit at least one The second connector on face is fixedly connected as an entirety.
4. steel reinforcement cage as claimed in claim 1, it is characterised in that be fixedly installed the first positioning on first connector The second keeper is fixedly installed on part, second connector, first keeper and second keeper, which are matched somebody with somebody, to be shared In the position for limiting relatively described second connector of the first connector.
5. steel reinforcement cage as claimed in claim 4, it is characterised in that first keeper is to be opened up on first connector A groove, second keeper is that one extended on second connector is raised, the groove and the male cooperation For limiting the position between first connector and second connector.
6. steel reinforcement cage as claimed in claim 1, it is characterised in that at least one is offered on first connector is used to hold Receive a steel reinforcement cage unit reinforcing bar the first holding tank, offer on second connector at least one be used to accommodating it is another Second holding tank of the reinforcing bar of individual steel reinforcement cage unit.
7. steel reinforcement cage as claimed in claim 1, it is characterised in that first connector and steel reinforcement cage unit Reinforcement welding, and/or second connector and another steel reinforcement cage unit reinforcement welding.
8. steel reinforcement cage as claimed in claim 1, it is characterised in that the fixture and first connector and described second Connector is connected by screw bolts.
9. steel reinforcement cage as claimed in claim 1, it is characterised in that first connector, the second connector and fixture are equal For plate.
10. steel reinforcement cage as claimed in claim 9, it is characterised in that the two sides of first connector and the second connector is equal It is fixed with fixture.
11. steel reinforcement cage as claimed in claim 9, it is characterised in that on first connector, the second connector and fixture Offer multiple through holes.
12. a kind of manufacture method of steel reinforcement cage as described in any one of claim 1 to 11, including:
Steel reinforcement cage unit is made, the steel reinforcement cage includes at least two section steel reinforcement cage units;And
During lower cage, two adjacent section steel reinforcement cage units are fixedly connected, multiple steel reinforcement cage units is joined end to end;Its feature exists In,
Wherein, steel reinforcement cage at least is fixedly connected with using an attachment means, and an attachment means are fixedly connected with two adjacent sections Steel reinforcement cage unit;
The steel reinforcement cage unit that adjacent use attachment means are fixedly connected is when making, by multiple first connectors and a reinforcing bar The reinforcing bar of cage unit is fixedly connected, and first connector connects at least one reinforcing bar, by multiple second connectors and a steel The reinforcing bar of muscle cage unit is fixedly connected, and second connector connects at least one reinforcing bar;
During lower cage, the first connector and the second connector are fixedly connected using at least one fixture, make adjacent steel reinforcement cage Unit is fixedly connected.
13. a kind of manufacture method of steel reinforcement cage as claimed in claim 12, it is characterised in that the radial section of the steel reinforcement cage For circle, the steel reinforcement cage unit that adjacent use attachment means are fixedly connected first fixes multiple first connectors when making It is connected as an entirety, and/or multiple second connectors are fixedly connected as an entirety, then by multiple first connectors and one Steel reinforcement cage unit is adjacent to be fixedly connected, and multiple second connectors are fixedly connected with another steel reinforcement cage unit.
14. a kind of manufacture method of steel reinforcement cage as claimed in claim 12, it is characterised in that the radial section of the steel reinforcement cage For rectangle, the steel reinforcement cage unit that adjacent use attachment means are fixedly connected is when making, by a steel reinforcement cage unit extremely first The first connector in few one side is fixedly connected as second in an entirety, and/or another steel reinforcement cage unit at least one side Connector is fixedly connected as an entirety, then multiple first connectors are fixedly connected with a steel reinforcement cage unit, and will be many Individual second connector is fixedly connected with another steel reinforcement cage unit.
15. a kind of manufacture method of steel reinforcement cage as claimed in claim 12, it is characterised in that adjacent use attachment means are consolidated Surely the first keeper is fixedly installed when making in the steel reinforcement cage unit connected on the first connector, solid on the second connector Second keeper is set surely;During lower cage, first the first keeper and the second keeper are coordinated, the first connector and second is connected Position between part is relatively fixed, then is fixedly connected with the first connector and the second connector using at least one fixed plate.
16. a kind of manufacture method of steel reinforcement cage as described in any one of claim 12 to 15, it is characterised in that adjacent use The steel reinforcement cage unit that attachment means are fixedly connected makes two when making, using same mould bases and saves steel reinforcement cage unit, and first is connected After fitting and the second connector are fixedly connected with corresponding steel reinforcement cage unit respectively, then unload lower mold holder.
17. a kind of manufacture method of steel reinforcement cage as claimed in claim 16, it is characterised in that by first by the way of welding Connector and the second connector are fixedly connected with steel reinforcement cage unit respectively.
CN201710433536.6A 2017-06-09 2017-06-09 The production method of steel reinforcement cage and steel reinforcement cage Active CN107142925B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710433536.6A CN107142925B (en) 2017-06-09 2017-06-09 The production method of steel reinforcement cage and steel reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710433536.6A CN107142925B (en) 2017-06-09 2017-06-09 The production method of steel reinforcement cage and steel reinforcement cage

