CN107128752A - A kind of bridge equipment - Google Patents

A kind of bridge equipment Download PDF

Info

Publication number
CN107128752A
CN107128752A CN201710508509.0A CN201710508509A CN107128752A CN 107128752 A CN107128752 A CN 107128752A CN 201710508509 A CN201710508509 A CN 201710508509A CN 107128752 A CN107128752 A CN 107128752A
Authority
CN
China
Prior art keywords
guiding groove
block
position guiding
wheel
pivoted arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710508509.0A
Other languages
Chinese (zh)
Inventor
斯幼云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710508509.0A priority Critical patent/CN107128752A/en
Publication of CN107128752A publication Critical patent/CN107128752A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H75/00Storing webs, tapes, or filamentary material, e.g. on reels
    • B65H75/02Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
    • B65H75/34Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
    • B65H75/38Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
    • B65H75/44Constructional details
    • B65H75/4473Constructional details without arrangements or adaptations for rotating the core or former
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H75/00Storing webs, tapes, or filamentary material, e.g. on reels
    • B65H75/02Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
    • B65H75/34Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
    • B65H75/38Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
    • B65H75/44Constructional details
    • B65H75/4481Arrangements or adaptations for driving the reel or the material
    • B65H75/4484Electronic arrangements or adaptations for controlling the winding or unwinding process, e.g. with sensors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables

Landscapes

  • Transmission Devices (AREA)

Abstract

The invention discloses a kind of bridge equipment, including pedestal and it is arranged on the clamping machine that pedestal over top and left and right are oppositely arranged, pedestal bottom is installed with foot lever, foot lever bottom sets slipmat, the first position guiding groove is provided with pedestal, mating connection bottom plate is slided in first position guiding groove, end position is provided with the first slide slot in first position guiding groove bottom, first slide slot front and rear sides mutually claim to be provided with the second position guiding groove, in first slide slot block is slided provided with first, first front and rear sides for sliding block bottom are respectively equipped with first penetrated in the position guiding groove of front and rear sides second and lead a block, end position stretches the port set provided with left and right in bottom base plate end face;The present invention is simple in construction, can realize and automatically control moving left and right for bottom plate, realizes and left and right sides strut combination part switching winding rope and disassembling, assembling and replacing rope drum are worked, and improves the convenience of installation and removal and does not influence to wind the process of rope.

Description

A kind of bridge equipment
Technical field
The present invention relates to bridge field, specifically a kind of bridge equipment.
Background technology
, it is necessary to use substantial amounts of rope in bridge construction work progress, to facilitate the work such as fixed, connection, traction, when Rope is generally furled by manpower later using complete, its complex operation, and arduously, it is existing also to have by serving line machine Rope closing is carried out, existing rope rolling includes two poles that activity is set relatively, the fake axle being arranged on two poles, is arranged In the serving load barrel on fake axle and the motor for driving fake axle to rotate;When furling rope, first rope one end is fixed on On serving load barrel, motor is opened, rope retracting action is carried out.Then need to take the rope for furling into tubular from fake roller Under, the process for unloading tubular rope is more numerous and diverse, subsequently more renews rope cylinder and batches again, then starts the winding of next round, Such a mode is less efficient, and need to expend more manpowers and time, the overall fake process of influence, reduces rope closing efficiency.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of bridge equipment, and it can solve the problem that above-mentioned show in the art Problem.
The present invention is achieved through the following technical solutions:A kind of bridge equipment of the present invention, including pedestal and set The clamping machine being oppositely arranged in the pedestal over top and left and right is put, the pedestal bottom is installed with foot lever, the pin Bar bottom, which sets to be provided with the first position guiding groove, first position guiding groove in slipmat, the pedestal, slides mating connection bottom plate, institute State end position in the first position guiding groove bottom and be provided with the first slide slot, the first slide slot front and rear sides mutually claim to lead position provided with second Groove, slides block in first slide slot provided with first, first front and rear sides for sliding block bottom are respectively equipped with penetrate before First in the position guiding groove of both sides second leads end position leading to provided with left and right stretching, extension setting in a block, the bottom base plate end face afterwards Mouthful, both sides to the left and right are connected with the bottom plate above the port and stretch the first spiral bar set, the bottom plate The left and right sides of top end face mutually claims to be provided with strut combination part, and the strut combination part is by front and rear mutual the first pole for claiming to be provided with With the second pole, the second slide slot is set in second pole, described second slides trench bottom provided with the 3rd position guiding groove, described the Slided in two slide slots and be connected with second and slide block, described second slides block bottom provided with penetrating in the 3rd position guiding groove Second lead a block, described second slides to be rotatably assorted in block anterior end surface and is connected with the first pivoted arm, is set in first pole There is the transmission cavity for stretching set downwards, transmission cavity bottom extending part is penetrated in the bottom plate, the first pole rear side end Rotation in surface stretches before and after being connected with and stretches afterbody and described first turn on rear side of the second pivoted arm set, second pivoted arm Arm front side tail is oppositely arranged and is equipped with holding firmware, on front side of second pivoted arm extending part penetrate in the transmission cavity and with institute State transmission cavity front side end to be rotatably assorted connection, the first transmission wheel is installed with second pivoted arm in the transmission cavity, it is described Connect to be provided with to be rotatably assorted in connection hole, the hole between the transmission cavity and the port in bottom plate and be connected with front and rear stretching, extension The shaft coupling of setting.
Afterbody is matched somebody with somebody with the first position guiding groove left-hand end rotation on the left of preferably technical scheme, the first spiral bar Close afterbody on the right side of connection, the first spiral bar to be connected with the first motor, first motor is installed on first position guiding groove Right-hand end is interior and is fixedly connected.
Preferably technical scheme, described first slides to be provided with recessed channel, the female groove in end face at the top of block and sets Top ejection described first is fixed with before and after having on 3rd pivoted arm of stretching, extension, the 3rd pivoted arm to slide at the top of block outside end face The first taper wheel, first taper are fixed with the 3rd pivoted arm on front side of first tooth-like wheel, first tooth-like wheel Wheel lower front is connected with the second taper wheel, and the second taper wheel bottom is connected with the second motor, second motor The female trench bottom is fixedly installed in, the described first second position guiding groove led above a block is interior provided with spring element, described First, which slides trench bottom, is provided with and the described first pushing cylinder for sliding block mating connection.
Preferably technical scheme, the bottom base plate surrounding is equipped with scroll wheel.
It is described provided with front and rear the second spiral bar for stretching and setting in preferably technical scheme, the 3rd position guiding groove Second leads a block and mating connection described in second spiral bar break-through, and the second spiral bar rear side end is connected with the 3rd motor, institute State the 3rd motor and be fixedly installed in the 3rd position guiding groove rear lateral portion, the second spiral bar front side end and the 3rd position guiding groove Front side end is rotatably assorted connection.
On rear side of preferably technical scheme, the shaft coupling extending part penetrate in the port and afterbody with after the port Sidepiece is rotatably assorted connection, and extending part on front side of the second tooth-like wheel, the shaft coupling is fixed with the shaft coupling in the port Penetrate in the transmission cavity and be rotatably assorted with the transmission cavity front side end and is connected, it is fixed on the shaft coupling in the transmission cavity Provided with the second transmission wheel, conveyer belt is connected between second transmission wheel and first transmission wheel.
Rope drum, the serving are connected between preferably technical scheme, the holding firmware of front and rear sides Fixing slot is equipped with the end face of cylinder front and rear sides, the holding firmware opposite side of front and rear sides, which is equipped with, to be used to and the rope drum The holding block that the fixing slot in the end face of front and rear sides is connected.
Rope is connected between preferably technical scheme, clamping machine described in the left and right sides.
The beneficial effects of the invention are as follows:
1. setting the first slide slot by end position in the first position guiding groove bottom, the mutual title in the first slide slot front and rear sides sets second and leads position First is set in groove, the first slide slot and slides block, first slide set in end face at the top of block set in recessed channel, recessed channel before and after stretching, extension It is fixed on 3rd pivoted arm, the 3rd pivoted arm to set top ejection first and slide the first tooth-like wheel at the top of block outside end face, the first tooth-like wheel It is fixed on 3rd pivoted arm of front side to set the first taper wheel, the first taper wheel lower front the second taper wheel of mating connection, the second cone Shape wheel bottom connects the second motor, and the second motor bottom is installed in recessed trench bottom and is fixedly connected, and first leads above a block The second position guiding groove in set spring element, first slide trench bottom set with the first pushing cylinder for sliding block mating connection, so as to realize Automatic drive control, improves the operating efficiency of fake work, reduces artificial operation.
2. mating connection bottom plate is slided by being set in pedestal in the first position guiding groove, the first position guiding groove, base top end surface The left and right sides mutually claims to set strut combination part, and the first spiral bar left side afterbody is rotatably assorted with the first position guiding groove left-hand end to be connected, Afterbody is connected with the first motor on the right side of first spiral bar, and the first motor is installed in the first position guiding groove right-hand end and is fixedly connected, So as to realize alternating switching fake work and the new rope drum of disassembling, assembling and replacing of left and right sides strut combination part, fake is improved Operating efficiency.
3. stretching the second spiral bar set before and after by being set in the 3rd position guiding groove, a block is led in the second spiral bar break-through second And be connected, the second spiral bar rear side end is connected with the 3rd motor, the 3rd motor be installed on the 3rd position guiding groove rear lateral portion it is interior and It is fixedly connected, the second spiral bar front side end is rotatably assorted with the 3rd position guiding groove front side end to be connected, so as to realize the automatic of rope drum Work is installed and automatically disengaged in locking, is improved the convenience of installation and removal and is not influenceed to wind the process of rope.
4. the present invention is simple in construction, it can realize and automatically control moving left and right for bottom plate, realize to left and right sides strut combination Part switching winding rope and the work of disassembling, assembling and replacing rope drum, improve the convenience of installation and removal and do not influence to wind rope Process.
Brief description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and accompanying drawing.
Fig. 1 is a kind of bridge equipment of the invention;
Fig. 2 is the sectional view of " A-A " in Fig. 1 of the present invention;
Fig. 3 is bottom base plate upward view of the invention;
Fig. 4 is schematic diagram on front side of the rope drum of the present invention;
Position views of the Fig. 5 for holding block of the invention on holding firmware;
The partial enlarged drawing that Fig. 6 is Fig. 1 in the present invention.
Embodiment
As shown in figs 1 to 6, a kind of bridge equipment of the invention, including pedestal 4 and be arranged on the top of the pedestal 4 The clamping machine 3 that side and left and right are oppositely arranged, the bottom of pedestal 4 is installed with foot lever 401, and the bottom of foot lever 401 is set It is provided with slipmat 402, the pedestal 4 in the first position guiding groove 41, first position guiding groove 41 and slides mating connection bottom plate 5, institute State in the bottom of the first position guiding groove 41 end position and be provided with the first slide slot 59, the front and rear sides of the first slide slot 59 mutually claim provided with the Block 592 is slided provided with first in two position guiding grooves 591, first slide slot 59, described first slides front and rear the two of the bottom of block 592 Side is respectively equipped with first penetrated in the second position guiding groove of front and rear sides 591 and leads a block 593, the bottom end face middle-end position of bottom plate 5 Install left and right and stretch and be connected with both sides to the left and right in the port 55 set, the bottom plate 5 of the top of the port 55 and stretch The the first spiral bar 42 set is opened up, the left and right sides of the top end face of bottom plate 5 mutually claims to be provided with strut combination part 51, the branch Bar sub-assembly 51 sets the second cunning in front and rear mutual the first pole 511 and the second pole 510 for claiming to be provided with, second pole 510 Row groove 5101, the bottom of the second slide slot 5101, which is provided with to slide in the 3rd position guiding groove 5102, second slide slot 5101, matches somebody with somebody Conjunction is connected with second and slides block 58, and described second slides the bottom of block 58 leads provided with second penetrated in the 3rd position guiding groove 5102 Position block 581, described second slides to be rotatably assorted in the anterior end surface of block 58 and is connected with the first pivoted arm 584, in first pole 511 Provided with the downward transmission cavity 53 for stretching and setting, the bottom extending part of transmission cavity 53 is penetrated in the bottom plate 5, first pole Be rotatably assorted the second pivoted arm 531 for stretching and setting before and after being connected with 511 back end surfaces, and the rear side of the second pivoted arm 531 stretches Afterbody is oppositely arranged with the front side tail of the first pivoted arm 584 and is equipped with holding firmware 54, and the front side of the second pivoted arm 531 is stretched Portion penetrates in the transmission cavity 53 and is rotatably assorted with the front side end of transmission cavity 53 and is connected, and described the in the transmission cavity 53 Connected between the transmission cavity 53 being installed with two pivoted arms 531 in first transmission wheel 532, the bottom plate 5 and the port 55 Provided with connection hole 56, it is rotatably assorted in the hole 56 before and after being connected with and stretches the shaft coupling 561 set.
Wherein, the left side afterbody of the first spiral bar 42 is rotatably assorted with the left-hand end of the first position guiding groove 41 and is connected, institute State the right side afterbody of the first spiral bar 42 to be connected with the first motor 43, it is right that first motor 43 is installed on first position guiding groove 41 Side is interior and is fixedly connected, so as to realize alternating switching fake work and the disassembling, assembling and replacing of left and right sides strut combination part 51 New rope drum 1, improves fake operating efficiency.
Wherein, described first slide provided with recessed channel 596 in the top end face of block 592, the female groove 596 is interior provided with front and rear Top ejection described first is fixed with the 3rd pivoted arm 5961 stretched, the 3rd pivoted arm 5961 and slides the top end of block 592 The first cone is fixed with the first tooth-like wheel 5962 outside face, the 3rd pivoted arm 5961 of the front side of the first tooth-like wheel 5962 Shape wheel 5963, the lower front of the first taper wheel 5963 is connected with the second taper wheel 5964, the second taper wheel 5964 bottoms are connected with the second motor 5965, and second motor 5965 is fixedly installed in the bottom of the female groove 596, described One leads spring element 594 is provided with second position guiding groove 591 of the top of a block 593, the bottom of the first slide slot 59 be provided with Described first slides the pushing cylinder 595 of the mating connection of block 592, so as to realize automatic drive control, improves the work of fake work Make efficiency, reduce artificial operation.
Wherein, the bottom surrounding of bottom plate 5 is equipped with scroll wheel 57, is led so as to reduce when bottom plate 5 is moved left and right with first The frictional force produced between the bottom of groove 41 of position, improves the movement flexibility of bottom plate 5.
Wherein, provided with front and rear the second spiral bar 582 for stretching and setting, second spiral in the 3rd position guiding groove 5102 Second leads a block 581 and mating connection described in the break-through of bar 582, and the rear side end of the second spiral bar 582 connects with the 3rd motor 583 Connect, the 3rd motor 583 is fixedly installed in the rear lateral portion of the 3rd position guiding groove 5102, the front side end of the second spiral bar 582 It is rotatably assorted and is connected with the front side end of the 3rd position guiding groove 5102, so as to realizes that the automatic locking of rope drum 1 is installed and automatic Depart from work.
Wherein, the rear side extending part of shaft coupling 561 is penetrated in the port 55 and afterbody turns with the rear lateral portion of port 55 It is dynamic to be connected, the second tooth-like wheel 551 is fixed with the shaft coupling 561 in the port 55, the front side of shaft coupling 561 is stretched Exhibition portion penetrates in the transmission cavity 53 and is rotatably assorted with the front side end of transmission cavity 53 and is connected, described in the transmission cavity 53 The second transmission wheel 533 is fixed with shaft coupling 561, coordinates between second transmission wheel 533 and first transmission wheel 532 and connects Conveyer belt 534 is connected to, transmission work is automatically controlled so as to realize, fake stability is improved.
Wherein, rope drum 1, the front and rear sides of rope drum 1 are connected between the holding firmware 54 of front and rear sides Be equipped with fixing slot 11 in end face, the opposite sides of the holding firmware 54 of front and rear sides be equipped with to before and after the rope drum 1 The holding block 541 that the fixing slot 11 in the end face of both sides is connected, so as to realize that fast and easy is dismounted.
Wherein, rope 2 is connected between clamping machine 3 described in the left and right sides, so as to realize positioning work.
During original state, because first leads pressure on top surface of the block 593 by the spring element 594 in the second position guiding groove 591, make First leads lowest position of the block 593 in the second position guiding groove 591, is slided while driving first to slide block 592 positioned at first Lowest position in row groove 59, now, first, which slides block 592, is fully located in the first slide slot 59, meanwhile, bottom plate 5 is moved When moving to right-most position in the first position guiding groove 41, now, the second tooth-like wheel 551 in the left bottom end face of bottom plate 5 is located at First slides the surface relative position of the first tooth-like wheel 5962 in the top end face of block 592.
When needing fake in use, two groups of rope drums 1 to be separately mounted to the strut combination part 51 of the left and right sides first It is interior, then it will be connected after clamping machine 3 of the rope 2 through the left and right sides with the rope drum 1 on left side strut combination part 51, Now, first is driven to slide block 592 and move up by pushing cylinder 595, while making first to slide the first of the front and rear sides of block 592 Leading a block 593 overcomes the pressure on top surface of spring element 594 to slide upwards, until, first slides the first dentation in the top end face of block 592 The top of wheel 5962 is connected with the bottom end of the second tooth-like wheel 551 in left side port 55, now, and control pushes cylinder 595 and stopped Rotate, then drive the second taper wheel 5964 to rotate by the second motor 5965, the first taper is driven by the second taper wheel 5964 Wheel 5963, and then drive by the first taper wheel 5963 the first tooth-like wheel 5962 on the 3rd pivoted arm 5961 and the 3rd pivoted arm 5961 Rotate, drive the second tooth-like wheel 551 in the port 55 of left side to rotate by the first tooth-like wheel 5962, and then in left side port 55 Second tooth-like wheel 551 drives the shaft coupling 561 in the port 55 of left side to rotate, and then the shaft coupling 561 in left side port 55 drives a left side The second transmission wheel 533 in transmission cavity 53 in side pole 511 is rotated, and passes through in the transmission cavity 53 in left side pole 511 second Conveyer belt 534 between the transmission wheel 532 of transmission wheel 533 and first drives the first transmission wheel 532 to rotate, and then by left side pole The first transmission wheel 532 in transmission cavity 53 in 511 drives 531 turns of the second pivoted arm in the transmission cavity 53 in the pole 511 of left side Dynamic, finally the second pivoted arm 531 in the transmission cavity 53 in left side pole 511 drives the rope drum on left side strut combination part 51 1 realizes that fake works, and after the completion of the fake of rope drum 1 on left side strut combination part 51, now cuts off rope 2, then Drive first to slide block 592 and be moved down into initial position by pushing cylinder 595, then pass through the first motor 43 and drive the first spiral shell Shape bar 42 is rotated, and the left-most position that bottom plate 5 is moved in the first position guiding groove 41 is driven by the first spiral bar 42, now, control First motor 43 stops operating, meanwhile, the second tooth-like wheel 551 in the bottom right side end face of bottom plate 5 is slided block 592 positioned at first The surface relative position of the first tooth-like wheel 5962 in the end face of top, now, drives first to slide block 592 by pushing cylinder 595 Move up, overcome the pressure on top surface of spring element 594 upward while making first to slide the first of the front and rear sides of block 592 and lead a block 593 Slide, until, first slides the top of the first tooth-like wheel 5962 in the top end face of block 592 and the second dentation in right side port 55 The mating connection of 551 bottom ends is taken turns, now, control pushes cylinder 595 and stopped operating, while making rope 2 and right side strut combination part 51 On rope drum 1 be fixedly connected, then by the second motor 5965 drive the second taper wheel 5964 rotate, as described above left side serving Rope step, makes the second motor 5965 drive the rope drum 1 on right side strut combination part 51 to realize that fake works, now, passes through The 3rd motor 583 in the second pole of left side 510 drives the second spiral bar 582 to rotate, and drives second to lead by the second spiral bar 582 Position block 581 is located at the last side position in the 3rd position guiding groove 5102, now, leads a block 581 by second and drives second to slide block 58 The last side position slided into the second slide slot 5101, makes the holding block on the second holding firmware 54 for sliding the anterior end surface of block 58 541 completely disengage from the left side rear side fixing slot 11 of rope drum 1, and now, the holding firmware 54 of the anterior end surface of block 58 is slided most in left side second Big holding firmware 54 of the degree away from the back end surface of the second pivoted arm of left side 531, finally takes out the rope drum 1 for completing winding work, so New rope drum 1 is moved to holding firmware 54 and the rear side of the second pivoted arm of left side 531 that the anterior end surface of block 58 is slided in left side second afterwards Between the holding firmware 54 of end face, while making at the holding block 541 on the front and rear fixing slot 11 and front and rear side holding firmware 54 of rope drum 1 In relative position, rope drum 1 is then moved, makes the front side fixing slot 11 of rope drum 1 and the phase of holding block 541 on front side holding firmware 54 Connection, subsequently by controlling the 3rd motor 583 to drive the second spiral bar 582 to rotate backward, until on left side holding firmware 54 In the fixing slot 11 of the fully-inserted rear side of rope drum 1 of holding block 541, when the rope drum 1 on right side strut combination part 51 has been wound Cheng Hou, rotates the right-most position for driving bottom plate 5 to be moved in the first position guiding groove 41, now, as described above by the first motor 43 Rope drum 1 on left side fake step, control left side strut combination part 51 realizes winding work, and then left side is dismounted as described above Step, changes the rope drum 1 on right side strut combination part 51, so as to realize the continuous firing of winding rope 2, improves fake Whole progress.
The beneficial effects of the invention are as follows:
1. setting the first slide slot by end position in the first position guiding groove bottom, the mutual title in the first slide slot front and rear sides sets second and leads position First is set in groove, the first slide slot and slides block, first slide set in end face at the top of block set in recessed channel, recessed channel before and after stretching, extension It is fixed on 3rd pivoted arm, the 3rd pivoted arm to set top ejection first and slide the first tooth-like wheel at the top of block outside end face, the first tooth-like wheel It is fixed on 3rd pivoted arm of front side to set the first taper wheel, the first taper wheel lower front the second taper wheel of mating connection, the second cone Shape wheel bottom connects the second motor, and the second motor bottom is installed in recessed trench bottom and is fixedly connected, and first leads above a block The second position guiding groove in set spring element, first slide trench bottom set with the first pushing cylinder for sliding block mating connection, so as to realize Automatic drive control, improves the operating efficiency of fake work, reduces artificial operation.
2. mating connection bottom plate is slided by being set in pedestal in the first position guiding groove, the first position guiding groove, base top end surface The left and right sides mutually claims to set strut combination part, and the first spiral bar left side afterbody is rotatably assorted with the first position guiding groove left-hand end to be connected, Afterbody is connected with the first motor on the right side of first spiral bar, and the first motor is installed in the first position guiding groove right-hand end and is fixedly connected, So as to realize alternating switching fake work and the new rope drum of disassembling, assembling and replacing of left and right sides strut combination part, fake is improved Operating efficiency.
3. stretching the second spiral bar set before and after by being set in the 3rd position guiding groove, a block is led in the second spiral bar break-through second And be connected, the second spiral bar rear side end is connected with the 3rd motor, the 3rd motor be installed on the 3rd position guiding groove rear lateral portion it is interior and It is fixedly connected, the second spiral bar front side end is rotatably assorted with the 3rd position guiding groove front side end to be connected, so as to realize the automatic of rope drum Work is installed and automatically disengaged in locking, is improved the convenience of installation and removal and is not influenceed to wind the process of rope.
4. the present invention is simple in construction, it can realize and automatically control moving left and right for bottom plate, realize to left and right sides strut combination Part switching winding rope and the work of disassembling, assembling and replacing rope drum, improve the convenience of installation and removal and do not influence to wind rope Process.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any The change or replacement expected without creative work, should all be included within the scope of the present invention.Therefore, it is of the invention Protection domain should be determined by the scope of protection defined in the claims.

Claims (8)

1. a kind of bridge equipment, including pedestal and the clamping machine that pedestal over top and left and right are oppositely arranged is arranged on, it is special Levy and be:Pedestal bottom is installed with foot lever, and foot lever bottom, which is set, is provided with the first position guiding groove in slipmat, pedestal, first leads End position in mating connection bottom plate, the first position guiding groove bottom is slided in the groove of position to be provided with two before and after the first slide slot, the first slide slot Side mutually claims to be provided with the second position guiding groove, the first slide slot slides block provided with first, and first slides the front and rear sides difference of block bottom Lead in a block, bottom base plate end face end position provided with first penetrated in the position guiding groove of front and rear sides second and stretched provided with left and right and set Port, be connected with both sides to the left and right in the bottom plate above port and stretch the first spiral bar set, base top end surface The left and right sides mutually claim to be provided with strut combination part, strut combination part by it is front and rear it is mutual claim the first pole and the second pole that are provided with, Set the second slide slot in second pole, second slides trench bottom provided with the 3rd position guiding groove, and mating connection is slided in the second slide slot There is second to slide block, second slides block bottom leads a block provided with second penetrated in the 3rd position guiding groove, and second slides block front side end Rotation in surface is connected with provided with the transmission cavity for stretching setting downwards in the first pivoted arm, the first pole, and transmission cavity bottom is stretched Portion is penetrated in bottom plate, and be rotatably assorted the second pivoted arm for stretching and setting before and after being connected with, the second pivoted arm in the first pole back end surface Rear side stretches afterbody and the first pivoted arm front side tail is oppositely arranged and is equipped with holding firmware, and extending part penetrates biography on front side of the second pivoted arm Send intracavitary and be rotatably assorted with transmission cavity front side end and is connected, the first transmission wheel, bottom plate are installed with the second pivoted arm in transmission cavity Connected between interior transmission cavity and port and be provided with connection hole, be rotatably assorted in connection hole and the shaft coupling of setting is stretched before and after being connected with.
2. a kind of bridge equipment according to claim 1, it is characterised in that:On the left of the first spiral bar afterbody with it is described First position guiding groove left-hand end is rotatably assorted connection, and afterbody is connected with the first motor on the right side of the first spiral bar, first horse Up to being installed in the first position guiding groove right-hand end and be fixedly connected.
3. a kind of bridge equipment according to claim 1, it is characterised in that:Described first slides and is provided with end face at the top of block It is described that top ejection is fixed with provided with front and rear the 3rd pivoted arm stretched in recessed channel, the female groove, on the 3rd pivoted arm First slides the is fixed with the 3rd pivoted arm at the top of block on front side of the first tooth-like wheel outside end face, first tooth-like wheel One taper wheel, the first taper wheel lower front is connected with the second taper wheel, and the second taper wheel bottom is connected with Second motor, second motor is fixedly installed in the female trench bottom, described first lead above a block described second lead Spring element is provided with the groove of position, described first, which slides trench bottom, is provided with and the described first pushing cylinder for sliding block mating connection.
4. a kind of bridge equipment according to claim 1, it is characterised in that:The bottom base plate surrounding is equipped with rolling Wheel.
5. a kind of bridge equipment according to claim 1, it is characterised in that:Provided with front and rear stretching, extension in 3rd position guiding groove The the second spiral bar set, second leads after a block and mating connection, the second spiral bar described in the second spiral bar break-through Side is connected with the 3rd motor, and the 3rd motor is fixedly installed in the 3rd position guiding groove rear lateral portion, the second spiral bar Front side end is rotatably assorted with the 3rd position guiding groove front side end and is connected.
6. a kind of bridge equipment according to claim 1, it is characterised in that:Extending part penetrates described logical on rear side of the shaft coupling Intraoral and afterbody is rotatably assorted with the port rear lateral portion and is connected, and the second dentation is fixed with the shaft coupling in the port Extending part, which is penetrated in the transmission cavity and is rotatably assorted with the transmission cavity front side end, on front side of wheel, the shaft coupling is connected, described to pass Send and the second transmission wheel is fixed with the shaft coupling of intracavitary, coordinate between second transmission wheel and first transmission wheel and connect It is connected to conveyer belt.
7. a kind of bridge equipment according to claim 1, it is characterised in that:Coordinate between the holding firmware of front and rear sides It is connected with rope drum, rope drum front and rear sides end face and is equipped with fixing slot, the holding firmware opposite side of front and rear sides It is equipped with the holding block to be connected with the fixing slot in the end face of the rope drum front and rear sides.
8. a kind of bridge equipment according to claim 1, it is characterised in that:Coordinate between clamping machine described in the left and right sides and connect It is connected to rope.
CN201710508509.0A 2017-06-28 2017-06-28 A kind of bridge equipment Withdrawn CN107128752A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710508509.0A CN107128752A (en) 2017-06-28 2017-06-28 A kind of bridge equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710508509.0A CN107128752A (en) 2017-06-28 2017-06-28 A kind of bridge equipment

Publications (1)

Publication Number Publication Date
CN107128752A true CN107128752A (en) 2017-09-05

Family

ID=59737163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710508509.0A Withdrawn CN107128752A (en) 2017-06-28 2017-06-28 A kind of bridge equipment

Country Status (1)

Country Link
CN (1) CN107128752A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108202712A (en) * 2017-12-08 2018-06-26 韦德高 It is a kind of novel to be used for new-energy automobile brushing device
CN108238014A (en) * 2017-12-08 2018-07-03 韦德高 It is a kind of follow-on for new-energy automobile brushing device
CN108248561A (en) * 2017-12-08 2018-07-06 韦德高 One kind is used for new-energy automobile brushing device

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4883230A (en) * 1987-06-12 1989-11-28 Kabmatik Ab Cable switching device
US5511742A (en) * 1994-11-14 1996-04-30 Phillips Petroleum Company Apparatus and method for producing a single coil of a double run pipe
CN1179767A (en) * 1995-02-27 1998-04-22 西筘机械制造公司 Apparatus for and method of continuously spooling a continuous filament on reels with accessible long inside ends
DE19983089T1 (en) * 1998-04-03 2001-05-17 Nextrom Holding Sa Procedure and arrangement for double winding
CN2820707Y (en) * 2005-06-03 2006-09-27 上海查理包装设备科技有限公司 Double work station winding packing machine
CN201857153U (en) * 2010-12-21 2011-06-08 莱芜金鼎电子材料有限公司 Splitting machine
CN102152208A (en) * 2010-12-30 2011-08-17 宁波大榭开发区综研化学有限公司 Grinding device of pipes used for curved surface anti-buckling tests of adhesive tapes
CN104528433A (en) * 2014-12-30 2015-04-22 桂林中昊力创机电科技有限公司 Double-station automatic winding machine for tire cord fabric
CN204528807U (en) * 2015-03-30 2015-08-05 西安航天华阳机电装备有限公司 A kind of high speed and definite length Double-station winding device
CN204568989U (en) * 2015-03-04 2015-08-19 扬州戎星电气有限公司 A kind of cable housing device
CN205061156U (en) * 2015-10-15 2016-03-02 安徽亚南电缆厂 Cable taking -up device
CN106429557A (en) * 2016-09-23 2017-02-22 东莞市联洲知识产权运营管理有限公司 Winding equipment on protection film production equipment
CN106829580A (en) * 2017-04-06 2017-06-13 孝感市科莱达商贸有限公司 A kind of environmentally-friendly plastic thinfilms device
CN206265942U (en) * 2016-12-08 2017-06-20 江阴中达软塑新材料股份有限公司 A kind of light low haze cigarette film rolling-up mechanism high

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4883230A (en) * 1987-06-12 1989-11-28 Kabmatik Ab Cable switching device
US5511742A (en) * 1994-11-14 1996-04-30 Phillips Petroleum Company Apparatus and method for producing a single coil of a double run pipe
CN1179767A (en) * 1995-02-27 1998-04-22 西筘机械制造公司 Apparatus for and method of continuously spooling a continuous filament on reels with accessible long inside ends
DE19983089T1 (en) * 1998-04-03 2001-05-17 Nextrom Holding Sa Procedure and arrangement for double winding
CN2820707Y (en) * 2005-06-03 2006-09-27 上海查理包装设备科技有限公司 Double work station winding packing machine
CN201857153U (en) * 2010-12-21 2011-06-08 莱芜金鼎电子材料有限公司 Splitting machine
CN102152208A (en) * 2010-12-30 2011-08-17 宁波大榭开发区综研化学有限公司 Grinding device of pipes used for curved surface anti-buckling tests of adhesive tapes
CN104528433A (en) * 2014-12-30 2015-04-22 桂林中昊力创机电科技有限公司 Double-station automatic winding machine for tire cord fabric
CN204568989U (en) * 2015-03-04 2015-08-19 扬州戎星电气有限公司 A kind of cable housing device
CN204528807U (en) * 2015-03-30 2015-08-05 西安航天华阳机电装备有限公司 A kind of high speed and definite length Double-station winding device
CN205061156U (en) * 2015-10-15 2016-03-02 安徽亚南电缆厂 Cable taking -up device
CN106429557A (en) * 2016-09-23 2017-02-22 东莞市联洲知识产权运营管理有限公司 Winding equipment on protection film production equipment
CN206265942U (en) * 2016-12-08 2017-06-20 江阴中达软塑新材料股份有限公司 A kind of light low haze cigarette film rolling-up mechanism high
CN106829580A (en) * 2017-04-06 2017-06-13 孝感市科莱达商贸有限公司 A kind of environmentally-friendly plastic thinfilms device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108202712A (en) * 2017-12-08 2018-06-26 韦德高 It is a kind of novel to be used for new-energy automobile brushing device
CN108238014A (en) * 2017-12-08 2018-07-03 韦德高 It is a kind of follow-on for new-energy automobile brushing device
CN108248561A (en) * 2017-12-08 2018-07-06 韦德高 One kind is used for new-energy automobile brushing device

Similar Documents

Publication Publication Date Title
CN107128752A (en) A kind of bridge equipment
CN206309254U (en) Louvered curtain
CN107215699B (en) A kind of cloth-rolling device easy to textile cloth winding
JP2013072224A (en) Slat lifting apparatus for blind
CN107128753A (en) One kind changes efficiently bridge equipment
CN107244585A (en) A kind of bridge equipment
CN107161792B (en) A kind of convenient adjustable weaving winding mechanism
CN110419279B (en) 180-degree rotation adjusting and locking mechanism for ridge building component
CN107872194A (en) A kind of modified photovoltaic panel assembly
CN207673617U (en) A kind of fan on stealthy fan lamp
CN108238515A (en) A kind of bridge equipment fast used
CN107235375B (en) A kind of efficient cable machinery
CN106994524B (en) A kind of bridge construction device
CN107187932A (en) A kind of efficient bridge equipment
CN104154639A (en) Air deflector driving device and air conditioner with same
CN107265191A (en) A kind of power cable device
CN107187938A (en) A kind of easily power cable device
CN107324133A (en) A kind of automatically weaving Winder
CN107697687A (en) The cloth-rolling device that a kind of modified textile cloth is quickly wound
CN108238469A (en) A kind of deduster of practicality
CN107310953A (en) A kind of deduster
CN107662834A (en) The cloth-rolling device that a kind of practical textile cloth is quickly wound
CN108204110A (en) A kind of painting device of indoor decoration
CN107700274A (en) A kind of novel papermaking equipment
CN107043077A (en) A kind of bridge hoisting equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170905

WW01 Invention patent application withdrawn after publication