CN107127467A - Welding method, air conditioning pipe system and the air conditioner of idle call shock absorbing pipe - Google Patents

Welding method, air conditioning pipe system and the air conditioner of idle call shock absorbing pipe Download PDF

Info

Publication number
CN107127467A
CN107127467A CN201710241730.4A CN201710241730A CN107127467A CN 107127467 A CN107127467 A CN 107127467A CN 201710241730 A CN201710241730 A CN 201710241730A CN 107127467 A CN107127467 A CN 107127467A
Authority
CN
China
Prior art keywords
pipe
shock absorbing
connection ring
bellows
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710241730.4A
Other languages
Chinese (zh)
Inventor
王小明
许永锋
梁伯启
郭芳程
吴敌
肖俊钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Original Assignee
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Guangdong Midea HVAC Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201710241730.4A priority Critical patent/CN107127467A/en
Publication of CN107127467A publication Critical patent/CN107127467A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/08Compressors specially adapted for separate outdoor units
    • F24F1/12Vibration or noise prevention thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/24Means for preventing or suppressing noise
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/06Tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • General Engineering & Computer Science (AREA)
  • Joints Allowing Movement (AREA)

Abstract

The present invention discloses a kind of welding method, air conditioning pipe system and the air conditioner of idle call shock absorbing pipe, wherein, the welding method of the idle call shock absorbing pipe comprises the following steps:S10, one shock absorbing pipe of offer;The shock absorbing pipe includes tube body and is fixedly welded on the pipe joint at the tube body two ends, and the welding temperature of the pipe joint and the tube body is T1;S20, the one end of the pipe joint away from the tube body and air-conditioning duct be welded and fixed;The welding temperature of the pipe joint and the air-conditioning duct is T2, and the T2 and the T1 meet relational expression:T2 < T1.Technical solution of the present invention ensures that welding structure or solder between pipe joint and tube body are not influenceed by subsequent soldering processes, it is ensured that the stability of shock-absorbing tubular construction, is conducive to strengthening the sealing property of air-conditioning duct and improves the bearing capacity of air-conditioning duct.

Description

Welding method, air conditioning pipe system and the air conditioner of idle call shock absorbing pipe
Technical field
The present invention relates to air-conditioning technical field, more particularly to a kind of welding method of idle call shock absorbing pipe, air-conditioning duct system System and air conditioner.
Background technology
With the development of air-conditioning technical, compressor operating frequency scope is more and more wider, in ultra-wideband range of operation, compression The problem of vibration and stress are bigger than normal occurs in machine pipeline, especially for air injection enthalpy-increasing DC frequency-changeable compressor, the row of compressor Gas port, the vibration of gas returning port and jet and stress ratio customary DC frequency-changeable compressor will be big, therefore, the pipe of compressor section Road requires higher, to prevent the risk of disconnected pipe occurs in running.By using on the big pipeline of vibration of compressor and stress Set up shock absorbing pipe, can effectively reduce vibration and the stress of pipeline, yet with shock absorbing pipe itself be welding be made, and shock absorbing pipe and Air-conditioning duct is also to be connected by welding manner, when welding shock absorbing pipe with air-conditioning duct, easily occurs high temperature and causes shock-absorbing The situation that the welding structure that pipe itself pre-selection is welded is destroyed, ultimately results in shock absorbing pipe leakage failure.
The content of the invention
The main object of the present invention is to propose a kind of welding manner of idle call shock absorbing pipe, it is intended to improve shock absorbing pipe and air-conditioning The welding procedure of pipeline, it is to avoid high temperature causes the welding structure that shock absorbing pipe itself pre-selection is welded to be destroyed.
To achieve the above object, the welding manner of idle call shock absorbing pipe proposed by the present invention, comprises the following steps:
S10, one shock absorbing pipe of offer;The shock absorbing pipe includes tube body and connect with the pipe for being fixedly welded on the tube body two ends The welding temperature of head, the pipe joint and the tube body is T1;
S20, the one end of the pipe joint away from the tube body and air-conditioning duct be welded and fixed;The pipe joint and institute The welding temperature for stating air-conditioning duct is T2, and the T2 and the T1 meet relational expression:T2 < T1.
Preferably, the T1 and the T2 meet relational expression:T1-T2≥100°.
Preferably, the T1 and the T2 meet relational expression:T1-T2≤200°.
Preferably, the tube body includes bellows and the connection ring located at the bellows two ends, in the step S10 Before, the welding method of the idle call shock absorbing pipe also includes:
S30, first to weld the bellows and the connection ring, then weld the side of the connection ring and the pipe joint Formula, prepares the shock absorbing pipe;
Wherein, the T1 is the welding temperature of the connection ring and the pipe joint, the connection ring and the bellows Welding temperature meet relational expression for T3, the T1 and the T3:T3 > T1.
Preferably, the tube body also includes pressure ring and is sheathed on the net of the bellows, and the pressure ring is to by institute State the outer peripheral face that net pressure is fixed in the connection ring;
The step S30 is specially:First to weld the bellows and the connection ring, then weld the connection ring with The pipe joint, then the mode that the net, the connection ring are mutually welded and fixed with the pressure ring, prepare the shock-absorbing Pipe;
Wherein, the welding temperature of the pressure ring, the net and the connection ring is T4, the T1, the T2, the T3 Relational expression is met between the T4:T3 > T1 > T4 > T2.
Preferably, the tube body also includes pressure ring and is sheathed on the net of the bellows, and the pressure ring is to by institute State the outer peripheral face that net pressure is fixed in the connection ring;
The step S30 is specially:First to weld the bellows and the connection ring, then by the net, described Connection ring is mutually welded and fixed with the pressure ring, then welds the mode of the connection ring and the pipe joint, prepares described keep away Shake pipe;
The welding temperature of the pressure ring, the net and the connection ring is T4, between the T1, the T3 and the T4 Meet relational expression:T3 > T4 > T1.
Preferably, the tube body includes bellows and the connection ring located at the bellows two ends, in the step S10 Before, the welding method of the idle call shock absorbing pipe also includes:
S40, first to weld the connection ring and the pipe joint, then weld the side of the bellows and the connection ring Formula, prepares the shock absorbing pipe;
Wherein, the T1 is the welding temperature of the connection ring and the pipe joint, the connection ring and the bellows Welding temperature meet relational expression for T3, the T1 and the T3:T1 > T3.
Preferably, the tube body also includes pressure ring and is sheathed on the net of the bellows, and the pressure ring is to by institute State the outer peripheral face that net pressure is fixed in the connection ring;
The step S40 is specially:To be first welded to connect ring and the pipe joint, then weld the bellows with it is described Connection ring, then the mode that the net, the connection ring, the pressure ring are mutually welded and fixed, prepare the shock absorbing pipe;
The welding temperature of the pressure ring, the net and the connection ring is T4, the T1, the T2, the T3 and institute State and meet relational expression between T4:T1 > T3 > T4 > T2.
The present invention also proposes a kind of air conditioning pipe system, including air-conditioning duct and the shock-absorbing that is connected with the air-conditioning duct Pipe, the shock absorbing pipe is welded and fixed according to following steps with the air-conditioning duct:
S10, one shock absorbing pipe of offer;The shock absorbing pipe includes tube body and connect with the pipe for being fixedly welded on the tube body two ends The welding temperature of head, the pipe joint and the tube body is T1;
S20, the one end of the pipe joint away from the tube body and air-conditioning duct be welded and fixed;The pipe joint and institute The welding temperature for stating air-conditioning duct is T2, and the T2 and the T1 meet relational expression:T2 < T1.
The present invention also proposes a kind of air conditioner, including air conditioning pipe system, and the air conditioning pipe system includes air-conditioning duct With the shock absorbing pipe being connected with the air-conditioning duct, the shock absorbing pipe is welded and fixed according to following steps with the air-conditioning duct:
S10, one shock absorbing pipe of offer;The shock absorbing pipe includes tube body and connect with the pipe for being fixedly welded on the tube body two ends The welding temperature of head, the pipe joint and the tube body is T1;
S20, the one end of the pipe joint away from the tube body and air-conditioning duct be welded and fixed;The pipe joint and institute The welding temperature for stating air-conditioning duct is T2, and the T2 and the T1 meet relational expression:T2 < T1.
Technical solution of the present invention when the shock absorbing pipe being welded in advance is soldered into air-conditioning duct, the tube body of shock absorbing pipe and Pipe joint is welded in advance, then again mutually welds pipe joint with air-conditioning duct, and the welding temperature of tube body and pipe joint is T1, pipe The welding temperature of joint and air-conditioning duct is T2, in welding process, by strictly controlling T2 temperature, it is met T2 < T1, it is ensured that welding structure or solder between pipe joint and tube body are not influenceed by subsequent soldering processes, it is ensured that shock absorbing pipe The stability of structure, is conducive to strengthening the sealing property of air-conditioning duct and improves the bearing capacity of air-conditioning duct.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Structure according to these accompanying drawings obtains other accompanying drawings.
Fig. 1 is the principle schematic of air conditioning pipe system of the present invention;
Fig. 2 is the process chart of the welding method of idle call shock absorbing pipe of the present invention;
Fig. 3 is the structural representation of an embodiment of shock absorbing pipe in Fig. 1;
Fig. 4 is the process chart of the welding method of idle call shock absorbing pipe of the present invention in one embodiment;
Fig. 5 is the process chart of the welding method of idle call shock absorbing pipe of the present invention in another embodiment.
Drawing reference numeral explanation:
Label Title Label Title
1 Air conditioning pipe system 214 Pressure ring
10 Compressor 220 Pipe joint
20 Shock absorbing pipe 30 Condenser
210 Tube body 40 Throttle part
211 Bellows 50 Evaporator
212 Connection ring 60 Air-conditioning duct
213 Net
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not made it is all its His embodiment, belongs to the scope of protection of the invention.
If it is to be appreciated that related in the embodiment of the present invention directionality indicate (such as up, down, left, right, before and after ...), Then directionality indicate to be only used for explain relative position relation under a certain particular pose (as shown in drawings) between each part, Motion conditions etc., if the particular pose changes, directionality indicates also correspondingly therewith to change.
If in addition, relating to the description of " first ", " second " etc. in the embodiment of the present invention, being somebody's turn to do " first ", " second " etc. Description be only used for describing purpose, and it is not intended that indicating or implying its relative importance or implicit indicate indicated skill The quantity of art feature.Thus, " first " is defined, at least one spy can be expressed or be implicitly included to the feature of " second " Levy.In addition, the technical scheme between each embodiment can be combined with each other, but must be with those of ordinary skill in the art's energy Based on enough realizations, when the combination appearance of technical scheme is conflicting or can not realize it will be understood that the knot of this technical scheme Conjunction is not present, also not within the protection domain of application claims.
The present invention proposes a kind of welding method of idle call shock absorbing pipe.
In an embodiment of the present invention, referring to Figures 1 and 2, the welding method of the idle call shock absorbing pipe comprises the following steps:
S10, one shock absorbing pipe 20 of offer;The shock absorbing pipe 20 includes tube body 210 and is fixedly welded on the tube body 210 The welding temperature of the pipe joint 220 at two ends, the pipe joint 220 and the tube body 210 is T1;
S20, the one end of the pipe joint 220 away from the tube body 210 and air-conditioning duct 60 be welded and fixed;The pipe The welding temperature of joint 220 and the air-conditioning duct 60 is T2, and the T2 and the T1 meet relational expression:T2 < T1.
Usually, in air conditioner, running frequency is wider when being worked due to compressor 10, is connected for compressor 10 For air-conditioning duct 60, easily cause air-conditioning duct 60 to produce larger vibration, cause pipeline stress bigger than normal, can cause when serious The risk of disconnected pipe leakage.In order to ensure the safe operation of air conditioning pipe system 1, shock absorbing pipe 20 is set using in air-conditioning duct 60 Mode come prevent compressor 10 produce vibrational energy with air-conditioning duct 60 continue propagate, and then weaken air-conditioning duct 60 vibration And stress.Wherein, shock absorbing pipe 20 is typically using made by copper or stainless steel and other metal materials, and possessing for metal shock absorbing pipe 20 is good Pressure-resistant performance, it is wide using scope, and last a long time.Under normal circumstances, bulk well prepared in advance, the shock-absorbing of shock absorbing pipe 20 The tube body 210 of pipe 20 is typically a kind of flexible duct, with preferably flexible, compressible, stretching, extension and bending, when compressor 10 Vibrational energy when conducting with pipeline to shock absorbing pipe 20, tube body 210 occurs vibration or compression and then effectively absorbs and weakening is shaken Energy, prevents follow-up pipeline from occurring larger vibration, and then ensure the safety of pipe-line system.
Reference picture 1, in air conditioning pipe system 1, by air-conditioning duct 60 by compressor 10, condenser 30, throttle part 40 And evaporator 50 is connected, the circulation line of refrigerant is formed, wherein above-mentioned shock absorbing pipe 20 is generally positioned at close to compressor 10 At air-conditioning duct 60, to prevent follow-up air-conditioning duct 60 from occurring larger vibration, and then ensure the safety of air conditioning pipe system 1.
It should be noted that shock absorbing pipe 20 is to be welded in advance, the two ends of tube body 210 are welded with pipe joint 220, When shock absorbing pipe 20 is attached into air-conditioning duct 60, then weld air-conditioning duct 60 and pipe joint 220.Wherein, pipe connects in shock absorbing pipe 20 First 220 and the welding manner of tube body 210 have a variety of, such as soldering, pressure welding or high temperature furnace melting welding, in welding air-conditioning duct 60 It is typically to be welded to each other using modes such as soldering or argon arc weldings with pipe joint 220.It is understood that air-conditioning duct 60 and compression Machine 10 is connected, and it has strict demand as the circulation line of high pressure refrigerant to its sealing property and pressure-resistant performance, therefore, on The welding stated between tube body 210 and pipe joint 220, pipe joint 220 and air-conditioning duct 60 should ensure that good sealing property, The impact that high pressure refrigerant is brought can be born, it is to avoid leak in weld, to ensure the sealing property of pipeline.
The welding temperature of pipe joint 220 and tube body 210 is T1, refers to what is formed between pipe joint 220 and tube body 210 Welded melting temperature by the wlding used between T1 or pipe joint 220 and tube body 210 melting temperature for T1, pipe The welding temperature of joint 220 and air-conditioning duct 60 is T2, refers to the welding structure formed between pipe joint 220 and air-conditioning duct 60 Melting temperature by the wlding used between T2 or pipe joint 220 and air-conditioning duct 60 melting temperature for T2, due to welding There is sequence problem in technique, pipe joint 220 and tube body 210 are to be welded in advance, thus work as welded stub connection 220 and During air-conditioning duct 60, length direction transfer spreading of the heat along pipe joint 220, once T2 temperature values are higher than T1 temperature, conduction Transition temperature to pipe joint 220 and the weld of tube body 210 is likely larger than formation between pipe joint 220 and tube body 210 Welded melting temperature or pipe joint 220 and tube body 210 between the melting temperature of wlding that is used, therefore, should The welding structure or wlding at place may melt again, in turn result in generation rosin joint or close between tube body 210 and pipe joint 220 The problem of sealing bad.
In order to avoid said circumstances, in the present embodiment, in welded stub connection 220 and air-conditioning duct 60, to T2 temperature Value has strict demand, that is, requires T2 < T1, in this way, the transition temperature of pipe joint 220 and the weld of tube body 210 is far smaller than Welding structure or the melting temperature of wlding between pipe joint 220 and tube body 210, it is ensured that pipe joint 220 and air-conditioning duct 60 Between welding structure or solder do not influenceed by subsequent soldering processes, it is ensured that the stability of the structure of shock absorbing pipe 20.
Technical solution of the present invention by the shock absorbing pipe being welded in advance 20 when being soldered to air-conditioning duct 60, the pipe of shock absorbing pipe 20 Body 210 and pipe joint 220 are welded in advance, then again mutually weld pipe joint 220 with air-conditioning duct 60, tube body 210 and pipe The welding temperature of joint 220 is T1, and the welding temperature of pipe joint 220 and air-conditioning duct 60 is T2, in welding process, by tight Lattice control T2 temperature, it is met T2 < T1, it is ensured that welding structure or solder between pipe joint 220 and tube body 210 are not Influenceed by subsequent soldering processes, it is ensured that the stability of the structure of shock absorbing pipe 20, be conducive to strengthening the sealing of air-conditioning duct 60 The bearing capacity of air-conditioning duct 60 and can be improved.
Further, in the above-described embodiments, the welding temperature T2 of pipe joint 220 and air-conditioning duct 60 also meets relation Formula:The requirement of T1-T2 >=100 °, now the welding temperature T2 of pipe joint 220 and air-conditioning duct 60 and pipe joint 220 and tube body 100 ° are at least differed between 210 welding temperature T1, in this way, welding structure or weldering between pipe joint 220 and air-conditioning duct 60 The melting temperature of material is at least lower 100 ° than the welding structure or the melting temperature of solder between pipe joint 220 and tube body 210, this When can be further assured that pipe joint 220 and air-conditioning duct 60 welding when, the welding structure between pipe joint 220 and tube body 210 Or solder is unaffected, shock absorbing pipe 20 is obtained structure and more stablize.
What deserves to be explained is, the welding temperature T2 and pipe joint 220 and tube body 210 of pipe joint 220 and air-conditioning duct 60 Numerical value of welding temperature T1 its difference in theory be the bigger the better, but in actual mechanical process, by existing welding material, weldering Connect the limitation of technique and welding equipment, T2 and T1 difference are bigger, and it is to welding material, welding procedure and welding equipment Also bring serious test, the production cost for ultimately resulting in product is higher, in order to take into account structural stability and the life of shock absorbing pipe 20 Cost, in the present embodiment, T2 and T1 difference are produced it is also preferred that control is within 200 °, i.e. T1-T2≤200 °.
Further, reference picture 3, above-mentioned shock absorbing pipe 20 has following structure:The tube body 210 of shock absorbing pipe 20 includes ripple Pipe 211 and the connection ring 212 located at the two ends of bellows 211, wherein, connection ring 212 is used to be tightly connected bellows 211 and pipe connects First 220, bellows 211 and pipe joint 220 are inserted in connection ring 212 from the two ends of connection ring 212 respectively, then pass through welding again Bellows 211 and connection ring 212 are welded and fixed by technique, pipe joint 220 and connection ring 212 are welded and fixed.Wherein, bellows 211 tube wall is set in wavy setting or spiral ring so that bellows 211 possesses preferably flexible, it is compressible, stretch and Bending, when the vibrational energy of compressor 10 is conducted to shock absorbing pipe 20 with pipeline, bellows 211 occurs vibration or compresses and then have Effect absorbs and weakened vibrational energy, prevents follow-up air-conditioning duct 60 from occurring larger vibration, and then ensure the peace of air conditioning pipe system 1 Entirely.Bellows 211 can be made of tin-phosphor bronze or stainless steel, and tin-phosphor bronze bellows 211 has preferably corrosion-resistant And abrasion resistance properties, and its thermal conductivity factor is relatively low, good heat-insulation effect, is protected available for the antidetonation to refrigerant pipeline in air-conditioning;No Become rusty corrugated steel pipe 211 have corrosion-resistant, high temperature resistant, low temperature resistant, lightweight, small volume, it is flexible the characteristics of, and its cost compared with It is low.Meanwhile, in order to ensure the pressure-resistant performance of shock absorbing pipe 20 and be easy to the welded and installed of each several part of shock absorbing pipe 20, above-mentioned connection ring 212 and pipe joint 220 can be using made by red copper material, red copper is a kind of tough and tensile, flexible, rich malleable metal material, And with good weldability, available for realizing that connection ring 212 is close with bellows 211 with pipe joint 220, connection ring 212 Soldering and sealing connects.Certainly, above-mentioned connection ring 212 and pipe joint 220 can be also made of stainless steel, stainless steel have it is corrosion-resistant, High temperature resistant, low temperature resistant, lightweight, small volume, it is flexible the characteristics of, and its cost is relatively low, advantageously reduces the life of shock absorbing pipe 20 Cost is produced, the life-span of shock absorbing pipe 20 is improved.It is, of course, understood that in other embodiment, bellows 211, connection ring 212nd, pipe joint 220 also can be using made by other metal materials, and this is no longer going to repeat them.
Reference picture 3 and Fig. 4, and Fig. 1 is combined, in one embodiment of this invention, before above-mentioned steps S10, i.e., in system During the standby shock absorbing pipe 20, the welding method of this idle call shock absorbing pipe is further comprising the steps of:
S30, first to weld the bellows 211 and the connection ring 212, then weld the connection ring 212 and the pipe The mode of joint 220, prepares the shock absorbing pipe 20.
In the present embodiment, because bellows 211 is deposited with connection ring 212, connection ring 212 and the welding procedure of pipe joint 220 In precedence, first welding bellows 211 and connection ring 212, after be welded to connect ring 212 and pipe joint 220, be welded to connect ring 212 with pipe joint 220 during, welding structure or solder between bellows 211 and connection ring 212 may be melted again, Cause bellows 211 to be welded not thoroughly with connection ring 212, fixed unreliable or poor sealing defect occur.
It is understood that the welding temperature T1 of pipe joint 220 and tube body 210 is connection ring 212 and pipe joint 220 The welding temperature of welding temperature, connection ring 212 and bellows 211 is T3, in order to avoid there is drawbacks described above, and T1 and T3, which are met, to close It is formula:T3 > T1.In this way, when being welded to connect ring 212 with pipe joint 220, the welding between bellows 211 and connection ring 212 Structure or solder are not influenceed by subsequent soldering processes, it is ensured that between bellows 211 and connection ring 212 reliability of structure with And sealing property.
In order to be protected to bellows 211, and strengthen shock absorbing pipe in the pressure-resistant performance of bellows 211, the present embodiment 20 tube body 210 also includes pressure ring 214 and is sheathed on the net 213 of bellows 211, is crimped net 213 by pressure ring 214 It is fixed on the outer peripheral face of connection ring 212.Wherein, net 213 is preferably wire sheathing, and wire sheathing has preferably pressure-resistant Effect and intensity, enhance the explosion-proof performance of bellows 211;Pressure ring 214 is preferably also red copper or stainless steel, improves pressure ring 214 Solderability.
Further, in the present embodiment, above-mentioned steps S30 is specially:First to weld the bellows 211 and the company Ring 212 is connect, the connection ring 212 and the pipe joint 220 is then welded, then by the net 213, the and of the connection ring 212 The mode that the pressure ring 214 is mutually welded and fixed, prepares the shock absorbing pipe 20.Now, shock absorbing pipe 20 is preparing welding procedure There is timing, in order to prevent from finally welding when net 213, connection ring 212 and pressure ring 214, pipe joint 220 and connection ring 212, The welding structure or solder of bellows 211 and connection ring 212 are melted again, to pressure ring 214, the net 213 and connection ring 212 Welding temperature T4 also there are certain requirements, i.e., relational expression is met between T1, T2, T3 and T4:T3 > T1 > T4 > T2.In this way, It can guarantee that shock absorbing pipe 20 using the structural stability and sealing property during welding procedure.Certainly, with other variant embodiments, on Stating step S30 also can be specially:First to weld the bellows 211 and the connection ring 212, then by the net 213, institute State connection ring 212 to be mutually welded and fixed with the pressure ring 214, then weld the mode of the connection ring 212 and the pipe joint 220, Prepare the shock absorbing pipe 20.Now, what is finally welded is connection ring 212 and pipe joint 220, is met between T1, T3 and T4 Relational expression:T3 > T4 > T1, in this way, can avoid when being welded to connect ring 212 with pipe joint 220, connection ring 212 and bellows 211st, the problem of occurring solid not prison welding or bad welded seal between net 213, connection ring 212 and pressure ring 214.
Reference picture 3 and Fig. 5, and Fig. 1 is combined, in another embodiment of the invention, before above-mentioned steps S10, that is, exist When preparing the shock absorbing pipe 20, the welding method of this idle call shock absorbing pipe is further comprising the steps of:
S40, first to weld the connection ring 212 and the pipe joint 220, then weld the bellows 211 and the company The mode of ring 212 is connect, the shock absorbing pipe 20 is prepared.
In the present embodiment, because connection ring 212 is deposited with pipe joint 220, bellows 211 and the welding procedure of connection ring 212 In precedence, ring 212 and pipe joint 220, rear welding bellows 211 and connection ring 212 are first welded to connect, in welding bellows 211 with connection ring 212 during, welding structure or solder between connection ring 212 and pipe joint 220 may be melted again, Cause bellows 211 to be welded not thoroughly with connection ring 212, fixed unreliable or poor sealing defect occur.
It is understood that the welding temperature T1 of pipe joint 220 and tube body 210 is connection ring 212 and pipe joint 220 The welding temperature of welding temperature, connection ring 212 and bellows 211 is T3, in order to avoid there is drawbacks described above, and T1 and T3, which are met, to close It is formula::T1 > T3.In this way, in welding bellows 211 and connection ring 212, the welding between connection ring 212 and pipe joint 220 Structure or solder are not influenceed by subsequent soldering processes, it is ensured that between bellows 211 and connection ring 212 reliability of structure with And sealing property.
In order to be protected to bellows 211, and strengthen shock absorbing pipe in the pressure-resistant performance of bellows 211, the present embodiment 20 tube body 210 also includes pressure ring 214 and is sheathed on the net 213 of bellows 211, is crimped net 213 by pressure ring 214 It is fixed on the outer peripheral face of connection ring 212.
Further, in the present embodiment, above-mentioned steps S430 is specially:Connect with being first welded to connect ring 212 and the pipe First 220, then weld the bellows 211 and the connection ring 212, then by the net 213, connection ring 212, described The mode that pressure ring 214 is mutually welded and fixed, prepares the shock absorbing pipe 20.Now, shock absorbing pipe 20 is preparing welding procedure presence Timing, in order to prevent from finally welding when net 213, connection ring 212 and pressure ring 214, pipe joint 220 and connection ring 212, ripple The welding structure or solder of pipe 211 and connection ring 212 are melted again, the weldering to pressure ring 214, the net 213 and connection ring 212 Jointing temp T4 also be there are certain requirements, i.e., relational expression is met between T1, T2, T3 and T4:T1 > T3 > T4 > T2.In this way, could protect Shock absorbing pipe 20 is demonstrate,proved using the structural stability and sealing property during welding procedure.
Reference picture 1, the present invention also proposes a kind of air conditioning pipe system 1, and the air conditioning pipe system 1 includes the He of air-conditioning duct 60 The shock absorbing pipe 20 being connected with air-conditioning duct 60, welding method and air-conditioning duct that the shock absorbing pipe 20 passes through above-mentioned idle call shock absorbing pipe 60 are welded and fixed, and the specific steps of the welding method of the idle call shock absorbing pipe are with reference to above-described embodiment, due to this air-conditioning duct system System 1 employs whole technical schemes of above-mentioned all embodiments, therefore at least the technical scheme with above-described embodiment is brought All beneficial effects, this is no longer going to repeat them.
The present invention also propose a kind of air conditioner, the air conditioner include air conditioning pipe system, the air conditioning pipe system it is specific Structure because this air conditioner employs whole technical schemes of above-mentioned all embodiments, therefore at least has with reference to above-described embodiment All beneficial effects that the technical scheme for having above-described embodiment is brought, this is no longer going to repeat them.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the scope of the invention, it is every at this Under the inventive concept of invention, the equivalent structure transformation made using description of the invention and accompanying drawing content, or directly/use indirectly It is included in other related technical fields in the scope of patent protection of the present invention.

Claims (10)

1. a kind of welding method of idle call shock absorbing pipe, it is characterised in that comprise the following steps:
S10, one shock absorbing pipe of offer;The shock absorbing pipe includes tube body and is fixedly welded on the pipe joint at the tube body two ends, The welding temperature of the pipe joint and the tube body is T1;
S20, the one end of the pipe joint away from the tube body and air-conditioning duct be welded and fixed;The pipe joint and the sky The welding temperature for adjusting pipeline is T2, and the T2 and the T1 meet relational expression:T2 < T1.
2. the welding method of idle call shock absorbing pipe as claimed in claim 1, it is characterised in that the T1 and T2, which is met, to close It is formula:T1-T2≥100°.
3. the welding method of idle call shock absorbing pipe as claimed in claim 2, it is characterised in that the T1 and T2, which is met, to close It is formula:T1-T2≤200°.
4. the welding method of the idle call shock absorbing pipe as described in any one in claims 1 to 3, it is characterised in that the pipe Body includes bellows and the connection ring located at the bellows two ends, before the step S10, the idle call shock absorbing pipe Welding method also include:
S30, first to weld the bellows and the connection ring, then weld the mode of the connection ring and the pipe joint, make It is standby to obtain the shock absorbing pipe;
Wherein, the T1 is the connection ring and the welding temperature of the pipe joint, the weldering of the connection ring and the bellows Jointing temp is T3, and the T1 and the T3 meet relational expression:T3 > T1.
5. the welding method of idle call shock absorbing pipe as claimed in claim 4, it is characterised in that the tube body also includes pressure ring With the net for being sheathed on the bellows, outer peripheral face of the pressure ring the net pressure to be fixed in the connection ring;
The step S30 is specially:First to weld the bellows and the connection ring, then weld the connection ring with it is described Pipe joint, then the mode that the net, the connection ring are mutually welded and fixed with the pressure ring, prepare the shock absorbing pipe;
Wherein, the welding temperature of the pressure ring, the net and the connection ring is T4, the T1, the T2, the T3 and institute State and meet relational expression between T4:T3 > T1 > T4 > T2.
6. the welding method of idle call shock absorbing pipe as claimed in claim 4, it is characterised in that the tube body also includes pressure ring With the net for being sheathed on the bellows, outer peripheral face of the pressure ring the net pressure to be fixed in the connection ring;
The step S30 is specially:First to weld the bellows and the connection ring, then by the net, the connection Ring is mutually welded and fixed with the pressure ring, then welds the mode of the connection ring and the pipe joint, prepares the shock absorbing pipe;
The welding temperature of the pressure ring, the net and the connection ring is T4, is met between the T1, the T3 and the T4 Relational expression:T3 > T4 > T1.
7. the welding method of the idle call shock absorbing pipe as described in any one in claims 1 to 3, it is characterised in that the pipe Body includes bellows and the connection ring located at the bellows two ends, before the step S10, the idle call shock absorbing pipe Welding method also include:
S40, first to weld the connection ring and the pipe joint, then weld the mode of the bellows and the connection ring, make It is standby to obtain the shock absorbing pipe;
Wherein, the T1 is the connection ring and the welding temperature of the pipe joint, the weldering of the connection ring and the bellows Jointing temp is T3, and the T1 and the T3 meet relational expression:T1 > T3.
8. the welding method of idle call shock absorbing pipe as claimed in claim 7, it is characterised in that the tube body also includes pressure ring With the net for being sheathed on the bellows, outer peripheral face of the pressure ring the net pressure to be fixed in the connection ring;
The step S40 is specially:To be first welded to connect ring and the pipe joint, the bellows and the connection are then welded Ring, then the mode that the net, the connection ring, the pressure ring are mutually welded and fixed, prepare the shock absorbing pipe;
The welding temperature of the pressure ring, the net and the connection ring is T4, the T1, the T2, the T3 and the T4 Between meet relational expression:T1 > T3 > T4 > T2.
9. a kind of air conditioning pipe system, it is characterised in that the shock absorbing pipe being connected including air-conditioning duct and with the air-conditioning duct, institute State welding method and the air-conditioner pipe of the shock absorbing pipe by idle call shock absorbing pipe as claimed in any of claims 1 to 8 in one of claims Road is welded and fixed.
10. a kind of air conditioner, it is characterised in that including the air conditioning pipe system described in claim 9.
CN201710241730.4A 2017-04-13 2017-04-13 Welding method, air conditioning pipe system and the air conditioner of idle call shock absorbing pipe Pending CN107127467A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710241730.4A CN107127467A (en) 2017-04-13 2017-04-13 Welding method, air conditioning pipe system and the air conditioner of idle call shock absorbing pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710241730.4A CN107127467A (en) 2017-04-13 2017-04-13 Welding method, air conditioning pipe system and the air conditioner of idle call shock absorbing pipe

Publications (1)

Publication Number Publication Date
CN107127467A true CN107127467A (en) 2017-09-05

Family

ID=59715967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710241730.4A Pending CN107127467A (en) 2017-04-13 2017-04-13 Welding method, air conditioning pipe system and the air conditioner of idle call shock absorbing pipe

Country Status (1)

Country Link
CN (1) CN107127467A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108758900A (en) * 2018-06-27 2018-11-06 广东美的暖通设备有限公司 Filter, the manufacturing method of filter and air conditioner
US11828485B2 (en) 2018-06-27 2023-11-28 Gd Midea Heating & Ventilating Equipment Co., Ltd. Filter, manufacturing method for filter and air conditioner

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61205737A (en) * 1985-03-08 1986-09-11 Saginomiya Seisakusho Inc Vibration-deadening structure of pipeline in air-conditioning device
CN201206683Y (en) * 2008-05-26 2009-03-11 徐志平 Fixing and connecting structure for hose joint
CN201772185U (en) * 2010-07-20 2011-03-23 浙江鸿森机械有限公司 Corrugated shock absorbing pipe
CN201925625U (en) * 2011-01-28 2011-08-10 北京兴达波纹管有限公司 Metal hose for high-temperature and high-pressure pipeline
CN202501121U (en) * 2012-03-05 2012-10-24 浙江鸿森机械有限公司 Tightly-connected bellows
CN202532094U (en) * 2012-03-05 2012-11-14 沈阳新东海制冷配件有限公司 Vibration absorber
CN203215122U (en) * 2013-03-23 2013-09-25 浙江鸿森机械有限公司 Double-welded corrugated pipe with single welding spot
CN205118558U (en) * 2015-10-23 2016-03-30 诸暨市神通机电工业有限公司 Ripple pipe of moving away to avoid possible earthquakes

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61205737A (en) * 1985-03-08 1986-09-11 Saginomiya Seisakusho Inc Vibration-deadening structure of pipeline in air-conditioning device
CN201206683Y (en) * 2008-05-26 2009-03-11 徐志平 Fixing and connecting structure for hose joint
CN201772185U (en) * 2010-07-20 2011-03-23 浙江鸿森机械有限公司 Corrugated shock absorbing pipe
CN201925625U (en) * 2011-01-28 2011-08-10 北京兴达波纹管有限公司 Metal hose for high-temperature and high-pressure pipeline
CN202501121U (en) * 2012-03-05 2012-10-24 浙江鸿森机械有限公司 Tightly-connected bellows
CN202532094U (en) * 2012-03-05 2012-11-14 沈阳新东海制冷配件有限公司 Vibration absorber
CN203215122U (en) * 2013-03-23 2013-09-25 浙江鸿森机械有限公司 Double-welded corrugated pipe with single welding spot
CN205118558U (en) * 2015-10-23 2016-03-30 诸暨市神通机电工业有限公司 Ripple pipe of moving away to avoid possible earthquakes

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
柳庆喜: "金属软管嵌装工艺的研究", 《管道技术与设备》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108758900A (en) * 2018-06-27 2018-11-06 广东美的暖通设备有限公司 Filter, the manufacturing method of filter and air conditioner
US11828485B2 (en) 2018-06-27 2023-11-28 Gd Midea Heating & Ventilating Equipment Co., Ltd. Filter, manufacturing method for filter and air conditioner

Similar Documents

Publication Publication Date Title
JP4062325B2 (en) Dissimilar metal pipe connection structure
KR20160126834A (en) Copper and steel multiunit tube, production method thereof, application and welding sturucture thereof
CN107314168A (en) A kind of pipe fitting joint structure and a kind of attachment structure of stainless steel pipe
CN107127467A (en) Welding method, air conditioning pipe system and the air conditioner of idle call shock absorbing pipe
CN101493091A (en) Exhaust pipe for air-conditioned compressor, method for producing the same and assembly method
CN204913089U (en) Pipe fitting welded structure
CN105855654A (en) Gas-liquid separator and connecting pipe welding assembly
CN102128323A (en) Connection structure of copper-aluminum composite pipe and copper pipe and welding method thereof
US20090301701A1 (en) Use of a Heat Exchanger Tube
CN104439732A (en) Novel welding structure and welding method
CN108080806A (en) The connection structure and gas-liquid separator of pipe fitting and connecting component
CN202303694U (en) Connection pipe of air conditioner
CN201206683Y (en) Fixing and connecting structure for hose joint
CN201202902Y (en) Integral non-welding corrugated metal soft connecting part
CN106247040A (en) Clamp-press type pipe, socket pipe member, its method of attachment, attachment structure and pipeline thereof
CN201836546U (en) Pipeline connecting assembly of air conditioner
CN210774745U (en) Welded type storehouse body structure for preventing thermal expansion and cold contraction deformation
EP2975354B1 (en) Connector for a heat exchanger
JP2007093035A (en) Welding structure and welding method for aluminum accumulator, and heat exchanger
CN208057416U (en) Air intake duct group and compressor
CN208886208U (en) A kind of fixed Wiring device
CN201081062Y (en) Aluminum connecting pipe end composite structure
CN207777129U (en) Compressor and refrigeration equipment
CN206816985U (en) Refrigeration system
WO2006006442A1 (en) Welding structure and welding method for aluminum accumulator, and heat exchanger

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170905