Publications (2)

Publication Number Publication Date
CN107142925A true CN107142925A (en) 2017-09-08
CN107142925B CN107142925B (en) 2019-11-22

Family

ID=59781247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710433536.6A Active CN107142925B (en) 2017-06-09 2017-06-09 The production method of steel reinforcement cage and steel reinforcement cage

Country Status (1)

Country Link
CN (1) CN107142925B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677922A (en) * 2018-06-07 2018-10-19 中铁二局第工程有限公司 A kind of fabrication of reinforcing cage and installation method
CN110258511A (en) * 2019-05-28 2019-09-20 广州穗岩土木科技股份有限公司 The construction method of steel reinforcement cage unit, system and construction method and diaphram wall
CN112211187A (en) * 2020-09-25 2021-01-12 福建新华夏建工有限公司 Reinforcement cage structure for karst area pile foundation and pile foundation construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06264442A (en) * 1993-03-10 1994-09-20 Takenaka Komuten Co Ltd Application of guide pipe of high strength cast-in-place concrete pile
CN200996147Y (en) * 2006-08-31 2007-12-26 杨修霞 Directional reinforcing-bar cage
CN102839671A (en) * 2011-06-21 2012-12-26 上海市第一建筑有限公司 Concrete supporting reinforced cage prefabricated assembling technology and construction method
CN103938616A (en) * 2014-05-15 2014-07-23 东南大学 Underground diaphragm wall steel bar cage structure and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06264442A (en) * 1993-03-10 1994-09-20 Takenaka Komuten Co Ltd Application of guide pipe of high strength cast-in-place concrete pile
CN200996147Y (en) * 2006-08-31 2007-12-26 杨修霞 Directional reinforcing-bar cage
CN102839671A (en) * 2011-06-21 2012-12-26 上海市第一建筑有限公司 Concrete supporting reinforced cage prefabricated assembling technology and construction method
CN103938616A (en) * 2014-05-15 2014-07-23 东南大学 Underground diaphragm wall steel bar cage structure and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677922A (en) * 2018-06-07 2018-10-19 中铁二局第工程有限公司 A kind of fabrication of reinforcing cage and installation method
CN108677922B (en) * 2018-06-07 2020-06-12 中铁二局第一工程有限公司 Manufacturing and mounting method of reinforcement cage
CN110258511A (en) * 2019-05-28 2019-09-20 广州穗岩土木科技股份有限公司 The construction method of steel reinforcement cage unit, system and construction method and diaphram wall
CN112211187A (en) * 2020-09-25 2021-01-12 福建新华夏建工有限公司 Reinforcement cage structure for karst area pile foundation and pile foundation construction method

Also Published As

Publication number Publication date
CN107142925B (en) 2019-11-22

Similar Documents

Publication Publication Date Title
CN205894364U (en) Prefabricated formula wall body and prefabricated formula housing construction
CN107142925A (en) The preparation method of steel reinforcement cage and steel reinforcement cage
CN108978859A (en) Assembled beam-column connecting node
CN109736438A (en) A kind of concrete filled steel tube connects with steel tube device and its construction method
CN213448546U (en) Tower crane foundation supporting device
CN202607811U (en) Concrete slatted floor combined die
CN205934722U (en) Seam bolted connection precast concrete decking
CN210313110U (en) Hoisting structure
CN209129227U (en) A kind of Prefabricated stacking floor
CN208034956U (en) Mold and its end mode structure
CN106087741A (en) A kind of seam bolt connects precast concrete floorings and method for prefabricating
CN214498380U (en) Sinking tank hanging mould reinforcing and positioning device
CN104234269A (en) Construction method for prefabricated row hole-type shear wall
CN210562135U (en) Reinforced concrete square pile
CN208733812U (en) Assembled beam-column connecting node
CN207194165U (en) The connecting node of composite beam and superposed member
CN208815778U (en) Biting connecions steel-concrete coupled column and column connected node
CN207630233U (en) A kind of hollow building block die
KR20110003420A (en) Block for retaining wall
CN209891463U (en) Reinforced structure of wall body
CN206815534U (en) Connector for assembly concrete component
CN109339347A (en) A kind of assembled architecture reinforcing bar connector and its application method
CN210562262U (en) High-strength cement electric pole
CN205742643U (en) Novel fabricated building connects node
CN214364405U (en) Combined assembled concrete precast slab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant